Maintenance method for prefabricated box girder body of high-speed railway
Through real-time monitoring and precise spraying technology, the problem of insufficient spraying of box girders on high-speed railways is solved, ensuring full coverage and wetness of box girders, improving structural strength and service life, and avoiding safety hazards.
Patent Information
- Application Number
- CN202411009448.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-07-25
AI Technical Summary
During the spray maintenance process, some areas are not fully wet due to blockage, damage, insufficient water pressure, etc. of the spray head during the spray maintenance process, resulting in cracks in dry areas, affecting structural strength and durability, and may cause safety hazards.
The first spray head is used to spray the side of the box girder, monitor and identify the dry area in real time, and plan the path on the guide rail assembly through the second spray head, accurately move to the dry area and spray wet, ensuring full coverage and efficient treatment.
It effectively solves the drying problem caused by insufficient spraying, improves the efficiency of water resource utilization, avoids beam body quality problems such as cracking and warping, and ensures the overall structural strength and service life of the box beam.
Smart Images

Figure CN118952431A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of maintenance or repair of railway track structure components, and in particular to a method for maintaining a prefabricated box girder for a high-speed railway. Background Art
[0002] The box girder is an important component of the high-speed railway bridge. Its quality and condition directly affect the safety and durability of the bridge. The concrete material needs to maintain appropriate humidity during the hardening process, and the impregnation treatment can form a protective layer on the surface of the box girder to resist the invasion of the external environment and extend the service life of the box girder. In addition, the moist concrete surface can effectively prevent moisture from entering the interior, reducing internal erosion and steel corrosion caused by moisture penetration.
[0003] The impregnation treatment of box girders is an important measure to ensure their structural integrity and extend their service life. Due to the large mass of box girders and their inconvenience in moving, the current impregnation treatment is mostly carried out by spraying the box girders to achieve the purpose of maintenance. However, since box girders are generally large, even small-span box girders generally have a span of 10 to 30 meters. During the spraying process, it is inevitable that some areas are not impregnated due to nozzle blockage, damage, insufficient water pressure and other reasons, and dry areas are prone to shrinkage cracks. These cracks not only affect the surface appearance, but more importantly, they may penetrate deep into the interior and weaken the overall structural strength of the box girder. The microcracks and pores on the surface of the dry area are more susceptible to environmental erosion, such as rainwater infiltration, freeze-thaw cycles, etc. These factors will accelerate the aging of concrete and the corrosion of steel bars, significantly reducing the durability of the box girder. The box girder may be partially damaged or collapsed during long-term use, forming a safety hazard, especially under heavy loads or extreme weather conditions. These hazards may cause serious safety accidents. Summary of the invention
[0004] The present application provides a method for maintaining prefabricated box girders for high-speed railways, thereby solving the problem in the prior art that some areas of the box girders are inevitably not wetted during the spraying process due to nozzle blockage, damage, insufficient water pressure, etc. The method monitors the dryness of the box girder body in real time and wets it in time, thereby ensuring that the dry areas on the sides of the girder body can be wetted in time and fully, avoiding quality problems of the girder body caused by drying, such as cracking, warping, etc., thereby greatly improving product quality.
[0005] The present application provides a method for maintaining a prefabricated box girder for a high-speed railway, including a method for maintaining the side surface, the upper surface, and the lower surface of the girder. The method for maintaining the side surface of the girder comprises the following steps: using a first spray head to spray the side surface of the box girder; obtaining an image covering the side surface area of the box girder, identifying a dry area in the image, and calculating the coordinates and area of the dry area; obtaining the coordinates (x p,y p ), obtain the coordinates of the center point of the second sprinkler head in the preset motion range coordinate system (x p ,y p )’s target coordinates (x m ,y m ), obtain the current position of the second sprinkler head, and plan the second sprinkler head to the target coordinate (x m ,y m ) moving path; controlling the nozzle to move to the corresponding coordinates along the path; and controlling the nozzle to spray when the nozzle reaches the corresponding coordinates to wet the dry area.
