Foundation pit supporting device and foundation pit supporting method
By using reusable temporary support systems and lifting systems in foundation pit excavation, combined with steel support and concrete support, the problems of unstable and high cost during foundation pit excavation are solved, and rapid support and high efficiency are achieved Excavation.
Patent Information
- Application Number
- CN202411347471.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-11-15
AI Technical Summary
During the excavation and construction of foundation pits, it is difficult for the existing technology to quickly form support, resulting in the foundation pit being exposed for a long time and causing large deformation. At the same time, the cost of steel support is high and difficult to recycle, and the concrete support process is long, which affects efficiency .
Reusable temporary support system and lifting system are adopted, combined with steel support and construction concrete support, and the load is adjusted through the axial force servo system to achieve rapid support and reduce costs.
The foundation pit exposure time is shortened, the stable and strong support state is provided, the operating costs are reduced, the excavation efficiency is improved, and the equipment service life is extended by the alternating use of steel and concrete supports.
Smart Images

Figure CN118958312A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation pit engineering construction, and in particular to a foundation pit supporting device and a foundation pit supporting method. Background Art
[0002] At present, in the conventional foundation pit excavation construction process, concrete support or steel support can be used as foundation pit support. Figure 1 As shown in the figure, concrete support has the advantages of large bearing capacity and economical cost. However, it needs to go through the processes of laying, steel bar tying, concrete pouring, and curing from the bottom form of the cushion layer to reach the target strength. This process is not only long (usually takes more than seven days), but also cannot form support quickly within the elevation range during this process. The entire foundation pit will be in an unsupported condition in the excavation layer, that is, the foundation pit will undergo large (major) deformation during this period of time. On the other hand, combined with the attached Figure 2 As shown, although the steel support equipped with the servo axial force compensation system has a short installation time (usually six hours) and can quickly form support, when the lower earthwork is continued to be excavated, due to the material characteristics of the steel support, the bearing capacity it provides is too low to meet the bearing capacity requirements of large and deep foundation pits, and it is difficult to recycle and the cost is high. Therefore, how to ensure that the foundation pit can be quickly supported after excavation to the corresponding elevation, avoid the foundation pit being exposed for a long time and causing large deformation, and effectively reduce the operating cost and improve the operating efficiency are the problems that people in this field need to solve. Summary of the invention
[0003] The purpose of the present invention is to provide a foundation pit support device and a foundation pit support method to ensure that support can be quickly formed after the foundation pit is excavated to a corresponding elevation, avoid the foundation pit being exposed for a long time and causing large deformation, and effectively reduce operating costs and improve operating efficiency.
[0004] To achieve this object, the present invention adopts the following technical solutions:
[0005] A foundation pit support device, comprising:
[0006] A reusable temporary support system and lifting system, wherein the lifting system is arranged at the top of a foundation pit, the temporary support system can provide steel support and construction concrete support in the foundation pit, and the lifting system can drive the temporary support system to move up and down in the foundation pit.
[0007] Optionally, a concrete formwork is provided on the temporary support system, and concrete can be poured into the concrete formwork and provide construction concrete support for the foundation pit after solidification.
[0008] Optionally, a steel support system is provided under the concrete formwork, and the steel support system can provide steel support for the foundation pit.
[0009] As an option, the concrete formed in the concrete formwork and the steel support system can alternately provide support to the foundation pit.
[0010] Optionally, it also includes an axial force servo system, which is arranged on the temporary support system and detachably connected to the side wall of the foundation pit. The axial force servo system can adjust the load in the steel support system according to the deformation of the foundation pit.
[0011] On the other hand, a foundation pit supporting method is provided, wherein the foundation pit supporting device is used to perform operations, and the method comprises the following steps:
[0012] S1. Installing the support assembly in the foundation pit support device in the foundation pit and positioning it above the earth to be excavated to provide steel support for the foundation pit;
[0013] S2, pouring concrete into the foundation pit support device, and excavating the earth to be excavated to the target depth;
[0014] S3, after the concrete reaches the support strength, a concrete support is formed to provide construction concrete support for the foundation pit. At the same time, the support combination unloads and moves to above the target depth, and then provides steel support for the foundation pit again;
[0015] S4, pouring concrete into the foundation pit support device again, and excavating the earth to be excavated to the next target depth;
[0016] S5, repeating steps S3 and S4 until the foundation pit excavation is completed;
[0017] S6. The supporting assembly part structure is buried at the bottom of the foundation pit, or it is disassembled and hoisted out in an unobstructed space for reuse.
[0018] Optionally, the support assembly in the foundation pit support device includes a temporary support system and an axial force servo system, and the axial force servo system is arranged at both ends of the steel support system and pressed against the side wall of the foundation pit.
