Experimental method for plugging and killing well
By adjusting the characteristics of the simulated crack system and injecting drilling fluid and oil, combined with the data acquisition system, the performance of leak plugging agents in different types of cracks is evaluated, and the problem of insufficient simulation of crack characteristics in the existing technology is solved, and efficient blocking is achieved Leak performance evaluation and experimental efficiency improvement.
Patent Information
- Application Number
- CN202411012605.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-26
- Publication Date
- 2024-11-12
AI Technical Summary
The existing simulated leak plugging experimental devices are difficult to comprehensively evaluate the leak plugging performance of leak plugging agents in different types of crack environments, especially the simulation of features such as the height and geometric shape of the cracks.
An experimental method for plugging the leak-pressure well was designed. By adjusting the seam width, seam height and roughness of the simulated crack system, drilling fluid and oil are injected using the simulated wellbore flow system and the simulated formation system, so that the drilling fluid and oil are in the simulated cracks. The leakage occurs in the process and the target data is collected with the help of the data acquisition system, and the leakage plugging agent is added to evaluate its performance.
It achieves a comprehensive performance evaluation of leak plugging agents in different types of crack environments, improves experimental efficiency, visualizes the device, has strong pressure bearing capacity, and high measurement accuracy of flow and pressure, and is suitable for multi-condition simulation under complex conditions.
Smart Images

Figure CN118933736A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of drilling engineering, in particular to an experimental method for plugging leaks and killing wells. Background Art
[0002] In the process of oil and gas resource extraction, various types of well leakage problems are a major challenge that needs to be solved urgently. These well leakages mainly come from natural cracks in the formation or cracks caused by artificial fracturing. These cracks have different geometric dimensions, roughness and other characteristics, which bring great difficulties to the plugging operation.
[0003] Currently, there are experimental devices for simulating plugging, but they can only simulate cracks of different widths, and a small number can simulate cracks of different roughnesses. Other crack characteristics such as crack height and geometric shape are not involved, making it difficult to comprehensively evaluate the plugging performance of plugging agents under different types of crack environments. Summary of the invention
[0004] In view of the above problems or problems existing in the prior art, the present invention is proposed.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: an experimental method for plugging and killing wells, which comprises adjusting a simulated fracture system according to a preset value;
[0006] Injecting drilling fluid and oil into the simulated wellbore flow system and the simulated formation system, so that the drilling fluid and the oil leak and coexist in the simulated fracture system;
[0007] Add plugging agent to the simulated wellbore flow system and collect target data through the data acquisition system.
[0008] As a preferred solution of the experimental method for plugging and killing wells of the present invention, the simulated fracture system includes:
[0009] A connecting valve and a simulated fracture, wherein the connecting valve connects the simulated wellbore flow system and the simulated fracture, and two sides of the simulated fracture are respectively connected to the simulated wellbore flow system and the simulated formation system;
[0010] The simulated crack is composed of a cover plate, a transparent PVC plate, a metal pad and a back plate, wherein there is a ten-mm simulated crack space between the transparent PVC plate and the back plate.
[0011] As a preferred solution of the experimental method for plugging and killing wells of the present invention, the simulation of the wellbore flow system includes:
[0012] A simulated wellbore, a simulated drill pipe, a gas-liquid separator, a first liquid storage tank, a first screw pump and a first waste liquid tank, wherein the first screw pump connects the first liquid storage tank and the inlet end of the simulated drill pipe, the simulated drill pipe is arranged in the center of the simulated wellbore, the gas-liquid separator connects the first liquid storage tank and the inlet end of the simulated wellbore, and forms a flow circulation among the simulated drill pipe, the simulated wellbore and the first liquid storage tank.
[0013] As a preferred solution of the experimental method for plugging and killing wells of the present invention, the simulated formation system includes:
[0014] A simulated formation, a second liquid storage tank, a second screw pump, a gas air compressor, a pressure regulator and a second waste liquid tank, wherein the second screw pump is connected to the second liquid storage tank and the inlet end of the simulated formation, the gas air compressor is connected to the inlet end of the simulated formation, the pressure regulator is connected to the gas air compressor and the inlet end of the simulated formation, and the second waste liquid tank is connected to the bottom outlet end of the simulated formation.
