Super-large-area anti-cracking terrace structure and construction method

By using a combination technology of welding agent layer, leveling layer, floor layer and caulking in floor layer, the problems of hollowing, layering and cracks in traditional floor layer construction are solved, and high-precision and durable super-large area are achieved Anti-cracking floor structure simplifies the construction process and reduces maintenance costs.

CN118933302APending Publication Date: 2024-11-12CHINA CONSTR FOURTH ENG DIV CORP LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411203108.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Due to the poor bonding effect in traditional floor construction, hollowing, layering and cracking are prone to occur, which affects the appearance and quality of use.

Method used

Adopt an ultra-large area anti-cracking floor structure including welding agent layer, leveling layer, floor layer and caulking. Through the combination of high-strength polymer welding agent and fine stone concrete, combined with waterproof layer and caulking technology, the floor layer is ensured. High precision and durability.

Benefits of technology

The floor layer has been achieved without layers, no hollowing and zero cracking, which improves the simplicity and efficiency of construction, reduces post-maintenance costs, and ensures high precision and durability of the floor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933302A_ABST
    Figure CN118933302A_ABST
Patent Text Reader

Abstract

The invention provides an ultra-large-area anti-cracking terrace structure. The ultra-large-area anti-cracking terrace structure comprises a welding agent layer, a leveling layer, a terrace layer and a caulking joint. The welding agent layer is formed by brushing a welding agent on the floor which is treated to be clean; the leveling layer is obtained by pouring cement mortar into the welding agent layer for leveling; the terrace layer is obtained by pouring concrete on the leveling layer and then scattering a wear-resistant material; the caulking is obtained by arranging kerfs on the terrace layer and inlaying the filler between the kerfs. The construction method of the ultra-large-area anti-cracking terrace structure comprises the steps of base layer treatment, seam arrangement at the edges of the wall columns, pump wetting and erecting, welding agent layer and leveling layer construction, terrace layer manufacturing and maintenance, line snapping, seam cutting and seam filling. The durable terrace provided by the invention is free of cracking and layering phenomena, the precision can reach + / -3mm, the terrace is simple to construct, time-saving and labor-saving, a worker can operate the terrace easily, the constructed terrace layer is free of flaking, hollowing and cracking, and the later maintenance cost of the terrace is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of construction and decoration of building projects, and in particular to an ultra-large area anti-cracking floor structure and a construction method. Background Art

[0002] The quality of the factory floor construction directly affects the overall appearance, and the floor has always had various quality problems. In traditional practices, the use of cement slurry bonding layer does not have a good bonding effect, which will cause the floor to hollow and peel. After the floor is poured, cracks will occur due to problems such as concrete expansion and contraction and untimely maintenance. This greatly reduces the appearance and quality of the floor. In order to solve the above problems, ensure the effective bonding between the floor and the structural layer, and make high-precision control of data such as thickness and flatness, so that the floor has no peeling, no hollowing, and zero cracking, it is necessary to have a durable, crack-free and stratified floor structure layer with high precision. At the same time, the construction is simple, time-saving and labor-saving, and the construction method that is easy for workers to operate can solve the problems of hollowing, peeling, and cracks in the floor, so as to meet the use requirements. Summary of the invention

[0003] In order to solve the above problems, the purpose of the present invention is to provide an ultra-large area anti-cracking floor structure and construction method which is durable, will not crack or delaminate, has high precision, is simple to construct, saves time and effort, and is easy for workers to operate.

[0004] The purpose of the present invention is achieved through the following technical solutions: A super-large area anti-cracking floor structure, characterized in that it includes a welding agent layer, a leveling layer, a floor layer and caulking; the welding agent layer is formed by brushing welding agent on a clean floor surface; the leveling layer is obtained by pouring cement mortar on the welding agent layer for leveling; the floor layer is obtained by pouring concrete on the leveling layer and then sprinkling wear-resistant material; the caulking is obtained by setting cuts on the floor layer and inlaying fillers between the cuts.

[0005] Furthermore, the welding agent layer is formed by brushing a high-strength polymer welding agent on the cleaned floor surface.