[0006] Furthermore, identifying the dry area in the image and recording the coordinates of the dry area specifically includes: preprocessing the image, including grayscale and filtering denoising; using a threshold segmentation method to segment the grayscale image into dry areas and wet areas to detect the edges of the dry areas and highlight the contours of the dry areas; using a contour detection algorithm to find the contours of the dry areas and filter out the non-dry areas; and calculating the pixel coordinates and area of the center point of each dry area.
[0007] Furthermore, the coordinates (x p ,y p )’s target coordinates (x m ,y m ) specifically includes: determining the range of the pixel coordinate system, recorded as (0,0) to (W p ,H p ), W p and H p Represent the width and height of the image respectively; determine the range of the preset motion range coordinate system, recorded as (0,0) to (W m ,H m ), W m and H m Respectively represent the width and height of the range of motion;
[0008] Calculate the conversion ratio from pixel coordinates to motion range coordinates, including the horizontal ratio S x The ratio S in the vertical direction y , Calculate the coordinates (x p ,y p )’s target coordinates (x m ,y m ), x m =x p ×S x ,y m =y p ×S y .
[0009] Furthermore, planning the path for the second shower head to move toward the target coordinates includes: marking the current position coordinate of the second shower head in the motion range coordinate system as (x c ,y c ), calculate the target coordinates (x m ,y m ) and the current position coordinates (x c ,y c ) between the horizontal and vertical differences Δx and Δy, Δx = x m -c x , Δy=y m -y c .
[0010] Furthermore, the second spray head is mounted on a guide rail assembly, which includes a horizontal guide rail and a vertical guide rail. A first lead screw and a second lead screw are installed inside the horizontal guide rail and the vertical guide rail, respectively. The first lead screw and the second lead screw have the same specifications, and the first lead screw and the second lead screw are both connected to a servo motor. When the first lead screw and the second lead screw rotate one circle, the movement increment of the second spray head is Δx respectively. s and Δy s .
[0011] Furthermore, the second shower head moves along the path to the corresponding coordinates of the rotation number c of the first lead screw and the second lead screw. x and c y They are:
[0012] Furthermore, the image is acquired once at a specified time interval.
[0013] Furthermore, the first spray head and the second spray head are both swing spray heads.
[0014] In the second aspect, the present application provides a system for maintaining a prefabricated box girder for a high-speed railway, which adopts the method for maintaining a prefabricated box girder for a high-speed railway as described in the first aspect, and includes: a first spray module, an image acquisition module, a path planning module, a target movement module and a second spray module.
[0015] The first spray module is used for the first spray head to spray the side of the box girder body; the image acquisition module is used to acquire an image covering the side area of the box girder body, identify the dry area in the image, and calculate the coordinates and area of the dry area; the path planning module is used to obtain the coordinates (x p ,y p ), obtain the coordinates of the center point of the second sprinkler head in the preset motion range coordinate system (x p ,y p)’s target coordinates (x m ,y m ), obtain the current position of the second sprinkler head, and plan the second sprinkler head to the target coordinate (x m ,y m ) moving path; the target moving module is used to control the second sprinkler head to move to the target coordinate (x) according to the path m ,y m ); The second spray module is used to move the second spray head to the target coordinate (x m ,y m ) when controlling the second sprinkler head to spray and thus wet the dry area.
[0016] In a third aspect, the present application provides a device for maintaining a prefabricated box girder for a high-speed railway, which comprises a memory and a processor; the memory is used to store a computer program; the processor is used to implement the steps of the method for maintaining a prefabricated box girder for a high-speed railway as in the first aspect when executing the computer program.
[0017] The technical solution provided by this application has at least the following technical effects or advantages:
[0018] Since the first spray head is used to spray the side of the box girder, the dry area is monitored and identified in real time, and the second spray head is promptly controlled to move to and infiltrate the dry area, the problem of some areas not being infiltrated due to nozzle blockage, damage, insufficient water pressure, etc. during the spraying process of the box girder is effectively solved. The utilization efficiency of water resources can be improved, and the quality problems of the beam body caused by drying, such as cracking and warping, are effectively avoided, thereby greatly improving the product quality and ensuring the efficient operation of the entire care process. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a flow chart of the method for maintaining the high-speed railway prefabricated box girder in this application;
[0020] Figure 2 This is a structural schematic diagram of the first spray head spraying the side of the box girder in this application;
[0021] Figure 3 Schematic diagram of the conversion of curved surface ab into plane AB in this application;
[0022] Figure 4 This is a schematic diagram of the structure when the second sprinkler head is installed on the guide rail assembly in this application;
[0023] Figure 5 It is a schematic diagram of the structure of the horizontal guide rail and the vertical guide rail in this application;
[0024] Figure 6This is a flow chart for planning a path for the second shower head to move toward the target coordinates in this application. DETAILED DESCRIPTION
[0025] The present application can monitor and identify the dry area of the box girder body during the spray curing process in real time, and timely control the second spray head to move to and infiltrate the dry area, which can improve the utilization efficiency of water resources and effectively avoid the quality problems of the beam body caused by drying, thereby greatly improving the product quality and ensuring the efficient operation of the entire care process.
