Ultrahigh-pressure fracturing pump valve box structure and machining method thereof

Through the chip design and soft nitriding treatment, the fatigue resistance and corrosion resistance of the fracturing pump and valve box are improved, and the problem of insufficient hardness and wear resistance in the existing technology is solved, which reduces maintenance costs and time. In the environment of ultra-high pressure oil and gas field.

CN118934596AInactive Publication Date: 2024-11-12YIANGYIN DAYI MASCH MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410973864.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing fracturing pump valve box has problems such as insufficient hardness, wear resistance, toughness and corrosion resistance in ultra-high pressure and ultra-deep oil well environments, resulting in easy scrapping, high maintenance costs and poor fatigue resistance.

Method used

Using the structure and processing method of the valve box of the pieced ultra-high pressure fracturing pump, the bushing is strengthened by cast steel materials and stainless steel, and the nitride layer is formed through soft nitriding treatment, which improves the fatigue resistance and corrosion resistance of the valve box and simplifies the Manufacturing process.

Benefits of technology

It reduces the overall scrapping risk caused by human error, reduces maintenance costs and time, and significantly improves the fatigue resistance, corrosion resistance and wear resistance of the valve box, and is suitable for harsh oil and gas field environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118934596A_ABST
    Figure CN118934596A_ABST
Patent Text Reader

Abstract

The invention discloses an ultrahigh pressure fracturing pump valve box structure and a machining method thereof.The valve box structure comprises at least one middle valve box, a left side valve box and a right side valve box, the middle valve box comprises a valve body, a liquid discharging cavity is vertically formed in the center of the top of the valve body, and a liquid inlet cavity coaxial and communicated with the liquid discharging cavity is formed in the center of the bottom of the valve body; a plunger cavity is formed in one side of the valve body, a reinforcing lining is further arranged in the plunger cavity, a gland sealing cavity communicated with the reinforcing lining is formed in the other side of the valve body, the reinforcing lining is communicated with the liquid discharging cavity and the liquid inlet cavity, a fixing cylinder communicated with the plunger cavity is fixedly connected to one side of the valve body, and a fixing panel is fixedly connected to one end of the fixing cylinder. The side face of the valve body is provided with a liquid high-pressure channel, and the high-pressure channel communicates with the liquid discharging cavity. The ultrahigh pressure fracturing pump valve box structure meets the ultrahigh pressure requirement, the fatigue resistance of the valve box is improved, the maintenance cost is reduced, and the manufacturing process is optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of fracturing pump production, and in particular to an ultra-high pressure fracturing pump valve box structure and a processing method thereof. Background Art

[0002] In the fracturing operation of deep wells and medium-deep wells in oil and gas fields, fracturing pumps are indispensable key equipment. As an important component of the fracturing pump, the performance of the valve box directly affects the effect and efficiency of the fracturing operation. At present, the fracturing pump valve boxes commonly used in the market are mostly made of stainless steel to meet the working requirements in high-pressure and high-corrosion environments. However, with the increasing number of ultra-high-pressure and ultra-deep oil wells, higher requirements are placed on the hardness, wear resistance, toughness and corrosion resistance of the fracturing pump valve box. However, this type of valve box still has many shortcomings in practical applications: the integral valve box is easy to scrap: due to the complex structure of the valve box, once human errors occur during heat treatment or machining, the entire valve box may be scrapped due to local defects, resulting in material waste and increased costs; high maintenance cost: when a cavity inside the valve box cracks, the valve box needs to be replaced as a whole instead of replacing a single damaged part, which not only increases the maintenance cost, but also prolongs the downtime; insufficient fatigue resistance: under ultra-high pressure, reciprocating, vibration and corrosive harsh working conditions, fatigue cracks are prone to occur inside the valve box, affecting its service life and safety. Summary of the invention

[0003] 1. Technical issues to be resolved

[0004] In view of the deficiencies in the prior art, the present invention provides an ultra-high pressure fracturing pump valve box structure and a processing method thereof, which meet ultra-high pressure requirements, improve the fatigue resistance of the valve box, reduce maintenance costs and optimize the manufacturing process.

