Construction method of comprehensive support for dense rib structure
The construction problems caused by the complexity of the dense rib structure are solved through BIM technology, and the construction process and cost control are achieved, and construction quality and safety are improved.
Patent Information
- Application Number
- CN202411078653.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-12
AI Technical Summary
The complex elevation system and interlaced rib arrangement method of dense rib structure have led to insufficient visualization, difficulty in coordination, cumbersome modification, inaccurate construction guidance, waste of materials and safety hazards in traditional two-dimensional deepening technology in construction.
BIM software is used to establish a three-dimensional model of dense rib structure and integrated bracket, conduct mechanical analysis and installation simulation, obtain a material list, and release support columns and control lines on site through measuring instruments, and install adjustment devices to achieve precise construction.
It improves the visualization, collaborative design and safety of construction, reduces rework and material waste, reduces construction risks and costs, and improves construction quality and economic benefits.
Smart Images

Figure CN118940379A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a construction method for a comprehensive bracket of a dense-rib structure. Background Art
[0002] In view of the complex elevation system of dense rib structure, staggered rib arrangement, large number of ribs and small size, the traditional two-dimensional deepening technology is used to deepen the support and hanger, and the construction defects are obvious. Specifically, there are the following defects: Insufficient visualization: It is difficult for two-dimensional drawings to intuitively display the structural relationship in three-dimensional space, which makes it difficult for designers and construction personnel to fully understand and predict the specific situation of the structure in actual construction. Coordination difficulties: In projects with multi-disciplinary collaboration, two-dimensional drawings are prone to information islands, and the communication and coordination between different disciplines are inefficient, which is prone to design conflicts and construction errors. Complicated modification: Once the design needs to be modified, the modification process of two-dimensional drawings is cumbersome, and often a large number of drawings need to be redrawn, which is time-consuming and labor-intensive. Inaccurate construction guidance: The construction guidance provided by two-dimensional drawings is relatively abstract, and construction personnel may have misunderstandings in actual operation, resulting in inaccurate construction and increasing the possibility of rework. Material waste: Due to the limitations of two-dimensional design, material estimation may be inaccurate, resulting in material waste and increasing project costs. Safety hazards: It is difficult to conduct detailed structural simulation analysis with two-dimensional design, and some key structural safety issues may be ignored, increasing safety risks during construction. Backward information management: The traditional two-dimensional drawing management method lacks effective information means, and the retrieval, update and sharing of project information are inefficient, which is not conducive to the modernization of project management; these are what technical personnel in this field do not want to see. Summary of the invention
[0003] In view of the above-mentioned problems, the present invention discloses a construction method for an integrated support for a dense-rib structure, so as to solve the problems in the prior art of the complex elevation system of the dense-rib structure, the staggered rib arrangement, the large number of ribs and the small size, which make the integrated support difficult to deepen and arrange.
[0004] A construction method for a comprehensive support of a dense rib structure, comprising:
[0005] Step S1, using BIM software to establish a three-dimensional model of the dense rib structure and the integrated support according to the construction drawings, and after inputting the structural parameter information, load condition information, and material property information of the integrated support into the BIM software, performing mechanical analysis and installation simulation on the dense rib structure, and obtaining a material list of the integrated support;
[0006] Step S2, providing materials required for the construction of the integrated support according to the material list;
[0007] Step S3, using a measuring instrument to release the positions and control lines of the support columns on the dense-rib structure according to the three-dimensional model and the construction drawings, and installing the support columns according to the released positions and control lines of the support columns;
[0008] Step S4, hoisting the crossbeam to the top of the support column, and after connecting it to the support column by bolts, installing diagonal braces on the support column and the crossbeam according to the designed angle;
[0009] Step S5, installing an adjustment device at the bottom of the support column and the end of the crossbeam, and after adjusting the height and position of the integrated support by the adjustment device so that the integrated support fits tightly with the dense-rib structure, fixing the integrated support.
[0010] In some of the embodiments, the BIM software is Revit software.
[0011] In some of the embodiments, the column is a seamless steel pipe.
[0012] In some embodiments, the crossbeam is an I-beam, and the I-beam is connected to the support column by bolts.
[0013] In some of the embodiments, the cross beam is a channel steel, and the channel steel is fixed to the support column by welding, and a back plate is welded at the weld.
[0014] In some of the embodiments, the diagonal brace is made of angle steel.
[0015] In some of the embodiments, the support columns, cross braces and diagonal braces are all made of Q355B steel.
[0016] In some of the embodiments, the measuring instrument is a total station, a theodolite or a laser level.
[0017] In some embodiments, in step S3, the step of installing the support column according to the position of the released support column and the control line includes:
[0018] Lifting the support column to the installation location and fixing it with temporary supports;
[0019] Using a level and a plumb line to adjust the verticality of the support column;
[0020] The bottom of the support column is welded to the structural embedded parts or fixed together with chemical anchor bolts.
[0021] In some of the embodiments, the adjusting device is an adjustable screw or a jack.