[0006] Furthermore, the floor layer is formed by pouring fine stone concrete and spreading 2-3 mm thick non-metallic wear-resistant material on top.

[0007] Furthermore, the caulking is obtained by cutting slits at a certain distance on the floor layer and embedding filling materials between the slits.

[0008] Furthermore, the filler is asphalt paste.

[0009] Furthermore, in another structure of the present invention, the ultra-large area anti-cracking floor structure also includes a waterproof layer arranged between the leveling layer and the floor layer; the waterproof layer includes a waterproof coating and a non-woven fabric; after the leveling layer is formed, the waterproof coating is first brushed on the leveling layer, and then the non-woven fabric is laid to form a waterproof layer, and then the floor layer is poured on the waterproof layer.

[0010] Furthermore, in another structure of the present invention, the ultra-large area anti-cracking floor structure also includes an anti-cracking layer; the anti-cracking layer includes a concrete cushion layer and a rammed soil base layer; the anti-cracking layer is arranged below the welding agent layer, and before the welding agent layer is applied, the original landform is first rammed to form a rammed soil base layer, and then a concrete cushion layer is poured on the rammed soil base layer to obtain an anti-cracking layer, and then a welding agent layer, a leveling layer, a waterproof layer, a floor layer and caulking are sequentially arranged on the concrete cushion layer.

[0011] A construction method for a super-large area anti-cracking floor structure comprises the following steps: S1. Base treatment: Make the ground rough and clean it.

[0012] S2. Set seams at the edge of wall columns: Set expansion joints at the lower edge of wall columns, and paste extruded polystyrene boards. The width of the extruded polystyrene boards is 2-3mm, and the elevation is 2-3mm higher than the floor layer.

[0013] S3. Wet pump: The base is fully clean and moist without any water accumulation, and the pump is ready for concrete pouring; S4. Construction of welding agent layer and leveling layer: Apply 1-2mm thick high-strength polymer welding agent evenly without aggregation and flow to form a welding agent layer; pour cement mortar on the welding agent layer for leveling to form a leveling layer.

[0014] S5. Make the floor layer: After the leveling is completed, pour fine stone concrete on the leveling layer, sprinkle 2-3mm thick wear-resistant material, pour concrete for leveling and smoothing to make the floor layer.

[0015] S6. Maintenance, marking, cutting and filling of seams: Within 24 hours after the completion of the floor layer, water it for maintenance and keep it moist. People are allowed to walk on it only after the compressive strength reaches 5MPa. After it is walkable, mark the lines and cut. Use a handheld cutting machine to cut the inner corners of the wall columns. Clean the mud in the seams in time during the cutting process, and clean the extruded polystyrene boards pasted under the wall columns. After cutting the seams, cover them with a film in time and continue to water them for maintenance. The maintenance time should be no less than 7d. When the age is reached, fill the seams with asphalt paste to form caulking.

[0016] In another construction method, a construction method of a super-large area anti-cracking floor structure is provided, comprising the following steps: S1. Base treatment: Make the ground rough and clean it.

[0017] S2. Set seams at the edge of wall columns: Set expansion joints at the lower edge of wall columns, and paste extruded polystyrene boards. The width of the extruded polystyrene boards is 2-3mm, and the elevation is 2-3mm higher than the floor layer.

[0018] S3. Wet pump: The base is fully clean and moist without any water accumulation, and the pump is ready for concrete pouring; S4. Construction of welding agent layer and leveling layer: Apply 1-2mm thick high-strength polymer welding agent evenly without aggregation and flow to form a welding agent layer; pour cement mortar on the welding agent layer for leveling to form a leveling layer.

[0019] S5. Make waterproof layer and floor layer: After leveling, first apply waterproof coating on the leveling layer, then lay non-woven fabric to form a waterproof layer, and then pour fine stone concrete on the waterproof layer, sprinkle 2-3mm thick wear-resistant material, pour concrete, level and finish, and make the floor layer.