[0005] (II) Technical solution

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: an ultra-high pressure fracturing pump valve box structure, comprising: at least one middle valve box, a left valve box and a right valve box, the left valve box is arranged on the left side of the leftmost middle valve box, the right valve box is arranged on the right side of the rightmost middle valve box, the middle valve box comprises a valve body, a liquid discharge cavity is vertically arranged in the top center of the valve body, a liquid inlet cavity is arranged in the bottom center of the valve body, which is coaxial with and connected to the liquid discharge cavity, a plunger cavity is arranged on one side of the valve body, and a pressure relief cavity is also arranged in the plunger cavity. A reinforced bushing, a gland sealing cavity connected to the reinforced bushing is provided on the other side of the valve body, the reinforced bushing is connected to the liquid discharge cavity and the liquid inlet cavity, a fixed cylinder connected to the plunger cavity is fixedly connected to one side of the valve body, a fixed panel is fixedly connected to one end of the fixed cylinder, an end cap is threadedly connected to one side of the fixed panel, a sealing assembly is provided between the end cap and the reinforced bushing, a liquid high-pressure channel is provided on the side of the valve body, the high-pressure channel is connected to the liquid discharge cavity, connecting seats are provided on both sides of the valve body, and an oil nozzle is provided on the surface of the fixed cylinder;

[0007] The internal structure of the left valve box and the right valve box is the same as that of the middle valve box. A fixing seat adapted to the connecting seat is provided on the side of the left valve box and the right valve box close to the middle valve box. Mounting screw holes are provided on the surface of the left valve box and the right valve box at positions corresponding to the liquid high-pressure channel.

[0008] The intermediate valve box, the left valve box and the right valve box are made of cast steel, the reinforced bushing is made of stainless steel, the surfaces of the plunger cavity, the liquid discharge cavity, the gland sealing cavity and the liquid inlet cavity are subjected to soft nitriding treatment to form a first nitriding layer, and the surface of the reinforced bushing is subjected to soft nitriding treatment to form a second nitriding layer;

[0009] The maximum diameters of the plunger cavity, the liquid discharge cavity, the gland sealing cavity and the liquid inlet cavity are less than 50% of the width of the valve body.

[0010] Preferably, a connection tube is provided on the surface of one side of the valve body and located at a position corresponding to the liquid high-pressure channel, and a connection groove adapted to the connection tube is provided on the surface of the other side of the valve body and located at a position corresponding to the liquid high-pressure channel.

[0011] Preferably, a first sealing groove is provided on the end surface of the connecting tube, and a second sealing groove is provided on the surface of the connecting tube.

[0012] Preferably, a left connecting cylinder adapted to the connecting groove is provided on one side of the left valve box, and a right connecting groove adapted to the connecting cylinder is provided on one side of the right valve box.

[0013] Preferably, the connecting seat and the fixing seat and adjacent connecting seats are fixedly connected by bolt assemblies.

[0014] Preferably, a positioning pin shaft is provided on one side of the valve body, a positioning pin hole matching the positioning pin shaft is provided on the other side of the valve body, a shaft matching the positioning pin hole is provided on one side of the left valve box, and a hole matching the positioning pin shaft is provided on one side of the right valve box.

[0015] Preferably, the reinforced bushing includes a fixed cylinder, a plunger sliding cavity is arranged inside the fixed cylinder, a mounting slope is arranged at one end of the fixed cylinder, a through hole perpendicular to the axial direction of the plunger sliding cavity is arranged on the surface of the fixed cylinder, and a guide slide is arranged on one side of the fixed cylinder.

[0016] A method for processing an ultra-high pressure fracturing pump valve box structure, comprising the following steps:

[0017] Step 1: Rough machining the forging blanks of the middle valve box, the left valve box and the right valve box respectively;

[0018] Step 2: Normalizing and tempering the valve box workpieces respectively;

[0019] Step 3: Finish the valve box workpiece in the machining center according to the preset size;

[0020] Step 4: Rough and finish the reinforced bushing according to the preset;

[0021] Step 5: Perform soft nitriding treatment on the inside of the valve box workpiece and perform soft nitriding treatment on the reinforced bushing;

[0022] Step 6: Cool down the reinforced bushing and then install it inside the valve box workpiece;

[0023] Step 7: Assemble the middle valve box, the left valve box and the right valve box as needed;

[0024] Step 8: After comprehensive inspection, qualified products are put into storage and shipped out of the factory.