[0015] As a preferred solution of the experimental method for plugging and killing wells of the present invention, the data acquisition system includes:
[0016] multiple gas flow meters, multiple liquid flow meters, multiple pressure gauges, high-speed cameras, and computers;
[0017] The gas flow meter includes a first gas flow meter, a second gas flow meter and a third gas flow meter, wherein the first gas flow meter is connected to the upper end of the gas-liquid separator, the second gas flow meter is arranged at the inlet end of the simulated formation, and the third gas flow meter is connected to the gas compressor and the inlet end of the simulated formation;
[0018] The liquid flow meter includes a first liquid flow meter, a second liquid flow meter, a third liquid flow meter and a fourth liquid flow meter, wherein the first liquid flow meter is connected to the lower end of the gas-liquid separator, the second liquid flow meter is connected to the first liquid storage tank and the inlet end of the simulated drill pipe, the third liquid flow meter is connected to the simulated wellbore and the simulated fracture, and the fourth liquid flow meter is connected to the simulated formation and the simulated fracture;
[0019] The pressure gauges include a first pressure gauge, a second pressure gauge, a third pressure gauge, a fourth pressure gauge, a fifth pressure gauge, a sixth pressure gauge, a seventh pressure gauge and an eighth pressure gauge, wherein the first pressure gauge and the second pressure gauge are respectively arranged at the upper and lower ends of the simulated wellbore, the seventh pressure gauge and the eighth pressure gauge are respectively arranged at the upper and lower ends of the simulated formation, and the third pressure gauge, the fourth pressure gauge, the fifth pressure gauge and the sixth pressure gauge are arranged at the upper and lower ends of the simulated fracture;
[0020] A high-speed camera is set up facing the simulated crack system.
[0021] As a preferred solution of the experimental method for plugging and killing wells of the present invention, wherein: adjusting the simulated fracture system according to the preset value includes:
[0022] Adjust the metal backing plate according to the preset seam width, seam height, crack geometry and roughness.
[0023] As a preferred solution of the experimental method for plugging and killing wells of the present invention, the method includes: injecting drilling fluid and oil into a simulated wellbore flow system and a simulated formation system so that the drilling fluid and oil leak and coexist in the simulated fracture system, including:
[0024] The first screw pump and the second screw pump are turned on to pump drilling fluid and oil into the simulated wellbore and simulated formation respectively. When the pressure is stable, the connecting valve is opened. Under the action of gravity displacement, the drilling fluid and oil leak and coexist in the simulated fracture.
[0025] As a preferred solution of the experimental method for plugging and killing wells of the present invention, a plugging agent is added to a simulated wellbore flow system, and target data is collected through a data acquisition system, including:
[0026] A plugging agent is added to the first liquid storage tank, and the plugging agent is pumped into the simulated wellbore along with the drilling fluid and flows into the simulated fracture. Target data is collected through the third liquid flow meter and the fourth liquid flow meter, and the third pressure gauge, the fourth pressure gauge, the fifth pressure gauge and the sixth pressure gauge.
[0027] As a preferred solution of the experimental method for plugging and killing wells of the present invention, the method further comprises: adding a plugging agent into a simulated wellbore flow system, collecting target data through a data acquisition system, and then:
[0028] Turn off the first screw pump and the second screw pump, and open the control system to release pressure and flow;
[0029] Control system, including stainless steel needle valve and ball valve;
[0030] The stainless steel needle valve comprises a first needle valve, a second needle valve and a third needle valve, wherein the second needle valve is a liquid pressure regulating valve;
[0031] The ball valves include a first ball valve, a second ball valve, a third ball valve, a fourth ball valve, a fifth ball valve, a sixth ball valve, a seventh ball valve and an eighth ball valve.
[0032] As a preferred solution of the experimental method for plugging and killing wells of the present invention, the control system is opened to release pressure and flow, including:
[0033] Open the fourth ball valve, the seventh ball valve and the eighth ball valve to release pressure and flow.
