Reinforced concrete combined cofferdam suitable for vibration sensitive area under unbalanced soil pressure effect
By adopting a steel-concrete combination cofferdam design in bridge engineering, including locking steel pipe-drilling combined support piles and counterpressure platforms, the structural deformation and construction safety problems caused by unbalanced soil pressure are solved, and the construction environment is realized. Drying and stability meet the needs of high drops and water level changes during flood seasons, and improve engineering efficiency.
Patent Information
- Application Number
- CN202411258609.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-12
AI Technical Summary
In bridge projects in vibration-sensitive areas, the existing technology is difficult to effectively deal with structural deformation and construction safety problems caused by unbalanced soil pressure. Especially when the terrain of large embankment slopes is complex, traditional cofferdam design cannot effectively reduce vibration. The impact of the levee and the construction environment is difficult to keep dry.
Adopt a steel-concrete combination cofferdam design, including locking steel pipe-drilling combined support piles, high-pressure rotary spray piles, backpressure platform, internal support and back cover concrete, through multi-layer beef legs, steel lattice columns and fine stone concrete Filling improves structural stability and push stiffness, and sets up leak-proof dams to collect wastewater, reducing the thickness of the bottom cover concrete to improve craftsmanship.
Effectively reduce the impact of vibration on the embankment, ensure the dryness and stability of the construction environment, improve the floating resistance of the cofferdam, meet the needs of high drops and water level changes during flood season, and reduce construction investment and improve project progress. .
Smart Images

Figure CN118933037A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge engineering, in particular to a steel-concrete composite cofferdam suitable for use under the action of unbalanced earth pressure in a vibration-sensitive area. Background Art
[0002] When constructing underwater bridges, water retaining structures such as cofferdams are used to provide a dry working environment for the construction of the foundation, which is crucial to ensuring quality and construction safety. Common types of cofferdams include earth cofferdams, steel sheet pile cofferdams, lock steel pipe pile cofferdams, double-wall steel cofferdams, etc. Earth cofferdams are suitable for riverside shoals with low flow rates (≤0.5m / s) and shallow water depths (≤1.5m). At the same time, earth cofferdams will compress the river section and pollute the water source, so their use is limited. Steel sheet pile cofferdams use steel sheet piles to be inserted one by one (group), and the steel sheet piles bite each other to form a construction space. They can be used in water depths of less than 10m. As the water depth increases further, lock steel pipe pile cofferdams or double-wall steel cofferdams with stronger bearing capacity become better choices. Double-wall steel cofferdams are complex to process and manufacture, have low reuse rates, and are expensive. Lock steel pipe piles have high bending stiffness, and the steel pipe model can be selected according to the force requirements. The processing and manufacturing are simple and fast, and the material recycling rate is high. They are widely used in actual projects. The methods of driving the lock steel pipe piles are divided into hammering and vibration. When the bridge piers are set on the river bank, the shock waves formed by hammering or vibration will threaten the stability of the levee, especially when there is a liquefiable soil layer under the levee. The shock wave increases sharply with the increase of the cross-section of the steel pipe and the depth of the soil. The cofferdam is generally located in the water to resist the water pressure around and the soil side pressure below the riverbed surface. The top elevation of the cofferdam is consistent, generally 0.5 to 0.7m higher than the highest water surface (including waves). When the underground part of the building is constructed on the shore, the space formed by excavating from the ground is the foundation pit. Retaining components such as concrete cast-in-place support piles are often used to withstand the soil side pressure. The top elevation of the pile is generally the original ground elevation. The ground elevation difference of the levee slope is large, and the water level difference in different seasons is large. The temporary area enclosed for the dry operation of the cap has the characteristics of both cofferdam and foundation pit. By comprehensively utilizing the advantages of cofferdam locking steel pipe piles and foundation pit bored cast-in-place supporting piles, a locking steel pipe-drilled cast-in-place combined supporting pile is developed, which has important engineering value for projects with large original ground height differences and sensitive vibrations on large embankment slopes.
