Mud flat wetland ecosystem restoration method

By dividing the wetlands into different areas, planting specific plants and setting up fixed troughs, and using purified ceramics and water bodies to repair microbial compositions, the problems of soil and soil solidification and secondary pollution in wetlands in the tidal flats are solved, and the continuous purification and ecology of wetlands in the tidal flats are achieved Environment recovery.

CN118978265APending Publication Date: 2024-11-19WUHAN GARDENS CONSTR ENG CO

Patent Information

Application Number
CN202411269978.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The existing wetland repair methods for mudflats are poor in solidifying soil and soil, and the withering of herbs may lead to eutrophication of soil and soil, causing secondary pollution problems.

Method used

Dividing mudflat wetlands into nearshore areas, wet areas and mudflat areas, plant willows or metasequoia, pine and aquatic plants respectively, and set up fixed tanks in wet areas to fill purify ceratops and water-repair microbial compositions, and use aquatic economic crops to float. The island regularly harvests nutrients to avoid pollution.

Benefits of technology

Effectively solidify the soil and water, continuously purify the water body, restore the ecological environment, avoid secondary pollution, and improve the biodiversity and ecological functions of tidal flats and wetlands.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118978265A_ABST
    Figure CN118978265A_ABST
Patent Text Reader

Abstract

The invention discloses a mud flat wetland ecological system restoration method. According to the restoration method, a mud flat wetland is divided into a near-shore area, a wetland area and a mud flat area; the remediation method comprises the following steps that S1, a plurality of fixing grooves are formed in the underwater sludge position of the humid area at intervals, basalt fiber woven bags filled with purification ceramsite are fixedly arranged in the fixing grooves, porous basalt ceramsite is adopted as the purification ceramsite, and a water body remediation microorganism composition is fixed in the purification ceramsite; s2, planting the water pine in the humid area at intervals; s3, planting aquatic plants in the mud flat area; s4, willows or metasequoia are planted in the near-shore area at intervals; s5, arranging a moored and fixed aquatic economic crop floating island between the aquatic plant planting area and the water pine planting area, planting aquatic economic crops, and regularly harvesting the aquatic economic crops. The ecological environment of the inland mudflat wetland can be effectively restored, water and soil of the mudflat wetland can be continuously purified, the water and the soil can be fixed, and secondary pollution cannot be caused.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of environmental protection technology, and in particular to a method for restoring a tidal flat wetland ecosystem. Background Art

[0002] Tidal flat wetlands are a special type of wetlands. Tidal flat wetlands in inland my country are widely distributed on the banks of rivers, lakes and other water systems. Inland tidal flat wetlands are a type of ecological wetlands formed on the banks of water systems due to the different water levels of rivers, lakes and other water systems during the flood season and the dry season. They play an extremely important role in my country's environmental protection field. Taking the Yangtze River Basin as an example, the Yangtze River Basin has many tidal flat wetlands, including many ecologically sensitive areas and biodiversity protection areas. The tidal flat wetlands in the Yangtze River Basin are feeding grounds, breeding grounds and habitats for many aquatic animals; they also have a variety of ecological functions, such as regulating atmospheric components, purifying the environment, fishery production, and wildlife habitats.

[0003] In the past, due to factors such as reclamation, water conservancy projects, and sewage discharge, the environment of some tidal flats and wetlands in the Yangtze River Basin and some larger lakes in my country has deteriorated, leading to a series of ecological and environmental problems such as degradation or even loss of biological habitats, decline in fishery resources, reduction in biodiversity index, and decline in ecological and environmental quality. However, as my country pays more and more attention to the ecological environment, ecological restoration projects for these tidal flats and wetlands have been launched in recent years, and some tidal flats and wetlands have been restored.

[0004] At present, there are two main methods for repairing the above-mentioned tidal flats and wetlands. One is to repair the tidal flats and wetlands with less ecological damage by scientific planning and restoring vegetation; the other is to repair the tidal flats and wetlands with more serious ecological damage and pollution by combining pollution control with vegetation restoration. Among the existing restoration methods, vegetation restoration mostly adopts the method of planting aquatic shrubs near the shore and aquatic herbs in the wetlands far from the shore. This restoration method is relatively ineffective in consolidating water and soil, and the withering of the herbs will lead to eutrophication of the water and soil of the tidal flats and wetlands, which is prone to secondary pollution problems. Summary of the invention

[0005] In order to solve at least one of the above technical problems, a restoration method is developed that can effectively repair the ecological environment of inland tidal flats and wetlands, continuously purify the water and soil of tidal flats and wetlands, and fix the water and soil without causing secondary pollution. The present application provides a tidal flat wetland ecosystem restoration method.

[0006] The present application provides a method for restoring a tidal flat wetland ecosystem, wherein the restoration method divides the tidal flat wetland into a nearshore area that is a wetland only during the flood season, a wetland area that is a wetland only during the dry season, and a tidal flat area between the nearshore area and the wetland area;

[0007] The repair method comprises the following steps:

[0008] S1. A plurality of fixed grooves are set at intervals in the bottom mud of the wetland area, and basalt fiber woven bags filled with purified ceramsite are fixedly arranged in the fixed grooves. The purified ceramsite is made of porous basalt ceramsite, and a water body restoration microbial composition is fixed therein;

[0009] S2. Plant Chinese glyptostroboides at intervals in wet areas;

[0010] S3. Set up aquatic plant planting areas in the tidal flats to plant aquatic plants;

[0011] S4. Plant willow or metasequoia trees at intervals in the nearshore area;

[0012] S5. During the period when the tidal flat area is flooded, fixed floating islands of aquatic cash crops are set up between the aquatic plant planting area and the Metasequoia planting area in the wetland area, and aquatic cash crops are planted and harvested regularly.

[0013] Optionally, in step S1, the size of the fixing groove is 500-2000 mm×500-2000 mm×100-400 mm, and the spacing between the fixing grooves is 5-6 m.

[0014] Optionally, in step S1, the water body remediation microbial composition includes Candida tropicalis, Bacillus licheniformis, Bacillus subtilis, nitrifying bacteria and denitrifying bacteria.

