Pre-buried grouting pipe construction technology
Through the construction process of pre-embedded grouting pipes, the problems of interruption and leakage in concrete transportation during construction are solved, efficient and low-cost leakage repair is achieved, and construction quality and efficiency are improved.
Patent Information
- Application Number
- CN202411078321.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-08-07
AI Technical Summary
During construction, problems such as interruption of concrete transport and concrete separation or aggregate sinking lead to a decline in construction quality. The existing restoration methods consume a lot of labor costs and affect the construction cycle.
Adopt the construction process of pre-embedded grouting pipes. First install grouting pipes in the building's easily leaky positions. After detecting the leakage point, the slurry is injected into the grouting pipe to solidify, repair the leakage point, and set the appropriate grouting pipe bending radius. The material feed assembly ensures uniform adhesion of the slurry and stability of the grouting tube.
It improves construction efficiency, saves construction costs, reduces manpower consumption and construction cycle during the restoration process, and improves the quality and stability of the restoration.
Smart Images

Figure CN118979649A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of building construction, and in particular to a pre-buried grouting pipe construction process. Background Art
[0002] When constructing a building, a large amount of concrete is often used. If the construction site (such as a station) is located in a downtown area and traffic is congested, the transportation of concrete will be interrupted, and the continuous supply of concrete cannot be guaranteed, which affects the combination of new and old concrete and leads to a decline in the construction quality of the building. In addition, when constructing taller buildings, there is a phenomenon of concrete segregation or aggregate sinking, which also leads to a decline in the construction quality of the building.
[0003] In the related art, if there is a connection between old and new concrete in a building, or if the concrete pouring at the bottom of the building is insufficient, a notch is usually drilled at the corresponding problem location of the building, and then concrete is poured again in the notch. After the concrete solidifies, it is further repaired to overcome the problem of poor construction quality of the building. However, this method requires a lot of manpower costs, and the repair process will affect the construction period, which has many disadvantages for the construction. Summary of the invention
[0004] In order to improve the efficiency of building construction and save construction costs, the present application provides a pre-buried grouting pipe construction process.
[0005] The present application provides a pre-buried grouting pipe construction process, which adopts the following technical solution:
[0006] A pre-buried grouting pipe construction process includes the following construction processes:
[0007] S1: After the construction of some buildings is completed, grouting pipes are installed at the locations prone to leakage in the buildings;
[0008] S2: construct another part of the building, and the grouting pipe is set between the two parts of the building;
[0009] S3: Detect the location of leakage points in two parts of the building;
[0010] S4: According to the leakage point of the building, slurry is introduced into the grouting pipe corresponding to the leakage point.
[0011] By adopting the above technical scheme, when constructing a building, after completing part of the building, grouting pipes are pre-buried at the location of the building that is prone to leakage (construction joints, cold joints or gaps between adjacent buildings). After the grouting pipes are pre-buried, another part of the building is constructed, and the feed port of the grouting pipe is exposed to the outside of the building. After the construction of the building is completed, the building is checked for leakage points. If there is a leakage point somewhere in the building, the slurry is passed into the grouting pipe. The slurry solidifies in contact with the building, thereby repairing the leakage point of the building, thereby improving the efficiency of the construction and saving construction costs.
[0012] Optionally, in step S4, grouting is performed at the lowest end of the grouting pipe.
[0013] By adopting the above technical solution, when the slurry is introduced into the grouting pipe through the feed port, the slurry moves slowly in the grouting pipe at the lowest end of the grouting pipe. This arrangement allows more slurry to be evenly attached to the leakage location, which helps to improve the quality of building repair.
[0014] Optionally, in step S1, the bending radius of the grouting pipe is between 10 mm and 20 mm.
[0015] By adopting the above technical solution, when a gradual pipe is installed at a leakage position with a curved trajectory, the bending radius of the grouting pipe is set between 10 mm and 20 mm. In this way, when the slurry moves in the grouting pipe, the grouting time is reduced due to excessive bending of the grouting pipe, or the slurry is easily blocked in the grouting pipe due to too small bending of the grouting pipe.