[0003] Usually, when designing cofferdams and foundation pit supports, the outer side of the retaining structure bears active earth pressure and water pressure, and the inner side is simplified to an elastic support for calculating soil reaction force. The foundation pit as a whole is in a state of contraction after being subjected to force. In special terrain with large height differences of river bank slopes, the effect of unbalanced earth pressure is obvious. The excessive lateral pressure of the retaining structure at a higher level is transmitted to the lower retaining structure through the internal support system, forcing the lower retaining structure to deform outward, which is different from the conventional calculation assumptions and requires the calculation method to be revised.
[0004] The object of the present invention is to provide a steel-concrete composite cofferdam and a calculation revision method suitable for unbalanced earth pressure in vibration-sensitive areas to solve the problems mentioned in the above background technology. Summary of the invention
[0005] To achieve the above-mentioned purpose, the present invention provides a steel-concrete composite cofferdam suitable for use under the unbalanced earth pressure in a vibration-sensitive area, comprising a plurality of locking steel pipe-bored cast-in-place composite support piles, high-pressure rotary jet piles, a back pressure platform, an inner support, and bottom sealing concrete. A plurality of pile foundation casings are arranged in the construction area, and a plurality of the locking steel pipe-bored cast-in-place composite support piles are sequentially connected end to end along the outer side of the cap construction area. The high-pressure rotary jet piles are arranged along the inner and outer sides of the locking steel pipe-bored cast-in-place composite support piles and in the gap between every two support piles. The back pressure platform is arranged on the side with a lower ground terrain and is close to the locking steel pipe-bored cast-in-place composite support pile. The inner support is fixedly installed in the space surrounded by the locking steel pipe-bored cast-in-place composite support piles through fasteners. On the inner wall of the area, the inner support includes multiple groups of struts, and the multiple groups of struts are evenly distributed from top to bottom along the locking steel pipe-drilled and cast-in-place combined supporting piles. Auxiliary supporting members are also provided on the multiple groups of struts. A circle of anchoring steel bars is welded on the outer wall of the pile foundation casing, and each anchoring steel bar is arranged at an interval of 50 cm. The periphery of the bottom cover concrete is connected with the pile foundation steel casing and the locking steel pipe-drilled and cast-in-place combined supporting piles. The anchoring steel bars are arranged 20 cm above the bottom of the bottom cover concrete. The auxiliary supporting members are arranged between the struts and the bottom cover concrete and are connected and fixed to the two. The locking steel pipe-drilled and cast-in-place combined supporting piles are divided into three parts: a locking steel pipe pile hollow section, a locking steel pipe-concrete combination section and a concrete pile section.
[0006] As a further improvement of the present invention, the support rod includes multiple transverse supports, longitudinal supports, and a support pad. Both ends of the transverse supports and the longitudinal supports are provided with a support pad. The inner wall of the area enclosed by the inner side of the locking steel pipe-drilled and cast-in-place combined support pile is provided with multiple fasteners. The ends of the transverse supports and the longitudinal supports close to the inner side of the locking steel pipe-drilled and cast-in-place combined support pile are connected and fixed to the fasteners through the support pad. The longitudinal support is arranged between each of the transverse supports, and the auxiliary support member is fixedly installed on the longer longitudinal support.
[0007] As a further improvement of the present invention, the fasteners include a purlin, a corbel, and a steel hanger. The corbels are evenly distributed on the inner side of the locking steel pipe-drilled cast-in-place combined support piles. The purlins are installed on the top of the corbels. The vertical surfaces of the corbels connected to the locking steel pipe piles are fixed by welding. The vertical surfaces of the corbels connected to the reinforced concrete piles are welded with steel hangers and are connected and fixed to the locking steel pipe piles by the steel hangers.
[0008] As a further improvement of the present invention, fine stone concrete is also filled between the perimeter purlin and the locking steel pipe-drilled cast-in-place combined supporting piles.
[0009] As a further improvement of the present invention, the auxiliary support members include steel lattice columns and embedded plates. The steel lattice columns are evenly distributed along the horizontal direction of the longitudinal supports, and are connected and fixed to each of the longitudinal supports in sequence from top to bottom, and the bottom is fixedly connected to the embedded plates. The bottom welded anchor bars of the embedded plates are inserted into the bottom concrete for fixation.