[0020] S6. Maintenance, marking, cutting and filling of seams: Within 24 hours after the completion of the floor layer, water it for maintenance and keep it moist. People are allowed to walk on it only after the compressive strength reaches 5MPa. After it is walkable, mark the lines and cut. Use a handheld cutting machine to cut the inner corners of the wall columns. Clean the mud in the seams in time during the cutting process, and clean the extruded polystyrene boards pasted under the wall columns. After cutting the seams, cover them with a film in time and continue to water them for maintenance. The maintenance time should be no less than 7d. When the age is reached, fill the seams with asphalt paste to form caulking.

[0021] In another construction method, a construction method of a super-large area anti-cracking floor structure is provided, comprising the following steps: S1. Soil compaction: compact the original landform to form a soil compaction base, and then pour concrete on the soil compaction base to form a concrete cushion layer.

[0022] S2. Treatment of the base layer: After the concrete base layer solidifies, the ground surface shall be roughened and cleaned.

[0023] S3. Wet pump: The concrete cushion layer must be fully clean and moist without any water accumulation. The pump is ready for concrete pouring.

[0024] S4. Construction of welding agent layer and leveling layer: Apply 1-2mm thick high-strength polymer welding agent evenly without aggregation and flow to form a welding agent layer; pour cement mortar on the welding agent layer for leveling to form a leveling layer.

[0025] S5. Make waterproof layer and floor layer: After leveling, first apply waterproof coating on the leveling layer, then lay non-woven fabric to form a waterproof layer, and then pour fine stone concrete on the waterproof layer, sprinkle 2-3mm thick wear-resistant material, pour concrete, level and finish, and make the floor layer.

[0026] S6. Maintenance, marking, cutting and filling of seams: Within 24 hours after the completion of the floor layer, water it for maintenance and keep it moist. People are allowed to walk on it only after the compressive strength reaches 5MPa. After it is walkable, mark the lines and cut. Use a handheld cutting machine to cut the inner corners of the wall columns. Clean the mud in the seams in time during the cutting process, and clean the extruded polystyrene boards pasted under the wall columns. After cutting the seams, cover them with a film in time and continue to water them for maintenance. The maintenance time should be no less than 7d. When the age is reached, fill the seams with asphalt paste to form caulking.

[0027] The beneficial effects of the present invention are: The present invention provides a durable floor which will not crack or delaminate, with an accuracy of ±3mm. The floor construction is simple, time-saving and labor-saving, and workers can operate it easily. The completed floor layer has no delamination, no hollowing, and zero cracking, and the subsequent maintenance costs of the floor are reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] The present invention will be further described in detail below in conjunction with the accompanying drawings.

[0029] Figure 1 This is a schematic structural diagram of the ultra-large area anti-cracking floor structure described in Example 1 of the present invention.

[0030] Figure 2 This is a schematic structural diagram of the ultra-large area anti-cracking floor structure described in Example 2 of the present invention.

[0031] Figure 3 This is a schematic structural diagram of the ultra-large area anti-cracking floor structure described in Example 2 of the present invention.

[0032] Figure 4 The present invention is a process flow chart for construction using the ultra-large area anti-cracking floor structure described in Example 1.

[0033] Figure 5 The present invention is a process flow chart for construction using the ultra-large area anti-cracking floor structure described in Example 2.

[0034] Figure 6 The present invention is a process flow chart for construction using the ultra-large area anti-cracking floor structure described in Example 3.

[0035] As shown in the figure: 1-welding agent layer, 2-leveling layer, 3-floor layer, 4-caulking, 5-floor, 6-waterproof coating, 7-non-woven fabric, 8-concrete cushion layer, 9-soil rammed base. DETAILED DESCRIPTION

[0036] The following is an explanation of the implementation of the present invention by specific specific embodiments. People familiar with the technology can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0037] It should be noted that the structures, proportions, sizes, etc. drawn in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no substantial technical significance. Any modification of the structure, change of the proportional relationship or adjustment of the size should still fall within the scope of the technical content disclosed by the present invention without affecting the effects and purposes that can be achieved by the present invention. At the same time, the terms such as "upper", "lower", "left", "right", "middle" and so on quoted in this specification are only for the convenience of description, and are not used to limit the scope of the implementation of the present invention. The change or adjustment of their relative relationship should also be regarded as the scope of the implementation of the present invention without substantially changing the technical content.