[0016] Optionally, in step S4, a material passing assembly is included for passing the slurry into the grouting pipe; the material passing assembly includes a delivery pipe, a connecting pipe and a first fixing member; the connecting pipe extends into the grouting pipe and is connected to the grouting pipe; the delivery pipe is arranged at the other end of the connecting pipe through the first fixing member, and is used for passing the slurry into the connecting pipe.
[0017] By adopting the above technical solution, one end of the connecting pipe is connected to one end of the grouting pipe, the other end of the delivery pipe is close to the other end of the connecting pipe, and the delivery pipe and the connecting pipe are fixed using a first fixing member, so as to facilitate the introduction of slurry into the grouting pipe.
[0018] Optionally, the first fixing member includes at least two fixing blocks, a fixing bolt and a fixing nut; the two fixing blocks are rotatably connected to the connecting pipe, and a fixing space for the conveying pipe is formed between the fixing blocks; the fixing bolt passes through the relatively arranged fixing blocks; the fixing nut is threadedly connected to the fixing bolt and can be tightly pressed against the fixing blocks.
[0019] By adopting the above technical solution, the delivery pipe is close to the connecting pipe, the end of the delivery pipe is aligned with the connecting pipe, the fixing block is adjusted, the two fixing blocks cover the delivery pipe, the fixing bolt is adjusted, the fixing bolt passes through the fixing block, the fixing nut is adjusted, the fixing nut moves on the fixing bolt, and when the fixing nut is tightly pressed against the fixing block, the purpose of fixing the delivery pipe on the connecting pipe is achieved; at the same time, after pouring for a period of time, the first fixing piece can be adjusted to separate the delivery pipe from the connecting pipe, so as to facilitate the cleaning of the delivery pipe.
[0020] Optionally, a side of the fixing block close to the delivery pipe has a groove, and the groove is matched with the outer peripheral side of the delivery pipe.
[0021] By adopting the above technical solution, a groove is set on the side of the fixed block close to the delivery pipe, which can make the fixed block and the delivery pipe fit better, improve the connection strength between the delivery pipe and the connecting pipe, thereby reducing the phenomenon of the delivery pipe detaching during the grouting process and improving the repair stability of the building.
[0022] Optionally, the material passing assembly also includes a second fixing member; the connecting pipe is provided with an arc-shaped ear, and when the connecting pipe is extended into the grouting pipe, the arc-shaped ear contacts the outer peripheral side of the grouting pipe; the second fixing member includes an arc-shaped clamping block and a fixing screw; the arc-shaped clamping block is provided with a through hole through which the connecting pipe passes, and the arc-shaped clamping block can be clamped against the side of the arc-shaped ear away from the grouting pipe, and the fixing screw is used to fix the arc-shaped clamping block to the building.
[0023] By adopting the above technical solution, when the connecting pipe is extended into the grouting pipe through the feed port, the arc-shaped ear arranged on the connecting pipe is in tight contact with the outer peripheral side of the grouting pipe, and then the arc-shaped clamping block is adjusted, and the arc-shaped clamping block slides on the connecting pipe. After the arc-shaped clamping block is in tight contact with the arc-shaped ear, the arc-shaped clamping block is fixed to the building by fixing screws, thereby achieving the purpose of fixing the connecting pipe to the grouting pipe.
[0024] Optionally, along the axial direction of the grouting pipe, the distance between adjacent arc-shaped abutting blocks is between 200 and 300 mm.
[0025] By adopting the above technical solution, by setting the distance between two adjacent arc-shaped clamping blocks between 200 and 300 mm, on the one hand, the fixing effect of the grouting pipe on the building can be improved, and on the other hand, the phenomenon of grouting quality degradation caused by the movement of the grouting pipe during the grouting process can be reduced.
[0026] Optionally, the connecting pipe is made of flexible material.
[0027] By adopting the above technical solution, the connecting pipe is set to a flexible material, which is convenient for connection with the grouting pipes at leakage positions in different directions, so that pre-buried grouting can be performed on leakage positions of different shapes.
[0028] Optionally, a plurality of the material passing assemblies are provided along the axial direction of the grouting pipe.
