Supporting system of foundation pit and construction method of supporting system
By adopting multi-channel support systems and servo systems in foundation pit projects, temporary steel support is used to reduce the exposure time without support, the problem of foundation pit deformation control is solved, and the construction efficiency and deformation control effect are improved.
Patent Information
- Application Number
- CN202411148669.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-21
AI Technical Summary
In foundation pit projects, the construction and maintenance time of concrete support is long, resulting in too long exposure time of earthwork, making deformation control difficult, and the bearing capacity of steel support is limited, making it difficult to widely use in large deep foundation pits.
Using a top-down multi-channel support system, including steel and concrete support, reduces unsupported exposure time by installing temporary steel support at the end of the concrete support system, and uses the servo system to apply active load on the foundation pit to Control deformation.
It effectively reduces the exposure time of the foundation pit without support, reduces the time and space effect of the ground wall, ensures the deformation control of the foundation pit, and improves the construction efficiency and micro-control ability of deformation.
Smart Images

Figure CN118933019A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a foundation pit support system and a construction method thereof. Background Art
[0002] In foundation pit engineering, concrete supports have the characteristics of high rigidity, long on-site pouring and curing time; steel supports have the characteristics of low rigidity, easy installation and removal, fast construction speed and reusability. Servo systems are used in both steel supports and concrete supports in on-site construction. However, due to the limited bearing capacity and low rigidity of steel supports, they are not widely used in large deep foundation pits. Concrete supports are prone to deformation due to the exposure of earthwork and failure to form supports in time under strict deformation control requirements due to the long construction and curing time. Considering that it usually takes 3 days from the completion of earthwork excavation to the formation of supports, it usually takes about 3 days to apply the servo system for concrete strength formation. That is, if the time for the exposure of earthwork without supporting is about 6-7 days, the deformation of one supporting earthwork exposed for 6-7 days will be about 20mm. The deeper the foundation pit is, the greater the time and space effect. In the case of multiple supports in deep foundation pits, the accumulated deformation of the foundation pit exposed without support plus the deformation during the excavation process may exceed the allowable value of the environment.
[0003] Therefore, how to reduce the exposure time of the foundation pit without support to reduce the deformation of the foundation pit is a technical problem that technical personnel in this field urgently need to solve. Summary of the invention
[0004] The object of the present invention is to provide a support system for a foundation pit and a construction method thereof, which can reduce the exposure time of the foundation pit without support, thereby effectively reducing the time and space effect of the ground wall during the formation of a support, and can effectively control the deformation of the foundation pit.
[0005] In order to solve the above technical problems, the present invention provides a support system for a foundation pit, wherein the support system for the foundation pit comprises: a first support system, a second support system, ..., an nth support system, and steel supports distributed from top to bottom, where n is an integer greater than or equal to 3; the steel supports are detachably installed on the first area where the excavation of the last partition of the nth layer is completed.
[0006] Optionally, the support system of the foundation pit further includes: a concrete back, which is arranged above the transverse concrete support and the longitudinal concrete support of the nth support system.
[0007] Optionally, in the support system of the foundation pit, one end of the steel support is supported on the back of the concrete, and the other end is connected to a jack and supported on the rear lining steel plate of the ground wall.
[0008] Optionally, in the support system of the foundation pit, the number of the steel supports is at least one.
[0009] Optionally, in the support system of the foundation pit, the steel support is a steel pipe, a steel section or a lattice component.
[0010] Optionally, in the support system of the foundation pit, each support system includes: horizontal concrete support, longitudinal concrete support, columns and surrounding purlins.
[0011] The present invention also provides a construction method of a foundation pit support system, the construction method of the foundation pit support system comprising:
[0012] S1: Construct engineering piles, column piles and enclosures according to design documents and construction plans;
[0013] S2: excavating the first layer of earthwork, the second layer of earthwork, ..., the n-1th layer of earthwork in sequence to form the first support system, the second support system, ..., the n-1th support system in sequence; wherein n is an integer greater than or equal to 3;
[0014] S3: excavating the nth layer of earthwork, detachably installing steel supports in the first area where the excavation of the last partition of the nth layer of earthwork is completed, and forming an nth support system, applying a first active control load to the steel supports using a jack and a servo system;
[0015] S4: excavate the n+1th layer of earthwork, and after the strength of the lateral concrete support of the nth support system meets the loading requirement, use the jack and the servo system to apply the second active control load to the lateral concrete support of the nth support system;
[0016] S5: when the second active control load is greater than or equal to the first active control load of the corresponding steel support, the steel support is unloaded and removed;
[0017] S6: Repeat S3 to S5 until the construction of all remaining support systems is completed.