[0034] The beneficial effects of the present invention include: the width, height, geometry and roughness of cracks can be realistically simulated, and the plugging performance of plugging agents under different types of crack environments can be comprehensively evaluated. Furthermore, the plugging and well-pressuring experimental device of the present invention is visualized in the simulated crack part, and the plugging process and plugging effect of the plugging material in the crack can be observed by a high-speed camera. Moreover, the simulated crack part is simple and convenient to disassemble, install and change crack characteristics compared with existing devices, which greatly improves the efficiency of the experiment. In addition, the plugging and well-pressuring experimental device of the present invention has a strong pressure-bearing capacity, and a high accuracy in measuring flow and pressure, and can provide a hardware basis for multi-condition simulation under complex conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0036] Figure 1 Schematic diagram of the flow chart of the experimental method for plugging and well killing.
[0037] Figure 2 Schematic diagram of the structural connection of the experimental method for plugging leaks and killing wells.
[0038] Figure 3 Flow diagram for simulating the wellbore flow system.
[0039] Figure 4 Schematic diagram of the simulated crack structure.
[0040] Figure 5 Schematic diagram of simulating cracks of different heights.
[0041] Figure 6 Schematic diagram of simulating cracks with different geometric shapes. DETAILED DESCRIPTION
[0042] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0043] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0044] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0045] Example
[0046] Reference Figure 1 to Figure 6 , is an embodiment of the present invention, which provides an experimental method for plugging and killing a well, comprising:
[0047] S1. Adjust the simulated crack system 300 according to preset values.
[0048] Further, the simulated fracture system 300 includes,
[0049] The connecting valve 301 and the simulated fracture 302 are connected. The connecting valve 301 connects the simulated wellbore flow system 100 and the simulated fracture 302. The two sides of the simulated fracture 302 are respectively connected to the simulated wellbore flow system 100 and the simulated formation system 200.
[0050] It should be noted that the simulation wellbore flow system 100 can realize the actual drilling wellbore pressure conditions, and the simulation formation system 200 can realize the actual formation pressure conditions.
[0051] The simulated crack 302 is composed of a cover plate 302-1, a transparent PVC plate 302-2, a metal pad 302-3 and a back plate 302-4, wherein there is a ten millimeter simulated crack space 302-5 between the transparent PVC plate 302-2 and the back plate 302-4, and the cover plate 302-1 and the transparent PVC plate 302-2 have a high pressure bearing capacity.
[0052] Further, adjusting the simulated crack system 300 according to the preset value includes:
[0053] The metal pad 302 - 3 is adjusted according to the preset seam width, seam height, crack geometry and roughness.
[0054] It should be noted that, to simulate cracks of different widths: metal pads 302 - 3 of different widths are installed on the back plate 302 - 4 to change the width of the cracks;
[0055] Simulate cracks of different heights: Use small pads of different heights to install at the upper and lower ends of the back plate 302-4 to change the height of the middle crack area;
[0056] Simulate cracks of different geometric shapes: According to the actual crack shape, the pad is laser cut to the actual crack shape. The crack shape changes from the original rectangular body to the irregular shape of the actual crack. The width of the crack is changed by first using a complete pad;
[0057] Simulating cracks with different roughness: The metal pad 302-3 is subjected to sandblasting and scoring treatments, and the roughness of the cracks is changed by changing the sandblasting material and changing the shape, area and depth of the scratches.
[0058] In the present disclosure, the normal height of the simulated crack 302 is 40 cm, the width is 10 mm, and the crack width is 10 mm.
[0059] Use a 40cm high and 2mm wide pad to install on the back plate 302-4, and then use two 1cm high and 8mm wide pads to install on the upper and lower ends of the back plate 302-4. The middle crack area becomes a 38cm high and 8mm wide crack. First use a complete pad to change the crack width, and then use a small pad to change the crack height.