[0015] Optionally, in step S1, the particle size of the purified ceramsite is 8 to 20 mm, and the specific surface area is not less than 3.5 m 2 / g.

[0016] Optionally, the planting spacing of the Metasequoia glyptostroboides is 8 to 10 m.

[0017] Optionally, in step S3, the aquatic plants are selected from one or more of reed, pampas grass or Phragmites australis.

[0018] Optionally, in step S3, the planting spacing of the aquatic plants is 200 to 400 mm.

[0019] Optionally, in step S3, a plurality of fixed grooves are provided at intervals on one side of the tidal flat area located in the wetland area, and basalt fiber woven bags filled with purified ceramsite are fixedly arranged in the fixed grooves.

[0020] Optionally, in step S4, the planting spacing of the willow trees or metasequoia trees is 4 to 8 m.

[0021] Optionally, in step S5, the aquatic economic crops are selected from one or more of calamus, water celery, water plantain or sagittaria.

[0022] In summary, the present invention includes at least one of the following beneficial technical effects:

[0023] 1. The present application rationally plans the area of ​​the tidal flat wetland, and slots in the wetland area to fix basalt fiber woven bags filled with purified expanded clay, which can continuously purify the silt of the tidal flat wetland and the water body in the area through the microbial composition fixed by the purified expanded clay, and continuously repair the environment of the tidal flat wetland; at the same time, the present application plants large aquatic shrubs such as Metasequoia glyptostroboides in the wetland area, which, in addition to being able to fix water and soil, can also effectively absorb the eutrophication formed by the withering of aquatic plants and the eutrophication existing in the water body, which can effectively purify the water body and repair the ecology.

[0024] 2. This application plants aquatic plants in the tidal flat area, which can effectively restore vegetation, repair the biological habitat ecological environment of the tidal flat area, and beautify the tidal flat area; under the barrier of the Metasequoia glyptostroboides in the wetland area, even if the aquatic plants in the tidal flat area are not cleaned up after withering, it can ensure that most of them are blocked in the Metasequoia glyptostroboides planting belt, and the rich nutrients formed by their decay can also be mostly absorbed by the Metasequoia glyptostroboides, avoiding secondary pollution to the water system.

[0025] 3. This application plants willows or Metasequoia in the nearshore area, and at the same time sets up moored floating islands of aquatic economic crops between the aquatic plant planting area and the Metasequoia planting area in the wetland area, which can effectively purify the eutrophic substances formed by the withering of aquatic plants in the tidal flat area, and effectively and continuously repair the ecological environment of the tidal flat area; in addition, the planting of economic crops can also produce certain economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a schematic diagram of the tidal flat wetland area division structure for this application;

[0027] Figure 2 This is a schematic diagram of the planning structure of the tidal flat wetland planting area for this application;

[0028] Figure 3 This is a schematic diagram of the structure of the fixed slot of this application;

[0029] In the figure: 1. nearshore area; 2. tidal flat area; 3. wetland area; 4. fixed trough; 41. trough body; 42. fixed piles; 5. aquatic plant planting area. DETAILED DESCRIPTION

[0030] The present application is further described in detail below with reference to the accompanying drawings and embodiments.

[0031] Unless otherwise specified, the raw materials used in this application are conventional raw materials in the art and can be purchased on the market. The test methods and detection methods in the following examples are conventional methods unless otherwise specified, and the instruments and apparatus used in the tests can be obtained through commercial channels. The parts not elaborated in this specification belong to the prior art.

[0032] This application designs a method for restoring a tidal flat wetland ecosystem, such as Figure 1 and Figure 2 As shown, the restoration method divides the tidal flat wetland into a nearshore area 1 which is a wetland only during the flood season, a wetland area 3 which is a wetland only during the dry season, and a tidal flat area 2 located between the nearshore area 1 and the wetland area 3 .

[0033] The repair method of this application includes the following steps:

[0034] S1, a plurality of fixed grooves 4 are provided at intervals in the bottom mud of the wetland area 3, and a basalt fiber woven bag filled with purified ceramsite is fixedly arranged in the fixed groove 4, wherein the purified ceramsite is porous basalt ceramsite, and a water body restoration microbial composition is fixed therein;

[0035] S2. Plant Chinese ginkgo at 3 intervals in wet areas;

[0036] S3, setting up an aquatic plant planting area 5 in the tidal flat area 2 to plant aquatic plants;

[0037] S4. Plant willow or metasequoia trees at intervals near the shore;

[0038] S5. During the period when the tidal flat area 2 is flooded, a moored floating island of aquatic cash crops is set between the aquatic plant planting area 5 and the Metasequoia planting area of ​​the wetland area 3, and aquatic cash crops are planted and harvested regularly.

[0039] Specifically, Figure 3 As shown, in step S1 of the present application, the fixed groove 4 can be set in the following manner. First, a shallow pit is dug at the location where the fixed groove 4 needs to be set in the wetland area 3, and a fixed pile 42 is driven into the pit. The fixed pile 42 can be a concrete pile or a reinforced concrete pile; then, a basalt mesh box is prepared as a groove body 41, and the groove body 41 is fixedly installed on the top of the fixed pile 42, and the setting of the fixed groove 4 is completed.

[0040] The present application sets fixed piles 42, which can cooperate with the Chinese cypress planted in the wetland area 3 to fix the water and soil in the wetland area 3 and prevent the polluted water and soil from being lost due to water erosion. By fixing the trough 41 with fixed piles 42, the basalt fiber woven bag filled with purified ceramsite can also be effectively fixed in the wetland area 3, and then the silt and water in the wetland area 3 and the surrounding area can be continuously purified by the purified ceramsite to repair the environment of the tidal flat wetland. The trough 41 and the woven bag made of basalt have good biological affinity, will not damage the environment of the wetland area 3, and can also be conducive to the colonization of algae in the water body, which can effectively promote the recovery of the ecological function of the wetland area 3.

