66results about How to "Improve building construction efficiency" patented technology

Modularized steel structure unit construction

The invention relates to a modularized steel structure unit construction. The modularized steel structure unit construction is characterized in that two ends of a modularized steel structure unit framework are in frame steel flange plate structures; four steel flange plate corner parts on the frame steel flange plates are provided with hoisting holes and mounting holes and are provided with L-shaped steel corner elements with hoisting holes and mounting holes in a welding way; a lateral wall connection U-bar is combined through the mounting holes in the frame steel flange plates and the L-shaped steel corner elements; extra connectors are not required to exist among module unit bodies; direct connection between upper and lower units, left and right units and front and rear units can be fast achieved; each unit is stacked and combined to form an overall structure, and the overall structure has relatively high overall strength and forms a flexible seismic system. According to the modularized steel structure unit construction, standardized and industrial production of the modularized steel structure buildings can be achieved; a variety of forms of standard products are achieved, and the contradiction of assemblage and standardization of the building is solved. A composite maintenance structure disclosed by the invention has high-strength advantage of a steel structure and the performances of heat preservation and decoration, and the energy consumption of the building can be reduced by 80-90% compared with that of the conventional building.
Owner:赵冰洋

Quick template supporting construction method of elevator shaft

The invention discloses a quick template supporting construction method of an elevator shaft. Firstly, a supporting frame which comprises a bottom stretcher, middle vertical posts and a top workbench is constructed in the bottom of the elevator shaft; the top workbench is matched with the elevator shaft in size; the lower end of the bottom stretcher is butted on an elevator door; the upper end is built on an elevator shaft wall which is opposite to the elevator door; the upper ends of the middle vertical posts are articulated together with the bottom surface of the top workbench; the lower end of one group of the middle vertical posts is articulated together with the upper stretcher body of the bottom stretcher; the lower end of the other group of the middle vertical posts is clamped on the bottom stretcher; then, an inner and an outer wall templates and an outer scaffold are constructed on the top workbench for casting the elevator shaft wall; after one layer of elevator shaft is cast, the inner wall template is moved inwards to leave a wall surface; the outer wall template is removed; the supporting frame is integrally lifted upwardly by one layer by vertical lifting equipment; then, the inner wall template is moved outwardly to be near the wall surface; the outer wall template is repeatedly constructed; and the casting of a previous elevator shaft wall is finished.
Owner:XINJIANG CONSTR ENG GRP +2

Fabricated prefabricated reinforced concrete beam connection joint and construction method thereof

The invention discloses a fabricated prefabricated reinforced concrete beam connection joint and a construction method thereof. The connection joint comprises a lower convex prefabricated concrete beam and an upper convex prefabricated concrete beam. First concave openings are formed in the upper and lower end faces of the connection side wall of the lower convex prefabricated concrete beam, and second concave openings are correspondingly formed in the upper and lower end faces of the connection side wall of the upper convex prefabricated concrete beam; upper prefabricated steel plates and lower prefabricated steel plates are arranged inside the first concave openings and the second concave openings; the upper and lower prefabricated steel plates are correspondingly connected with upper and lower reinforcing steel plates; the connection side walls of the two beams are provided with a third concave opening and a fourth concave opening respectively, and load-bearing bars are correspondingly and transversely arranged inside the third concave opening and the fourth concave opening. The method comprises the steps of manufacturing the two beams, prefabricating the steel plates, performing butt connection on the two beams, and connecting the load-bearing bars inside the two beams. Due to the structural design, three-layer energy dissipation is achieved, and the problems that the shockresistance is poor and the ductility deformability is poor between dry type connection beams are solved; after seismic damage, replacement is easy, assembling is convenient, and the assembling rate is high.
Owner:CHANGAN UNIV

Building envelope inner and outer wall anti-seismic and sound insulation anti-cracking integrated structure and construction method thereof

Disclosed are a building envelope inner and outer wall anti-seismic and sound insulation anti-cracking integrated structure and a construction method of the structure. An outer wall is connected with the outer side of a frame column to form an integrated building envelope surrounding the frame column, one part of the frame column is embedded in the outer wall, the outer wall is a cast-in-place sandwich wall, the outer wall is filled with light porous inorganic core materials, a lightgage steel joist in the core materials is anchored with face plates on the two sides, the outer wall is connected with the inner wall through connecting ribs, and a reinforcing keel is arranged on the connecting portion. According to the structure, containment and heat preservation are integrated, connection between the cast-in-place light inorganic heat preservation composite outer wall and the constructed inner wall is successfully achieved, the good heat preservation, sound isolation and deformation anti-cracking treatment is achieved, industrial wastes are recycled to be used as raw materials to form nonflammable inorganic foam heat preservation slurry, and due to the rich porous structure in the slurry, the slurry has the excellent heat preservation and sound isolation effects. According to the structure and the method, form removal is not required, construction is easy, the forming speed is high, maintenance is not needed, flexible and continuous casting can be achieved, the building construction efficiency is improved by 30 percent, and the cost is reduced by more than 10 percent.
Owner:CHINA CONSTR SECOND ENG BUREAU LTD