[0060] Use two 1cm high and 10mm wide pads to install on the upper and lower ends of the back plate 302-4, and the height of the middle crack area becomes 38cm. Use two 5cm high and 10mm wide pads to install on the upper and lower ends of the back plate 302-4, and the height of the middle crack area becomes 30cm.
[0061] Preferably, the present invention can realistically simulate the crack width, crack height, crack geometry and roughness of the crack 302, and can comprehensively evaluate the plugging performance of the plugging agent under different types of crack environments.
[0062] S2. Inject drilling fluid and oil into the simulated wellbore flow system 100 and the simulated formation system 200, so that the drilling fluid and oil leak out and coexist in the simulated fracture system 300.
[0063] Further, the simulated wellbore flow system 100 includes,
[0064] A simulated wellbore 101, a simulated drill pipe 102, a gas-liquid separator 103, a first liquid storage tank 104, a first screw pump 105 and a first waste liquid tank 106, wherein the first screw pump 105 connects the first liquid storage tank 104 and the inlet end of the simulated drill pipe 102, the simulated drill pipe 102 is arranged in the center of the simulated wellbore 101, and the gas-liquid separator 103 connects the first liquid storage tank 104 and the inlet end of the simulated wellbore 101, and forms a flow circulation among the simulated drill pipe 102, the simulated wellbore 101 and the first liquid storage tank 104.
[0065] It should be noted that the simulated wellbore 101 is made of stainless steel metal material with strong pressure bearing capacity, and the first liquid storage tank 104 is filled with plugging agent and drilling fluid.
[0066] Preferably, the first liquid storage tank 104 is provided with a stirring motor and a heating rod, which can not only prepare the drilling fluid directly in the liquid storage tank, but also heat the drilling fluid to simulate the temperature of the drilling fluid in the actual drilling wellbore.
[0067] Further, the simulated formation system 200 includes,
[0068] A simulated formation 201, a second liquid storage tank 203, a second screw pump 202, a gas compressor 204, a pressure regulator 205 and a second waste liquid tank 206, wherein the second screw pump 202 is connected to the second liquid storage tank 203 and the inlet end of the simulated formation 201, the gas compressor 204 is connected to the inlet end of the simulated formation 201, the pressure regulator 205 is connected to the gas compressor 204 and the inlet end of the simulated formation 201, and the second waste liquid tank 206 is connected to the bottom outlet end of the simulated formation 201.
[0069] It should be noted that the simulated stratum 201 is made of stainless steel metal material with strong pressure bearing capacity, and the second liquid storage tank 203 is filled with oil liquid, such as crude oil, diesel, etc.
[0070] Further, drilling fluid and oil are injected into the simulated wellbore flow system 100 and the simulated formation system 200, so that the drilling fluid and oil are leaked and coexist in the simulated fracture system 300, including:
[0071] The first screw pump 105 and the second screw pump 202 are turned on to pump drilling fluid and oil into the simulated wellbore 101 and the simulated formation 201 respectively. When the pressure is stable, the connecting valve 301 is opened. Under the action of gravity displacement, the drilling fluid and oil leak and coexist in the simulated fracture 302.
[0072] S3. Add plugging agent into the simulated wellbore flow system 100 and collect target data through the data acquisition system.