[0041] In the design of the present application, large-scale Metasequoia trees are planted in wetland areas 3 far away from the shore. In the dry season, the bottom of the Metasequoia is half exposed above the water surface, and in the flood season, the bottom of the Metasequoia is completely submerged in water. Such an environment is more suitable for the growth of Metasequoia. In addition, in addition to fixing water and soil, large trees such as Metasequoia have a much higher demand for nutrients than other aquatic small shrubs or aquatic plants such as water grasses. They can effectively absorb the rich nutrients produced by aquatic animals and plants in the wetland area 3 and the surrounding ecological areas, and continuously maintain the environment of the wetland area 3.

[0042] In the design of the present application, an aquatic plant planting area 5 is set up in the nearshore tidal flat area 2, and aquatic plants are planted. The tidal flat area 2 is in a semi-exposed state most of the time except in the flood season, which is more conducive to the growth of small aquatic plants such as reeds. This type of aquatic plants can restore the ecological function of the tidal flat area 2 and provide a suitable environment for birds or waterfowl to live. Based on the design of the wetland area 3, the organic matter after the aquatic plants wither and rot can be absorbed by the Metasequoia; and the remaining organic matter will provide nutrients for organisms such as algae or plankton in the water body. In this way, the planting of aquatic plants in the tidal flat area 2 of the present application does not require manual regular cleaning of withered plants, which greatly reduces labor input and saves costs.

[0043] In the design of this application, willows or metasequoia trees are planted in the nearshore area 1. In addition to beautifying the environment, these larger trees can also absorb organic matter from the withered and decayed aquatic plants in the tidal flat area 2, ensuring that the tidal flat area 2 will not be eutrophicated due to the planting of aquatic plants. The trees in the nearshore area 1 can also play a role in fixing water and soil, and at the same time provide a habitat for birds and other creatures, effectively restoring ecological functions.

[0044] In addition to the above functions, the trees in the nearshore area 1 and wetland area 3 can also rely on their huge demand for nutrients to continuously protect the environment of the tidal flat wetland. Even if there is domestic sewage discharge in the surrounding area, the environment of the tidal flat wetland can be maintained.

[0045] The following are preparation examples and embodiments of this application

[0046] The purification ceramsite used in the preparation examples and embodiments of the present application is basalt solidified microbial carrier particles produced by Fujian Bayer Biotechnology Co., Ltd., with a particle size of 12 to 18 mm and a specific surface area of ​​5.5 m 2 / g. The sources of microorganisms used in the preparation examples and examples of the present application are as follows: Candida tropicalis was purchased from Beijing Biobowei Biotechnology Co., Ltd.; Bacillus licheniformis was purchased from Shanghai Bo Ke Biotechnology Co., Ltd.; Bacillus subtilis was purchased from Pujian Biotechnology (Wuhan) Technology Co., Ltd.; nitrifying bacteria and denitrifying bacteria were purchased from Guangzhou Shengshi Tianjiao Environmental Protection Technology Co., Ltd.

[0047] The water body remediation microbial composition used in the present application preferably comprises tropical Candida, Bacillus licheniformis, Bacillus subtilis, nitrifying bacteria and denitrifying bacteria, and the ratio of the number of live bacteria of each component is 10-20:8-16:8-16:10-16:6-10:4-8.

[0048] Preparation Examples 1 to 4

[0049] Preparation Example 1

[0050] The preparation method of the purified ceramsite of this preparation example comprises the following steps:

[0051] Sa, Candida tropicalis, Bacillus licheniformis, Bacillus subtilis, nitrifying bacteria and denitrifying bacteria were diluted to 5×10 8 / mL of bacterial solution;

[0052] Sb, preparing a composite microbial bacterial solution according to the volume ratio of Candida tropicalis, Bacillus licheniformis, Bacillus subtilis, nitrifying bacteria and denitrifying bacteria solution of 10:8:8:10:6:4;

[0053] Sc. Add the composite microbial solution prepared in step Sb dropwise to the ceramsite of the purified ceramsite at a loading ratio of 0.5 mL / g to adsorb the loading and obtain the purified ceramsite.

[0054] Preparation Example 2

[0055] The preparation method of the purified ceramsite of this preparation example comprises the following steps:

[0056] Sa, Candida tropicalis, Bacillus licheniformis, Bacillus subtilis, nitrifying bacteria and denitrifying bacteria were diluted to 5×10 8 / mL of bacterial solution;

[0057] Sb, preparing a composite microbial bacterial solution according to the volume ratio of Candida tropicalis, Bacillus licheniformis, Bacillus subtilis, nitrifying bacteria and denitrifying bacteria solution of 14:12:14:12:8:5;

[0058] Sc. Add the composite microbial solution prepared in step Sb dropwise to the ceramsite of the purified ceramsite at a loading ratio of 0.5 mL / g to adsorb the loading and obtain the purified ceramsite.

[0059] Preparation Example 3

[0060] The preparation method of the purified ceramsite of this preparation example comprises the following steps:

[0061] Sa, Candida tropicalis, Bacillus licheniformis, Bacillus subtilis, nitrifying bacteria and denitrifying bacteria were diluted to 5×10 8 / mL of bacterial solution;

[0062] Sb, preparing a composite microbial bacterial solution according to the volume ratio of Candida tropicalis, Bacillus licheniformis, Bacillus subtilis, nitrifying bacteria and denitrifying bacteria solution of 16:14:12:14:8:6;

[0063] Sc. Add the composite microbial solution prepared in step Sb dropwise to the ceramsite of the purified ceramsite at a loading ratio of 0.5 mL / g to adsorb the loading and obtain the purified ceramsite.

[0064] Preparation Example 4

[0065] The preparation method of the purified ceramsite of this preparation example comprises the following steps:

[0066] Sa, Candida tropicalis, Bacillus licheniformis, Bacillus subtilis, nitrifying bacteria and denitrifying bacteria were diluted to 5×10 8 / mL of bacterial solution;

[0067] Sb, preparing a composite microbial bacterial solution according to the volume ratio of Candida tropicalis, Bacillus licheniformis, Bacillus subtilis, nitrifying bacteria and denitrifying bacteria solution of 20:16:16:16:10:8;

[0068] Sc. Add the composite microbial solution prepared in step Sb dropwise to the ceramsite of the purified ceramsite at a loading ratio of 0.5 mL / g to adsorb the loading and obtain the purified ceramsite.