[0019] Optionally, step S1 includes:
[0020] S1.1. Install the steel support system and the axial force servo system in the foundation pit support device in the foundation pit, and both are located above the earth to be excavated, so that the axial force servo system presses against the side wall of the foundation pit to provide steel support thereto;
[0021] S1.2. Assemble the concrete formwork onto the steel support system.
[0022] Optionally, step S2 includes:
[0023] S2.1. Pre-embed the lifting system in the concrete formwork;
[0024] S2.2. Pour concrete into the concrete formwork in the foundation pit support device and excavate the earth to be excavated to the target depth.
[0025] Optionally, step S3 includes:
[0026] S3.1. After the concrete reaches the supporting strength, it forms a concrete support. After it is demoulded from the concrete formwork, the concrete support provides construction concrete support for the foundation pit;
[0027] S3.2, the axial force servo system adaptively unloads the force until it is separated from the side wall of the foundation pit, and then moves to above the target depth through the lifting system together with the temporary support system;
[0028] S3.3, the axial force servo system is pressed against the side wall of the foundation pit again to provide steel support for it.
[0029] Beneficial effects of the present invention:
[0030] The temporary support system in the present invention can provide steel support for the foundation pit, and can provide construction concrete support through its template, so as to shorten the exposure time of the foundation pit and achieve the temporary support effect. Specifically, the temporary support system can provide steel support for rapid support to resist the deformation of the foundation pit enclosure, and can also provide templates to realize construction concrete support, so as to ensure that the foundation pit enclosure structure is always operated in a stable and strong support state, and the cost is economical and the cost is reduced. At the same time, the excavation efficiency of the foundation pit can be effectively improved by alternating the steel support and the construction concrete support, and the large deformation of the foundation pit can be avoided. Further, the temporary support system in the present invention can be lifted and moved in the foundation pit through the lifting system, thereby providing multi-layer support protection for the foundation pit, and will not affect the foundation pit excavation operation. Moreover, the rapid support of the foundation pit can be realized by repeatedly using the foundation pit support device of the present invention, which not only reduces the operating cost, but also avoids the repeated installation and removal of the steel support and the template layer by layer, and the operating efficiency can be correspondingly improved. On the other hand, the present invention can realize the foundation pit support method by using the support combination in the foundation pit support device, and can also achieve the above effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic diagram of a structure using construction concrete support in the prior art;
[0032] Figure 2 It is a schematic diagram of a structure using steel support in the prior art;
[0033] Figure 3is a schematic top view of a foundation pit support device according to an embodiment of the present invention;
[0034] Figure 4 is a schematic top view of a foundation pit according to an embodiment of the present invention;
[0035] Figure 5 is a schematic diagram of a foundation pit support device according to an embodiment of the present invention being placed in a foundation pit;
[0036] Figure 6 is a front view schematic diagram of a foundation pit support device according to an embodiment of the present invention;
[0037] Figure 7 is a partial structural schematic diagram of a foundation pit support device according to an embodiment of the present invention;
[0038] Figure 8 is a schematic diagram of step S1 in the foundation pit supporting method according to an embodiment of the present invention;
[0039] Fig. 9 is a schematic diagram of step S2 in the foundation pit supporting method according to an embodiment of the present invention;
[0040] Fig.10 is another schematic diagram of step S2 in the foundation pit supporting method according to an embodiment of the present invention;
[0041] Fig.11 is another schematic diagram of step S2 in the foundation pit supporting method according to an embodiment of the present invention;
[0042] Fig.12 is a schematic diagram of step S3 in the foundation pit supporting method according to an embodiment of the present invention;
[0043] Fig.13 It is another schematic diagram of step S3 in the foundation pit supporting method described in an embodiment of the present invention.
[0044] In the figure:
[0045] 100-concrete; 100'-concrete support; 200-lattice column; 300-earth to be excavated; 401-foundation pit; 402-unobstructed space;
[0046] 10-temporary support system; 20-lifting system; 30-axis force servo system;
[0047] 11-steel support system; 12-concrete formwork; 13-bracket; 111-connecting rod; 112-steel support structure; 121-first chamber; 122-second chamber; 123-third chamber;
[0048] 21-reaction beam; 22-hydraulic pump station; 23-jack; 24-steel strand; 201-root anchor. DETAILED DESCRIPTION
[0049] The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar parts or parts having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0050] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection, it can be a mechanical connection or an electrical connection, it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0051] In the description of the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include the first feature being in direct contact with the second feature, or may include the first feature being in contact with the second feature through another feature between them instead of being in direct contact. Moreover, a first feature being "above", "above" and "above" a second feature includes the first feature being directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes the first feature being directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0052] At present, in the conventional foundation pit excavation construction process, concrete support or steel support can be used as foundation pit support. Figure 1 As shown in the figure, concrete support has the advantages of large bearing capacity and economical cost. However, it needs to go through the processes of laying, steel bar tying, concrete pouring, and curing from the bottom form of the cushion layer to reach the target strength. This process is not only long (usually takes more than seven days), but also cannot form support quickly within the elevation range during this process. The entire foundation pit will be in an unsupported condition in the excavation layer, that is, the foundation pit will undergo large (major) deformation during this period of time. On the other hand, combined with the attached Figure 2As shown, although the steel support equipped with the servo axial force compensation system has a short installation time (usually six hours) and can quickly form support, when the lower earthwork is continued to be excavated, due to the material characteristics of the steel support, the bearing capacity it provides is too low to meet the bearing capacity requirements of large and deep foundation pits, and it is difficult to recycle and the cost is high. Therefore, how to ensure that the foundation pit can be quickly supported after excavation to the corresponding elevation, avoid the foundation pit being exposed for a long time and causing large deformation, and effectively reduce the operating cost and improve the operating efficiency are the problems that people in this field need to solve.