[0025] Preferably, in step 2, normalizing includes primary normalizing: heating the workpiece to 750-800°C and keeping it warm for 60-120 minutes, taking it out of the furnace and cooling it to 200-300°C; secondary normalizing: heating the workpiece to 850-900°C and keeping it warm for 50-120 minutes, taking it out of the furnace and cooling it to 200-300°C; tertiary normalizing: heating the workpiece to 920-940°C and keeping it warm for 120-360 minutes, taking it out of the furnace and cooling it to 200-300°C;

[0026] The quenching and tempering treatment includes heating the forging to 870-890°C for 360-480 minutes, followed by quenching, and heating the forging to 620-660°C for 420-540 minutes and then tempering.

[0027] Preferably, the thickness of the nitrided layer after the soft nitriding treatment in step 5 is 0.1-0.8 mm.

[0028] (III) Beneficial effects

[0029] The present invention provides an ultra-high pressure fracturing pump valve box structure and a processing method thereof, which has the following beneficial effects:

[0030] (1) The valve box structure of this ultra-high pressure fracturing pump effectively reduces the risk of overall scrapping due to human error through the segmented valve box design, and improves production efficiency and material utilization; when the valve box is partially damaged, only the single-piece valve box at the corresponding part needs to be replaced, and there is no need to replace the entire valve box, which greatly reduces maintenance costs and time; by increasing the wall thickness of the valve box, the requirements of ultra-high pressure are met, and at the same time, a bushing structure is added inside the valve box and a nitride layer is formed on the surface, which significantly improves the fatigue resistance, corrosion resistance and wear resistance of the valve box, making it suitable for harsh oil and gas field environments.

[0031] (2) The processing method of the valve box structure of the ultra-high pressure fracturing pump simplifies the processing flow and reduces the production cost and processing difficulty by optimizing the heat treatment steps and parameters. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0033] Figure 2 The structure of the intermediate valve box of the present invention is shown in FIG. Figure 1 ;

[0034] Figure 3 The structure of the intermediate valve box of the present invention is shown in FIG. Figure 2 ;

[0035] Figure 4 is a cross-sectional view of the intermediate valve box of the present invention;

[0036] Figure 5 For the present invention Figure 2 Enlarged view of point A in the middle;

[0037] Figure 6 It is a schematic structural diagram of the reinforcing bushing of the present invention.

[0038] In the figure: 1-middle valve box, 2-left valve box, 3-right valve box, 4-valve body, 5-liquid discharge chamber, 6-fixed cylinder, 7-fixed panel, 8-oil nozzle, 9-end cover, 10-reinforced bushing, 101-fixed cylinder, 102-plunger sliding chamber, 103-mounting slope, 104-through hole, 105-guide slide, 11-pressure cover sealing chamber, 12-liquid inlet chamber, 13-liquid high-pressure channel, 14-sealing assembly, 15-connecting cylinder, 16-connecting groove, 17-first sealing groove, 18-second sealing groove, 19-positioning pin shaft, 20-positioning pin hole, 21-connecting seat, 22-mounting screw hole, 23-fixed seat. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] See also Figure 1-6 The present invention provides a technical solution: an ultra-high pressure fracturing pump valve box structure, comprising: at least one middle valve box 1, a left valve box 2 and a right valve box 3, the left valve box 2 is arranged on the left side of the leftmost middle valve box 1, and the right valve box 3 is arranged on the right side of the rightmost middle valve box 1. The slicing valve box design effectively reduces the overall scrap risk caused by human error, improves production efficiency and material utilization; when the valve box is partially damaged, only the single-piece valve box at the corresponding part needs to be replaced, without the need for overall replacement, which greatly reduces maintenance costs and time.

[0041] The intermediate valve box 1 includes a valve body 4, a liquid discharge chamber 5 is vertically arranged at the top center of the valve body 4, a liquid inlet chamber 12 is coaxial with and connected to the liquid discharge chamber 5 and is arranged at the bottom center of the valve body 4, a plunger chamber is arranged on one side of the valve body 4, a reinforcing bushing 10 is also arranged in the plunger chamber, the reinforcing bushing 10 includes a fixed cylinder 101, a plunger slide chamber 102 is arranged inside the fixed cylinder 101, a mounting inclined surface 103 is arranged at one end of the fixed cylinder 101, a through hole 104 perpendicular to the axial direction of the plunger slide chamber 102 is arranged on the surface of the fixed cylinder 101, and a guide slide bar 105 is arranged on one side of the fixed cylinder 101. By adding the reinforcing bushing 10 structure to the valve box, the fatigue resistance of the valve box is significantly improved and the service life is extended.