[0069] The fixed troughs 4 used in the embodiments of the present application all use a square mesh box made of basalt as the trough body 41 and are fixed with fixed piles 42 made of concrete. Four fixed piles 42 are arranged at the bottom of the trough body 41 of each fixed trough 4, respectively arranged at the four corners of the bottom of the trough body 41.

[0070] Examples 1 to 8 of the present application and the comparative example use the heavily polluted area of ​​the wetland area along the river in Tianxingzhou, Wuhan City as the experimental area of ​​the scheme. This application has a total of 8 experimental areas and 1 control area, and the spacing between adjacent experimental areas and / or control areas is 500 meters. Each experimental area or control area occupies a 400-meter wide area along the river, and each experimental area is divided into a nearshore area 1, a tidal flat area 2, and a wetland area 3 according to the design of this application. The sludge sampling test of the nearshore water body and wetland area 3 of each experimental area and control area showed that the COD of the water body in the experimental area and control area was 13.8-14.4 mg / L, and the ammonia nitrogen was 0.7-0.8 mg / L; the COD of the sludge in the wetland area 3 of the experimental area and control area was 450-500 mg / L.

[0071] Examples 1 to 8

[0072] Example 1

[0073] The size of the groove body 41 of the fixing groove 4 of this embodiment is 2000 mm×2000 mm×400 mm.

[0074] The method for restoring the tidal flat wetland ecosystem of this embodiment comprises the following steps:

[0075] S1, in the wet area 3, a fixed trough 4 is arranged at intervals of 5 meters, trenches are dug, piles are driven, and fixed troughs 4 are installed in the wet area 3; then, the purified ceramsite of Preparation Example 1 is filled in the basalt fiber woven bag, and the basalt fiber woven bag filled with purified ceramsite is filled into the trough body 41, and then the upper cover of the trough body 41 is closed;

[0076] S2. In the wetland area 3, two rows of ginkgo trees are planted at intervals of 9 m along the waterside and 18 m along the direction from the wetland area 3 to the nearshore area 1. The ginkgo trees are planted in the empty areas between the fixed grooves 4.

[0077] S3, setting up an aquatic plant planting area 5 in the tidal flat area 2, and planting reeds at intervals of 400 mm;

[0078] S4. In the nearshore area 1, a row of willow trees is planted at intervals of 8m along the shore;

[0079] S5. During the period when the tidal flat area 2 is flooded, a 2m wide moored floating island of aquatic economic crops is set between the aquatic plant planting area 5 and the Metasequoia planting area of ​​the wetland area 3, and water celery is planted and harvested regularly.

[0080] Example 2

[0081] The difference between this embodiment and embodiment 1 is that this embodiment uses the purified ceramsite of preparation example 2.

[0082] Example 3

[0083] The difference between this embodiment and embodiment 1 is that this embodiment uses the purified ceramsite of preparation example 3.

[0084] Example 4

[0085] The difference between this embodiment and embodiment 1 is that this embodiment uses the purified ceramsite of preparation example 4.

[0086] Example 5

[0087] The size of the groove body 41 of the fixing groove 4 of this embodiment is 500 mm×500 mm×100 mm.

[0088] The method for restoring the tidal flat wetland ecosystem of this embodiment comprises the following steps:

[0089] S1, in the wet area 3, a fixed trough 4 is arranged at intervals of 9 meters, trenches are dug, piles are driven, and fixed troughs 4 are installed in the wet area 3; then, the purified ceramsite of Preparation Example 3 is filled in the basalt fiber woven bag, and the basalt fiber woven bag filled with purified ceramsite is filled into the trough body 41, and then the upper cover of the trough body 41 is closed;

[0090] S2. In the wetland area 3, two rows of ginkgo trees are planted at intervals of 10 m along the waterside and 20 m along the direction from the wetland area 3 to the nearshore area 1. The ginkgo trees are planted in the empty areas between the fixed grooves 4.

[0091] S3, setting up an aquatic plant planting area 5 in the tidal flat area 2, and planting reeds at intervals of 400 mm;

[0092] S4. In the nearshore area 1, a row of willow trees is planted at intervals of 8m along the shore;

[0093] S5. During the period when the tidal flat area 2 is flooded, a 2m wide moored floating island of aquatic economic crops is set between the aquatic plant planting area 5 and the Metasequoia planting area of ​​the wetland area 3, and water celery is planted and harvested regularly.

[0094] Example 6

[0095] The size of the groove body 41 of the fixing groove 4 of this embodiment is 1000 mm×1000 mm×300 mm.

[0096] The method for restoring the tidal flat wetland ecosystem of this embodiment comprises the following steps:

[0097] S1, in the wet area 3, a fixed trough 4 is arranged at intervals of 6 meters, trenches are dug, piles are driven, and fixed troughs 4 are installed in the wet area 3; then, the purified ceramsite of Preparation Example 3 is filled in the basalt fiber woven bag, and the basalt fiber woven bag filled with purified ceramsite is filled into the trough body 41, and then the upper cover of the trough body 41 is closed;

[0098] S2. In the wetland area 3, two rows of ginkgo trees are planted at intervals of 8m along the waterside and 16m from the wetland area 3 to the nearshore area 1. The ginkgo trees are planted in the empty areas between the fixed grooves 4.

[0099] S3, setting up an aquatic plant planting area 5 in the tidal flat area 2, and planting reeds at intervals of 200 mm;

[0100] S4. In the nearshore area 1, a row of willow trees is planted at 4m intervals along the shore;

[0101] S5. During the period when the tidal flat area 2 is flooded, a 2m wide moored floating island of aquatic economic crops is set between the aquatic plant planting area 5 and the Metasequoia planting area of ​​the wetland area 3, and water celery is planted and harvested regularly.

[0102] Example 7

[0103] The size of the groove body 41 of the fixing groove 4 of this embodiment is 1000 mm×1000 mm×300 mm.