[0010] As a further improvement of the present invention, high-pressure rotary jet piles are provided between the locking steel pipe-drilled cast-in-place combination support piles, the top of the high-pressure rotary jet pile on the outside of the locking steel pipe-drilled cast-in-place combination support pile is flush with the ground line, the top of the high-pressure rotary jet pile on the inside of the locking steel pipe-drilled cast-in-place combination support pile is slightly higher than the top surface of the bottom sealing concrete, and the bottom end of the high-pressure rotary jet pile is lower than the bottom of the bottom sealing concrete.
[0011] As a further improvement of the present invention, a plurality of diagonal braces are welded to the four corners of the inner wall of the area enclosed by the locking steel pipe-drilled cast-in-place combination supporting piles, and a supporting pad seat 2 is provided at both ends of the plurality of diagonal braces, and the supporting pad seat 2 is connected and fixed to the surrounding purlin arranged on the inner wall of the locking steel pipe-drilled cast-in-place combination supporting piles.
[0012] As a further improvement of the present invention, a sloped drainage ditch is provided around the top of the bottom sealing concrete, and water collection pits are provided at the lower elevations of the four corners of the drainage ditch.
[0013] As a further improvement of the present invention, the back pressure platform is filled with soil and stone filling materials with low permeability on the side close to the locking steel pipe-drilled and cast-in-place combined supporting pile, and is filled with block stones on the side away from the platform to prevent scouring.
[0014] As a further improvement of the present invention, the anti-leakage dam arranged at the lower part of the original ground is composed of fill soil and anti-seepage geotextile.
[0015] As a further improvement of the present invention, when calculating the cofferdam under the action of unbalanced earth pressure, firstly, according to the relevant specifications, the soil layer acts on the outside of the cofferdam with active earth pressure, and the soil layer provides the initial distributed earth reaction and the elastic boundary of the earth reaction on the inside of the cofferdam, and the deformation of the cofferdam retaining structure is calculated. If the retaining structure in the soil layer produces deformation toward the outside of the cofferdam, it is inconsistent with the conventional calculation assumptions, and it is necessary to apply a compression-only spring boundary to the retaining structure on the outside of the cofferdam in the soil layer. The compressive stiffness of the spring is related to the burial depth, the internal friction angle of the soil and the cohesion. The burial depth should be taken into account the fill height of the counterpressure platform.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. The present invention is provided with locking steel pipe-drilled cast-in-place combined support piles, in which the locking steel pipe piles only need to be driven through the surface poor geology to meet the requirements of bored pile construction casing. Compared with the traditional locking steel pipe piles, the driving depth is shallow, which greatly reduces the impact of vibration on vibration-sensitive embankments.
[0018] 2. The present invention is provided with a counter-pressure platform. The part adjacent to the counter-pressure platform and the locking steel pipe-drilling and grouting combined support pile adopts fillers with large internal friction angle and small permeability coefficient. Sufficient anti-thrust stiffness can ensure that the overall deformation of the combined cofferdam under the action of unbalanced earth pressure is controllable and the inside of the cofferdam is kept as a dry working environment. The part farther from the counter-pressure platform and the locking steel pipe-drilling and grouting combined support pile adopts block stone filling to improve the anti-scouring ability.
[0019] 3. The present invention is provided with a leak-proof dam, which is composed of filler and impermeable geotextile, and can collect wastewater and waste residue generated during the construction process to protect the ecological environment.
[0020] 4. The locking hollow section of the locking steel pipe-drilled cast-in-place combined support pile can be used to meet the requirements of the same top elevation when the ground has a high drop, and meet the demand for rising water levels on the river bank slope during the flood season.
[0021] 5. The present invention welds a plurality of anchoring steel bars around the pile foundation casing. Through the bond strength between the anchoring steel bars and the concrete, the thickness of the bottom concrete is reduced while ensuring the anti-floating stability of the cofferdam, the investment in personnel, materials and equipment is reduced, the work efficiency is improved, and the progress of the project is accelerated.