[0026] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0027] Embodiment 1
[0028] like Figure 1 - Figure 6 As shown, this embodiment provides a method for maintaining a prefabricated box girder for a high-speed railway, including a maintenance method for the side surface of the girder, the upper surface of the girder, the lower surface of the girder, the girder end and the contact network.
[0029] The maintenance method of the side of the beam includes the following steps:
[0030] S100. Use the first spray head 1 to spray the side surface 5 of the box girder body.
[0031] The number of the first spray heads 1 is set to be multiple. Taking a 32-meter prefabricated box girder as an example, 8 are set on each side of the box girder to cover all areas of the outer web and flange plates of the box girder as much as possible. 6 are also set inside the box to spray and maintain the inner wall of the box.
[0032] S200. Acquire an image covering the area on the side surface 5 of the box girder body, identify the dry area in the image, and calculate the coordinates and area of the dry area.
[0033] like Figure 2 - Figure 3 As shown, the side surface 5 of the box girder body is a curved surface shown by ab, and a and b represent the upper and lower edges of the curved surface respectively. During spray curing, the curved surface ab can be equivalent to the plane AB, and A and B represent the upper and lower edges of the plane respectively. When the first spray head 1 sprays and cures the side surface 5 of the box girder body, if some areas are dry, such as the first spray head 1 is blocked or damaged, the water pressure is insufficient, etc., the dryness of the side surface 5 of the box girder body can be monitored in real time through the acquired images to ensure that the dry area can be found in time, providing accurate data support for subsequent infiltration treatment.
[0034] Identifying dry areas in an image and recording the coordinates of the dry areas specifically includes:
[0035] S210. Preprocess the image, including grayscale conversion and filtering to remove noise.
[0036] If the image of the box girder surface is a color image, the color image contains three channels RGB. Grayscale simplifies it into a single channel, thereby reducing processing complexity and focusing on brightness information. Grayscale images may contain noise. Filtering and denoising can make the image smoother and the edges more obvious. Gaussian filters can be used to smooth the image and reduce noise and detail interference.
[0037] S220. Use a threshold segmentation method to segment the grayscale image into a dry area and a wet area to detect the edge of the dry area and highlight the contour of the dry area.
[0038] The global threshold segmentation method can be used to segment the grayscale image into dry areas and wet areas. After filtering and denoising, it is easier to distinguish between bright dry and dark wet areas through threshold segmentation. The image after threshold segmentation has clearer edges, and the Canny edge detection can accurately find the edges of the dry area.
[0039] S230. Use a contour detection algorithm to find the contour of the dry area and filter out the non-dry area.
[0040] After edge detection, the image contains obvious boundaries of dry areas, which can be identified through contour detection. The areas identified by contour detection may contain noise. Through area or shape filtering, irrelevant areas can be removed and only important dry areas can be retained.
[0041] S240. Calculate the pixel coordinates and area of the center point of each dry area.
[0042] Calculate the bounding box of each dry area, obtain the coordinates of the four vertices of the bounding box, and then calculate the coordinates of the center point of each dry area based on the bounding box. Through contour detection, the boundaries of the dry area can be determined, so as to calculate the minimum rectangle surrounding these boundaries, that is, the bounding box, and the center point is the geometric center of the bounding box. After the coordinates of the four vertices of the bounding box are determined, the pixel coordinates of its center point can be calculated by geometric methods, and the contour obtained by contour detection can be used to calculate the area of each dry area. For example, the cv2.contourArea function in OpenCV can directly calculate the area of the area enclosed by the contour.