[0053] The technical solution of this embodiment is further explained below with reference to the accompanying drawings and through specific implementation methods.
[0054] like Figure 3-Figure 13 As shown, this embodiment provides a foundation pit support device, including a reusable temporary support system 10 and a lifting system 20. The lifting system 20 is arranged on the top of the foundation pit. The temporary support system 10 can provide steel support and construction concrete support in the foundation pit, and the lifting system 20 can drive the temporary support system 10 to move up and down in the foundation pit.
[0055] On the other hand, this embodiment also provides a foundation pit support method, comprising the following steps:
[0056] S1. Install the support assembly in the foundation pit support device in the foundation pit 401 and place it above the earth to be excavated 300 to provide steel support for the foundation pit 401;
[0057] S2, pouring concrete 100 into the foundation pit support device, and excavating the earth 300 to be excavated to the target depth;
[0058] S3, after the concrete 100 reaches the support strength, a concrete support 100' is formed to provide construction concrete support for the foundation pit 401, and at the same time, the support combination is unloaded and moved to above the target depth, and then steel support is provided to the foundation pit 401 again;
[0059] S4, pouring concrete 100 into the foundation pit support device again, and excavating the earth 300 to be excavated to the next target depth;
[0060] S5, repeating steps S3 and S4 until the excavation of the foundation pit 401 is completed;
[0061] S6. The supporting assembly part structure is buried at the bottom of the foundation pit 401, or it is disassembled and hoisted out in the unobstructed space 402 for reuse.
[0062] Specifically, the temporary support system 10 in this embodiment can provide steel support for the foundation pit, and can provide construction concrete support through its template, so as to shorten the exposure time of the foundation pit and achieve the temporary support effect. Specifically, the temporary support system 10 can provide steel support for rapid support to resist the deformation of the foundation pit enclosure, and can also provide templates to achieve construction concrete support to ensure that the foundation pit enclosure structure is always in a stable and strong support state. The cost is economical and the cost is reduced. At the same time, the excavation efficiency of the foundation pit can be effectively improved by alternating between steel support and construction concrete support, and large deformation of the foundation pit can be avoided. Further, the temporary support system 10 in this embodiment can be lifted and moved in the foundation pit through the lifting system 20, thereby providing multi-layer support protection for the foundation pit without affecting the foundation pit excavation operation. Moreover, the rapid support of the foundation pit can be achieved by repeatedly using the foundation pit support device of this embodiment, which not only reduces the operating cost, but also avoids the repeated installation and removal of steel support and template layer by layer, and the operating efficiency can also be improved accordingly. On the other hand, the present embodiment utilizes the support combination in the foundation pit support device to realize the foundation pit support method and also achieve the above-mentioned effect.
[0063] The specific contents of the foundation pit supporting device in this embodiment are described below.
[0064] Combination Figure 4-Figure 8 As shown, the foundation pit support device in this embodiment includes a support combination and a lifting system 20, wherein the support combination includes a temporary support system 10 and an axial force servo system 30. Specifically, the foundation pit support device is mainly used for supporting and protecting the foundation pit 401 during excavation, so as to provide a higher bearing capacity for a large and deep foundation pit 401 and reduce the deformation of the foundation pit 401. At the same time, each system in the foundation pit support device in this embodiment can be reused, which can effectively save operating costs. Optionally, the lifting system 20 is arranged at the top of the foundation pit 401, and the temporary support system 10 can provide construction concrete support or steel support for it in the foundation pit 401. Compared with the single support scheme in the prior art, it can improve the higher bearing capacity and have the advantages of rapid support to meet the needs of different foundation pits 401. Specifically, in this embodiment, the lifting system 20 can drive the temporary support system 10 to move up and down in the foundation pit 401, so as to support different positions inside the foundation pit 401. Furthermore, the axial force servo system 30 is arranged on the temporary support system 10 and is detachably connected to the side wall of the foundation pit 401, so as to ensure the stability of the steel support provided by the temporary support system 10 to the foundation pit 401, and enable the lifting system 20 to drive the temporary support system 10 and the axial force servo system 30 to move up and down as a whole in the foundation pit 401 after unloading the axial force servo system 30.