[0038] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances. It should be noted that the terms "include", "comprise" or any other variants are intended to cover non-exclusive inclusion, so that a process, method, article or device that includes a series of elements includes not only those elements, but also includes other elements that are not explicitly listed, or also includes elements inherent to such process, method, article or device. Example 1

[0039] like Figure 1 As shown, this embodiment provides a large-area anti-cracking floor structure, including a welding agent layer 1, a leveling layer 2, a floor layer 3 and a caulking 4. The floor structure is an anti-cracking floor structure layer without a waterproof layer on the floor.

[0040] The solder layer 1 is formed by applying a high-strength polymer solder on the cleaned floor surface 5 .

[0041] The leveling layer 2 is obtained by pouring cement mortar on the welding agent layer 1 for leveling.

[0042] The floor layer 3 is formed by pouring fine stone concrete and spreading 2-3 mm thick non-metallic wear-resistant material on top.

[0043] The caulking 4 is obtained by cutting slits at a certain distance on the floor layer 3 and embedding asphalt paste between the slits.

[0044] like Figure 3 As shown, the construction method of the ultra-large area anti-cracking floor structure described in this embodiment includes the following steps: S1. Base treatment: Make the ground rough and clean it. The specific steps are: roughen the ground base to make its surface rough, remove the dust, floating dust, floating slurry, etc. on the ground to make it clean, and use a high-pressure water gun to rinse it clean to wash away the fine loose gravel.

[0045] S2. Set seams at the edge of wall columns: Set expansion joints at the lower edge of wall columns, and paste extruded polystyrene boards. The width of the extruded polystyrene boards is 2-3mm, and the elevation is 2-3mm higher than the floor layer.

[0046] S3. Wet pump: The base layer must be fully clean and moist without any water accumulation. Set up the pump and prepare for concrete pouring.

[0047] S4. Construction of welding agent layer and leveling layer: evenly apply 1-2mm thick high-strength polymer welding agent without aggregation and flow to form welding agent layer 1; then pour cement mortar on welding agent layer 1 for leveling to form leveling layer 2.

[0048] S5. Making the floor layer: After the leveling is completed, pour fine stone concrete on the leveling layer 2, sprinkle 2-3mm thick wear-resistant material, pour concrete for leveling and finish finishing to make the floor layer 3.

[0049] in, The concrete pouring and leveling steps are as follows: during the concrete pouring process, a laser automatic leveling instrument is used to perform high-precision control on data such as thickness and flatness, and the bottom foot of the tripod supporting the instrument is set to a spherical shape to protect the finished product.

[0050] The finishing and plastering steps are as follows: before the initial setting, a wooden scraper is used to scrape the floor level according to the floor layer height. After the floor is scraped, it is immediately smoothed with a wooden trowel, and the operation is performed from the inside to the outside. The flatness is checked at any time with a laser automatic leveling instrument. After the wooden trowel is smoothed, an iron trowel is immediately used to press the first time until the slurry comes out; after the initial setting, when a person steps on it and there are footprints but it does not sink, an iron trowel is used to press the second time, and the pits and concave parts are filled while pressing, and it is required that there is no leakage, and the surface is flattened and polished; before the final setting, a third time of polishing is performed (there are slight footprints when a person steps on it), and when there are no more smearing marks when the iron trowel is used, the iron trowel is used to flatten, compact and polish all the smearing marks left by the second time of smearing; S6. Maintenance, marking, cutting and filling of seams: Within 24 hours after the completion of the floor layer 3, watering and maintenance are carried out (after cutting, cover with film) to keep it moist. People are allowed to walk on it only after the compressive strength reaches 5MPa; after it is walkable, marking and cutting are carried out, and the inner corners of the wall columns are cut with a handheld cutting machine. During the cutting process, the mud in the seams is cleaned in time, and the extruded polystyrene boards pasted under the wall columns are cleaned; after cutting, the film is covered in time and watering and maintenance are continued. The curing time is not less than 7d. When the age is reached, fill the seams with asphalt paste to form caulking 4, completing the construction of the ultra-large area anti-cracking floor structure. Example 2

[0051] like Figure 2 As shown, this embodiment provides a large-area anti-cracking floor structure, including a welding agent layer 1, a leveling layer 2, a floor layer 3, a caulking 4 and a waterproof layer. The floor structure is a floor anti-cracking floor structure layer including a waterproof layer.