[0042] The other side of the valve body 4 is provided with a pressure cap sealing cavity 11 connected with the reinforced bushing 10, and the reinforced bushing 10 is connected with the liquid discharge cavity 5 and the liquid inlet cavity 12. One side of the valve body 4 is fixedly connected with a fixed cylinder 6 connected with the plunger cavity, and one end of the fixed cylinder 6 is fixedly connected with a fixed panel 7, which is connected with the power end through the fixed panel 7. One side of the fixed panel 7 is threadedly connected with an end cover 9, and a sealing assembly 14 is provided between the end cover 9 and the reinforced bushing 10. The sealing assembly 14 is used to seal the plunger. A liquid high-pressure channel 13 is provided on the side of the valve body 4, and the high-pressure channel 13 is connected with the liquid discharge cavity 5. Connecting seats 21 are provided on both sides of the valve body 4, and an oil nozzle 8 is provided on the surface of the fixed cylinder 6. The oil nozzle 8 lubricates the plunger to reduce friction and increase service life.

[0043] The internal structure of the left valve box 2 and the right valve box 3 is the same as the internal structure of the middle valve box 1. A fixing seat 23 adapted to the connecting seat 21 is provided on the side of the left valve box 2 and the right valve box 3 close to the middle valve box 1. Mounting screw holes 22 are provided on the surface of the left valve box 2 and the right valve box 3 at positions corresponding to the liquid high-pressure channel 13. Bolt assemblies are used to fix the connecting seat 21 and the fixing seat 23 and between adjacent connecting seats 21 to achieve connection between adjacent valve boxes.

[0044] The middle valve box 1, the left valve box 2 and the right valve box 3 are made of cast steel, the reinforced bushing 10 is made of stainless steel, the surfaces of the plunger cavity, the liquid discharge cavity 5, the pressure cover sealing cavity 11 and the liquid inlet cavity 12 are soft nitrided to form a first nitrided layer, and the surface of the reinforced bushing 10 is soft nitrided to form a second nitrided layer. The dense layer formed on the surface of the workpiece by soft nitriding effectively improves the corrosion resistance and wear resistance of the valve box, which is suitable for harsh oil and gas field environments.

[0045] The maximum diameters of the plunger cavity, the liquid discharge cavity 5, the gland sealing cavity 11 and the liquid inlet cavity 12 are less than 50% of the width of the valve body 4, increasing the overall wall thickness to meet the requirements of 175 MPa ultra-high pressure.

[0046] A connecting cylinder 15 is provided on the surface of one side of the valve body 4 and located at a position corresponding to the liquid high pressure channel 13, a connecting groove 16 adapted to the connecting cylinder 15 is provided on the surface of the other side of the valve body 4 and located at a position corresponding to the liquid high pressure channel 13, a first sealing groove 17 is provided on the end face of the connecting cylinder 15, a second sealing groove 18 is provided on the surface of the connecting cylinder 15, a left connecting cylinder adapted to the connecting groove 16 is provided on one side of the left valve box 2, and a right connecting groove adapted to the connecting cylinder 15 is provided on one side of the right valve box 3. A sealing ring is provided in the sealing groove, and the pressure on the sealing ring is reduced by the connecting cylinder 15, thereby improving the overall pressure resistance, and the double sealing arrangement improves the sealing performance.

[0047] A locating pin shaft 19 is provided on one side of the valve body 4, and a locating pin hole 20 adapted to the locating pin shaft 19 is provided on the other side of the valve body 4. A shaft adapted to the locating pin hole 20 is provided on one side of the left valve box 2, and a hole adapted to the locating pin shaft 19 is provided on one side of the right valve box 3, which facilitates positioning during directional installation and improves installation efficiency.