[0065] Combination Figure 3 and Figure 6-Figure 8As shown, in this embodiment, a plurality of lattice columns 200 are arranged at intervals in the foundation pit 401, and the plurality of lattice columns 200 are arranged parallel to and perpendicular to the bottom of the foundation pit 401. In this embodiment, the temporary support system 10 is sleeved on the lattice columns 200, so that the temporary support system 10 can be guided and limited by the lattice columns 200, and corresponding support can also be provided to the temporary support system 10 to prevent its position from shaking and affecting the subsequent support effect. Further, in this embodiment, the temporary support system 10 and the lattice columns 200 are arranged perpendicular to each other.
[0066] like Figure 4 and Figure 8 As shown, in this embodiment, there is earth 300 to be excavated in the foundation pit 401, and the temporary support system 10 is always located above the earth 300 to be excavated, so that the excavated area of the foundation pit 401 can be supported, thereby ensuring the smooth progress of subsequent excavation operations. For example, in this embodiment, both sides of the temporary support system 10 are provided with a lifting system 20, so that the lifting system 20 can simultaneously lift the entire temporary support system 10 to ensure the stable movement of the temporary support system 10 in the foundation pit 401. Further, in this embodiment, after the excavation of the foundation pit 401 is completed, part of the structure of the temporary support system 10 can also be permanently buried in the foundation pit 401 to ensure that the foundation pit 401 can be constructed under the condition of support and ensure the overall construction safety, or, after the excavation of the foundation pit 401 is completed, the entire structure of the temporary support system 10 can be completely disassembled in the foundation pit 401, and then taken out of the foundation pit 401 by a hoisting machine, so as to achieve the reuse of the foundation pit support device and improve the economy of the operation.
[0067] like Figure 6-Figure 8As shown, specifically, the temporary support system 10 in this embodiment includes a steel support system 11, a concrete formwork 12 and a bracket 13. Optionally, the concrete 100 can be poured in the concrete formwork 12, and can provide construction concrete support for the foundation pit 401 after the concrete 100 is solidified and formed. Further, the steel support system 11 is located below the concrete formwork 12, and can provide steel support for the foundation pit 401, so that the foundation pit support device can provide a concrete pouring formwork in the foundation pit 401 through the concrete formwork 12 and the steel support system 11 to achieve the effect of construction concrete support and steel support. Exemplarily, in this embodiment, the concrete 100 formed in the concrete formwork 12 and the steel support system 11 can alternately provide support for the foundation pit 401, that is, after the concrete 100 solidifies and takes shape in the concrete formwork 12 to gradually provide construction concrete support for the foundation pit 401, the steel support system 11 unloads force at both ends so that only construction concrete support exists in the foundation pit 401 until the steel support system 11 moves down to pour concrete at the next position, and the steel support system 11 provides steel support effect for the foundation pit 401 again, thereby reducing the deformation of the foundation pit 401 and effectively extending the service life of the foundation pit support device, improving the quality and efficiency of the support protection, and thereby improving the excavation operation efficiency. Exemplarily, an axial force servo system 30 is provided at both ends of the steel support system 11, thereby ensuring the steel support effect of the steel support system 11 on the inner wall of the foundation pit 401 at both ends, and after the force is unloaded and disassembled between the axial force servo system 30 and the side wall of the foundation pit 401, the steel support system 11 and the axial force servo system 30 can move synchronously until they are in the next position to provide steel support to the foundation pit 401 again through the axial force servo system 30.
[0068] like Figure 3 and Figure 7As shown, in this embodiment, the steel support system 11 includes a connecting rod 111 and a steel support structure 112. Specifically, the connecting rod 111 and the steel support structure 112 are arranged perpendicular to each other, and each steel support system 11 is provided with a plurality of connecting rods 111 and steel support structures 112. Exemplarily, a plurality of steel support structures 112 are arranged in parallel and at intervals, and every two steel support structures 112 are arranged as a group, and an axial force servo system 30 is arranged at both ends of each group of steel support structures 112, so that the axial force servo system 30 can realize the stable placement of the steel support structure 112 in the foundation pit 401 to provide a stable steel support effect for the foundation pit 401. Furthermore, a plurality of connecting rods 111 are arranged in parallel and at intervals on the steel support structure 112 to connect all the steel support structures 112, that is, the steel support structure 112 and the connecting rod 111 constitute a horizontal and vertical combination. Specifically, the steel support structure 112, the connecting rod 111 and the lattice column 200 are arranged perpendicular to each other in pairs, and the two ends of the connecting rod 111 are respectively connected to the lifting system 20, and then when the connecting rod 111 is lifted and moved by the lifting system 20, all the steel support structures 112 can be driven to move synchronously with it, thereby realizing the synchronous movement of the entire steel support system 11. Optionally, each group of steel support structures 112 is arranged corresponding to the same row of lattice columns 200. Exemplarily, a steel support structure 112 is arranged on both sides of each row of lattice columns 200, and a bracket 13 is sleeved on the outside of each lattice column 200, and the bottom of each group of steel support structures 112 is erected above a bracket 13, so as to ensure the stable connection between the steel support system 11 and the lattice column 200. Furthermore, the axial force servo system 30 can adjust the load in the steel support system 11 according to the deformation of the foundation pit.
