Advanced pre-embedding steel bar planting-free construction method in structure

By adopting the advanced pre-embedded and free planting method in construction, the detachable and connected embedded ribs and formwork are used to solve the problems of cumbersome and high cost in traditional reinforcement technology, achieving simple and efficient construction results, and reducing pollution and cost, extending service life.

CN118933187APending Publication Date: 2024-11-12CHINA RAILWAY 10 BUREAU GRP NO 7 ENG CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411135211.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The traditional reinforcement process is complicated in construction, long construction time, high cost and difficult, and the existing reinforcement-free reinforcement method has a large amount of welding and high cost.

Method used

The advanced pre-embedding and no planting method is adopted. The process of detachable connection between the processed and molded pre-embedded ribs and the formwork is removed after pouring concrete, so as to achieve a construction process without opening and welding.

Benefits of technology

It simplifies the construction process, improves construction efficiency, reduces costs, reduces pollution, extends service life, and has high economic benefits and promotion value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933187A_ABST
    Figure CN118933187A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for pre-embedding in advance without planting steel bars in a structure, which comprises the following steps: step 1, processing pre-embedded steel bars: processing molded pre-embedded steel bars according to drawing design requirements; 2, formwork machining is conducted, specifically, the machined embedded ribs are installed on the inner side face of the formwork, and the embedded ribs are detachably connected with the formwork; 3, concrete pouring construction is conducted, specifically, after the machined formwork and the wallboard are connected, concrete is poured; and 4, the formwork is dismantled, specifically, after the concrete is solidified, the formwork is dismantled, and the formwork is reused. The construction method has the advantages that construction is easy and convenient, the number of construction procedures is small, construction efficiency is high, a pull-out test is not needed, welding is not needed, environment pollution can be reduced, full-assembly assembling is achieved, durability is effectively improved, the service life is prolonged, high economic benefits are achieved, large-scale construction is facilitated, and the popularization value is remarkable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and more particularly to a construction method for pre-embedded reinforcement-free structure. Background Art

[0002] Usually, the tie bars at the junction of the main structure and the infill wall are post-embedded, that is, holes are drilled in the main wall, and then embedded with anchor glue and steel bars are inserted for reinforcement. The traditional rebar embedding process has a series of drawbacks, such as cumbersome procedures, long construction time, high cost, and difficult construction. First of all, the traditional rebar embedding process requires multiple construction processes, including drilling, cleaning holes, grouting, and placing bars. These processes are not only time-consuming, but also difficult to construct and prone to quality problems. Secondly, the traditional rebar embedding process is costly, requires specialized machinery and construction personnel, and requires a large number of pull-out tests, which increases the construction cost and construction period of the project.

[0003] The Chinese invention patent with publication number CN111021768A discloses a method for constructing secondary structure steel bars without planting steel bars, including: S100, pretreatment of steel bar anchor plates: filling the anchor holes on the steel bar anchor plates with filling materials; S200, processing of the main structure: positioning the pretreated steel bar anchor plates on the beam plates, and pouring concrete to form the main structure; S300, reprocessing of the steel bar anchor plates: finding the position where the steel bar anchor plates are positioned on the main structure, drilling holes inward until the anchor holes are partially or completely exposed, and removing the filling materials in the anchor holes; S400, inserting structural steel bars: screwing structural steel bars into the anchor holes. The present invention achieves the effect of no need for manual drilling and firm positioning by filling the anchor holes on the steel bar anchor plates with filling materials and then positioning them, and removing the filling materials after the main structure is completed and then screwing in the structural steel bars.

[0004] However, although the above patented method of free rebar embedding does not require secondary drilling, the amount of welding of the pre-embedded plates in the early stage is large and the pre-embedded steel plates cannot be removed after embedding, resulting in construction costs far greater than traditional rebar embedding, and it is labor-intensive and time-consuming.

[0005] Therefore, how to provide a method for pre-embedded reinforcement-free construction in a structure with simple construction and high construction efficiency is one of the technical problems that urgently need to be solved in this field. Summary of the invention

[0006] In view of this, the present invention provides a construction method for pre-embedded reinforcement-free structure in order to solve the problems existing in the prior art.

[0007] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0008] A method for pre-embedded reinforcement-free construction in a structure, comprising the following steps:

[0009] Step 1: Embedded reinforcement processing: Process the formed embedded reinforcement according to the design requirements of the drawing;

[0010] Step 1: Formwork processing: installing the processed embedded reinforcement on the inner side of the formwork, wherein the embedded reinforcement and the formwork are detachably connected;

[0011] Step 1: Concrete pouring construction: connect the processed formwork with the wall panel and then pour concrete;

[0012] Step 1: Formwork removal: After the concrete solidifies, remove the formwork and reuse it.

[0013] Preferably, the embedded reinforcement includes an embedded section and an exposed section which are vertically arranged.

[0014] Preferably, the front end of the embedded section on the embedded reinforcement is bent 8° to form a hook.

[0015] Preferably, in the step, the hook at the front end of the embedded section is fixedly connected to the structural steel bar.

[0016] Preferably, a groove matching the exposed section of the embedded reinforcement is provided on the inner side surface of the template; and the exposed section of the embedded reinforcement is embedded in the groove.

[0017] Preferably, after the demoulding is completed, the exposed section of the embedded reinforcement is straightened into a horizontal shape.