[0052] The solder layer 1 is formed by applying a high-strength polymer solder on the cleaned floor surface 5 .

[0053] The leveling layer 2 is obtained by pouring cement mortar on the welding agent layer 1 for leveling.

[0054] The floor layer 3 is formed by pouring fine stone concrete and spreading 2-3 mm thick non-metallic wear-resistant material on top.

[0055] The caulking 4 is obtained by cutting slits at a certain distance on the floor layer 3 and embedding asphalt paste between the cut slits.

[0056] The waterproof layer is arranged between the leveling layer 2 and the floor layer 3, and the waterproof layer includes a waterproof coating 6 and a non-woven fabric 7; after the leveling layer 2 is formed, the waterproof coating 6 is firstly brushed on the leveling layer 2, and then the non-woven fabric 7 is laid to form a waterproof layer, and then the floor layer 3 is poured on the waterproof layer.

[0057] like Figure 4 As shown, the construction method of the ultra-large area anti-cracking floor structure described in this embodiment includes the following steps: S1. Base treatment: Make the ground rough and clean it. The specific steps are: roughen the ground base to make it rough, remove the dust, floating dust, floating slurry, etc. on the ground to make it clean, and use a high-pressure water gun to wash it clean to wash away the fine loose gravel; S2. Set seams at the edge of wall columns: Set expansion joints at the lower edge of wall columns, and paste extruded polystyrene boards. The width of the extruded polystyrene boards is 2-3mm, and the elevation is 2-3mm higher than the floor layer.

[0058] S3. Wet pump: The base is fully clean and moist without any water accumulation, and the pump is ready for concrete pouring; S4. Construction of welding agent layer and leveling layer: evenly apply 1-2mm thick high-strength polymer welding agent without aggregation and flow to form welding agent layer 1; pour cement mortar on welding agent layer 1 for leveling to form leveling layer 2.

[0059] S5. Make waterproof layer and floor layer: After leveling, first apply waterproof coating 6 on the leveling layer 2, then lay non-woven fabric 7 to form a waterproof layer, and then pour fine stone concrete on the waterproof layer, sprinkle 2-3mm thick wear-resistant material, pour concrete, level and finish, and make the floor layer 3.

[0060] The concrete pouring and leveling steps are as follows: during the concrete pouring process, a laser automatic leveling instrument is used to perform high-precision control on data such as thickness and flatness, and the bottom foot of the tripod supporting the instrument is set to a spherical shape to protect the finished product.

[0061] The steps for finishing and plastering are: before the initial setting, use a wooden scraper to scrape the floor layer at the height. After scraping, immediately use a wooden trowel to smooth it, working from the inside to the outside, and use a laser automatic leveling instrument to check its flatness at any time. After smoothing with the wooden trowel, immediately use an iron trowel to press it for the first time until the slurry comes out; after the initial setting, when people step on it and there are footprints but it does not sink, use an iron trowel to press it for the second time, filling the pits and depressions while pressing, requiring that no pressure is left, and the surface is flattened and polished; before the final setting, carry out the third polishing (there are slight footprints when people step on it), when there are no more smear marks after smearing with the iron trowel, use the iron trowel to flatten, compact and polish all the smear marks left by the second smearing.

[0062] S6. Maintenance, marking, cutting and filling of seams: Within 24 hours after the completion of the floor layer 3, water it for maintenance (after cutting, cover it with a film) to keep it moist. People are allowed to walk on it only after the compressive strength reaches 5MPa. After it is walkable, mark the lines and cut. Use a handheld cutting machine to cut the inner corners of the wall columns. During the cutting process, clean the mud in the seams in time, and clean the extruded polystyrene boards pasted under the wall columns. After cutting the seams, cover them with a film in time and continue to water them for maintenance. The maintenance time should be no less than 7d. When the age is reached, fill the seams with asphalt paste to form caulking 4. Example 3

[0063] like Figure 3 As shown, this embodiment provides a large-area anti-cracking floor structure, including a welding agent layer 1, a leveling layer 2, a floor layer 3, a caulking 4, a waterproof layer and an anti-cracking layer. The floor structure is a floor structure layer containing a waterproof layer and an anti-cracking floor structure.