[0043] S300. Obtain the center coordinates (x p ,y p ), obtain the coordinates (x p ,y p )’s target coordinates (x m ,ym ), obtain the current position of the second spray head 2, and plan the second spray head 2 to the target coordinate (x m ,y m ) path along which the
[0044] By obtaining the coordinates of the center point of the largest dry area in the pixel coordinate system, the target coordinates of the second spray head 2 facing the center point in the preset motion range coordinate system are determined, and the movement path of the spray head is planned to achieve precise wetting treatment of the dry area.
[0045] Get the coordinates (x p ,y p )'s target coordinates ( x m,y m ) specifically include:
[0046] S310. Determine the range of the pixel coordinate system, recorded as (0,0) to (W p ,H p ), where W p and H p Represent the width and height of the image respectively; determine the range of the preset motion range coordinate system, recorded as (0,0) to (W m ,H m ), W m and H m Respectively represent the width and height of the range of motion;
[0047] S320. Calculate the conversion ratio from pixel coordinates to motion range coordinates, including the horizontal ratio S x The ratio S in the vertical direction y ,
[0048] S330. Calculate the coordinates (x p ,y p )’s target coordinates (x m ,y m ), x m =x p ×S x ,y m =y p ×S y .
[0049] Planning the path for the second spray head 2 to move toward the target coordinates includes: marking the current position coordinate of the second spray head 2 in the motion range coordinate system as (x c ,y c ), calculate the target coordinates (x m ,y m) and the current position coordinates (x c ,y c ) between the horizontal and vertical differences Δx and Δy, Δx = x m -x c , Δy=y m -y c .
[0050] By converting the preset motion range coordinate system and the image coordinate system, automatic positioning and path planning of the sprinkler head can be achieved, reducing manual intervention, improving the degree of automation and work efficiency of the operation. Accurate path planning can enable the sprinkler head to move to the target coordinates with the shortest path and the fastest speed, shortening the processing time, further improving the overall work efficiency, realizing dynamic adjustment of the sprinkler head, and flexibly responding to drying areas of different sizes and shapes, ensuring the comprehensiveness and uniformity of the infiltration treatment.
[0051] S400. Control the second spray head 2 to move to the target coordinate (x m ,y m ).
[0052] like Figure 4 - Figure 5 As shown, the second spray head 2 is installed on the guide rail assembly, which includes a horizontal guide rail 3 and a vertical guide rail 4. The first lead screw 31 and the second lead screw 41 are installed inside the horizontal guide rail 3 and the vertical guide rail 4 respectively. The first lead screw 31 and the second lead screw 41 have the same specifications, and the first lead screw 31 and the second lead screw 41 are both connected to the servo motor. When the first lead screw 31 and the second lead screw 41 rotate one circle, the movement increment of the second spray head 2 is Δx s and Δy s .
[0053] The second shower head 2 moves to the corresponding coordinate according to the path. The rotation number c of the first lead screw 31 and the second lead screw 41 x and c y They are:
[0054] A guide rail assembly is used to realize the movement of the second sprinkler head 2, wherein the vertical guide rail 4 can move along the horizontal guide rail 3, and the second sprinkler head 2 can move along the vertical guide rail 4. The horizontal guide rail 3 and the vertical guide rail 4 respectively control the horizontal and vertical movements of the sprinkler head, thereby accurately positioning the sprinkler head to achieve comprehensive coverage of the target area.
[0055] S500. Move to the target coordinate (x m ,y m ) when controlling the second spray head 2 to spray and thus wet the dry area.
[0056] The first spray head 1 and the second spray head 2 are both swinging spray heads, which can effectively increase the spraying range, and can intermittently obtain images of 5 areas on the side of the box girder body, such as obtaining an image once at a specified interval. If there are multiple dry areas, the dry areas can be infiltrated one by one, and the second spray head 2 only sprays the areas that need to be moistened, avoiding repeated spraying of the already moistened areas, thereby maximizing the utilization efficiency of water resources, improving the efficiency and accuracy of the box girder infiltration treatment, achieving efficient moistening of the dry areas, and ensuring the efficient operation of the entire care process.