[0018] Optionally, in the construction method of the foundation pit support system, step S2 includes:
[0019] Excavate each layer of earth, construct horizontal concrete supports, vertical concrete supports, columns and purlins to form the support system of the corresponding layer.
[0020] Optionally, in the construction method of the foundation pit support system, in step S3, the detachable installation of the steel support in the first area where the excavation of the last partition of the nth layer of earthwork is completed includes:
[0021] Construct concrete backing above the transverse concrete support and longitudinal concrete support of the nth support system;
[0022] Place one end of the steel support on the concrete back and connect the other end to the jack to push it onto the rear steel plate of the ground wall.
[0023] Optionally, in the construction method of the foundation pit support system, the construction process of the rear lining steel plate is as follows:
[0024] Pre-embed the rear lining steel plate at the predetermined position of the ground wall; or,
[0025] Placed after the nth layer of earth is excavated.
[0026] In the foundation pit support system and construction method provided by the present invention, the foundation pit support system includes a first support system, a second support system, ..., an nth support system, and a steel support distributed from top to bottom, where n is an integer greater than or equal to 3; the steel support is detachably installed on the first area where the excavation of the last partition of the nth layer is completed. By installing temporary steel supports at the end of the construction of a concrete support system, the exposure time of the foundation pit without support is reduced, thereby effectively reducing the time and space effect of the ground wall during the formation of a support, and effectively controlling the deformation of the foundation pit. In addition, since both the steel support and the concrete support can adopt a servo system, they can actively apply loads to the foundation pit, thereby actively controlling the deformation of the foundation pit, which is more conducive to ensuring the micro-deformation control of the foundation pit. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The above and other objects, features and advantages of the present disclosure will become more apparent through a more detailed description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present disclosure.
[0028] Figure 1 It is a schematic plan view of a third support system partially using steel support in one embodiment of the present invention;
[0029] Figure 2 It is a schematic elevation diagram of a third support system partially using steel support in one embodiment of the present invention;
[0030] Figure 3 It is a schematic plan view of a third support system in one embodiment of the present invention, which partially uses a steel support and a concrete combined support;
[0031] Figure 4 It is a schematic elevation diagram of a third support system in an embodiment of the present invention, in which a steel support and a concrete combined support are partially used;
[0032] Figure 5 It is demolished Figure 3 Schematic diagram of the plane after the steel support;
[0033] Figure 6 It is demolished Figure 4 Schematic diagram of the elevation after the steel support;
[0034] Figure 7 It is a flow chart of a construction method of a foundation pit support system in one embodiment of the present invention.
[0035] In the figure:
[0036] 1- horizontal concrete support; 2- vertical concrete support; 3- column, 4- column pile; 5- enclosure; 6- purlin; 7- concrete back; 8- steel support; 9- jack; 10- rear lining steel plate; X1- first support system; X2- second support system; X3- third support system. DETAILED DESCRIPTION
[0037] The following is a further detailed description of the foundation pit support system and construction method thereof proposed by the present invention in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer according to the following description and claims. It should be noted that the accompanying drawings are in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.
[0038] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.
[0039] In the description of the invention, it is necessary to understand that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention.
[0040] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0041] In the invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to the specific circumstances.
[0042] This embodiment provides a construction method for a foundation pit support system. Figure 7 The construction method of the support system of the foundation pit described in this embodiment is described in detail. In the figure, S1 is the outer soil layer of the foundation pit and S2 is the inner soil layer of the foundation pit.
[0043] First, execute step S1, construct engineering piles, column piles 4 and enclosures 5 according to the design documents and construction plan;
[0044] Next, step S2 is performed to excavate the first earthwork layer, the second earthwork layer, ..., the n-1th earthwork layer, and sequentially form the first support system X1, the second support system X2, ..., the n-1th support system; wherein n is an integer greater than or equal to 3. Specifically, each earthwork layer is excavated, and the horizontal concrete support 1, the longitudinal concrete support 2, the column 3 and the surrounding purlin 6 are constructed to form the support system of the corresponding layer.