[0022] 6. Multi-layer corbels are arranged on the locking steel pipe-drilled cast-in-place composite supporting piles according to the force requirements. The corbels are fixed by welding or steel hangers. The purlins are placed on the corbels. The gaps between the purlins and the locking steel pipe-drilled cast-in-place composite supporting piles are filled with fine stone concrete. The inner support of the cofferdam is connected to the purlin, and steel lattice columns are used to provide auxiliary support for the inner support, thereby improving the stability of the inner support. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic plan view of the cofferdam of the present invention;
[0024] Figure 2 It is a schematic cross-sectional view of the cofferdam of the present invention;
[0025] Figure 3 This is a schematic diagram of the locking steel pipe-drilled cast-in-place combined support pile structure of the present invention;
[0026] Figure 4 It is a detailed schematic diagram of the corbel hanger rod of the purlin of the present invention;
[0027] Figure 5 It is a schematic diagram of filling fine stone concrete between the purlin and the locking steel pipe-drilled cast-in-place composite support pile of the present invention;
[0028] Figure 6 It is a local pile position layout diagram of the high-pressure rotary jet grouting pile of the present invention;
[0029] Figure 7 It is a schematic diagram of the steel lattice column structure of the present invention;
[0030] Figure 8 It is a schematic plan view of the anchoring steel bars of the bottom concrete of the present invention;
[0031] Fig. 9 It is a schematic elevation diagram of the bottom concrete anchoring steel bars of the present invention.
[0032] In the figure: 1. Locking steel pipe-drilling and grouting combined support pile; 2. Locking steel pipe pile hollow section; 3. Locking steel pipe-reinforced concrete combination section; 4. Reinforced concrete pile section; 5. High-pressure rotary jet pile; 6. Internal support; 601. Diagonal support; 602. Horizontal support; 603. Longitudinal support; 604. Support pad one; 605. Support pad two; 7. Counterpressure platform; 8. Block stone; 9. Steel lattice column; 901. Embedded plate; 10. Leak-proof dam; 11. Anti-seepage geotextile; 12. Bottom sealing concrete; 13. Anchor steel bar; 14. Sump; 15. Pile foundation casing; 16. Purlin; 17. Fine stone concrete; 18. Corbel; 19. Steel hanger. DETAILED DESCRIPTION
[0033] To facilitate understanding of the present invention, the present invention will be described more comprehensively below with reference to the relevant drawings. Several embodiments of the present invention are given in the drawings, but the present invention can be implemented in different forms and is not limited to the embodiments described in the text. On the contrary, these embodiments are provided to make the content disclosed in the present invention more thorough and comprehensive.
[0034] It should be noted that when an element is referred to as being "fixed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used in this article are for illustrative purposes only.
[0035] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly connected by technicians in the technical field to which the present invention belongs. The terms used in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used in this article includes any and all combinations of one or more related listed items.
[0036] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0037] Embodiment 1:
[0038] See also Figure 1-9 The present invention provides a steel-concrete composite cofferdam suitable for use under the unbalanced earth pressure in a vibration-sensitive area, comprising a plurality of locking steel pipe-bored cast-in-place composite supporting piles 1, high-pressure rotary jet piles 5, a back pressure platform 7, an inner support 6, and a bottom sealing concrete 12. A plurality of pile foundation casings 15 are arranged in the construction area. A plurality of the locking steel pipe-bored cast-in-place composite supporting piles 1 are connected end to end in sequence along the outer side of the cap construction area. The high-pressure rotary jet piles 5 are arranged along the inner and outer sides of the locking steel pipe-bored cast-in-place composite supporting piles 1 and in the gap between every two supporting piles. The back pressure platform 7 is arranged on the side with a lower terrain and is close to the locking steel pipe-bored cast-in-place composite supporting piles 1. The inner support 6 is fixedly installed on the inner wall of the area surrounded by the locking steel pipe-bored cast-in-place composite supporting piles 1 through fasteners. The support 6 includes multiple groups of struts, which are evenly distributed from top to bottom along the locking steel pipe-drilled cast-in-place combined supporting pile 1. Auxiliary supporting members are also provided on the multiple groups of struts. A number of anchoring steel bars 13 are welded to the outer wall of the pile foundation casing 15, and each of the anchoring steel bars 13 is arranged at intervals of 50 cm. The periphery of the bottom seal concrete 12 is connected with the pile foundation steel casing and the locking steel pipe-drilled cast-in-place combined supporting pile 1. The anchoring steel bars 13 are arranged 20 cm above the bottom of the bottom seal concrete 12. The auxiliary supporting members are arranged between the struts and the bottom seal concrete 12, and are connected and fixed to the two. The locking steel pipe-drilled cast-in-place combined supporting pile 1 includes three parts: a locking steel pipe pile hollow section 2, a locking steel pipe-reinforced concrete combination section 3 and a reinforced concrete pile section 4.