[0057] Embodiment 2
[0058] Based on Example 1, the maintenance method for the upper surface of the beam body is: laying a water stop strip on the edge of the upper surface of the box beam body so that the water stop strip and the upper surface of the box beam body form a water storage cavity, and injecting water into the water storage cavity so that the water completely covers the upper surface of the box beam body.
[0059] Embodiment 3
[0060] On the basis of the first embodiment, the curing method of the lower surface of the beam body is: injecting water into a preset water curing pool, and moving the water curing pool so that the lower surface of the box beam body is completely immersed in the water in the water curing pool.
[0061] Embodiment 4
[0062] On the basis of Example 1, the beam end maintenance method is: setting up a beam end maintenance frame and an anchor maintenance frame, fixing the beam end with a frame + moisturizing tarpaulin + sponge, and when water needs to be replenished, only need to use a water pipe to inject from above the curing board, which can effectively ensure the maintenance quality of the beam end.
[0063] Embodiment 5
[0064] On the basis of Example 1, the maintenance method of the contact network is as follows: a 1.2m×1.2m support frame is set in the middle of the top of the box beam, and a 1m 3 The water storage tank is fixed with a capacity of 1000 tons. The upper part of the water storage tank is connected to a water pipeline for easy replenishment of water at any time. Two hoses are connected to the lower part of the water storage tank and are evenly arranged in strips on the contact network foundation. A hole is opened every 3 cm and the hose is fixed with a cross clamp to achieve maintenance of the contact network foundation.
[0065] Embodiment 6
[0066] This embodiment provides a maintenance system for prefabricated box girders for high-speed railways, which adopts the maintenance method for prefabricated box girders for high-speed railways as in Embodiment 1, and includes: a first spray module, an image acquisition module, a path planning module, a target movement module, and a second spray module.
[0067] The first spray module is used for the first spray head 1 to spray the side surface 5 of the box girder body; the image acquisition module is used to acquire an image covering the area on the side surface 5 of the box girder body, identify the dry area in the image, and calculate the coordinates and area of the dry area; the path planning module is used to obtain the coordinates (x p ,y p ), obtain the coordinates (x p ,y p )’s target coordinates (x m ,y m ), obtain the current position of the second spray head 2, and plan the second spray head 2 to the target coordinate (x m ,y m ) moving path; the target moving module is used to control the second spray head 2 to move to the target coordinate (x m ,y m ); The second spray module is used to move the second spray head 2 to the target coordinate (x m ,y m ) when controlling the second spray head 2 to spray and thus wet the dry area.
[0068] This embodiment has all the advantages of the high-speed railway prefabricated box girder maintenance method in the first embodiment, and can automatically implement all steps of the high-speed railway prefabricated box girder maintenance method.
[0069] Embodiment 7
[0070] The present embodiment provides a device for maintaining a prefabricated box girder for a high-speed railway, which includes a memory and a processor; the memory is used to store a computer program; the processor is used to implement the steps of the method for maintaining a prefabricated box girder for a high-speed railway as described in Embodiment 1 when executing the computer program.
[0071] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0072] What has been described above is only a preferred specific implementation manner of the embodiments of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes according to the technical scheme and concept of the present application within the technical scope disclosed in the present application, which should be covered by the protection scope of the present application.
Claims
1. A method for maintaining a prefabricated box girder for a high-speed railway, comprising a method for maintaining the side surface, the upper surface, and the lower surface of the girder, characterized in that: The maintenance method of the side of the beam includes the following steps: A first spray head (1) is used to spray the side surface (5) of the box girder body; Acquire an image of the area covering the side surface (5) of the box girder, identify the dry area in the image, and calculate the coordinates and area of the dry area; Get the center coordinates of the largest dry area in the pixel coordinate system (x p ,y p ), obtain the coordinates (x p ,y p )’s target coordinates (x m ,y m ), obtain the current position of the second spray head (2), and plan the second spray head (2) to move toward the target coordinate (x m ,y m )The path of movement; Control the second spray head (2) to move to the target coordinate (x m ,y m ); The second shower head (2) moves to the target coordinate (x m ,y m ) when controlling the second spray head (2) to spray and thereby wet the dry area.