[0073] Furthermore, the data acquisition system comprises,
[0074] A plurality of gas flow meters, a plurality of liquid flow meters, a plurality of pressure gauges, a high-speed camera and a computer, wherein the computer is used for updating the flow meter and pressure gauge data in real time;
[0075] The gas flow meter includes a first gas flow meter Q1, a second gas flow meter Q2 and a third gas flow meter Q3, wherein the first gas flow meter Q1 is connected to the upper end of the gas-liquid separator 103, the second gas flow meter Q2 is arranged at the inlet end of the simulated formation 201, and the third gas flow meter Q3 is connected to the gas compressor 204 and the inlet end of the simulated formation 201;
[0076] The liquid flow meter includes a first liquid flow meter Y1, a second liquid flow meter Y2, a third liquid flow meter Y3 and a fourth liquid flow meter Y4, wherein the first liquid flow meter Y1 is connected to the lower end of the gas-liquid separator 103, the second liquid flow meter Y2 is connected to the first liquid storage tank 104 and the inlet end of the simulated drill pipe 102, the third liquid flow meter Y3 is connected to the simulated wellbore 101 and the simulated fracture 302, and the fourth liquid flow meter Y4 is connected to the simulated formation 201 and the simulated fracture 302;
[0077] The pressure gauges include a first pressure gauge PT1, a second pressure gauge PT2, a third pressure gauge PT3, a fourth pressure gauge PT4, a fifth pressure gauge PT5, a sixth pressure gauge PT6, a seventh pressure gauge PT7 and an eighth pressure gauge PT8, wherein the first pressure gauge PT1 and the second pressure gauge PT2 are respectively arranged at the upper and lower ends of the simulated wellbore 101, the seventh pressure gauge PT7 and the eighth pressure gauge PT8 are respectively arranged at the upper and lower ends of the simulated formation 201, and the third pressure gauge PT3, the fourth pressure gauge PT4, the fifth pressure gauge PT5 and the sixth pressure gauge PT6 are arranged at the upper and lower ends of the simulated fracture 302;
[0078] The high-speed camera is disposed facing the simulated fracture system 300 , wherein the high-speed camera captures the flow of liquid in the simulated fracture 302 in real time.
[0079] Furthermore, a plugging agent is added to the simulated wellbore flow system 100, and target data is collected through a data acquisition system, including:
[0080] A plugging agent is added to the first liquid storage tank 104, and the plugging agent is pumped into the simulated wellbore 101 along with the drilling fluid and flows into the simulated fracture 302. Target data is collected through the third liquid flow meter Y3 and the fourth liquid flow meter Y4, and the third pressure gauge PT3, the fourth pressure gauge PT4, the fifth pressure gauge PT5 and the sixth pressure gauge PT6. The plugging effect of the plugging agent is judged based on the collected target data.
[0081] It should be noted that when the plugging material completely blocks the crack, no flow will pass through the third flow meter and the fourth flow meter, and the pressure values of the third pressure gauge PT3, the fourth pressure gauge PT4, the fifth pressure gauge PT5 and the sixth pressure gauge PT6 return to the values before the connecting valve 301 is opened; if it is not completely blocked, the plugging effect of the plugging material is judged by the changes in the values of the third flow meter and the fourth flow meter and the third pressure gauge PT3, the fourth pressure gauge PT4, the fifth pressure gauge PT5 and the sixth pressure gauge PT6.
[0082] Preferably, the plugging effect of the plugging agent can be determined by observing the flow of liquid in the simulated crack 302 through the transparent PVC plate 302-2, and a high-speed camera can simultaneously capture the situation in the simulated crack 302 in real time, so that the effect of the plugging material in plugging the crack can be observed in more detail.
[0083] S4. Turn off the first screw pump 105 and the second screw pump 202, and open the control system to release pressure and flow.
[0084] Furthermore, after adding a plugging agent to the simulated wellbore flow system 100 and collecting target data through the data acquisition system, the method further includes:
[0085] Turn off the first screw pump 105 and the second screw pump 202, and open the control system to release pressure and flow;
[0086] Control system, including stainless steel needle valve and ball valve;
[0087] The stainless steel needle valve includes a first needle valve M1, a second needle valve M2 and a third needle valve M3, wherein the second needle valve M2 is a liquid pressure regulating valve, and the remaining needle valves are flow check valves;
[0088] The ball valves include a first ball valve N1, a second ball valve N2, a third ball valve N3, a fourth ball valve N4, a fifth ball valve N5, a sixth ball valve N6, a seventh ball valve N7 and an eighth ball valve N8.
[0089] Further, the control system is opened to release pressure and flow, including,
[0090] Open the fourth ball valve N4, the seventh ball valve N7 and the eighth ball valve N8 to release pressure and flow.
[0091] It should be noted that the fourth ball valve N4 and the seventh ball valve N7 are opened to discharge the liquid in the simulated wellbore 101 and the simulated formation 201 into the first waste liquid tank 106 and the second waste liquid tank 206, and the eighth ball valve N8 is opened to drain the residual liquid in the simulated fracture 302.