[0039] High-pressure rotary jet piles 5 are arranged between the locking steel pipe-drilled cast-in-place combined support piles 1. The top of the high-pressure rotary jet pile 5 outside the locking steel pipe-drilled cast-in-place combined support pile 1 is flush with the ground line, and the top of the high-pressure rotary jet pile 5 inside the locking steel pipe-drilled cast-in-place combined support pile 1 is slightly higher than the top surface of the bottom sealing concrete 12, and the bottom end of the high-pressure rotary jet pile 5 is lower than the bottom of the bottom sealing concrete 12.
[0040] When in use, first install the locking steel pipe-drilled cast-in-place combined support pile 1, insert the locking steel pipe pile into the ground, the locking steel pipe pile also serves as a pile foundation construction casing, the locking steel pipe pile is buried deep only to meet the construction requirements of the bored pile, so as to minimize the vibration caused by the steel pipe pile insertion, the locking steel pipe pile top elevation should be unified, and meet the construction requirements of resisting the highest water level during the construction period, wherein the locking steel pipe pile insertion only needs to pass through the surface poor geology and meet the bored pile construction casing requirements. Compared with the traditional locking steel pipe pile, the insertion depth is shallow, which greatly reduces the impact of vibration on vibration-sensitive levees. The hollow section 2 of the locking steel pipe pile can be suitable for the requirements of the same top elevation when the ground has a high drop, and meets the demand for rising water levels on the river side slopes during the flood season. The concrete is poured to the original ground elevation, which is convenient for the subsequent cutting of the hollow section 2 of the locking steel pipe pile along the ground. The bored pile reinforcement cage is lowered before concrete pouring, and the locking steel pipe pile of the cofferdam closing section A CT-shaped lock or LT-shaped lock with a certain adjustment ability should be selected, and a CC-shaped lock should not be used. Subsequently, high-pressure rotary jet piles 5 are constructed on both sides of the locking steel pipe-drilled and cast-in-place combined support piles 1 and in the gap between every two support piles. The high-pressure rotary jet piles 5 bite into each other to form a water-stop curtain to ensure water-proofness, thereby providing a dry working construction environment inside the cofferdam. Subsequently, the interior of the cofferdam is excavated and the inner support 6 is promptly installed on the inner wall of the area enclosed by the locking steel pipe-drilled and cast-in-place combined support piles 1, and an auxiliary support is arranged between the inner support 6 and the bottom concrete 12 to improve the stability of the inner support 6. In this embodiment, by welding anchor steel bars 13 on the periphery of the casing and by the bonding force between the anchor steel bars 13 and the concrete, the thickness of the bottom concrete 12 is reduced while ensuring the anti-floating stability of the cofferdam, the investment in personnel, materials and equipment is reduced, the work efficiency is improved, and the progress of the project is accelerated.