[0064] The solder layer 1 is formed by applying a high-strength polymer solder on the cleaned floor surface 5 .

[0065] The leveling layer 2 is obtained by pouring cement mortar on the welding agent layer 1 for leveling.

[0066] The floor layer 3 is formed by pouring fine stone concrete and spreading 2-3 mm thick non-metallic wear-resistant material on top.

[0067] The caulking 4 is obtained by cutting slits at a certain distance on the floor layer 3 and embedding asphalt paste between the slits.

[0068] The waterproof layer is arranged between the leveling layer 2 and the floor layer 3, and the waterproof layer includes a waterproof coating 6 and a non-woven fabric 7; after the leveling layer 2 is formed, the waterproof coating 6 is firstly brushed on the leveling layer 2, and then the non-woven fabric 7 is laid to form a waterproof layer, and then the floor layer 3 is poured on the waterproof layer.

[0069] The anti-cracking layer includes a concrete cushion layer 8 and a rammed soil base layer 9; the anti-cracking layer is arranged below the welding agent layer 1. Before applying the welding agent layer 1, the original landform is first rammed to form a rammed soil base layer 9, and then the concrete cushion layer 8 is poured on the rammed soil base layer 9 to obtain the anti-cracking layer, and then the welding agent layer 1, the leveling layer 2, the waterproof layer, the floor layer 3 and the caulking 4 are arranged in sequence on the concrete cushion layer 8.

[0070] like Figure 6 As shown, the construction method of the ultra-large area anti-cracking floor structure described in this embodiment includes the following steps: S1. Soil tamping: The original landform is compacted by mechanical equipment to form a soil tamping base 9, and then concrete is poured on the soil tamping base 9 to form a concrete cushion 8; S2. Cushion treatment: After the concrete cushion 8 solidifies, the ground is treated to a rough surface and cleaned; the ground cushion is roughened to make its surface rough, and the dust, floating dust, and slurry on the ground are removed to make it clean, and a high-pressure water gun is used to rinse it clean to wash away the fine loose gravel.

[0071] S3. Wet pump: The concrete cushion layer 8 is fully clean and moist without any water accumulation, and the pump is ready for concrete pouring.

[0072] S4. Construction of welding agent layer and leveling layer: evenly apply 1-2mm thick high-strength polymer welding agent without aggregation and flow to form welding agent layer 1; pour cement mortar on welding agent layer 1 for leveling to form leveling layer 2.

[0073] S5. Make waterproof layer and floor layer: After leveling, first apply waterproof coating 6 on the leveling layer 2, then lay non-woven fabric 7 to form a waterproof layer, and then pour fine stone concrete on the waterproof layer, sprinkle 2-3mm thick wear-resistant material, pour concrete, level and finish, and make the floor layer 3.

[0074] The concrete pouring and leveling steps are as follows: during the concrete pouring process, a laser automatic leveling instrument is used to perform high-precision control on data such as thickness and flatness, and the instrument is supported by a tripod with a spherical bottom foot to protect the finished product. The finishing and plastering steps are as follows: before the initial setting, use a wooden scraper to scrape the floor layer according to the height. After scraping, immediately use a wooden trowel to smooth it, and operate from the inside to the outside. Use a laser automatic leveling instrument to check its flatness at any time. After smoothing with the wooden trowel, immediately use an iron trowel to press the first time until the slurry comes out; after the initial setting, when people step on it and there are footprints but it does not sink, use an iron trowel to press the second time, and fill the pits and concave places while pressing. It is required that there are no leaks and the surface is flattened and polished; before the final setting, the third time of polishing is carried out (there are slight footprints when people step on it). When there are no more smear marks after smearing with the iron trowel, use the iron trowel to flatten, compact and polish all the smear marks left by the second time of smearing. S6. Maintenance, marking, cutting and filling of seams: Within 24 hours after the completion of the floor layer 3, water it for maintenance (after cutting, cover it with a film) to keep it moist. People are allowed to walk on it only after the compressive strength reaches 5MPa. After it is walkable, mark the lines and cut. Use a handheld cutting machine to cut the inner corners of the wall columns. During the cutting process, clean the mud in the seams in time, and clean the extruded polystyrene boards pasted under the wall columns. After cutting the seams, cover them with a film in time and continue to water them for maintenance. The maintenance time should be no less than 7d. When the age is reached, fill the seams with asphalt paste to form caulking 4.