[0069] Combination Figure 8As shown, in this embodiment, the concrete formwork 12 is arranged above the steel support system 11, and the concrete 100 can be poured in the concrete formwork 12. Exemplarily, in this embodiment, the concrete formwork 12 includes a first chamber 121, a second chamber 122 and a third chamber 123. Specifically, the first chamber 121 is arranged between the steel support structure 112 on both sides of the steel support system 11 and the outer side of the lattice column 200, the second chamber 122 is arranged between the steel support structure 112 on both sides of the steel support system 11 and the inner side of the lattice column 200, and the third chamber 123 is arranged on both sides of the lattice column 200 corresponding to the steel support structure 112 located in the middle of the steel support system 11. Specifically, the first chamber 121, the second chamber 122 and the third chamber 123 are interconnected, and the three are arranged along the length direction of the steel support structure 112. Furthermore, the outer wall of the first chamber 121 is higher than the side walls of the second chamber 122 and the third chamber 123, and the concrete formwork 12 is integrated, so that after the concrete 100 fills the first chamber 121, the second chamber 122 and the third chamber 123, under the enclosure of the outer wall of the first chamber 121, it can be continuously poured above the first chamber 121, the second chamber 122 and the third chamber 123 until the concrete 100 in the three chambers is connected to form a whole. Furthermore, after all the concrete 100 is poured and solidified, the concrete formwork 12 is demolded. At this time, the formed concrete 100 can provide construction concrete support for the foundation pit 401, avoiding deformation of the foundation pit 401. At the same time, it is convenient for the concrete formwork 12 and the steel support system 11 to move together in the foundation pit 401 to perform new pouring and solidification operations of concrete 100 at the next position, until multiple layers of formed concrete 100 are arranged from the top surface to the bottom surface in the foundation pit 401, thereby ensuring the stability of the foundation pit 401 and reducing deformation.
[0070] For example, before the first chamber 121, the second chamber 122 and the third chamber 123 are poured with concrete 100, the foundation pit support device mainly supports the foundation pit 401 with steel through the steel support system 11 and the axial force servo systems 30 at both ends; when the concrete 100 in the concrete formwork 12 is solidified and formed and can support the foundation pit 401 with construction concrete, the axial force servo systems 30 at both ends of the steel support system 11 are adaptively unloaded, so that the foundation pit 401 is mainly supported by construction concrete, thereby realizing the alternating effect of construction concrete support and steel support. Furthermore, the steel support system 11 and the axial force servo system 30 can be simultaneously lowered to the next position of the foundation pit 401 through the lifting system 20, and then the above steps can be repeated to realize multi-layer construction concrete support, and the steel support and construction concrete support at each position can act alternately, effectively reducing the deformation of the foundation pit 401.
[0071] Combination Figure 7and Fig.12 As shown, illustratively, in this embodiment, the bracket 13 and the steel support system 11 are detachably connected, so that when the concrete 100 is solidified and formed, the bracket 13 can be lowered to the next position first, and it can be set and fixed on the lattice column 200, and then after the concrete formwork 12 is demoulded, the steel support system 11 and the concrete formwork 12 can be stably erected on the bracket 13 after being lowered to the target position, so as to ensure the stability of the temporary support system 10. Optionally, the cross-section of the bracket 13 in this embodiment is triangular to improve the stability of the support for the steel support system 11. Exemplarily, the bracket 13 is also arranged along the length direction of the steel support structure 112, and a bracket 13 is correspondingly arranged on each column of the lattice column 200, that is, a bracket 13 is correspondingly arranged on each group of steel support structures 112, so as to ensure the stability of the entire structure. Further, the bracket 13 is always located above the earthwork 300 to be excavated. In other embodiments, a bracket 13 may be provided on each lattice column 200, and the size of the bracket 13 may be set as required, which is not limited here. For example, in the temporary support system 10 of this embodiment, the steel support system 11, the concrete formwork 12 and the bracket 13 can all be disassembled, and the corresponding disassembly method can be set according to actual needs, which will not be described in detail here.