[0029] By adopting the above technical solution, multiple material passing components are set, and selective grouting can be performed according to the leakage conditions of different leakage locations. While ensuring the repair effect of the leakage location, the waste of slurry can be reduced and the repair cost of the leakage location can be reduced.
[0030] In summary, the present application includes at least one of the following beneficial technical effects:
[0031] 1. Pre-buried grouting pipes are placed at locations prone to leakage (construction joints, cold joints, or gaps between adjacent buildings) in the building. After the grouting pipes are pre-buried, another part of the building is constructed, and the feed port of the grouting pipe is exposed to the outside of the building. After the building is constructed, the building is checked for leakage points. If there is a leakage point somewhere in the building, the slurry is passed into the grouting pipe. The slurry solidifies in contact with the building to repair the leakage point of the building, thereby improving the efficiency of the construction and saving construction costs.
[0032] 2. The bending radius of the grouting pipe is set between 10mm and 20mm. In this way, when the slurry moves in the grouting pipe, the grouting time is too long due to the excessive bending of the grouting pipe, or the slurry is easily blocked in the grouting pipe due to the small bending of the grouting pipe.
[0033] 3. By setting a groove on the side of the fixed block close to the delivery pipe, the fixed block and the delivery pipe can be better matched, the connection strength between the delivery pipe and the connecting pipe is improved, thereby reducing the phenomenon of the delivery pipe detaching during the grouting process and improving the repair stability of the building.
[0034] 4. By making the connecting pipe a flexible material, it is easy to connect with the grouting pipes at leakage positions in different directions, so that pre-buried grouting can be performed on leakage positions of different shapes.
[0035] 5. By providing multiple material-passing components, selective grouting can be performed according to the leakage conditions of different leakage locations, thereby reducing the waste of slurry and the cost of repairing the leakage locations while ensuring the repair effect of the leakage locations. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0037] Figure 1 It is a schematic diagram of repairing the root of a building by using a pre-buried grouting pipe construction process in the present application.
[0038] Figure 2 This is a schematic diagram of a pre-buried grouting pipe construction process for repairing a building construction joint.
[0039] Figure 3 It is a schematic diagram of a structure used in the construction process of a pre-buried grouting pipe in the present application.
[0040] Figure 4 yes Figure 3 Enlarged view of part A in the middle.
[0041] Figure 5 It is a schematic diagram of a structure used in the construction process of a pre-buried grouting pipe in the present application.
[0042] Figure 6 yes Figure 5 Enlarged view of part B in the middle.
[0043] Figure 7 yes Figure 5 Enlarged view of part C in the middle.
[0044] Explanation of the reference numerals: 1. grouting pipe; 11. hard plastic pipe; 12. soft rubber pipe; 13. discharge port; 2. material passing assembly; 21. conveying pipe; 22. connecting pipe; 221. arc-shaped ear; 23. first fixing member; 231. fixing block; 2311. groove; 232. fixing bolt; 233. fixing nut; 24. second fixing member; 241. arc-shaped tightening block; 242. fixing screw. DETAILED DESCRIPTION
[0045] The following is combined with Figures 1 to 7 This application is described in further detail.
[0046] The embodiment of the present application discloses a pre-buried grouting pipe construction process.
[0047] When constructing a building, a large amount of concrete is often used. If the construction site (such as a station) is in a downtown area and traffic is congested, the transportation of concrete will be interrupted, and the continuous supply of concrete cannot be guaranteed, which will cause cold joints in the concrete. The inventor has found that if the construction is in summer and the weather is hot, the concrete may lose a lot of slump. In order to ensure the construction progress or convenience, water is directly added to the concrete at the construction site, resulting in concrete segregation or slump that does not meet the standard design requirements. Furthermore, the side wall of the station is high, and when pouring concrete, the free fall distance is large, causing concrete segregation or aggregate sinking, forming rotten wall roots. Or, during construction work, improper operation by construction workers will cause the steel bars to be tied tightly, making it difficult to insert the vibrator, resulting in vibration leakage, insufficient vibration, and insufficient vibration, which affects the density of the concrete.