[0045] Next, step S3 is executed to excavate the nth layer of earthwork, and the steel support 8 is detachably installed in the first area where the excavation of the last partition of the nth layer of earthwork is completed, and the nth support system is formed, and the first active control load is applied to the steel support 8 by using the jack 9 and the servo system; and the concrete back 7. Here, the temporary steel support 8 is installed before the construction of the lower horizontal concrete support 1 (i.e., the n+1th layer of earthwork); the steel support 8 and its corresponding system can also be used on the second support system X2, and can be used on several or one support system as needed.
[0046] By installing temporary steel supports at the end of the construction of a concrete support system, the exposure time of the foundation pit without support can be reduced, thereby effectively reducing the time and space effect of the ground wall during the formation of a support, and effectively controlling the deformation of the foundation pit.
[0047] Preferably, the models and specifications of the jacks 9 can be the same or different and can be configured according to needs.
[0048] For details, please refer to Figures 1 to 4The detachable installation of the steel support 8 in the first area after the excavation of the last partition of the nth layer of earthwork includes: constructing a concrete back 7 above the transverse concrete support 1 and the longitudinal concrete support 2 of the nth support system; one end of the steel support 8 is supported on the concrete back 7, and the other end is connected to the jack 9 and supported on the rear lining steel plate 10 of the ground wall 5. Here, the rear lining steel plate 10 can be pre-buried at a predetermined position of the ground wall, or can be set in a post-placement manner after the excavation of the nth layer of earthwork.
[0049] Next, execute step S4 to excavate the n+1th layer of earthwork. After the strength of the transverse concrete support 1 of the nth support system meets the loading requirement, use the jack 9 and the servo system to apply a second active control load to the transverse concrete support 1 of the nth support system.
[0050] The jack 9 is placed in the groove of the purlin 6, and a double purlin may be partially used with a groove in the middle.
[0051] Next, the reference Figure 5 and Figure 6 , execute step S5, when the second active control load is greater than or equal to the first active control load of the corresponding steel support 8, unload and remove the steel support 8. It can be understood that the steel support 8 can be removed as needed, or retained to play a supporting role together with the transverse concrete support 1. Both the steel support and the concrete support can adopt a servo system, which can actively apply loads to the foundation pit, thereby actively controlling the deformation of the foundation pit, and more advantageously ensuring the micro-deformation control of the foundation pit.
[0052] Next, execute step S6, and repeat steps S3 to S5 until the construction of all remaining support systems is completed.
[0053] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.
[0054] In another embodiment, the present invention also provides a foundation pit support system, please refer to Figure 1 and Figure 2 The support system of the foundation pit includes: the first support system X1, the second support system X2, ..., the nth support system, and the steel support 8, which are distributed from top to bottom, n is an integer greater than or equal to 3; the steel support 8 is detachably installed on the first area where the last partition earthwork excavation of the nth layer is completed. Each support system includes: a horizontal concrete support 1, a longitudinal concrete support 2, a column 3, and a surrounding purlin 6 or a crown beam.
[0055] In this embodiment, n=3, then the first support system X1, the second support system X2 and the third support system X3 are formed first, and the steel support 8 is detachably installed on the first area where the excavation of the last partition of the third layer is completed.
[0056] Furthermore, the support system of the foundation pit also includes: a concrete back 7, which is arranged above the horizontal concrete support 1 and the longitudinal concrete support 2 of the nth support system. Specifically, one end of the steel support 8 is supported on the concrete back 7, and the other end is connected to the jack 9 and supported on the rear lining steel plate 10 of the ground wall.
[0057] In this embodiment, the number of the steel support 8 is at least one, and the steel support 8 can be detachably installed on at least one transverse concrete support 1 in the middle of the nth floor wall, that is, it can be used on one or several transverse concrete supports 1 in the middle of the floor wall, or it can be used on all transverse concrete supports 1. The steel support 8 is preferably a steel pipe, and can also be selected from steel sections or lattice components.