[0104] The method for restoring the tidal flat wetland ecosystem of this embodiment comprises the following steps:

[0105] S1, in the wet area 3, a fixed trough 4 is arranged at intervals of 6 meters, trenches are dug, piles are driven, and fixed troughs 4 are installed in the wet area 3; then, the purified ceramsite of Preparation Example 3 is filled in the basalt fiber woven bag, and the basalt fiber woven bag filled with purified ceramsite is filled into the trough body 41, and then the upper cover of the trough body 41 is closed;

[0106] S2. In the wetland area 3, two rows of ginkgo trees are planted at intervals of 8m along the waterside and 16m from the wetland area 3 to the nearshore area 1. The ginkgo trees are planted in the empty areas between the fixed grooves 4.

[0107] S3, setting up an aquatic plant planting area 5 in the tidal flat area 2, and planting reeds at intervals of 200 mm;

[0108] S4. In the nearshore area 1, a row of willow trees is planted at intervals of 6 m along the shore;

[0109] S5. During the period when the tidal flat area 2 is flooded, a 2m wide moored floating island of aquatic economic crops is set between the aquatic plant planting area 5 and the Metasequoia planting area of ​​the wetland area 3, and water celery is planted and harvested regularly.

[0110] Example 8

[0111] The size of the groove body 41 of the fixing groove 4 of this embodiment is 1250 mm×1250 mm×250 mm.

[0112] The method for restoring the tidal flat wetland ecosystem of this embodiment comprises the following steps:

[0113] S1, in the wet area 3, a fixed trough 4 is arranged at intervals of 6.5 meters, trenches are dug, piles are driven, and fixed troughs 4 are installed in the wet area 3; then, the purified ceramsite of Preparation Example 3 is filled in the basalt fiber woven bag, and the basalt fiber woven bag filled with purified ceramsite is filled into the trough body 41, and then the upper cover of the trough body 41 is closed;

[0114] S2. In the wetland area 3, two rows of ginkgo trees are planted at intervals of 9 m along the waterside and 18 m along the direction from the wetland area 3 to the nearshore area 1. The ginkgo trees are planted in the empty areas between the fixed grooves 4.

[0115] S3, setting up an aquatic plant planting area 5 in the tidal flat area 2, and planting reeds at intervals of 250 mm;

[0116] S4. In the nearshore area 1, a row of willow trees is planted at 5m intervals along the shore;

[0117] S5. During the period when the tidal flat area 2 is flooded, a 1.8m wide moored floating island of aquatic economic crops is set between the aquatic plant planting area 5 and the Metasequoia planting area of ​​the wetland area 3, and water celery is planted and harvested regularly.

[0118] Comparative Example

[0119] The comparative examples of this application were tested in a control area.

[0120] The method for restoring the tidal flat wetland ecosystem of the comparative example of the present application comprises the following steps:

[0121] S1. Build a dam on the side of wetland area 3 away from the shore, then drain all the water in the area enclosed by the dam, then dig out the silt in wetland area 3 and tidal flat area 2, set up a sludge treatment site on the river bank, use existing biological treatment combined with chemical treatment to treat the sludge until the COD is reduced to less than 150 mg / L, and finally backfill it into wetland area 3 and tidal flat area 2;

[0122] S2, in the wetland area 3, within the area with a width of 20 meters on one side of the tidal flat area 2, and in the area of ​​the tidal flat area 2, reeds are planted at intervals of 250 mm;

[0123] S3. In the nearshore zone 1, plant two rows of willow trees at intervals of 5 m along the waterfront and 10 m along the wetland zone 3 to the nearshore zone 1;

[0124] S4, the purified ceramsite of Preparation Example 3 was sprinkled in the wet area 3 in a manner of sprinkling 2.5 kg per square meter;

[0125] S5. Remove the dam and complete the repair.

[0126] Effect detection

[0127] The repair effects of the repair methods of Examples 1 to 8 of the present application and the comparative example were tested.

[0128] The restoration was completed 2 months before the withering period of the reeds, and the planted pine and willow trees, as well as the reeds, were planted by transplanting the plants in the growing period. The 8 experimental areas were restored by the restoration methods of Examples 1 to 8, and the control area was restored by the restoration method of the comparative example.

[0129] On the 60th, 120th and 180th day after the completion of the restoration, samples were taken to test the turbidity of the water in wetland area 3, the COD and ammonia nitrogen content of the water in the area of ​​wetland area 3 located on the side of tidal flat area 2, and the silt COD in the area of ​​wetland area 3 located on the side of tidal flat area 2; and the animal habitat was observed. All test results are shown in Tables 1 to 3 below.

[0130] Table 1 60-day test results after repair

[0131] Turbidity (NTU) Water COD (mg / L) Ammonia nitrogen content in water (mg / L) Sludge COD (mg / L) Example 1 4.1 11.2 0.49 273 Example 2 3.9 10.8 0.46 271 Example 3 3.8 10.4 0.46 258 Example 4 4.0 11.3 0.48 266 Example 5 4.5 11.9 0.52 284 Example 6 3.7 10.3 0.43 261 Example 7 3.7 10.2 0.44 252 Example 8 3.6 10.0 0.41 244 Comparative Example 3.2 10.5 0.42 141

[0132] Table 2 Test results 120 days after repair completion

[0133] Turbidity (NTU) Water COD (mg / L) Ammonia nitrogen content in water (mg / L) Sludge COD (mg / L) Example 1 3.9 10.2 0.54 262 Example 2 3.7 9.9 0.52 251 Example 3 3.6 9.6 0.52 247 Example 4 3.9 10.1 0.53 252 Example 5 4.0 10.4 0.57 256 Example 6 3.7 9.7 0.49 244 Example 7 3.7 9.8 0.48 241 Example 8 3.5 9.4 0.44 229 Comparative Example 4.5 14.4 0.68 647

[0134] Table 3 Test results after 180 days of repair completion

[0135]

[0136]

[0137] Through observation, it was found that birds had inhabited the tidal flat wetlands in the experimental area at 60 days, and birds had fixed inhabitations at 180 days; birds had inhabited the tidal flat wetlands in the control area at 60 days, and the number of inhabiting birds at 120 days did not change significantly from that at 60 days, and the number of inhabiting birds decreased significantly at 180 days.