[0048] Also, during construction, garbage at the joints is not cleaned thoroughly, causing the concrete to become loose and not dense in parts during the concrete pouring process. The waterstop installation position is not centered, and the connection is not standardized. For example, the overlap length of the steel plate waterstop is not enough, and the weld is not continuous; the steel edge glue waterstop connection is not hot-melt treated; or drilling holes are performed on the waterstop to fix it, causing leakage hazards. Or when the concrete structure does not reach the designed strength, the side wall formwork and support are removed in advance, causing cracks in the concrete structure. When a large amount of concrete is poured in the station structure, in addition to the hydration heat of the concrete and the temperature difference between the inside and outside of the concrete, cracks will occur; at the same time, untimely or inadequate maintenance will also cause cracks in the newly poured concrete structure.
[0049] In the related art, the general process for repairing leaking concrete is as follows:
[0050] Check the leakage point: The simplest and most effective way is to wipe the wall to be checked dry, sprinkle a layer of dry cement on the wall, if there are wet spots or lines, the location of the penetration seam can be determined. If the wet area is too large, you can sprinkle another layer of dry cement powder on it, so that you can clearly see the penetration site.
[0051] Drilling and punching holes: For penetration at construction joints, a groove should be chiseled out along the penetration joint at the penetration point, and then holes should be drilled in the groove.
[0052] Cleaning: After completing the above steps, the chiseled point should be cleaned carefully.
[0053] Burying the grouting pipe 1: When setting the grouting pipe 1, pay attention to aligning the center of the pipe mouth with the hole, and then fix it around the grouting pipe 1 with sealing powder. For linear cracks, pay attention to sealing all the chiseled parts. In places where it is inconvenient to drill holes or bury the grouting pipe 1, foam strips can be used for sealing, but sealing powder must also be used for preliminary fixation.
[0054] Grouting: After burying the grouting pipe 1, grouting is carried out. First, some colored water is used for grouting. After the grouting is completed, the wall surface can be checked again. When no water leakage is found, grouting can be carried out. If the range to be grouted is large, one of the holes needs to be left ungrouted. After the grouting of other cavities is completed and there is no leakage, grouting can be carried out on this hole.
[0055] Inspection: After the above process is completed, the dry cement method is used for inspection again. If there are no traces, it proves success. If traces still appear, repeat the above steps. If grouting fails several times, you can consider using chemical grouting to seal it.
[0056] However, the related technology has the problems of repeated concrete leakage, poor appearance quality, long grinding time, long plugging time and low work efficiency.
[0057] Based on this, a pre-buried grouting pipe 1 construction process is provided ( Figure 1 It is a schematic diagram of repairing the root of a building in an embodiment of the present disclosure. Figure 2 is a schematic diagram of repairing a construction joint in an embodiment of the present disclosure), see Figure 1 , Figure 2 , including the following construction processes:
[0058] S1: After the construction of part of the building is completed, a grouting pipe 1 is installed at the location of the building that is prone to leakage;
[0059] S2: construct another part of the building, and the grouting pipe 1 is arranged between the two parts of the building;
[0060] S3: Detect the location of leakage points in two parts of the building;
[0061] S4: According to the leakage point of the building, slurry is introduced into the grouting pipe 1 corresponding to the leakage point.
[0062] In the implementation of the present disclosure, when a building is constructed, a grouting pipe 1 is pre-buried in the building. After the construction of the building is completed, if a leakage occurs in the building, after the leakage is detected, slurry is injected into the grouting pipe 1 corresponding to the leakage to achieve the purpose of plugging the leakage. In this way, the process of grooving and drilling holes in the building is reduced in the later stage, which helps to save the cost of plugging the leakage; at the same time, there is no need to repair the grooved part in the later stage, which improves the efficiency of plugging the leakage and also helps to improve the aesthetics of plugging the leakage.