[0072] like Figure 7 As shown, in this embodiment, the lifting system 20 includes a reaction beam 21, a hydraulic pump station 22, a jack 23 and a steel strand 24, and the steel strand 24 is connected to one end of the temporary support system 10 and is provided with a root anchor 201. Figure 6 As shown, specifically, in this embodiment, the reaction beam 21 is arranged in the concrete 100 at the top layer of the foundation pit 401, and is located above the steel support structures 112 on both sides of the steel support system 11, so as to ensure the stable placement of the lifting system 20 in the foundation pit 401. Further, the hydraulic pump station 22 and the jack 23 are both arranged on the reaction beam 21, and the jack 23 is arranged as a through-type jack, and the through-type jack is connected to the hydraulic pump station 22 through an oil pipe and a communication line to obtain a power source and an operation instruction.
[0073] like Figure 6 As shown, in this embodiment, the steel strand 24 is connected to the central axis of the jack 23 to ensure its mechanical strength. In other embodiments, other materials may be selected, which is not limited here. Specifically, one end of the steel strand 24 is fixed to the jack 23 of the lifting system 20, and the other end is fixed to the connecting rod 111 of the temporary support system 10, and the jack 23 can lift or lower the steel strand 24, so that the connecting rod 111 can be driven by the steel strand 24 to move up and down in the foundation pit 401, thereby achieving the synchronous lifting of the steel support structure 112 and the concrete formwork 12 above it, and realizing the lifting and lowering of the temporary support system 10 in the foundation pit 401. Figure 3 and Figure 4 As shown, each lifting system 20 is provided with four reaction beams 21, four jacks 23, four hydraulic pump stations 22 and four steel strands 24, which are arranged at intervals and located above the connecting rod 111, so that the connecting rod 111 can be lifted at multiple points to ensure the synchronization of its lifting and lowering movement. Furthermore, the steel strands 24 in each lifting system 20 are respectively connected to the two ends of the connecting rod 111, and are fixed to the connecting rod 111 through the root anchor 201 to avoid falling off during the lifting and lowering of the connecting rod 111, causing greater safety accidents. For example, after the foundation pit excavation operation is completed, the connecting rod 111 and the root anchor 201 can be dismantled, so that the temporary support system 10 and the lifting system 20 are separated, which is convenient for subsequent recycling and reuse, and will not be repeated here.
[0074] Exemplarily, in this embodiment, the axial force servo system 30 can also be set as a jack structure to ensure that the steel support system 11 provides stable steel support for the foundation pit 401. In other embodiments, other power devices can also be selected to ensure the axial force applied to the foundation pit 401 by both ends of the steel support structure 112.
[0075] The foundation pit supporting method in this embodiment is described in detail below.
[0076] The foundation pit support method comprises the following steps:
[0077] S1. Install the support assembly in the foundation pit support device in the foundation pit 401 and place it above the earth to be excavated 300 to provide steel support for the foundation pit 401;
[0078] S2, pouring concrete 100 into the foundation pit support device, and excavating the earth 300 to be excavated to the target depth;
[0079] S3, after the concrete 100 reaches the support strength, a concrete support 100' is formed to provide construction concrete support for the foundation pit 401, and at the same time, the support combination is unloaded and moved to above the target depth, and then steel support is provided to the foundation pit 401 again;
[0080] S4, pouring concrete 100 into the foundation pit support device again, and excavating the earth 300 to be excavated to the next target depth;
[0081] S5, repeating steps S3 and S4 until the excavation of the foundation pit 401 is completed;
[0082] S6. The supporting assembly part structure is buried at the bottom of the foundation pit 401, or it is disassembled and hoisted out in the unobstructed space 402 for reuse.
[0083] like Figure 8As shown, further, step S1 includes:
[0084] S1.1. Install the steel support system 11 and the axial force servo system 30 in the foundation pit support device in the foundation pit 401, and both are located above the earthwork 300 to be excavated, so that the axial force servo system 30 presses against the side wall of the foundation pit 401 to provide steel support thereto;
[0085] S1.2, assemble the concrete formwork 12 onto the steel support system 11.
[0086] Exemplarily, several partitions are provided in the foundation pit 401. During the process of sequentially excavating the partitions, the temporary support systems 10 and the axial force servo systems 30 corresponding to the partitions can be installed sequentially without waiting for the excavation surfaces of all the partitions to be completed before installing the temporary support systems 10 and the axial force servo systems 30, thereby improving the efficiency of the entire excavation operation. Specifically, in this embodiment, when installing the temporary support system 10, the steel support system 11 and the axial force servo system 30 are installed first, so that steel support can be provided to the foundation pit 401, ensuring that the foundation pit 401 is supported by the axial force before the concrete 100 is poured and will not be deformed, thereby ensuring the excavation accuracy and quality. Optionally, each partition of the foundation pit 401 is excavated to a depth slightly lower than the depth of the support combination support. In this embodiment, the depth is at least greater than the cross-sectional height of a steel support system 11, and then the steel support system 11 and the axial force servo system 30 are installed.
