Power transmission line anchoring device for loose foundation and installation method of power transmission line anchoring device

By injecting cement grout into the lower part of the anchor bolt to expand the expansion bladder, the problem of anchor bolt fixation in loose foundations is solved, achieving the effects of simplified construction and improved bearing capacity.

CN118932999APending Publication Date: 2024-11-12CONSTR BRANCH OF STATE GRID XINJIANG ELECTRIC POWER CO LTD +2
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411318325.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Conventional anchor bolts are difficult to fix effectively in sandy and soft soil foundations, and the construction is complicated and the bearing capacity is insufficient.

Method used

An expansion bag and grouting mechanism are used to inject cement grout through the grout outlet at the bottom of the anchor rod, which expands the expansion bag, enhances the pull-out force of the anchor rod and fixes it in the installation hole.

Benefits of technology

It simplifies the construction process, improves the fixing effect of anchors in loose foundations, enhances the bearing capacity of the soil, and solves the problem of the difficulty of applying conventional anchors in sandy and soft soil foundations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932999A_ABST
    Figure CN118932999A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of anchor rod fixing, in particular to a power transmission line anchoring device for a loose foundation and an installation method thereof.The power transmission line anchoring device for the loose foundation comprises an expansion bag, a grouting mechanism and an anchor rod, the anchor rod is tubular, and the lower end of the anchor rod is sealed. According to the first technical scheme, when the anchor rod is used, downward drilling is carried out at a to-be-installed site to form an installation hole, the expansion body bag is arranged in the installation hole, the anchor rod is moved, the lower end of the anchor rod is inserted into the expansion body bag, grouting is started, cement paste flows into the expansion body bag through a paste outlet hole, then the expansion body bag is expanded, the upward pulling force of the anchor rod is improved, and after the cement paste is solidified, the anchor rod is pulled out. The anchor rod and the expansion body bag are integrated and fixed in the mounting hole, meanwhile, the expansion body bag expands to extrude the surrounding soil body during expansion, the bearing capacity of the soil body can be effectively improved, the structure is simple, mounting can be conveniently and rapidly completed, and the practicability is high. And the problem that an existing conventional anchor rod is difficult to be well applied to sand and soft soil foundations can be effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of anchor rod fixing, and is a transmission line anchoring device used for loose foundation and an installation method thereof. Background Art

[0002] Anchor rods are usually required as fixed foundations in power transmission line projects. However, conventional anchor rod foundations are usually suitable for relatively complete and soft rock formations. This is because the fixing and pull-out bearing capacity of anchor rods depend on the integrity and anchoring effect of the rock formation. In sandy and soft soil foundations, due to the loose soil structure and difficulty in drilling, the pull-out bearing capacity of anchor rods is often difficult to guarantee, making it difficult for conventional anchor rod foundations to be well applied in sandy and soft soil foundations.

[0003] The utility model patent with authorization announcement number CN221236033U discloses a pressurized water layer bladder-type expanded anti-floating anchor, which includes an anchor body, a guide head guard installed at the lower end of the anchor body, a bladder body is provided on the outer side wall of the lower end of the anchor body, a grouting pipe extending along the axial direction of the anchor body is provided on the side wall of the anchor body, and a grouting hole is opened on the guide head guard. The grouting pipe can grout the bladder body and the expanded body section of the anchor hole used to fix the pressurized water layer bladder-type expanded anti-floating anchor through the grouting hole. However, the patent structure is relatively complex, the operation is complex, and the construction is difficult. Summary of the invention

[0004] The present invention provides a transmission line anchoring device for loose foundation and an installation method thereof, which overcomes the deficiencies of the above-mentioned prior art and can effectively solve the problem that the existing conventional anchor rods are difficult to be well applied in sandy and soft soil foundations.

[0005] One of the technical solutions of the present invention is achieved through the following measures: a transmission line anchoring device for loose foundation, including an expansion bag, a grouting mechanism and an anchor rod, the anchor rod is tubular and has a closed lower end, an expansion bag is provided on the outer side of the lower part of the anchor rod, and a plurality of grouting holes connected inside and outside are evenly distributed on the lower part of the anchor rod corresponding to the inner position of the expansion bag, and the upper end of the anchor rod is fixedly connected to a grouting mechanism that can be connected to an external pressure grouting equipment.