[0138] It can be seen from the data in Tables 1 to 3 that Examples 1 to 8 of the present application adopt an ecological restoration planting area design in which large aquatic trees are planted in the wetland area 3, small and medium-sized aquatic plants are planted in the tidal flat area 2, and a row of willows or metasequoia are planted in the nearshore area 1; and a fixed trough 4 made of basalt material is set in the wetland area 3, and a large amount of purified expanded clay is fixed in the trough; the water body and underwater environment of the tidal flat wetland are significantly improved, plants grow normally, the ecological environment is significantly improved, and the ecological function is greatly restored.

[0139] The comparative example adopts a restoration method similar to the existing one, in which trees are planted in the nearshore area 1, aquatic plants such as reeds are planted in the tidal flat area 2 and the wetland area 3, and the sludge is initially purified, and then purified expanded clay is sprinkled in the wetland area 3; initially, the environment of the tidal flat wetland was rapidly restored, the vegetation was restored, and the ecological function was effectively restored; however, as the reeds withered and decayed, secondary pollution was formed on the tidal flat wetland, the environment deteriorated significantly, and the sustained effect was poor.

[0140] From the data comparison of Tables 1 to 3 and Examples 1 to 8, it can be seen that when the size of the fixed groove 4 of the present application is small, the planting density of Metasequoia glyptostroboides can be effectively increased, which is more conducive to the continuous restoration of the tidal flat wetland and the maintenance of the ecology. In order to increase the planting density of aquatic plants in the tidal flat area 2, it is necessary to adjust the tree planting density in the nearshore area 1 and the tree planting density in the wetland area 3, which is more conducive to the continuous improvement of the ecological environment.

[0141] Examples 9 to 12 of the present application use parts of Shahu Lake in Wuhan City, where environmental pollution is relatively serious, as the experimental area of ​​the program. This application sets up a total of 5 experimental areas, and the spacing between adjacent experimental areas is 500 meters. Each experimental area occupies a 500-meter wide area along the lake, and each experimental area is divided into nearshore area 1, tidal flat area 2 and wetland area 3 according to the design of this application. The sludge sampling test of the nearshore water body and wetland area 3 of each experimental area showed that the COD of the water in the experimental area was 76.2 to 79.6 mg / L, and the ammonia nitrogen was 1.2 to 1.4 mg / L; the COD of the sludge in wetland area 3 of the experimental area and the control area was 700 to 800 mg / L.

[0142] Example 9

[0143] The size of the groove body 41 of the fixing groove 4 of this embodiment is 1250 mm×1250 mm×250 mm.

[0144] The method for restoring the tidal flat wetland ecosystem of this embodiment comprises the following steps:

[0145] S1, in the wetland area 3, a fixed trough 4 is set at an interval of 6.5 meters, and a trough is dug, piled, and a fixed trough 4 is installed in the wetland area 3; then the purified ceramsite of Preparation Example 3 is filled in the basalt fiber woven bag, and the basalt fiber woven bag filled with purified ceramsite is filled into the trough body 41, and then the upper cover of the trough body 41 is closed; on one side of the tidal flat area 2 close to the wetland area 3, a fixed trough 4 is set at an interval of 8 meters, and a row of fixed troughs 4 are installed, and then a basalt fiber woven bag filled with purified ceramsite is also placed in the fixed trough 4;

[0146] S2. In the wetland area 3, two rows of ginkgo trees are planted at intervals of 9 m along the waterside and 18 m along the direction from the wetland area 3 to the nearshore area 1. The ginkgo trees are planted in the empty areas between the fixed grooves 4.

[0147] S3, setting up an aquatic plant planting area 5 in the tidal flat area 2, and planting reeds at intervals of 250 mm;

[0148] S4. In the nearshore area 1, a row of willow trees is planted at 5m intervals along the shore;

[0149] S5. During the period when the tidal flat area 2 is flooded, a 1.8m wide moored floating island of aquatic economic crops is set between the aquatic plant planting area 5 and the Metasequoia planting area of ​​the wetland area 3, and water celery is planted and harvested regularly.

[0150] Example 10

[0151] The difference between this embodiment and Embodiment 9 is that in step S1, on one side of the tidal flat area 2 close to the wetland area 3, a fixed groove 4 is arranged at intervals of 6.5 meters, trenches are dug, piles are driven, and the fixed grooves 4 are installed.

[0152] Embodiment 11

[0153] The difference between this embodiment and Embodiment 9 is that in step S1, trenches are dug, piles are driven, and a row of fixed trenches 4 are installed on one side of the tidal flat area 2 close to the wetland area 3 in a distribution manner of setting a fixed trench 4 at intervals of 5 meters.

[0154] Example 12

[0155] The difference between this embodiment and Embodiment 9 is that in step S1, on one side of the tidal flat area 2 close to the wetland area 3, a fixed groove 4 is arranged at intervals of 3.5 meters, trenches are dug, piles are driven, and a row of fixed grooves 4 are installed.

[0156] Comparison Example

[0157] This control example was repaired using exactly the same repair method as Example 8.

[0158] The same repair effect test was performed on Examples 9 to 12 of the present application and the control example, and samples were taken for testing on the 60th day and 180th day after the completion of the repair.

[0159] The results are shown in Tables 4 and 5 below.

[0160] Table 4 Test results after 60 days of repair completion

[0161] Turbidity (NTU) Water COD (mg / L) Ammonia nitrogen content in water (mg / L) Sludge COD (mg / L) Example 9 4.9 42.4 0.92 482 Example 10 4.7 40.6 0.90 465 Embodiment 11 4.6 38.2 0.89 448 Example 12 4.4 35.6 0.88 421 Comparison Example 5.4 53.1 0.98 628

[0162] Table 5 Test results after 180 days of repair completion

[0163] Turbidity (NTU) Water COD (mg / L) Ammonia nitrogen content in water (mg / L) Sludge COD (mg / L) Example 9 3.6 12.4 0.29 296 Example 10 3.4 11.9 0.28 282 Embodiment 11 3.4 11.7 0.26 274 Example 12 3.3 11.2 0.24 257 Comparison Example 4.6 25.1 0.58 399

[0164] By comparing the data in Table 4 and Table 5, it can be seen that for the tidal flat wetlands of seriously polluted lakes, after adding a fixed trough 4 in the tidal flat area 2 and placing basalt fiber woven bags filled with purified expanded clay, the repair and continuous purification effects of the water body and bottom silt in the tidal flat wetland area are significantly enhanced.