2. The high-speed railway prefabricated box girder maintenance method according to claim 1, characterized in that: Identifying dry areas in an image and recording the coordinates of the dry areas specifically includes: Preprocess the image, including grayscale and filtering to remove noise; The grayscale image is segmented into dry area and wet area by using threshold segmentation method, which is used to detect the edge of dry area and highlight the outline of dry area. Use contour detection algorithm to find the contour of dry area and filter out non-dry area; Calculate the pixel coordinates and area of the center point of each dry region.
3. The high-speed railway prefabricated box girder maintenance method according to claim 1, characterized in that: Obtain the coordinates (x) of the center point of the second spray head (2) in the preset motion range coordinate system p ,y p )’s target coordinates (x m ,y m ) specifically include: Determine the range of the pixel coordinate system, recorded as (0,0) to (W p ,H p ), where W p and H p Represent the width and height of the image respectively; determine the range of the preset motion range coordinate system, recorded as (0,0) to (W m ,H m ), W m and H m Respectively represent the width and height of the range of motion; Calculate the conversion ratio from pixel coordinates to motion range coordinates, including the horizontal ratio S x The ratio S in the vertical direction y , Calculate the coordinates (x) of the center point of the second shower head (2) in the preset motion range coordinate system p ,y p )’s target coordinates (x m ,y m ), x m =x p ×S x ,y m =y p ×S y .
4. The high-speed railway prefabricated box girder maintenance method according to claim 3, characterized in that: Planning the path for the second shower head (2) to move toward the target coordinates includes: The current position coordinate of the second shower head (2) in the motion range coordinate system is marked as (x c ,y c ), calculate the target coordinates (x m ,y m ) and the current position coordinates (x c ,y c ) between the horizontal and vertical differences Δx and Δy, Δx = x m -x c , Δy=y m -y c .
5. The high-speed railway prefabricated box girder maintenance method according to claim 4, characterized in that: The second spray head (2) is mounted on a guide rail assembly, the guide rail assembly comprising a horizontal guide rail (3) and a vertical guide rail (4), a first lead screw (31) and a second lead screw (41) are respectively mounted inside the horizontal guide rail (3) and the vertical guide rail (4), the first lead screw (31) and the second lead screw (41) have the same specifications, and the first lead screw (31) and the second lead screw (41) are both connected to a servo motor, and the movement increments of the second spray head (2) are Δx for each rotation of the first lead screw (31) and the second lead screw (41). s and Δy s .
6. The high-speed railway prefabricated box girder maintenance method according to claim 5, characterized in that: The second shower head (2) moves along the path to the corresponding coordinates by the rotation number c of the first lead screw (31) and the second lead screw (41). x and c y They are:
7. The high-speed railway prefabricated box girder maintenance method according to claim 1, characterized in that: The image is acquired once at a specified time interval.
8. The high-speed railway prefabricated box girder maintenance method according to claim 1, characterized in that: The first spray head (1) and the second spray head (2) are both swing-type spray heads.
9. The high-speed railway prefabricated box girder maintenance method according to claim 1, characterized in that: The maintenance method of the upper surface of the beam body is as follows: laying a waterproof rubber strip on the edge of the upper surface of the box beam body so that the waterproof rubber strip and the upper surface of the box beam body form a water storage cavity, and filling water into the water storage cavity so that the water completely covers the upper surface of the box beam body.
10. The high-speed railway prefabricated box girder maintenance method according to claim 1, characterized in that: The curing method for the lower surface of the beam body is: fill water into a preset water curing pool, and move the water curing pool so that the lower surface of the box beam body is completely immersed in the water in the water curing pool.
Citation Information
Patent Citations
Production control method, control equipment and system for concrete prefabricated part
CN113070996A
Concrete prefabricated product automatic production process
CN113119294A
Automatic spraying system for beam factory
CN115229955A
Concrete wall surface curing system and method based on intelligent AI linkage spraying
CN115439802A
Water and fertilizer spraying method and system based on image recognition
CN115589820A
Cited By
Intelligent concrete curing system based on temperature and humidity adjustment
CN119797959A
Intelligent Concrete Curing System Based on Temperature and Humidity Regulation
CN119797959B