[0006] The following are further optimizations and / or improvements to the above technical solutions: The above-mentioned grouting mechanism may include a grouting pipe, a grouting nozzle, a first valve and a pressure gauge. The upper part of the anchor rod is fixedly connected to the grouting pipe, the upper part of the grouting pipe is fixedly installed with a first valve, the lower part of the grouting pipe is fixedly installed with a second valve, and the outer side of the grouting pipe corresponding to the position between the first valve and the second valve is fixedly connected with a grouting nozzle and a pressure gauge from top to bottom in sequence.

[0007] A third valve may be fixedly installed in the middle of the grouting pipe at a position corresponding to the grouting nozzle and the pressure gauge.

[0008] A clamping ring may be fixedly installed on the inner side of the upper end of the above-mentioned expanded body bag, and a buckle may be fixedly installed on the inner side of the lower end of the expanded body bag.

[0009] The lower part of the grouting pipe and the upper part of the anchor rod can be connected by threads.

[0010] The second technical solution of the present invention is achieved by the following measures: the installation method of the above-mentioned transmission line anchoring device for loose foundation comprises the following steps: The first step is to drill down to form a mounting hole at the location to be installed; The second step is to install the centering bracket in the installation hole, and install the expansion bag in the centering bracket; The third step is to lift the anchor rod to the top of the centering bracket and align it with the guide hole of the centering bracket, lower the anchor rod, and insert the lower part of the anchor rod into the expansion bag; The fourth step is to install a grouting mechanism on the upper end of the anchor rod and connect the grouting mechanism to an external pressure grouting device; The fifth step is to grout the inside of the anchor rod. The cement slurry flows out from the grouting hole to the expansion bag. Continuous grouting increases the internal pressure of the expansion bag, thereby expanding the expansion bag. After the cement slurry solidifies, the anchor rod and the expansion bag are integrated and fixed in the installation hole.

[0011] The invention has a reasonable and compact structure and is easy to use. When used, the first technical solution is to drill down to form an installation hole at the location to be installed, place the expanded body bag in the installation hole, move the anchor rod, insert the lower end of the anchor rod into the expanded body bag, connect the external pressure grouting equipment with the grouting mechanism and start grouting, and the cement slurry flows into the anchor rod through the grouting mechanism. According to needs, the cement slurry can use the existing well-known M30 cement slurry. The cement slurry flowing into the anchor rod finally flows out to the expanded body bag through the slurry outlet hole. Continuous grouting increases the internal pressure of the expanded body bag, thereby expanding the expanded body bag and increasing the pull-out force of the anchor rod. After the cement slurry solidifies, the anchor rod and the expanded body bag are integrated and fixed in the installation hole. At the same time, when the expanded body bag expands, it expands and squeezes the surrounding soil, which can effectively improve the bearing capacity of the soil. The invention has a simple structure and can be installed conveniently and quickly, and can effectively solve the problem that the existing conventional anchor rods are difficult to be well applied in sand and soft soil foundations. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Attached Figure 1 This is a schematic diagram of the main structure of the first embodiment.

[0013] Attached Figure 2 For attachment Figure 1 Schematic diagram of the cross-sectional structure after enlargement at point A in the middle.

[0014] The codes in the accompanying drawings are: 1 is the expansion bag, 2 is the anchor rod, 3 is the clamping ring, 4 is the buckle, 5 is the slurry outlet hole, 6 is the grouting pipe, 7 is the grouting nozzle, 8 is the first valve, 9 is the pressure gauge, 10 is the second valve, and 11 is the third valve. DETAILED DESCRIPTION

[0015] The present invention is not limited by the following embodiments, and specific implementation methods can be determined based on the technical solution of the present invention and actual conditions.

[0016] In the present invention, for the convenience of description, the relative position relationship of each component is described according to the attached Figure 1 The layout is described in detail, such as the positional relationship of front, back, top, bottom, left, right, etc., which is based on the attached manual. Figure 1 The layout direction is determined by the

[0017] The present invention will be further described below in conjunction with embodiments and drawings: Embodiment 1, as attached Figure 1 , 2 As shown, the power transmission line anchoring device for loose foundation includes an expansion bag 1, a grouting mechanism and an anchor rod 2. The anchor rod 2 is tubular and closed at the lower end. The expansion bag 1 is provided on the outer side of the lower part of the anchor rod 2. A plurality of grouting holes 5 connected inside and outside are evenly distributed on the lower part of the anchor rod 2 corresponding to the inner position of the expansion bag 1. The upper end of the anchor rod 2 is fixedly connected to a grouting mechanism that can be connected to an external pressure grouting device.