[0165] The present application also designs an optimized design scheme for porous basalt ceramsite, which can prepare porous basalt ceramsite with larger specific surface area, better microbial fixation effect and better environmental affinity.

[0166] The preparation method of the porous basalt ceramsite optimized in the present application comprises the following steps:

[0167] Sa, the raw material components of porous basalt ceramsite include: 36-42 parts of porous basalt powder, 18-24 parts of clay, 10-16 parts of bauxite, 32-38 parts of ammonium bicarbonate powder, 12-18 parts of lake sediment, and 12-18 parts of cyclohexyl alcohol; the raw materials are accurately weighed and mixed according to the raw material component mass proportions, and then fully stirred to form a mixture;

[0168] Sb, placing the mixture obtained in step Sa in a granulator for granulation to prepare granular blanks of target particle size;

[0169] Sc. The granular blank obtained in step Sb is heated to 300-320° C. in a vacuum furnace, kept warm for more than 15 minutes, then heated to 940-960° C., sintered at high temperature, and then cooled in the furnace to obtain porous basalt ceramsite.

[0170] The following are Examples 13 to 18 of this application

[0171] The sources of the raw materials in Examples 13 to 18 of the present application are as follows:

[0172] Porous basalt powder was purchased from Lingshou County Baixin New Materials Technology Co., Ltd.; clay was purchased from Shandong Lusheng Refractory Materials Co., Ltd.; bauxite was purchased from Shandong Lusheng Refractory Materials Co., Ltd.; ammonium bicarbonate powder was purchased from Wuxi Jingke Chemical Co., Ltd.; cyclohexylethanol was purchased from Shanghai Aladdin Biochemical Technology Co., Ltd.; lake sediment was homemade, which was obtained by digging out lake sediment, purifying it and then dehydrating it.

[0173] Example 13

[0174] The preparation method of the porous basalt ceramsite of the present embodiment comprises the following steps:

[0175] Sa, the raw material components of porous basalt ceramsite include: 36 parts of porous basalt powder, 18 parts of clay, 10 parts of bauxite, 32 parts of ammonium bicarbonate powder, 12 parts of lake sediment, and 12 parts of cyclohexylethanol; the raw materials are accurately weighed and mixed according to the raw material component mass proportions, and then fully stirred to form a mixture;

[0176] Sb, placing the mixture obtained in step Sa in a granulator for granulation to form granules with a particle size of 12 to 18 mm;

[0177] Sc. The granular blank obtained in step Sb is heated to 300° C. in a vacuum furnace, kept warm for 15 minutes, then heated to 940° C., sintered at high temperature, and then cooled in the furnace to obtain porous basalt ceramsite.

[0178] Embodiment 14

[0179] The preparation method of the porous basalt ceramsite of the present embodiment comprises the following steps:

[0180] Sa, the raw material components of porous basalt ceramsite include: 42 parts of porous basalt powder, 24 parts of clay, 16 parts of bauxite, 38 parts of ammonium bicarbonate powder, 18 parts of lake sediment, and 18 parts of cyclohexyl alcohol; the raw materials are accurately weighed and mixed according to the raw material component mass proportions, and then fully stirred to form a mixture;

[0181] Sb, placing the mixture obtained in step Sa in a granulator for granulation to form granules with a particle size of 12 to 18 mm;

[0182] Sc. The granular blank obtained in step Sb is heated to 300° C. in a vacuum furnace, kept warm for 15 minutes, then heated to 940° C., sintered at high temperature, and then cooled in the furnace to obtain porous basalt ceramsite.

[0183] Embodiment 15

[0184] The preparation method of the porous basalt ceramsite of the present embodiment comprises the following steps:

[0185] Sa, the raw material components of porous basalt ceramsite include: 40 parts of porous basalt powder, 20 parts of clay, 12 parts of bauxite, 36 parts of ammonium bicarbonate powder, 16 parts of lake sediment, and 14 parts of cyclohexylethanol; the raw materials are accurately weighed and mixed according to the raw material component mass proportions, and then fully stirred to form a mixture;

[0186] Sb, placing the mixture obtained in step Sa in a granulator for granulation to form granules with a particle size of 12 to 18 mm;

[0187] Sc. The granular blank obtained in step Sb is heated to 300° C. in a vacuum furnace, kept warm for 15 minutes, then heated to 940° C., sintered at high temperature, and then cooled in the furnace to obtain porous basalt ceramsite.

[0188] Example 16

[0189] The preparation method of the porous basalt ceramsite of the present embodiment comprises the following steps:

[0190] Sa, the raw material components of porous basalt ceramsite include: 40 parts of porous basalt powder, 20 parts of clay, 12 parts of bauxite, 36 parts of ammonium bicarbonate powder, 16 parts of lake sediment, and 14 parts of cyclohexylethanol; the raw materials are accurately weighed and mixed according to the raw material component mass proportions, and then fully stirred to form a mixture;

[0191] Sb, placing the mixture obtained in step Sa in a granulator for granulation to form granules with a particle size of 12 to 18 mm;

[0192] Sc. The granular blank obtained in step Sb is heated to 320° C. in a vacuum furnace, kept warm for 15 minutes, then heated to 960° C., sintered at high temperature, and then cooled in the furnace to obtain porous basalt ceramsite.

[0193] Embodiment 17

[0194] The preparation method of the porous basalt ceramsite of the present embodiment comprises the following steps:

[0195] Sa, the raw material components of porous basalt ceramsite include: 40 parts of porous basalt powder, 20 parts of clay, 12 parts of bauxite, 36 parts of ammonium bicarbonate powder, 16 parts of lake sediment, and 14 parts of cyclohexylethanol; the raw materials are accurately weighed and mixed according to the raw material component mass proportions, and then fully stirred to form a mixture;

[0196] Sb, placing the mixture obtained in step Sa in a granulator for granulation to form granules with a particle size of 12 to 18 mm;

[0197] Sc. The granular blank obtained in step Sb is heated to 310° C. in a vacuum furnace, kept warm for 15 minutes, then heated to 950° C., sintered at high temperature, and then cooled in the furnace to obtain porous basalt ceramsite.