[0092] When in use, by changing the fracture width, fracture height, fracture geometry and roughness of the simulated fracture 302, steps S2 and S3 are repeated until the required plugging and well killing experiment is completed.
[0093] In summary, the beneficial effect of the experimental method for plugging and wellbore pressure of the present invention is that it can truly simulate the width, height, geometry and roughness of the crack 302, and can comprehensively evaluate the plugging performance of the plugging agent under different types of crack environments. Furthermore, the experimental device for plugging and wellbore pressure of the present invention is visualized in the simulated crack 302 part, and the plugging process and plugging effect of the plugging material in the crack can be observed by a high-speed camera. Moreover, the simulated crack 302 part is simple and convenient to disassemble, install and change the crack characteristics compared with the existing devices, which greatly improves the efficiency of the experiment. In addition, the experimental device for plugging and wellbore pressure of the present invention has a strong pressure-bearing capacity and a high accuracy in measuring flow and pressure, and can provide a hardware foundation for multi-condition simulation under complex conditions.
[0094] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. An experimental method for plugging and killing wells, characterized in that: include, Adjusting the simulated crack system (300) according to a preset value; Injecting drilling fluid and oil into the simulated wellbore flow system (100) and the simulated formation system (200), so that the drilling fluid and the oil leak and coexist in the simulated fracture system (300); A plugging agent is added to the simulated wellbore flow system (100), and target data is collected through a data collection system.
2. The experimental method for plugging and killing a well as claimed in claim 1, characterized in that: The simulated fracture system (300) comprises: A connecting valve (301) and a simulated fracture (302), wherein the connecting valve (301) connects the simulated wellbore flow system (100) and the simulated fracture (302), and two sides of the simulated fracture (302) are respectively connected to the simulated wellbore flow system (100) and the simulated formation system (200); The simulated crack (302) is composed of a cover plate (302-1), a transparent PVC plate (302-2), a metal pad (302-3) and a back plate (302-4), wherein a simulated crack space (302-5) of ten millimeters exists between the transparent PVC plate (302-2) and the back plate (302-4).
3. The experimental method for plugging and killing a well as claimed in claim 2, characterized in that: The simulated wellbore flow system (100) comprises: A simulated wellbore (101), a simulated drill pipe (102), a gas-liquid separator (103), a first liquid storage tank (104), a first screw pump (105) and a first waste liquid tank (106), wherein the first screw pump (105) connects the first liquid storage tank (104) and the inlet end of the simulated drill pipe (102), the simulated drill pipe (102) is arranged at the center of the simulated wellbore (101), and the gas-liquid separator (103) connects the first liquid storage tank (104) and the inlet end of the simulated wellbore (101), and forms a flow circulation among the simulated drill pipe (102), the simulated wellbore (101) and the first liquid storage tank (104).
4. The experimental method for plugging and killing a well as claimed in claim 3, characterized in that: The simulated formation system (200) comprises: A simulated formation (201), a second liquid storage tank (203), a second screw pump (202), a gas compressor (204), a pressure regulator (205) and a second waste liquid tank (206), wherein the second screw pump (202) is connected to the second liquid storage tank (203) and the inlet end of the simulated formation (201), the gas compressor (204) is connected to the inlet end of the simulated formation (201), the pressure regulator (205) is connected to the gas compressor (204) and the inlet end of the simulated formation (201), and the second waste liquid tank (206) is connected to the bottom outlet end of the simulated formation (201).