[0041] Embodiment 2:
[0042] On the basis of the first embodiment, in this embodiment, Figure 1-4 As shown, the support rod includes a plurality of transverse supports 602, a longitudinal support 603, and a support seat 604. Both ends of the transverse supports 602 and the longitudinal supports 603 are provided with a support seat 604. The inner wall of the area enclosed by the locking steel pipe-drilled cast-in-place composite support pile 1 is provided with a plurality of fasteners. The ends of the transverse supports 602 and the longitudinal supports 603 close to the inner side of the locking steel pipe-drilled cast-in-place composite support pile 1 are connected and fixed to the fasteners through the support seat 604. The longitudinal support 603 is arranged between each of the transverse supports 602, and the auxiliary support member is fixedly installed on the longitudinal support 603.
[0043] The fasteners include a purlin 16, a corbel 18, and a steel hanger 19. The corbel 18 is evenly distributed on the inner side of the locking steel pipe-drilled cast-in-place combined support pile 1. The purlin 16 is installed on the top of the corbel 18. The vertical surface of the corbel 18 connected to the locking steel pipe pile is fixed by welding. The vertical surface of the corbel 18 connected to the reinforced concrete pile is welded with a steel hanger 19, and is connected and fixed to the locking steel pipe pile through the steel hanger 19.
[0044] Fine stone concrete 17 is also filled between the surrounding purlin 16 and the locking steel pipe-drilled cast-in-place combined supporting pile 1.
[0045] A plurality of diagonal braces 601 are welded to the four corners of the inner wall of the area enclosed by the locking steel pipe-drilled cast-in-place composite supporting piles 1, and a supporting pad seat 2 605 is provided at both ends of the plurality of diagonal braces 601, and the supporting pad seat 2 605 is connected and fixed to the surrounding purlin 16 arranged on the inner wall of the locking steel pipe-drilled cast-in-place composite supporting piles 1.
[0046] The steel suspension rod 19 is made of H-shaped steel or I-shaped steel.
[0047] When in use, a plurality of corbels 18 are distributed in sequence from top to bottom on the inner wall of the locking steel pipe-drilled and cast-in-place combined supporting pile 1. The corbels 18 on the locking steel pipe pile are fixed by welding. At the reinforced concrete pile, a steel hanger 19 is pre-welded and installed on the upper end locking steel pipe column section. The corbels 18 are connected and fixed to the locking steel pipe pile section through the steel hanger 19. Then the purlin 16 is installed on the top of the corbel 18. The transverse support 602 and the longitudinal support 603 are installed in sequence. Furthermore, in order to improve the overall stability of the cofferdam, fine stone concrete 17 is filled in the gap between the purlin 16 and the locking steel pipe-drilled and cast-in-place combined supporting pile 1, which can effectively diffuse the stress transfer between the purlin 16 and the locking steel pipe-drilled and cast-in-place combined supporting pile 1 and improve the bearing capacity. Subsequently, the longitudinal support 603 of the auxiliary support is installed and fixed. In this embodiment, the steel hanger 19 adopts H-shaped steel, I-shaped steel and other steel with a planar structure, which is convenient for welding and fixing with the purlin 16.
[0048] Embodiment three:
[0049] On the basis of the first embodiment, in this embodiment, Figure 1 , Figure 2 , Figure 7 As shown, the auxiliary support members include steel lattice columns 9 and embedded plates 901. The steel lattice columns 9 are connected to each of the longitudinal supports 603 in turn, and the bottom is fixedly connected to the embedded plates 901. Anchor bars are provided at the bottom of the embedded plates 901 and are inserted into the bottom sealing concrete 12 for fixation.
[0050] When in use, multiple steel lattice columns 9 are installed equidistantly along the longitudinal support 603, and the embedded plates 901 fixedly connected to the bottom of the steel lattice columns 9 are pre-inserted into the bottom concrete 12 for fixation. The arrangement of the steel lattice columns 9 can provide vertical support for the inner support 6, thereby enhancing the overall stability of the inner support 6 system and avoiding instability of the longitudinal support 603 due to the large free length outside the plane.
[0051] Embodiment 4:
[0052] On the basis of the first embodiment, in this embodiment, Figure 2 As shown, a sloped drainage ditch is arranged around the top of the bottom concrete 12, and a water collection pit 14 is arranged at the lower elevation of the four corners of the drainage ditch.