[0198] Embodiment 18

[0199] The preparation method of the porous basalt ceramsite of the present embodiment comprises the following steps:

[0200] Sa, the raw material components of porous basalt ceramsite include: 40 parts of porous basalt powder, 20 parts of clay, 12 parts of bauxite, 36 parts of ammonium bicarbonate powder, 16 parts of lake sediment, and 14 parts of cyclohexylethanol; the raw materials are accurately weighed and mixed according to the raw material component mass proportions, and then fully stirred to form a mixture;

[0201] Sb, placing the mixture obtained in step Sa in a granulator for granulation to form granules with a particle size of 12 to 18 mm;

[0202] Sc. The granular blank obtained in step Sb is heated to 305° C. in a vacuum furnace, kept warm for 30 minutes, then heated to 950° C., sintered at high temperature, and then cooled in the furnace to obtain porous basalt ceramsite.

[0203] The specific surface area and crushing rate of the porous basalt ceramsite of Examples 13 to 18 of the present application were tested, and the specific results are shown in Table 6 below.

[0204] Table 6 Specific surface area test results of Examples 13 to 18

[0205] Embodiment 13 Embodiment 14 Embodiment 15 <![CDATA[Specific surface area (m 2 / g)]]> 17.6 18.2 18.5 Crushing rate (%) 4.5 4.4 4.6 Example 16 Embodiment 17 Embodiment 18 <![CDATA[Specific surface area (m 2 / g)]]> 18.6 18.7 18.6 Crushing rate (%) 4.9 3.8 1.9

[0206] It can be seen from the data in Table 6 that after the optimized porous basalt expanded clay design is adopted in the present application, the specific surface area is increased several times compared with the commercially available expanded clay, and the fixation effect of multiple microorganisms is obviously significantly improved.

[0207] In addition, the porous basalt expanded clay design optimized in this application, in addition to the basalt material components, also adds lake sediment to the raw materials. The resulting expanded clay has relatively better environmental affinity, which is conducive to the attachment and habitat of algae, plankton, fish, etc.

[0208] The applicant conducted an experiment using the above-mentioned porous basalt expanded clay to replace commercially available expanded clay, which significantly improved the restoration effect and sustained purification effect of tidal flat wetlands.

[0209] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A method for restoring a tidal flat wetland ecosystem, characterized in that: The restoration method divides the tidal flat wetland into a nearshore area (1) which is a wetland only in the flood season, a wetland area (3) which is a wetland only in the dry season, and a tidal flat area (2) located between the nearshore area (1) and the wetland area (3); the restoration method comprises the following steps: S1. A plurality of fixed grooves (4) are provided at intervals in the bottom mud of the wetland area (3), and a basalt fiber woven bag filled with purified ceramsite is fixedly arranged in the fixed groove (4), wherein the purified ceramsite is made of porous basalt ceramsite, and a water body restoration microbial composition is fixed in the purified ceramsite; S2. Planting Chinese cypress at intervals in wet areas (3); S3, setting up an aquatic plant planting area (5) in the tidal flat area (2) to plant aquatic plants; S4. Plant willow or metasequoia trees at intervals in the nearshore area (1); S5. During the period when the tidal flat area (2) is flooded, a moored floating island of aquatic cash crops is set between the aquatic plant planting area (5) and the Metasequoia planting area of ​​the wetland area (3), and aquatic cash crops are planted and harvested regularly.

2. The method for restoring a tidal flat wetland ecosystem according to claim 1, characterized in that: In the step S1, the size of the fixing groove (4) is 500-2000 mm×500-2000 mm×100-400 mm, and the spacing between the fixing grooves (4) is 5-6 m.

3. The method for restoring a tidal flat wetland ecosystem according to claim 1, characterized in that: In the step S1, the water body remediation microbial composition includes Candida tropicalis, Bacillus licheniformis, Bacillus subtilis, nitrifying bacteria and denitrifying bacteria.

4. The method for restoring a tidal flat wetland ecosystem according to claim 1, characterized in that: In step S1, the particle size of the purified ceramsite is 8 to 20 mm, and the specific surface area is not less than 3.5 m 2 / g.

5. The method for restoring a tidal flat wetland ecosystem according to claim 1, characterized in that: The planting distance of the Metasequoia glyptostroboides is 8 to 10 m.

6. The method for restoring a tidal flat wetland ecosystem according to claim 1, characterized in that: In step S3, the aquatic plants are selected from one or more of reed, pampas grass or reed bamboo.

7. The method for restoring a tidal flat wetland ecosystem according to claim 1, characterized in that: In step S3, the planting spacing of the aquatic plants is 200-400 mm.

8. The method for restoring a tidal flat wetland ecosystem according to claim 1, characterized in that: In the step S3, a plurality of fixed grooves (4) are provided at intervals on one side of the tidal flat area (2) located at the wetland area (3), and basalt fiber woven bags filled with purified ceramsite are fixedly arranged in the fixed grooves (4).

9. The method for restoring a tidal flat wetland ecosystem according to claim 1, characterized in that: In the step S4, the planting distance between the willow trees or metasequoia trees is 4 to 8 m.

10. The method for restoring a tidal flat wetland ecosystem according to claim 1, characterized in that: In step S5, the aquatic economic crops are selected from one or more of calamus, water celery, water plantain or sagittaria.

Citation Information

Patent Citations

  • Compound microorganism agent for treating black and odorous water body

    CN108441444A

  • Method for quickly building community of Yangtze River central island floodplain wetland plants

    CN112136410A

  • Reservoir tail hydro-fluctuation belt wetland restoration method based on forest habitat

    CN113615469A

  • Targeted target-based unit type mud flat wetland recovery method

    CN117426168A

  • Microorganism fixing material for treating polluted water body and preparation method of microorganism fixing material

    CN118495695A

Cited By

  • Treatment process applied to soil heavy metal pollution

    CN119702677A