5. The experimental method for plugging and killing a well as claimed in claim 4, characterized in that: The data acquisition system comprises: multiple gas flow meters, multiple liquid flow meters, multiple pressure gauges, high-speed cameras, and computers; The gas flow meter comprises a first gas flow meter (Q1), a second gas flow meter (Q2) and a third gas flow meter (Q3), wherein the first gas flow meter (Q1) is connected to the upper end of the gas-liquid separator (103), the second gas flow meter (Q2) is arranged at the inlet end of the simulated formation (201), and the third gas flow meter (Q3) is connected to the gas compressor (204) and the inlet end of the simulated formation (201); The liquid flow meter comprises a first liquid flow meter (Y1), a second liquid flow meter (Y2), a third liquid flow meter (Y3) and a fourth liquid flow meter (Y4), wherein the first liquid flow meter (Y1) is connected to the lower end of the gas-liquid separator (103), the second liquid flow meter (Y2) is connected to the first liquid storage tank (104) and the inlet end of the simulated drill pipe (102), the third liquid flow meter (Y3) is connected to the simulated wellbore (101) and the simulated fracture (302), and the fourth liquid flow meter (Y4) is connected to the simulated formation (201) and the simulated fracture (302); The pressure gauges include a first pressure gauge (PT1), a second pressure gauge (PT2), a third pressure gauge (PT3), a fourth pressure gauge (PT4), a fifth pressure gauge (PT5), a sixth pressure gauge (PT6), a seventh pressure gauge (PT7) and an eighth pressure gauge (PT8), wherein the first pressure gauge (PT1) and the second pressure gauge (PT2) are respectively arranged at the upper and lower ends of the simulated wellbore (101), the seventh pressure gauge (PT7) and the eighth pressure gauge (PT8) are respectively arranged at the upper and lower ends of the simulated formation (201), and the third pressure gauge (PT3), the fourth pressure gauge (PT4), the fifth pressure gauge (PT5) and the sixth pressure gauge (PT6) are arranged at the upper and lower ends of the simulated fracture (302); The high-speed camera is arranged facing the simulated crack system (300).
6. The experimental method for plugging and killing a well as claimed in claim 5, characterized in that: The step of adjusting the simulated crack system (300) according to the preset value comprises: The metal backing plate (302-3) is adjusted according to the preset crack width, crack height, crack geometry and roughness.
7. The experimental method for plugging and killing a well as claimed in claim 6, characterized in that: The step of injecting drilling fluid and oil into the simulated wellbore flow system (100) and the simulated formation system (200) so that the drilling fluid and the oil coexist in the simulated fracture system (300) after leakage, comprises: The first screw pump (105) and the second screw pump (202) are turned on to pump drilling fluid and oil into the simulated wellbore (101) and the simulated formation (201) respectively. When the pressure is stable, the connecting valve (301) is opened. Under the action of gravity displacement, the drilling fluid and the oil leak and coexist in the simulated fracture (302).
8. The experimental method for plugging and killing a well as claimed in claim 7, characterized in that: The step of adding a plugging agent to the simulated wellbore flow system (100) and collecting target data through a data acquisition system includes: A plugging agent is added to the first liquid storage tank (104), and the plugging agent is pumped into the simulated wellbore (101) along with the drilling fluid, and flows into the simulated fracture (302), and target data is collected through the third liquid flow meter (Y3) and the fourth liquid flow meter (Y4), as well as the third pressure gauge (PT3), the fourth pressure gauge (PT4), the fifth pressure gauge (PT5) and the sixth pressure gauge (PT6).
9. The experimental method for plugging and killing a well as claimed in claim 8, characterized in that: After adding a plugging agent to the simulated wellbore flow system (100) and collecting target data through a data acquisition system, the method further includes: Turning off the first screw pump (105) and the second screw pump (202), and opening the control system to release pressure and flow; The control system includes a stainless steel needle valve and a ball valve; The stainless steel needle valve comprises a first needle valve (M1), a second needle valve (M2) and a third needle valve (M3), wherein the second needle valve (M2) is a liquid pressure regulating valve; The ball valves include a first ball valve (N1), a second ball valve (N2), a third ball valve (N3), a fourth ball valve (N4), a fifth ball valve (N5), a sixth ball valve (N6), a seventh ball valve (N7) and an eighth ball valve (N8).
10. The experimental method for plugging and killing a well as claimed in claim 9, characterized in that: The opening of the control system to release pressure and flow includes: The fourth ball valve (N4), the seventh ball valve (N7) and the eighth ball valve (N8) are opened to release pressure and flow.