[0063] In some embodiments of the present disclosure, see Figure 3 , Figure 4The grouting pipe 1 includes a soft rubber pipe 12 and a hard plastic pipe 11; the hard plastic pipe 11 is coaxially arranged in the soft rubber pipe 12, wherein there is a discharge port 13 in the hard plastic pipe 11, and the discharge port 13 is arranged to facilitate the discharge of the slurry. When constructing some buildings, the soft rubber pipe 12 is subjected to the pressure outside the concrete. Due to the effect of pressure, the soft rubber pipe 12 is tightly attached to the discharge port 13 of the hard plastic pipe 11 to prevent the concrete slurry from mixing into the grouting pipe 1 during the pouring process. During the grouting process, when the pressure inside the grouting pipe 1 reaches a certain level, the slurry can lift the soft rubber pipe 12 under the action of pressure and overflow from the discharge port 13, thereby filling the leakage position and achieving the effect of blocking the leakage position.
[0064] Furthermore, the soft rubber tube 12 is fully matched with the building to achieve sealing of the building, which can reduce the entry of external moisture into the space between the two parts of the building and play a certain sealing role.
[0065] In some embodiments of the present disclosure, in step S4, grouting is performed at the lowest end of the grouting pipe 1. Such an arrangement can ensure sufficient grouting, so that more slurry can be attached to the leakage position, which helps to improve the repair quality of the leakage position of the building.
[0066] In some embodiments of the present disclosure, in step S1, the bending radius of the grouting pipe 1 is between 10 mm and 20 mm. In this way, when the gradual pipe is installed at a leakage position with a curved trajectory, the bending radius of the grouting pipe 1 is set between 10 mm and 20 mm, so that when the slurry moves in the grouting pipe 1, the phenomenon of the grouting time being too long due to the excessive bending of the grouting pipe 1, or the slurry being easily blocked in the grouting pipe 1 due to the small bending of the grouting pipe 1 is reduced.
[0067] In some embodiments of the present disclosure, see Figure 5 In step S4, a material passing component 2 is included for passing slurry into the grouting pipe 1; the material passing component 2 includes a delivery pipe 21, a connecting pipe 22 and a first fixing member 23; the connecting pipe 22 extends into the grouting pipe 1 and is connected to the grouting pipe 1; the delivery pipe 21 is arranged at the other end of the connecting pipe 22 through the first fixing member 23, and is used for passing slurry into the connecting pipe 22.
[0068] In this embodiment, see Figure 6 The first fixing member 23 includes at least two fixing blocks 231, a fixing bolt 232 and a fixing nut 233; the two fixing blocks 231 are rotatably connected to the connecting pipe 22, and a fixing space for the conveying pipe 21 is formed between the fixing blocks 231; the fixing bolt 232 passes through the relatively arranged fixing blocks 231; the fixing nut 233 is threadedly connected to the fixing bolt 232 and can be tightly pressed against the fixing block 231.
[0069] Furthermore, a pressure sensor is installed between the fixed block 231 and the delivery pipe 21 to monitor the pressure changes between the two in real time. When the fixing bolt 232 and the fixing nut 233 tighten the fixed block 231, the pressure sensor can record and feedback the pressure value between the fixed block 231 and the delivery pipe 21. The pressure sensor can detect whether there is uneven pressure distribution or looseness during the fixing process. By real-time monitoring of pressure changes, when it is detected that the pressure between the fixed block 231 and the delivery pipe 21 reaches a preset value, the system confirms that the installation has been firmly in place, ensuring the tight connection between the grouting pipe 1 and the connecting pipe 22, and improving the installation quality. During the construction process, the pressure sensor can also continuously monitor the connection status between the delivery pipe 21 and the connecting pipe 22. When an abnormal drop in the pressure value is detected, the system will sound an alarm, indicating that there may be a falling off or loosening phenomenon. At this time, the construction personnel can check and re-fix in time to avoid grouting failure or construction delay caused by the falling off of the delivery pipe. The data monitored by the pressure sensor can be transmitted to the remote control terminal through the wireless transmission module, which is convenient for construction management personnel to monitor and adjust the grouting process in real time. When the system detects insufficient fixing pressure or risk of falling off, the remote control end can take immediate measures to ensure the continuity and safety of construction.