[0058] In summary, in the foundation pit support system and construction method provided by the present invention, the foundation pit support system includes a first support system, a second support system, ..., an nth support system, and a steel support distributed from top to bottom, where n is an integer greater than or equal to 3; the steel support is detachably installed on the first area where the excavation of the last partition of the nth layer is completed. By installing temporary steel supports at the end of the construction of a concrete support system, the exposure time of the foundation pit without support is reduced, thereby effectively reducing the time and space effect of the ground wall during the formation of a support, and effectively controlling the deformation of the foundation pit. In addition, since both steel supports and concrete supports can adopt servo systems, loads can be actively applied to the foundation pit, thereby actively controlling the deformation of the foundation pit, which is more conducive to ensuring the micro-deformation control of the foundation pit.
[0059] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.
Claims
1. A foundation pit support system, characterized in that: include: The first support system (X1), the second support system (X2), ..., the nth support system, and the steel support (8) are distributed from top to bottom, where n is an integer greater than or equal to 3; the steel support (8) is detachably installed on the first area where the excavation of the last partition of the nth layer is completed.
2. The foundation pit support system according to claim 1, characterized in that: Also includes: The concrete back (7) is arranged above the transverse concrete support (1) and the longitudinal concrete support (2) of the nth support system.
3. The foundation pit support system according to claim 2, characterized in that: One end of the steel support (8) is supported on the concrete back (7), and the other end is connected to the jack (9) and supported on the rear lining steel plate (10) of the ground wall.
4. The foundation pit support system according to claim 1, characterized in that: The number of the steel support (8) is at least one.
5. The foundation pit support system according to claim 1, characterized in that: The steel support (8) is a steel pipe, a steel section or a lattice structure.
6. The foundation pit support system according to any one of claims 1 to 5, characterized in that: Each support system comprises: a transverse concrete support (1), a longitudinal concrete support (2), a column (3) and a surrounding purlin (6).
7. A construction method for a foundation pit support system, characterized in that: include: S1: According to the design documents and construction plan, construct engineering piles, column piles (4) and enclosures (5); S2: excavating the first layer of earthwork, the second layer of earthwork, ..., the n-1th layer of earthwork in sequence to form the first support system (X1), the second support system (X2) ..., the n-1th support system in sequence; wherein n is an integer greater than or equal to 3; S3: excavating the nth layer of earthwork, detachably installing a steel support (8) in the first area where the excavation of the last partition of the nth layer of earthwork is completed, and forming an nth support system, and applying a first active control load to the steel support (8) using a jack (9) and a servo system; S4: excavating the n+1th layer of earthwork, and after the strength of the transverse concrete support (1) of the nth support system meets the loading requirement, applying a second active control load to the transverse concrete support (1) of the nth support system using a jack (9) and a servo system; S5: when the second active control load is greater than or equal to the first active control load of the corresponding steel support (8), the steel support (8) is unloaded and removed; S6: Repeat S3 to S5 until the construction of all remaining support systems is completed.
8. The construction method of the foundation pit support system according to claim 7, characterized in that: Step S2 includes: Each layer of earth is excavated, and transverse concrete supports (1), longitudinal concrete supports (2), columns (3) and purlins (6) are constructed to form a support system for the corresponding layer.
9. The construction method of the foundation pit support system according to claim 7, characterized in that: In step S3, the detachable installation of the steel support (8) in the first area after the excavation of the last partition of the nth layer of earthwork is completed comprises: Constructing a concrete backing (7) above the transverse concrete support (1) and the longitudinal concrete support (2) of the nth support system; One end of the steel support (8) is supported on the concrete back (7), and the other end is connected to the jack (9) and supported on the rear lining steel plate (10) of the ground wall (5).
10. The construction method of the foundation pit support system according to claim 9, characterized in that: The construction process of the rear lining steel plate (10) is as follows: Pre-embed a rear lining steel plate (10) at a predetermined position of the ground wall; or, Placed after the nth layer of earth is excavated.
Citation Information
Patent Citations
Construction method of support structure of deep foundation pit
CN108755701A
Construction method of steel reinforced concrete combined supporting system capable of actively controlling deformation
CN115059095A
Servo concrete and steel support system for actively controlling deformation of foundation pit
CN116378048A