[0053] When in use, the drainage ditch can effectively collect rainwater, seepage water, etc. in the cofferdam, and collect them into the sump 14, so as to ensure that the inside of the cofferdam is dry, thus providing favorable conditions for construction.
[0054] Embodiment five:
[0055] On the basis of the first embodiment, in this embodiment, Figure 1 , Figure 2 As shown, the back pressure platform 7 is filled with two materials, the inner and outer materials. The inner material is required to have a large internal friction angle and a small permeability coefficient, and the outer material is required to have a strong ability to resist scour. The anti-leakage dam 10 is composed of filler and anti-seepage geotextile 11.
[0056] When in use, the portion adjacent to the counter-pressure platform 7 and the locking steel pipe-bored cast-in-place combined support pile 1 is filled with fillers with a large internal friction angle and a small permeability coefficient. Sufficient anti-thrust stiffness can ensure that the overall deformation of the combined cofferdam under the action of unbalanced earth pressure is controllable and the inside of the cofferdam is kept as a dry working environment. The portion farther from the counter-pressure platform 7 and the locking steel pipe-bored cast-in-place combined support pile 1 is filled with block stones 8 to improve the anti-scouring ability.
[0057] The anti-leakage dam 10 is composed of fillers and anti-seepage geotextiles 11, which can collect wastewater and waste residues generated during the construction process for centralized disposal and protect the ecological environment.
[0058] The above is an exemplary description of the present invention in combination with the accompanying drawings. It is obvious that the specific implementation of the present invention is not limited to the above-mentioned method. As long as such non-substantial improvements are made by adopting the method concept and technical solution of the present invention, or the concept and technical solution of the present invention are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.
Claims
1. A steel-concrete composite cofferdam suitable for use under unbalanced earth pressure in vibration-sensitive areas, characterized in that: The invention comprises a plurality of locking steel pipe-bored cast-in-place combined support piles (1), high-pressure rotary jet piles (5), a back pressure platform (7), an inner support (6), and bottom sealing concrete (12). A plurality of pile foundation casings (15) are provided in the construction area. A plurality of the locking steel pipe-bored cast-in-place combined support piles (1) are connected end to end in sequence along the outer side of the foundation construction area. The high-pressure rotary jet piles (5) are arranged along the inner and outer sides of the locking steel pipe-bored cast-in-place combined support piles (1) and in the gap between every two support piles. The back pressure platform (7) is arranged on the side with lower ground elevation and is close to the locking steel pipe-bored cast-in-place combined support piles (1). The inner support (6) is fixedly installed on the inner wall of the area surrounded by the locking steel pipe-bored cast-in-place combined support piles (1) by fasteners. The inner support (6) comprises a plurality of groups of support rods. The rods are evenly distributed from top to bottom along the locking steel pipe-drilling and grouting combined support pile (1), and auxiliary support members are also provided on multiple groups of the support rods. A plurality of anchoring steel bars (13) are welded to the outer wall of the pile foundation casing (15), and each of the anchoring steel bars (13) is arranged at intervals of 50 cm. The periphery of the bottom seal concrete (12) is connected to the pile foundation steel casing and the locking steel pipe-drilling and grouting combined support pile (1), and the anchoring steel bars (13) are arranged 20 cm above the bottom of the bottom seal concrete (12). The auxiliary support members are arranged between the support rods and the bottom seal concrete (12), and are connected and fixed to the two. The locking steel pipe-drilling and grouting combined support pile (1) comprises three parts: a locking steel pipe pile hollow section (2), a locking steel pipe-reinforced concrete combination section (3), and a reinforced concrete pile section (4).
2. The steel-concrete composite cofferdam suitable for use under unbalanced earth pressure in vibration-sensitive areas according to claim 1, characterized in that: The support rod comprises a plurality of transverse supports (602), a longitudinal support (603), and a support seat (604). Both ends of the transverse supports (602) and the longitudinal supports (603) are provided with a support seat (604). The inner wall of the area enclosed by the locking steel pipe-drilled cast-in-place composite support pile (1) is provided with fasteners. The transverse supports (602) and the longitudinal supports (603) are connected and fixed to the fasteners via the support seat (604). The auxiliary support is fixedly mounted on the longitudinal supports (603).