[0070] In some embodiments of the present disclosure, see Figure 6 The fixing block 231 has a groove 2311 on one side close to the delivery pipe 21, and the groove 2311 is matched with the outer peripheral side of the delivery pipe 21. By providing the groove 2311 on the side of the fixing block 231 close to the delivery pipe 21, the fixing block 231 and the delivery pipe 21 can be more matched, and the connection strength between the delivery pipe 21 and the connecting pipe 22 is improved, thereby reducing the phenomenon of the delivery pipe 21 being separated during the grouting process, and improving the repair stability of the building.
[0071] In some embodiments of the present disclosure, see Figure 7 The material passing assembly 2 also includes a second fixing member 24; an arc-shaped ear 221 is provided on the connecting pipe 22, and when the connecting pipe 22 extends into the grouting pipe 1, the arc-shaped ear 221 contacts the outer peripheral side of the grouting pipe 1; the second fixing member 24 includes an arc-shaped clamping block 241 and a fixing screw 242; the arc-shaped clamping block 241 is provided with a through hole through which the connecting pipe 22 passes, and the arc-shaped clamping block 241 can be clamped against the side of the arc-shaped ear 221 away from the grouting pipe 1, and the fixing screw 242 is used to fix the arc-shaped clamping block 241 to the building. When the connecting pipe 22 is extended into the grouting pipe 1 through the feed port, the arc-shaped ear 221 provided on the connecting pipe 22 is in tight contact with the outer peripheral side of the grouting pipe 1, and then the arc-shaped tightening block 241 is adjusted, and the arc-shaped tightening block 241 slides on the connecting pipe 22. After the arc-shaped tightening block 241 is in tight contact with the arc-shaped ear 221, the arc-shaped tightening block 241 is fixed to the building by the fixing screw 242, thereby achieving the purpose of fixing the connecting pipe 22 to the grouting pipe 1.
[0072] In addition, a pressure sensor is provided between the arc-shaped tightening block 241 and the arc-shaped ear 221 to monitor the installation effect and the flow of slurry in the grouting pipe based on pressure changes. Specifically, a pressure sensor is installed between the arc-shaped tightening block 241 and the arc-shaped ear 221 to monitor the pressure changes between the two in real time. When the connecting pipe 22 is extended into the grouting pipe 1 through the feed port and fixed by the arc-shaped tightening block 241 and the fixing screw 242, the pressure sensor can monitor the pressure changes during the installation process to ensure that the installation is stable and in place. The pressure sensor can detect whether there is uneven pressure distribution or looseness during the installation process, so as to adjust the fixings in time to ensure the tight connection between the grouting pipe 1 and the connecting pipe 22 and improve the installation quality. During the grouting process, the pressure sensor can also monitor the flow of slurry in the grouting pipe 1 in real time. When the slurry flows in the grouting pipe, it will cause pressure changes. By monitoring these changes, the system can understand the flow status of the slurry in real time and determine whether there are problems such as blockage or abnormal flow rate. The monitored data can be transmitted to the remote control end through the wireless transmission module, which is convenient for construction management personnel to monitor and adjust the grouting process in real time and improve construction efficiency and quality.
[0073] In some embodiments of the present disclosure, the distance between adjacent arc-shaped abutting blocks 241 is between 200 and 300 mm along the axial direction of the grouting pipe 1. In this way, on the one hand, the fixing effect of the grouting pipe 1 on the building can be improved, and on the other hand, the phenomenon of the grouting quality being reduced due to the movement of the grouting pipe 1 during the grouting process can be reduced.
[0074] In some embodiments of the present disclosure, the connecting pipe 22 is made of a flexible material. Thus, the connecting pipe 22 can be connected to the grouting pipe 1 at different leakage positions by changing the angle of the connecting pipe 22, so that pre-embedded grouting can be performed on leakage positions of different shapes.
[0075] In some embodiments of the present disclosure, a plurality of material passing assemblies 2 are provided along the axial direction of the grouting pipe 1. In this way, selective grouting can be performed according to the leakage conditions of different leakage locations, while ensuring the repair effect of the leakage location, the waste of slurry can be reduced, and the repair cost of the leakage location can be reduced.