[0087] Combination Figure 9-11 As shown, further, step S2 includes:
[0088] S2.1, embedding the lifting system 20 in the concrete formwork 12;
[0089] S2.2, pouring concrete 100 into the concrete formwork 12 in the foundation pit supporting device, and excavating the earth 300 to be excavated to the target depth.
[0090] Specifically, in this embodiment, the lifting system 20 is connected to the steel support system 11, and is used to lift or lower the steel support system 11, thereby enabling the lifting and lowering of the support assembly in the foundation pit 401 driven by the steel support system 11, and thus enabling the steel support and the construction concrete support to be alternately provided at different depths of the foundation pit 401. Exemplarily, the lifting system 20 is provided with a temporary bracket, and before the lifting system 20 is installed, its temporary bracket needs to be pre-buried in the concrete formwork 12, and then the concrete 100 is poured, thereby ensuring the subsequent stable placement of the lifting system 20 at the top of the foundation pit 401, thereby achieving stable movement of the support assembly in the foundation pit 401.
[0091] Combination Figure 12-13 As shown, further, step S3 includes:
[0092] S3.1, after the concrete 100 reaches the supporting strength, a concrete support 100' is formed, and after it is demoulded from the concrete formwork 12, the concrete support 100' provides construction concrete support for the foundation pit 401;
[0093] S3.2, the axial force servo system 30 adaptively unloads the force until it is separated from the side wall of the foundation pit 401, and then moves to above the target depth together with the temporary support system 10 through the lifting system 20;
[0094] S3.3, the axial force servo system 30 is pressed against the side wall of the foundation pit 401 again to provide steel support therefor.
[0095] Specifically, during the construction of the concrete support strength maintenance in this embodiment, the excavation of the lower earthwork can be carried out at the same time, and the stability of the foundation pit 401 is mainly guaranteed by the steel support. Exemplarily, the lifting system 20 can be installed and fixed on a temporary bracket during the construction of the concrete support strength maintenance. Specifically, the lifting system 20 includes a reaction beam 21, a hydraulic pump station 22, a jack 23 and a steel strand 24. During installation, the hydraulic pump station 22 and the jack 23 are first installed on the reaction beam 21, and then one end of the steel strand 24 is fixed on the jack 23, and the other end is fixed on the steel support system 11. Furthermore, an oil pipe and a control line are connected between the hydraulic pump station 22 and the jack 23 to ensure the winding and release of the steel strand 24. This can avoid the situation in the prior art where only concrete support is used for construction, where there is no support or reinforcement in the foundation pit 401 during the seven-day concrete curing period. In addition, in this embodiment, the concrete curing period does not occupy an absolute time, and the lower layer of earth can be excavated continuously. At this time, the steel support provided by the steel support system 11 to the foundation pit 401 is safe and reliable enough.
[0096] Furthermore, after the support strength of the concrete 100 reaches the requirement, the concrete formwork 12 is checked and processed, thereby realizing the demoulding operation of the concrete formwork 12. For example, when the concrete 100 is solidified and formed, the bracket 13 can be lowered to above the target depth first, and it can be fixed on the lattice column 200, and then after the concrete formwork 12 is demoulded, the steel support system 11, the concrete formwork 12 and the axial force servo system 30 are lowered together until they are stably mounted on the bracket 13, thereby ensuring the stability of the temporary support system 10 at this position. Correspondingly, the axial force servo system 30 can adaptively unload the force on the side wall of the foundation pit 401 until only the construction concrete support exists in the foundation pit 401 at this time, thereby ensuring that the foundation pit 401 will not be deformed. The lifting system 20 enables the steel support system 11, the concrete formwork 12 and its axial force servo system 30 to be synchronously descended in the foundation pit 401 until above the target depth and quickly form support, and provide steel support for the foundation pit 401 again to control the deformation of the foundation pit 401 and to produce the concrete support 100' at the next position.
[0097] Exemplarily, the excavation of the entire foundation pit 401 can be completed by cyclically operating step S3 and step S4 until the excavation of the last layer of earthwork of the foundation pit 401 is completed. Exemplarily, in this embodiment, the lifting system 20 is always located on the topmost concrete support 100' of the foundation pit 401 to provide a stable lifting effect for the steel support system 11. Furthermore, after the excavation of the last layer of earthwork is completed, the support assembly can be lowered as a whole to the bottom plate of the foundation pit 401, and disassembled and removed, and hoisted and transported out using a lifting machinery in the unobstructed space 402 next to the foundation pit 401, so as to achieve repeated use and save operating costs; alternatively, the steel support system 11 can also be permanently buried in the bottom plate of the foundation pit 401 as a part of the foundation pit 401, so that the foundation pit 401 is always constructed under support conditions to ensure its stability. Optionally, the lifting system 20 is finally dismantled as a whole for easy use next time.