[0018] When in use, drilling is performed at the installation site to be installed to form an installation hole, the expanded body bag 1 is placed in the installation hole, the anchor rod 2 is moved so that the lower end of the anchor rod 2 is inserted into the expanded body bag 1, the external pressure grouting equipment is connected to the grouting mechanism and grouting is started, and the cement slurry flows into the anchor rod 2 through the grouting mechanism. According to needs, the cement slurry can use the existing well-known M30 cement slurry, and the cement slurry flowing into the anchor rod 2 flows out to the expanded body bag 1 through the slurry outlet hole 5. Continuous grouting increases the internal pressure of the expanded body bag 1, thereby expanding the expanded body bag 1 and increasing the upward pull-out force of the anchor rod 2. After the cement slurry solidifies, the anchor rod 2 and the expanded body bag 1 are formed into one and fixed in the installation hole. At the same time, when the expanded body bag 1 expands, it expands and squeezes the surrounding soil, which can effectively improve the bearing capacity of the soil. The present invention has a simple structure and can be installed conveniently and quickly, and can effectively solve the problem that the existing conventional anchor rod 2 is difficult to be well applied in sand and soft soil foundations.

[0019] The above-mentioned transmission line anchoring device for loose foundation can be further optimized and / or improved according to actual needs: Embodiment 2, as attached Figure 1As shown, this embodiment is a further optimization of the above embodiment. The grouting mechanism includes a grouting pipe 6, a grouting nozzle 7, a first valve 8 and a pressure gauge 9. The upper part of the anchor rod 2 is fixedly connected to the grouting pipe 6, the upper part of the grouting pipe 6 is fixedly installed with the first valve 8, the lower part of the grouting pipe 6 is fixedly installed with the second valve 10, and the outer side of the grouting pipe 6 corresponding to the position between the first valve 8 and the second valve 10 is fixedly connected with the grouting nozzle 7 and the pressure gauge 9 from top to bottom.

[0020] When in use, the lower end of the grouting pipe 6 is fixedly connected to the upper end of the anchor rod 2, and the grouting nozzle 7 is connected to the external grouting equipment to carry out grouting. When the cement slurry height reaches the position of the grouting nozzle 7, the first valve 8 is closed to facilitate pressurizing the expansion bag 1 and prevent the cement slurry from flowing out from the upper end of the grouting pipe 6. A pressure gauge 9 is fixedly connected to the outside of the grouting pipe 6 to facilitate the staff to observe the anchor rod 2 and the cement slurry hydraulic pressure inside the expansion bag 1. After the expansion bag 1 completes the expansion, the second valve 10 is closed to unload the grouting pipe 6, which can facilitate the cleaning and reuse of the grouting pipe 6.

[0021] Embodiment 3, as attached Figure 1 As shown, this embodiment is a further optimization of the above embodiment, and a third valve 11 is fixedly installed in the middle of the grouting pipe 6 corresponding to the position between the grouting nozzle 7 and the pressure gauge 9. In this embodiment, the third valve 11 is provided, which can be conveniently used when the first valve 8 or the second valve 10 is damaged.

[0022] Embodiment 4, as attached Figure 2 As shown, this embodiment is a further optimization of the above embodiment, a clamping ring 3 is fixedly installed on the inner side of the upper end of the expanding body bag 1, a buckle 4 is fixedly installed on the inner side of the lower end of the expanding body bag 1, and a buckle groove opening outward is provided on the outer side of the anchor rod 2 corresponding to the position of the buckle 4. In this embodiment, the clamping ring 3, the buckle 4 and the buckle groove are provided, which can facilitate the installation of the expanding body bag 1 and the anchor rod 2 together, and reduce the probability of cement slurry overflowing from the lower part of the expanding body bag 1 when pressurized.

[0023] Embodiment 5: This embodiment is a further optimization of the above embodiment, and the lower part of the grouting pipe 6 is connected to the upper part of the anchor rod 2 by threads. The threaded connection can more conveniently connect the anchor rod 2 and the grouting pipe 6.