[0075] Other aspects of the present invention that are not described in detail are all conventional techniques known to those skilled in the art.

[0076] It should be noted that the terms "comprises", "includes" or any other variations are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.

[0077] The protection scope of the present invention is not limited to the technical solutions disclosed in the specific implementation methods. Any modifications, equivalent replacements, improvements, etc. made to the above embodiments based on the technical essence of the present invention shall fall within the protection scope of the present invention.

Claims

1. A super large area anti-cracking floor structure, characterized by: The invention comprises a welding agent layer (1), a leveling layer (2), a floor layer (3) and a caulking (4); the welding agent layer (1) is formed by brushing welding agent on a clean floor surface (5); the leveling layer (2) is obtained by pouring cement mortar on the welding agent layer (1) for leveling; the floor layer (3) is obtained by pouring concrete on the leveling layer (2) and then sprinkling wear-resistant material; the caulking (4) is obtained by setting slits on the floor layer (3) and embedding filler between the slits.

2. The ultra-large area anti-cracking floor structure according to claim 1 is characterized in that: The welding agent layer (1) is formed by applying a high-strength polymer welding agent on a clean floor surface (5).

3. The ultra-large area anti-cracking floor structure according to claim 1 is characterized in that: The floor layer (3) is formed by pouring fine stone concrete and spreading 2-3 mm thick non-metallic wear-resistant material on top.

4. The ultra-large area anti-cracking floor structure according to claim 1 is characterized in that: The caulking (4) is obtained by cutting slits at a certain distance on the floor layer (3) and embedding a filling material between the slits.

5. The ultra-large area anti-cracking floor structure according to claim 4 is characterized in that: The filler is asphalt paste.

6. The ultra-large area anti-cracking floor structure according to any one of claims 1 to 5, characterized in that: It also includes a waterproof layer arranged between the leveling layer (2) and the floor layer (3); the waterproof layer includes a waterproof coating (6) and a non-woven fabric (7); after the leveling layer (2) is formed, the waterproof coating (6) is firstly applied on the leveling layer (2), and then the non-woven fabric (7) is laid to form the waterproof layer, and then the floor layer (3) is poured on the waterproof layer.

7. The ultra-large area anti-cracking floor structure according to claim 6 is characterized in that: The invention also comprises an anti-cracking layer; the anti-cracking layer comprises a concrete cushion layer (8) and a plain soil rammed base layer (9); the anti-cracking layer is arranged below the welding agent layer (1); before the welding agent layer (1) is applied, the original landform is first rammed to form a plain soil rammed base layer (9); then a concrete cushion layer (8) is poured on the plain soil rammed base layer (9) to obtain the anti-cracking layer; then a welding agent layer (1), a leveling layer (2), a waterproof layer, a floor layer (3) and a caulking (4) are sequentially arranged on the concrete cushion layer (8).