[0098] Specifically, the foundation pit support method in this embodiment can not only quickly form support in the foundation pit 401, compensating for the adverse effects of the long-term maintenance of the construction concrete support on the deformation of the foundation pit 401, but also the axial force servo system 30 and the steel support system 11 can adjust the axial force of their support in real time according to actual use needs to ensure safe construction in the foundation pit 401. Furthermore, in this embodiment, the construction requirements of multi-layer foundation pit 401 support can be achieved only by the foundation pit support device, which has good economy.
[0099] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. Foundation pit support device, It is characterized in that include: A reusable temporary support system (10) and a lifting system (20), wherein the lifting system (20) is arranged at the top of a foundation pit, the temporary support system (10) can provide steel support and construction concrete support in the foundation pit, and the lifting system (20) can drive the temporary support system (10) to move up and down in the foundation pit.
2. The foundation pit support device according to claim 1, It is characterized in that The temporary support system (10) is provided with a concrete formwork (12), and concrete (100) can be poured into the concrete formwork (12) and provide construction concrete support for the foundation pit after solidification.
3. The foundation pit support device according to claim 2, It is characterized in that A steel support system (11) is arranged below the concrete formwork (12), and the steel support system (11) can provide steel support for the foundation pit.
4. The foundation pit support device according to claim 3, It is characterized in that The concrete (100) formed in the concrete formwork (12) and the steel support system (11) can alternately provide support for the foundation pit.
5. The foundation pit support device according to claim 1, It is characterized in that It also includes an axial force servo system (30), which is arranged on the temporary support system (10) and is detachably connected to the side wall of the foundation pit.
6. A foundation pit supporting method, using the foundation pit supporting device according to any one of claims 1 to 5 to perform operations, It is characterized in that The following steps are involved: S1. Installing the support assembly in the foundation pit support device according to any one of claims 1 to 5 in the foundation pit (401) and positioning it above the earth to be excavated (300) to provide steel support for the foundation pit (401); S2, pouring concrete (100) into the foundation pit support device, and excavating the earth to be excavated (300) to a target depth; S3, after the concrete (100) reaches the support strength, a concrete support (100') is formed to provide construction concrete support for the foundation pit (401), and at the same time, the support assembly is unloaded and moved to above the target depth, and then steel support is provided for the foundation pit (401) again; S4, pouring concrete into the foundation pit support device again (100), and excavating the earth to be excavated (300) to the next target depth; S5, repeating steps S3 and S4 until the excavation of the foundation pit (401) is completed; S6. The supporting assembly part structure is buried at the bottom of the foundation pit (401), or it is disassembled and hoisted out in an unobstructed space (402) for reuse.
7. The foundation pit supporting method according to claim 6, It is characterized in that The support assembly in the foundation pit support device comprises a temporary support system (10) and an axial force servo system (30). The axial force servo system (30) is arranged at both ends of the steel support system (11) and pressed against the side wall of the foundation pit (401). The axial force servo system (30) can adjust the load in the steel support system (11) according to the deformation of the foundation pit.
8. The foundation pit supporting method according to claim 7, It is characterized in that The step S1 comprises: S1.1, installing the steel support system (11) and the axial force servo system (30) in the foundation pit support device in the foundation pit (401), and both of them are located above the earth to be excavated (300), so that the axial force servo system (30) presses against the side wall of the foundation pit (401) to provide steel support thereto; S1.
2. Assemble the concrete formwork (12) onto the steel support system (11).
9. The foundation pit supporting method according to claim 8, It is characterized in that The step S2 comprises: S2.1, embedding the lifting system (20) in the concrete formwork (12); S2.2, pouring concrete (100) into the concrete formwork (12) in the foundation pit support device, and excavating the earth (300) to be excavated to the target depth.
10. The foundation pit supporting method according to claim 9, It is characterized in that The step S3 comprises: S3.1, after the concrete (100) reaches the supporting strength, a concrete support (100') is formed, and after it is demoulded from the concrete formwork (12), the concrete support (100') provides construction concrete support for the foundation pit (401); S3.2, the axial force servo system (30) adaptively unloads the force until it is separated from the side wall of the foundation pit (401), and then moves to above the target depth together with the temporary support system (10) through the lifting system (20); S3.3, the axial force servo system (30) is pressed against the side wall of the foundation pit (401) again to provide steel support thereto.
Citation Information
Patent Citations
Construction method of sliding-descending type rapid pre-supporting system of deep foundation pit
CN113389204A
Double-support platform structure for foundation pit engineering and construction method
CN114263188A
Construction method of small ultra-deep foundation pit applying front steel supporting system
CN116335149A
Construction method of support direct descending movable type deep foundation pit variable-spacing support
CN117536237A
Irregular foundation pit assembly type steel support device
CN210887229U
Cited By
Foundation pit supporting device and foundation pit construction method
CN121138303A
Ultra-deep foundation pit supporting device and construction method
CN121345131A