3. The steel-concrete composite cofferdam suitable for use under unbalanced earth pressure in vibration-sensitive areas according to claim 2, characterized in that: The fasteners include a purlin (16), a corbel (18), and a steel hanger (19); the corbels (18) are evenly distributed on the inner side of the locking steel pipe-bored cast-in-place combined support pile (1); the purlins (16) are all installed on the top of the corbels (18); the vertical surface of the corbels (18) connected to the locking steel pipe pile is fixed by welding; the vertical surface of the corbels (18) connected to the reinforced concrete pile is welded with a steel hanger (19), and is connected and fixed to the locking steel pipe pile by the steel hanger (19).
4. The steel-concrete composite cofferdam suitable for use under unbalanced earth pressure in vibration-sensitive areas according to claim 3, characterized in that: Fine stone concrete (17) is filled between the surrounding purlin (16) and the locking steel pipe-drilled cast-in-place combined support pile (1).
5. The steel-concrete composite cofferdam suitable for use under unbalanced earth pressure in vibration-sensitive areas according to claim 2, characterized in that: The auxiliary support members include steel lattice columns (9) and embedded plates (901); the steel lattice columns (9) are evenly distributed along the horizontal direction of the longitudinal supports (603), and are connected and fixed to each of the longitudinal supports (603) in sequence from top to bottom, and are fixedly connected to the embedded plates (901) at the bottom; and the bottom welded anchor bars of the embedded plates (901) are inserted into the bottom sealing concrete (12) for fixation.
6. The steel-concrete composite cofferdam suitable for use under unbalanced earth pressure in vibration-sensitive areas according to claim 1, characterized in that: High-pressure rotary jet piles (5) are arranged between the locking steel pipe-drilling and grouting combined support piles (1), the top of the high-pressure rotary jet pile (5) outside the locking steel pipe-drilling and grouting combined support pile (1) is flush with the ground line, the top of the high-pressure rotary jet pile (5) inside the locking steel pipe-drilling and grouting combined support pile (1) is slightly higher than the top surface of the bottom sealing concrete (12), and the bottom of the high-pressure rotary jet pile (5) is lower than the bottom of the bottom sealing concrete (12).
7. The steel-concrete composite cofferdam suitable for use under unbalanced earth pressure in vibration-sensitive areas according to claim 4, characterized in that: A plurality of diagonal braces (601) are welded to the four corners of the inner wall of the area enclosed by the locking steel pipe-drilled cast-in-place combined supporting pile (1), and a second supporting cushion seat (605) is provided at both ends of the plurality of diagonal braces (601), and the second supporting cushion seat (605) is connected and fixed to the surrounding purlin (16) provided on the inner wall of the locking steel pipe-drilled cast-in-place combined supporting pile (1).
8. The steel-concrete composite cofferdam suitable for use under unbalanced earth pressure in vibration-sensitive areas according to claim 1, characterized in that: A sloped drainage ditch is arranged around the top of the bottom sealing concrete (12), and water collection pits (14) are arranged at the four corners of the drainage ditch at lower elevations.
9. The steel-concrete composite cofferdam suitable for use under unbalanced earth pressure in vibration-sensitive areas according to claim 1, characterized in that: The back pressure platform (7) is filled with soil and stone filling material with low water permeability on the side close to the locking steel pipe-bored cast-in-place combined support pile (1), and is filled with block stones (8) on the side away from the back pressure platform to prevent scouring.
10. The steel-concrete composite cofferdam suitable for use under unbalanced earth pressure in vibration-sensitive areas according to claim 3, characterized in that: The anti-leakage dam (10) arranged at the lower part of the original ground is composed of fill soil and anti-seepage geotextile (11).
Citation Information
Cited By
Combined earth rock cofferdam structure and construction method thereof
CN121138322A
Combined earth-rock cofferdam structure and construction method thereof
CN121138322B