8. The construction method of the super-large area anti-cracking floor structure according to any one of claims 1 to 5, characterized in that: The following steps are involved: S1. Base treatment: Make the ground rough and clean it; S2. Set seams at the edge of the wall column: Set expansion joints at the lower edge of the wall column, and paste extruded polystyrene boards. The width of the extruded polystyrene boards is 2-3mm, and the elevation is 2-3mm higher than the floor layer; S3. Wet pump: The base is fully clean and moist without any water accumulation, and the pump is ready for concrete pouring; S4. Construction of welding agent layer and leveling layer: evenly apply 1-2 mm thick high-strength polymer welding agent without aggregation or flow to form a welding agent layer (1); pour cement mortar on the welding agent layer (1) for leveling to form a leveling layer (2); S5. Making the floor layer: After the leveling is completed, pour fine stone concrete on the leveling layer (2), sprinkle 2-3mm thick wear-resistant material, pour concrete, level and finish the surface to make the floor layer (3); S6. Maintenance, marking, cutting and sealing: Within 24 hours after the completion of the floor layer (3), water it for maintenance and keep it moist. People can walk on it only after the compressive strength reaches 5MPa. After it is walkable, mark it for cutting. The inner corners of the wall columns are cut with a handheld cutting machine. During the cutting process, the mud in the seams is cleaned in time, and the extruded polystyrene board pasted under the wall columns is cleaned. After cutting, cover the seams with a film in time and continue to water it for maintenance. The maintenance time is not less than 7 days. When the age is reached, fill the seams with asphalt paste to form caulking (4).

9. The construction method of the super-large area anti-cracking floor structure according to claim 6 is characterized in that: The following steps are involved: S1. Base treatment: Make the ground rough and clean it; S2. Set seams at the edge of the wall column: Set expansion joints at the lower edge of the wall column, and paste extruded polystyrene boards. The width of the extruded polystyrene boards is 2-3mm, and the elevation is 2-3mm higher than the floor layer; S3. Wet pump: The base is fully clean and moist without any water accumulation, and the pump is ready for concrete pouring; S4. Construction of welding agent layer and leveling layer: evenly apply 1-2 mm thick high-strength polymer welding agent without aggregation or flow to form a welding agent layer (1); pour cement mortar on the welding agent layer (1) for leveling to form a leveling layer (2); S5. Making waterproof layer and floor layer: After leveling, first apply waterproof coating (6) on the leveling layer (2), then lay non-woven fabric (7) to form a waterproof layer, and then pour fine stone concrete on the waterproof layer, sprinkle 2-3mm thick wear-resistant material, pour concrete, level and finish the surface to make the floor layer (3); S6. Maintenance, marking, cutting and sealing: Within 24 hours after the completion of the floor layer (3), water it for maintenance and keep it moist. People can walk on it only after the compressive strength reaches 5MPa. After it is walkable, mark it for cutting. The inner corners of the wall columns are cut with a handheld cutting machine. During the cutting process, the mud in the seams is cleaned in time, and the extruded polystyrene board pasted under the wall columns is cleaned. After cutting, cover the seams with a film in time and continue to water it for maintenance. The maintenance time is not less than 7 days. When the age is reached, fill the seams with asphalt paste to form caulking (4).

10. The construction method of the super-large area anti-cracking floor structure according to claim 7 is characterized in that: The following steps are involved: S1. Compacting the soil: compacting the original landform to form a compacted soil base (9), and then pouring concrete on the compacted soil base (9) to form a concrete cushion layer (8); S2. Pad treatment: After the concrete pad (8) solidifies, the ground is treated to a rough surface and cleaned; S3. Wet pump: The concrete cushion (8) is fully clean and moist without any water accumulation. The pump is ready for concrete pouring. S4. Construction of welding agent layer and leveling layer: evenly apply 1-2 mm thick high-strength polymer welding agent without aggregation or flow to form a welding agent layer (1); pour cement mortar on the welding agent layer (1) for leveling to form a leveling layer (2); S5. Making waterproof layer and floor layer: After leveling, first apply waterproof coating (6) on the leveling layer (2), then lay non-woven fabric (7) to form a waterproof layer, and then pour fine stone concrete on the waterproof layer, sprinkle 2-3mm thick wear-resistant material, pour concrete, level and finish the surface to make the floor layer (3); S6. Maintenance, marking, cutting and sealing: Within 24 hours after the completion of the floor layer (3), water it for maintenance and keep it moist. People can walk on it only after the compressive strength reaches 5MPa. After it is walkable, mark it for cutting. The inner corners of the wall columns are cut with a handheld cutting machine. During the cutting process, the mud in the seams is cleaned in time, and the extruded polystyrene board pasted under the wall columns is cleaned. After cutting, cover the seams with a film in time and continue to water it for maintenance. The maintenance time is not less than 7 days. When the age is reached, fill the seams with asphalt paste to form caulking (4).