[0076] Unless otherwise defined, the technical terms or scientific terms used in this application should be understood by people with ordinary skills in the field to which this application belongs. The words "first", "second", "third" and similar words used in the specification and claims of this application do not indicate any order, quantity or importance, but are only used to distinguish different components. "One" or "one" and similar words do not indicate a quantitative limit, but indicate that there is at least one. "Include" or "comprise" and similar words mean that the elements or objects appearing before "include" or "comprise" include the elements or objects listed after "include" or "comprise" and their equivalents, and do not exclude other elements or objects. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0077] The above are all optional embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A pre-buried grouting pipe construction process, characterized in that: The method comprises the following construction processes: S1: after a part of the building is constructed, a grouting pipe (1) is installed at a location of the building that is prone to leakage; S2: another part of the building is constructed, and the grouting pipe (1) is arranged between the two parts of the building; S3: Detecting the positions of the leakage points of the two parts of the building; S4: According to the leakage points of the building, injecting slurry into the grouting pipe (1) corresponding to the leakage points.
2. A pre-buried grouting pipe construction process according to claim 1, characterized in that: In step S4, grouting is performed at the lowest end of the grouting pipe (1).
3. A pre-buried grouting pipe construction process according to claim 1, characterized in that: In the step S1, the bending radius of the grouting pipe (1) is between 10 mm and 20 mm.
4. A pre-buried grouting pipe construction process according to claim 1, characterized in that: In step S4, a material passing component (2) is included for passing slurry into the grouting pipe (1); the material passing component (2) includes a delivery pipe (21), a connecting pipe (22) and a first fixing member (23); the connecting pipe (22) extends into the grouting pipe (1) and is connected to the grouting pipe (1); the delivery pipe (21) is arranged at the other end of the connecting pipe (22) through the first fixing member (23) and is used for passing slurry into the connecting pipe (22).
5. A pre-buried grouting pipe construction process according to claim 4, characterized in that: The first fixing member (23) comprises at least two fixing blocks (231), a fixing bolt (232) and a fixing nut (233); the two fixing blocks (231) are rotatably connected to the connecting pipe (22), and a fixing space for the conveying pipe (21) is formed between the fixing blocks (231); the fixing bolt (232) passes through the fixing blocks (231) arranged opposite to each other; the fixing nut (233) is threadedly connected to the fixing bolt (232) and can be tightly pressed against the fixing blocks (231).
6. A pre-buried grouting pipe construction process according to claim 5, characterized in that: A groove (2311) is provided on a side of the fixing block (231) close to the delivery pipe (21), and the groove (2311) is adapted to the outer peripheral side of the delivery pipe (21).
7. A pre-buried grouting pipe construction process according to claim 4, characterized in that: The material passing assembly (2) further comprises a second fixing member (24); the connecting pipe (22) is provided with an arc-shaped ear (221), and when the connecting pipe (22) is extended into the grouting pipe (1), the arc-shaped ear (221) contacts the outer peripheral side of the grouting pipe (1); the second fixing member (24) comprises an arc-shaped clamping block (241) and a fixing screw (242); the arc-shaped clamping block (241) is provided with a through hole through which the connecting pipe (22) passes, and the arc-shaped clamping block (241) can be clamped against a side of the arc-shaped ear (221) away from the grouting pipe (1), and the fixing screw (242) is used to fix the arc-shaped clamping block (241) to the building.
8. A pre-buried grouting pipe construction process according to claim 7, characterized in that: Along the axial direction of the grouting pipe (1), the distance between adjacent arc-shaped abutting blocks (241) is between 200 and 300 mm.
9. A pre-buried grouting pipe construction process according to claim 4, characterized in that: The connecting pipe (22) is made of flexible material.
10. A pre-buried grouting pipe construction process according to claim 4, characterized in that: A plurality of the material passing components (2) are arranged along the axial direction of the grouting pipe (1).
Citation Information
Patent Citations
Acrylate grouting plugging construction method for deformation joint
CN113137081A
Three-way steering device
CN203892775U
Construction joint built -in slip casting pipe
CN206144184U
Structure for preventing leakage of underground building structure extension connection part
CN209891255U
Leakage-proof detection device for pressure pipeline inspection
CN219367443U