[0022] Compared with the prior art, the present invention has at least one of the following advantages or beneficial effects:
[0023] The present invention discloses a construction method for an integrated support for a dense-rib structure, which utilizes the advanced visualization, simulation analysis and collaborative design functions of BIM technology to achieve high efficiency, precision and cost control of the integrated support for the dense-rib structure from design to construction, while improving the safety and stability during construction, reducing construction risks and costs, and improving the construction quality and economic benefits of the entire construction project. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The present invention and its features, appearance and advantages will become more apparent by reading the detailed description of non-limiting embodiments with reference to the following drawings. The same reference numerals indicate the same parts in all the drawings. The drawings are not drawn to scale, and emphasis is placed on illustrating the subject matter of the present invention.
[0025] Figure 1 It is a flow chart of the construction method of the integrated support for the dense-rib structure in the embodiment of the present invention. DETAILED DESCRIPTION
[0026] The present invention is further described below with reference to the accompanying drawings and specific embodiments, but is not intended to be a limitation of the present invention.
[0027] like Figure 1 As shown, the present invention discloses a construction method for a comprehensive support for a dense rib structure. Specifically, the construction method comprises:
[0028] Step S1, using BIM software such as Revit software to accurately establish a three-dimensional model of the dense-rib structure and the integrated support according to the construction drawings (the three-dimensional model can also be called a BIM model), and after inputting the structural parameter information, load condition information, material properties and other related information of the integrated support into the BIM software, the dense-rib structure is subjected to mechanical analysis and installation simulation, and a material list of the integrated support is obtained.
[0029] In this embodiment, the three-dimensional model of the dense rib structure and the integrated support is established according to the construction drawings using BIM software, which has the following effects: Enhanced visualization: The three-dimensional model provided by BIM technology can more intuitively show the relationship between the integrated support and the dense rib structure, helping designers and construction personnel to better understand the complex structural layout. Improve design accuracy: BIM software can perform accurate dimensional measurement and spatial analysis to ensure that the design of the integrated support meets the precise requirements of the dense rib structure, and can achieve three-dimensional design-plane output. Promote collaborative work: The BIM platform allows multiple professional team members to collaborate on the same model, improve communication, reduce design conflicts, and improve work efficiency. Optimize the construction process: By simulating the construction process through BIM, potential problems can be foreseen and solved before actual construction, reducing on-site adjustments and rework. Reduce construction risks: BIM technology can perform structural analysis and simulation of the integrated support to ensure the safety of construction and reduce the risk of accidents. Reduce material waste: BIM models can help accurately calculate material requirements, reduce over-purchasing and waste, and reduce costs. Improve project management efficiency: As an information center, the BIM model can centrally manage project data, improve the efficiency of information retrieval and sharing, and improve project management level. Support sustainable development: BIM technology can help evaluate the environmental impact of support and hanger design and support sustainable design and construction practices.
[0030] Step S2, providing materials required for the construction of the integrated support according to the material list; the materials required for the construction of the integrated support specifically include support columns, cross braces, diagonal braces, high-strength bolts, etc.
[0031] Specifically, the above step S2 includes the step of making construction preparations, and the construction preparations are specifically as follows:
[0032] 1. Technical disclosure: Organize technical training for construction personnel, explain the 3D model, construction drawings and construction process in detail, and emphasize the key points and difficulties of construction to ensure that construction personnel understand the construction requirements.
[0033] 2. Material preparation: Provide the materials required for the construction of the comprehensive support according to the material list; specifically purchase the support materials and components that meet the requirements. The materials required for the construction of the comprehensive support include support columns, cross braces, diagonal braces, high-strength bolts, etc., and conduct quality inspections on the materials to ensure that the strength and size of the materials meet the design requirements.
[0034] 3. Tool preparation: Prepare construction tools and measuring instruments such as electric welders, cutting machines, wrenches, levels, total stations, etc., and calibrate and debug the tools and instruments to ensure their good performance.
[0035] Step S3, using a measuring instrument to lay out the positions and control lines of the support columns on the dense-rib structure according to the three-dimensional model and the construction drawings, and installing the support columns according to the laid out positions and control lines of the support columns.
[0036] Specifically, the above-mentioned measuring instrument is a total station, a theodolite or a laser level.
[0037] In an embodiment of the present invention, in the above step S3, after the positions and control lines of the support columns are released on the dense-rib structure, the step further includes measuring and marking the elevation control points of the support columns and using them as the reference for installing the support columns.
[0038] In an embodiment of the present invention, in step S3, the step of installing the support column according to the position of the released support column and the control line includes:
[0039] First, the support column is hoisted to the installation position and fixed with temporary supports; wherein the installation position of the support column is determined according to the position and control line of the support column released on the dense rib structure and the reference for the installation of the support column.
[0040] Secondly, use a level and plumb line to adjust the verticality of the support column to ensure that the deviation is within the allowable range.
[0041] Then, the bottom of the support column is welded to the structural embedded parts or fixed together with chemical anchors.