[0048] A method for processing an ultra-high pressure fracturing pump valve box structure, comprising the following steps:

[0049] Step 1: Rough machining the forging blanks of the middle valve box, the left valve box and the right valve box respectively;

[0050] Step 2: Normalizing and tempering the valve box workpieces respectively;

[0051] Step 3: Finish the valve box workpiece in the machining center according to the preset size;

[0052] Step 4: Rough and finish the reinforced bushing according to the preset;

[0053] Step 5: Perform soft nitriding treatment on the inside of the valve box workpiece and perform soft nitriding treatment on the reinforced bushing;

[0054] Step 6: Cool down the reinforced bushing and then install it inside the valve box workpiece;

[0055] Step 7: Assemble the middle valve box, the left valve box and the right valve box as needed;

[0056] Step 8: After comprehensive inspection, qualified products are put into storage and shipped out of the factory.

[0057] In step 2, normalizing includes primary normalizing: heating the workpiece to 750-800°C and keeping it for 60-120 minutes, taking it out of the furnace and cooling it to 200-300°C; secondary normalizing: heating the workpiece to 850-900°C and keeping it for 50-120 minutes, taking it out of the furnace and cooling it to 200-300°C; tertiary normalizing: heating the workpiece to 920-940°C and keeping it for 120-360 minutes, taking it out of the furnace and cooling it to 200-300°C;

[0058] The quenching and tempering treatment includes heating the forging to 870-890°C for 360-480 minutes, followed by quenching, and heating the forging to 620-660°C for 420-540 minutes and then tempering.

[0059] After the soft nitriding treatment in step 5, the thickness of the nitrided layer is 0.1-0.8 mm.

[0060] The soft nitriding treatment places the workpiece in a furnace and heats it to 820℃-840℃ for 12h-14h. The penetrant (such as ammonia and anhydrous ethanol) and the catalyst (such as CaCl2) are introduced to allow carbon atoms and nitrogen atoms to penetrate into the surface of the workpiece at the same time to form a nitride layer. This process can significantly improve the hardness, wear resistance and corrosion resistance of the workpiece surface.

[0061] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0062] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An ultra-high pressure fracturing pump valve box structure, comprising: At least one middle valve box (1), a left valve box (2) and a right valve box (3), wherein the left valve box (2) is arranged on the left side of the leftmost middle valve box (1), and the right valve box (3) is arranged on the right side of the rightmost middle valve box (1), characterized in that the middle valve box (1) comprises a valve body (4), a liquid discharge chamber (5) is vertically arranged at the top center of the valve body (4), a liquid inlet chamber (12) coaxial with and connected to the liquid discharge chamber (5) is arranged at the bottom center of the valve body (4), a plunger chamber is arranged on one side of the valve body (4), a reinforcing bushing (10) is also arranged in the plunger chamber, and a pressure relief valve (12) is arranged on the other side of the valve body (4) and communicates with the reinforcing bushing (10). The valve body (4) is provided with a sealing chamber (11), the reinforcing bushing (10) is connected to the liquid discharge chamber (5) and the liquid inlet chamber (12), one side of the valve body (4) is fixedly connected to a fixed cylinder (6) connected to the plunger chamber, one end of the fixed cylinder (6) is fixedly connected to a fixed panel (7), one side of the fixed panel (7) is threadedly connected to an end cover (9), a sealing assembly (14) is provided between the end cover (9) and the reinforcing bushing (10), a liquid high-pressure channel (13) is provided on the side of the valve body (4), the high-pressure channel (13) is connected to the liquid discharge chamber (5), connecting seats (21) are provided on both sides of the valve body (4), and an oil nozzle (8) is provided on the surface of the fixed cylinder (6); The internal structure of the left valve box (2) and the right valve box (3) is the same as the internal structure of the middle valve box (1); a fixing seat (23) adapted to the connecting seat (21) is provided on the side of the left valve box (2) and the right valve box (3) close to the middle valve box (1); and mounting screw holes (22) are provided on the surface of the left valve box (2) and the right valve box (3) at positions corresponding to the liquid high-pressure channel (13); The intermediate valve box (1), the left valve box (2) and the right valve box (3) are made of cast steel, the reinforcing bushing (10) is made of stainless steel, the surfaces of the plunger cavity, the liquid discharge cavity (5), the gland sealing cavity (11) and the liquid inlet cavity (12) are subjected to soft nitriding treatment to form a first nitriding layer, and the surface of the reinforcing bushing (10) is subjected to soft nitriding treatment to form a second nitriding layer; The maximum diameters of the plunger cavity, the liquid discharge cavity (5), the gland sealing cavity (11) and the liquid inlet cavity (12) are less than 50% of the width of the valve body (4).