[0018] Compared with the prior art, the present invention has achieved the following technical effects:

[0019] 1) The present invention is applicable to various support system processes such as wooden formwork, aluminum alloy formwork, steel formwork, etc., and can effectively solve the problems of large construction volume, high construction cost, time-consuming and labor-intensive construction in the prior art;

[0020] 2) The construction method of the present invention has the advantages of simple construction, fewer construction steps, high construction efficiency, no need for pulling test, no need for welding, etc. It can reduce environmental pollution, realize full assembly, effectively improve durability, extend service life, have high economic benefits, facilitate large-scale construction, and have significant promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is the structural diagram of the embedded reinforcement;

[0022] Figure 2 It is a schematic diagram of the structure of the template;

[0023] Figure 3 This is a schematic diagram of the installation of embedded reinforcement and formwork;

[0024] Figure 4 It is a schematic diagram of the connection between the formwork and the wall panel;

[0025] Figure 5 It is a schematic diagram of a wall structure with embedded reinforcement;

[0026] Figure 6 This is a schematic diagram of the exposed section of the embedded reinforcement after being straightened into a horizontal state.

[0027] In the figure: 1. embedded reinforcement; 11. embedded section; 111. hook; 12. exposed section; 2. formwork; 21. formwork body; 22. first panel; 23. second panel; 3. groove. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] Example

[0030] The invention discloses a construction method for pre-embedded reinforcement-free structure, comprising the following steps:

[0031] Step 1, processing of embedded reinforcement 1: processing the formed embedded reinforcement 1 according to the design requirements of the drawing;

[0032] Step 2, processing the template 2: installing the processed embedded reinforcement 1 on the inner side of the template 2, wherein the embedded reinforcement 1 and the template 2 are detachably connected;

[0033] Step 3, concrete pouring construction: connect the processed formwork 2 with the wall panel and pour concrete;

[0034] Step 4, removing the formwork 2: After the concrete solidifies, remove the formwork 2 and reuse it.

[0035] The construction method of the above technical solution is simple and reliable, and it directly solves the problems existing in the existing rebar construction from the template design. Compared with other existing methods, the pull-out force of the embedded rebar of the present invention can be effectively improved. It has the characteristics of simple construction, fewer construction steps, and high construction efficiency. There is no need to conduct pull-out tests, and it can effectively improve durability and extend service life.

[0036] In this embodiment, the embedded reinforcement 1 includes an embedded section 11 and an exposed section 12 which are vertically arranged.

[0037] In this embodiment, the embedded section 11 and the exposed section 12 are an integrated structure, which is formed by bending a steel bar.

[0038] In this embodiment, the front end of the embedded section 11 on the embedded reinforcement 1 is bent 180° to form a hook 111 .

[0039] In this embodiment, in step 3, the hook 111 at the front end of the embedded section 11 is fixedly connected to the structural steel bar to improve the structural stability.

[0040] In this embodiment, a groove 3 is provided on the inner side surface of the template 2, which is compatible with the exposed section 12 of the embedded reinforcement 1; the groove width and groove depth of the groove 3 are the same as the diameter of the embedded reinforcement 1; the exposed section 12 of the embedded reinforcement 1 is embedded in the groove 3, which is convenient for the installation and disassembly of the template and the embedded reinforcement.

[0041] In this embodiment, two groups of grooves 3 are arranged side by side on the inner side of the template 2; the number of grooves 3 in each group is four.

[0042] In this embodiment, the template 2 includes a template body 21, a first panel 22 and a second panel 23; the first panel 22 is arranged on one side of the template body 21; the second panel 23 is arranged on the side of the first panel 22 away from the template body 21; the groove 3 is opened on the second panel 23.

[0043] In this embodiment, after the demoulding is completed, the exposed section 12 of the embedded reinforcement 1 is straightened into a horizontal shape.

[0044] In this embodiment, the template 2 is made of aluminum alloy. When in use, the template 2 is connected to the wall panel using pins and pin sheets.

[0045] In some other embodiments, the number and positions of the grooves 3 can be designed according to actual needs.

[0046] The above description is only a preferred embodiment of the present invention and does not limit the technical scope of the present invention. Therefore, any slight modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are still within the scope of the technical solution of the present invention.

Claims

1. A method for pre-embedded reinforcement-free construction in a structure, characterized in that: The following steps are involved: Step 1, processing the embedded reinforcement (1): processing the embedded reinforcement (1) into a formed shape according to the design requirements of the drawing; Step 2, processing the template (2): installing the processed embedded reinforcement (1) on the inner side of the template (2), wherein the embedded reinforcement (1) and the template (2) are detachably connected; Step 3, concrete pouring construction: connect the processed formwork (2) with the wall panel and then pour concrete; Step 4, removing the formwork (2): after the concrete solidifies, remove the formwork (2) and reuse the formwork (2).

2. The method for pre-embedded reinforcement-free construction in a structure according to claim 1, characterized in that: The embedded reinforcement (1) comprises an embedded section (11) and an exposed section (12) which are arranged vertically.

3. The method for pre-embedded reinforcement-free construction in a structure according to claim 2, characterized in that: The front end of the embedded section (11) on the embedded rib (1) is bent 180 degrees to form a hook (111).

4. The method for pre-embedded reinforcement-free construction in a structure according to claim 3, characterized in that: In step 3, the hook (111) at the front end of the embedded section (11) is fixedly connected to the structural steel bar.

5. The method for pre-embedded reinforcement-free construction in a structure according to claim 2, characterized in that: A groove (3) matching the exposed section (12) of the embedded reinforcement (1) is provided on the inner side surface of the template (2); the exposed section (12) of the embedded reinforcement (1) is embedded in the groove (3).

6. The method for pre-embedded reinforcement-free construction in a structure according to claim 2, characterized in that: After the demoulding is completed, the exposed section (12) of the embedded reinforcement (1) is straightened into a horizontal shape.

Citation Information

Patent Citations

  • Secondary structure constructional rebar embedding-free method

    CN111021768A