[0024] Embodiment 6, the installation method of the above-mentioned power transmission line anchoring device for loose foundation comprises the following steps: The first step is to drill down to form a mounting hole at the location to be installed; The second step is to install the centering bracket in the installation hole, and install the expansion bag 1 in the centering bracket; The third step is to lift the anchor rod 2 to the top of the centering bracket, align the lower end of the anchor rod 2 with the guide hole of the centering bracket and lower the anchor rod 2 so that the lower part of the anchor rod 2 is inserted into the expansion bag 1; The fourth step is to install a grouting mechanism on the upper end of the anchor rod 2 and connect the grouting mechanism to an external pressure grouting device; The fifth step is to grout the interior of the anchor rod 2. The cement slurry flows out through the grout outlet 5 to the expansion bag 1. Continuous grouting increases the internal pressure of the expansion bag 1, thereby expanding the expansion bag 1. After the cement slurry solidifies, the anchor rod 2 and the expansion bag 1 are integrated and fixed in the installation hole.

[0025] The centering bracket is an existing well-known technology and can be a centering device or a centering rod according to construction needs. In this embodiment, a grouting pipe 6 and a grouting nozzle 7 are arranged to facilitate grouting into the anchor rod 2. The cement slurry flows out to the expansion bag 1 through the slurry outlet 5, thereby expanding the expansion bag 1 and increasing the upward pulling force of the anchor rod 2. After the cement slurry solidifies, the anchor rod 2 and the expansion bag 1 are formed into one and fixed in the installation hole. At the same time, the expansion bag 1 expands and squeezes the surrounding soil when it expands, which can effectively improve the bearing capacity of the soil and make the anchor rod 2 more firmly fixed. The structure of the present invention is simple and can be installed conveniently and quickly.

[0026] The above technical features constitute the embodiments of the present invention, which have strong adaptability and implementation effect. Non-essential technical features can be added or reduced according to actual needs to meet the requirements of different situations.

Claims

1. A transmission line anchoring device for loose foundation, characterized in that It includes an expansion bag, a grouting mechanism and an anchor rod. The anchor rod is tubular and has a closed lower end. An expansion bag is provided on the outer side of the lower part of the anchor rod. A plurality of grouting holes connected inside and outside are evenly distributed on the lower part of the anchor rod corresponding to the inner position of the expansion bag. The upper end of the anchor rod is fixedly connected to a grouting mechanism that can be connected to an external pressure grouting equipment.

2. The power transmission line anchoring device for loose foundation according to claim 1, characterized in that The grouting mechanism includes a grouting pipe, a grouting nozzle, a first valve and a pressure gauge. The upper part of the anchor rod is fixedly connected to the grouting pipe, the upper part of the grouting pipe is fixedly installed with the first valve, the lower part of the grouting pipe is fixedly installed with the second valve, and the outer side of the grouting pipe corresponding to the position between the first valve and the second valve is fixedly connected with the grouting nozzle and the pressure gauge from top to bottom.

3. The power transmission line anchoring device for loose foundation according to claim 2, characterized in that A third valve is fixedly installed in the middle of the grouting pipe corresponding to the position between the grouting nozzle and the pressure gauge.

4. The power transmission line anchoring device for loose foundation according to claim 2 or 3, characterized in that A clamping ring is fixedly installed on the inner side of the upper end of the expanded body bag, and a buckle is fixedly installed on the inner side of the lower end of the expanded body bag.

5. The power transmission line anchoring device for loose foundation according to claim 2 or 3, characterized in that The lower part of the grouting pipe is connected to the upper part of the anchor rod through threads.

6. The power transmission line anchoring device for loose foundation according to claim 4, characterized in that The lower part of the grouting pipe is connected to the upper part of the anchor rod through threads.

7. A method for installing a power transmission line anchoring device for loose foundation using any one of claims 1 to 6, characterized in that: The following steps are involved: The first step is to drill down to form a mounting hole at the location to be installed; The second step is to install the centering bracket in the installation hole, and install the expansion bag in the centering bracket; The third step is to lift the anchor rod to the top of the centering bracket and align it with the guide hole of the centering bracket, lower the anchor rod, and insert the lower part of the anchor rod into the expansion bag; The fourth step is to install a grouting mechanism on the upper end of the anchor rod and connect the grouting mechanism to an external pressure grouting device; The fifth step is to grout the inside of the anchor rod. The cement slurry flows out from the grouting hole to the expansion bag. Continuous grouting increases the internal pressure of the expansion bag, thereby expanding the expansion bag. After the cement slurry solidifies, the anchor rod and the expansion bag are integrated and fixed in the installation hole.

Citation Information

Patent Citations

  • Grouting squeezing and expanding steel pipe anchor rod structure and construction method thereof

    CN115874618A