2. The ultra-high pressure fracturing pump valve box structure according to claim 1, characterized in that: A connection tube (15) is provided on the surface of one side of the valve body (4) and located at a position directly corresponding to the liquid high-pressure passage (13), and a connection groove (16) adapted to the connection tube (15) is provided on the surface of the other side of the valve body (4) and located at a position directly corresponding to the liquid high-pressure passage (13).

3. The ultra-high pressure fracturing pump valve box structure according to claim 2, characterized in that: The end surface of the connecting tube (15) is provided with a first sealing groove (17), and the surface of the connecting tube (15) is provided with a second sealing groove (18).

4. The ultra-high pressure fracturing pump valve box structure according to claim 2, characterized in that: A left connecting cylinder adapted to the connecting groove (16) is provided on one side of the left valve box (2), and a right connecting groove adapted to the connecting cylinder (15) is provided on one side of the right valve box (3).

5. The ultra-high pressure fracturing pump valve box structure according to claim 1, characterized in that: The connecting seat (21) and the fixing seat (23) as well as adjacent connecting seats (21) are fixedly connected by bolt assemblies.

6. The ultra-high pressure fracturing pump valve box structure according to claim 1, characterized in that: A positioning pin shaft (19) is provided on one side of the valve body (4), a positioning pin hole (20) adapted to the positioning pin shaft (19) is provided on the other side of the valve body (4), a shaft adapted to the positioning pin hole (20) is provided on one side of the left valve box (2), and a hole adapted to the positioning pin shaft (19) is provided on one side of the right valve box (3).

7. The ultra-high pressure fracturing pump valve box structure according to claim 1, characterized in that: The reinforcing bushing (10) comprises a fixed cylinder (101), a plunger sliding cavity (102) is arranged inside the fixed cylinder (101), a mounting inclined surface (103) is arranged at one end of the fixed cylinder (101), a through hole (104) perpendicular to the axial direction of the plunger sliding cavity (102) is arranged on the surface of the fixed cylinder (101), and a guide slide bar (105) is arranged on one side of the fixed cylinder (101).

8. A method for processing an ultra-high pressure fracturing pump valve box structure according to any one of claims 1 to 7, characterized in that: The following steps are involved: Step 1: Rough machining the forging blanks of the middle valve box, the left valve box and the right valve box respectively; Step 2: Normalizing and tempering the valve box workpieces respectively; Step 3: Finish the valve box workpiece in the machining center according to the preset size; Step 4: Rough and finish the reinforced bushing according to the preset; Step 5: Perform soft nitriding treatment on the inside of the valve box workpiece and perform soft nitriding treatment on the reinforced bushing; Step 6: Cool down the reinforced bushing and then install it inside the valve box workpiece; Step 7: Assemble the middle valve box, the left valve box and the right valve box as needed; Step 8: After comprehensive inspection, qualified products are put into storage and shipped out of the factory.

9. The method for processing a valve box structure of an ultra-high pressure fracturing pump according to claim 8, characterized in that: In the step 2, the normalizing includes primary normalizing: heating the workpiece to 750-800°C and keeping it warm for 60-120 minutes, taking it out of the furnace and cooling it to 200-300°C; secondary normalizing: heating the workpiece to 850-900°C and keeping it warm for 50-120 minutes, taking it out of the furnace and cooling it to 200-300°C; tertiary normalizing: heating the workpiece to 920-940°C and keeping it warm for 120-360 minutes, taking it out of the furnace and cooling it to 200-300°C; The quenching and tempering treatment includes heating the forging to 870-890°C for 360-480 minutes, followed by quenching, and heating the forging to 620-660°C for 420-540 minutes and then tempering.

10. The method for processing an ultra-high pressure fracturing pump valve box structure according to claim 8, characterized in that: The thickness of the nitrided layer after the soft nitriding treatment in step 5 is 0.1-0.8 mm.