[0042] Step S4, hoist the beam to the top of the support column, and after connecting it to the support column with high-strength bolts, adjust the horizontality and spacing of the beam to meet the design requirements; then install the diagonal brace on the support column and the beam according to the design angle. Specifically, the diagonal brace is welded to the support column and the beam or connected with bolts, and the overall stability of the integrated support is checked again, and loose parts are tightened.
[0043] Step S5, installing an adjustment device at the bottom of the support column and the end of the crossbeam, and adjusting the height and position of the integrated support through the adjustment device so that the integrated support fits tightly with the dense-rib structure, and the elevation and levelness of each part meet the design requirements before fixing the integrated support.
[0044] Specifically, when the adjusted integrated bracket is finally fixed, the welding parts are fully welded and the weld quality is checked. The bolt connection parts are tightened to ensure reliable connection.
[0045] In a specific embodiment of the present invention, the adjusting device is an adjustable screw or a jack.
[0046] In a specific embodiment of the present invention, the support columns are made of high-strength seamless steel pipes, and the diameter and wall thickness of the support columns are determined according to the load-bearing requirements and spatial layout of the dense-rib structure. The crossbeam is made of I-beam or channel steel. If the I-beam is used, it must be connected to the support column by high-strength bolts to ensure the stability of the connection. When channel steel is used, the column and the channel steel need to be chamfered and butt-welded at 45°, and the back plate must be welded at the weld. The diagonal brace is made of angle steel to enhance the overall stability of the bracket. In addition, considering the environment and load-bearing requirements of the dense-rib structure, the material of the above-mentioned integrated bracket should have high strength, corrosion resistance and good welding performance. For example, the support columns, cross braces and diagonal braces are all Q355B steel.
[0047] Those skilled in the art should understand that those skilled in the art can implement variations by combining the prior art and the above embodiments, which will not be described in detail here. Such variations do not affect the essential content of the present invention, and will not be described in detail here.
[0048] The above describes the preferred embodiments of the present invention. It should be understood that the present invention is not limited to the above-mentioned specific embodiments, and the devices and structures that are not described in detail should be understood to be implemented in a common manner in the art; any technician familiar with the art can use the above-disclosed methods and technical contents to make many possible changes and modifications to the technical solutions of the present invention without departing from the scope of the technical solutions of the present invention, or modify them into equivalent embodiments of equivalent changes, which does not affect the essential content of the present invention. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solutions of the present invention are still within the scope of protection of the technical solutions of the present invention.
Claims
1. A construction method for a comprehensive support of a dense rib structure, characterized in that: include: Step S1, using BIM software to establish a three-dimensional model of the dense rib structure and the integrated support according to the construction drawings, and after inputting the structural parameter information, load condition information, and material property information of the integrated support into the BIM software, performing mechanical analysis and installation simulation on the dense rib structure, and obtaining a material list of the integrated support; Step S2, providing materials required for the construction of the integrated support according to the material list; Step S3, using a measuring instrument to release the positions and control lines of the support columns on the dense-rib structure according to the three-dimensional model and the construction drawings, and installing the support columns according to the released positions and control lines of the support columns; Step S4, hoisting the crossbeam to the top of the support column, and after connecting it to the support column by bolts, installing diagonal braces on the support column and the crossbeam according to the designed angle; Step S5, installing an adjustment device at the bottom of the support column and the end of the crossbeam, and after adjusting the height and position of the integrated support by the adjustment device so that the integrated support fits tightly with the dense-rib structure, fixing the integrated support.
2. The construction method for the integrated support of the dense rib structure according to claim 1, characterized in that: The BIM software is Revit software.
3. The construction method for the integrated support of the dense rib structure according to claim 1, characterized in that: The support column is a seamless steel pipe.
4. The construction method for the integrated support of the multi-rib structure according to claim 1, characterized in that: The crossbeam is an I-beam, and the I-beam is connected to the support column by bolts.
5. The construction method for the integrated support of the dense rib structure according to claim 1, characterized in that: The cross beam is a channel steel, and the channel steel is fixed to the support column by welding, and a back plate is welded at the weld.
6. The construction method for the integrated support of the dense rib structure according to claim 1, characterized in that: The diagonal brace is an angle steel.
7. The construction method for the integrated support of the dense rib structure according to claim 1, characterized in that: The support columns, cross braces and diagonal braces are all made of Q355B steel.
8. The construction method for the integrated support of the dense rib structure according to claim 1, characterized in that: The measuring instrument is a total station, a theodolite or a laser level.
9. The construction method for the integrated support of the multi-rib structure according to claim 1, characterized in that: In step S3, the step of installing the support column according to the position of the released support column and the control line includes: Lifting the support column to the installation location and fixing it with temporary supports; Using a level and a plumb line to adjust the verticality of the support column; The bottom of the support column is welded to the structural embedded parts or fixed together with chemical anchor bolts.
10. The construction method for the integrated support of the multi-rib structure according to claim 1, characterized in that: The adjusting device is an adjustable screw rod or a jack.