Hole-free disassembly and assembly type aluminum form

The invention provides a hole-free disassembly and assembly type aluminum form, and belongs to the field of building forms. The hole-free disassembly and assembly type aluminum form comprises form main bodies and dorsal bars, the outer sides of the form main bodies are provided with containing cavities for containing the dorsal bars, each containing cavity is composed of a top plate, a bottom plate and a baffle are arranged on the corresponding bottom plate, the bottom plates are fixedly connected with the form main bodies, the top plates are in sliding connection with the form main bodies inthe height direction of the form main bodies, a group of first through grooves are formed in each bottom plate in the width direction, connecting rods and stop blocks are arranged at the bottoms of the baffles, the upper ends of the connecting rods are fixedly connected with the bottoms of the baffles, the lower ends of the connecting rods are fixedly connected with the stop blocks, the connectingrods penetrate through the first through grooves, the stop blocks are arranged at the bottoms of the bottom plates, the dorsal bars are arranged in the containing cavities, and the top plates or thebaffles of every two adjacent form main bodies are connected through fasteners. According to the aluminum form, the dorsal bars of different models can be installed in a hole-free mode according to requirements, the supporting strength requirement is met, and the structural performance of a poured and formed concrete pouring piece is better.
Owner:中铁一局集团建筑安装工程有限公司

Lifting device for building-attached lifting scaffold

The invention discloses a lifting device for a building-attached lifting scaffold (commonly known as 'climbing frame') or a building construction operation platform. The lifting device comprises a base, a lifting main machine, power boosting pulley blocks, a hinge, a tensioning mechanism and a chain. In the construction process, the base is fixed to the lower portion of a main frame of the attached lifting scaffold, the main machine is installed on the base, and the chain is wound across the power boosting pulley blocks and the lifting main machine. The number of the power boosting pulley blocks is two, and one power boosting pulley block is connected with a support of the attached lifting scaffold through the hinge. The tensioning mechanism is installed on the upper portion of the attached lifting scaffold. The lifting device can be matched with the universal attached lifting scaffold on the market, and ascends and descends along with a scaffold body. During construction, manual carrying is not needed, chain reversing is not needed, repeated wire disconnection and connection are not needed, the fault rate of equipment is reduced, the labor intensity of workers is relieved, the loss of the equipment is lowered, and the construction efficiency of a whole building is improved.
Owner:广东华坚金属制品有限公司

Building steel structure waterproof roof and construction method thereof

The invention discloses a building steel structure waterproof roof. The building steel structure waterproof roof comprises a plurality of supporting columns, the plurality of supporting columns are divided into two rows and arranged in parallel at equal intervals, a top beam is connected between the tops of every two supporting columns in the horizontal direction, and fixing bases are arranged atthe positions, close to the tops, of the front end and the rear end of each supporting column; a connecting rod is connected between the fixing bases on every two supporting columns in the longitudinal direction, a steel panel is connected between the tops of every two adjacent top beams, and a bearing mechanism is installed between the inner sides of every two supporting columns in the horizontaldirection and close to the lower portions of the top beams; bearing plates are installed at the positions, close to the lower portion of the corresponding bearing mechanism, of the opposite side surfaces of every two supporting columns located in the horizontal direction; and each bearing mechanism comprises a supporting beam, a plurality of vertical rods are welded to the bottom of the supporting beam at equal intervals, and mounting plates are welded to the bottoms of the vertical rods. According to the building steel structure waterproof roof, the stability is good, meanwhile, a heat insulation plate is convenient to install, the whole structure is firm and not prone to looseness, and the safety is good.
Owner:杭州紫腾材科技有限公司

Aluminum alloy formwork device for outer wall heat preservation

The invention provides an aluminum alloy formwork device for outer wall heat preservation. The aluminum alloy formwork device comprises an outer wall formwork, a heat preservation plate located on the inner side of the outer wall formwork, and a plurality of connecting bolts used for fixing the outer wall formwork and the heat preservation plate. Each connecting bolt comprises a connecting screw extending from the side, far away from the outer wall formwork, of the heat preservation plate and penetrating through the heat preservation plate and the outer wall formwork in sequence, a first nut fixed to the connecting screw in a sleeving mode, a third nut and a second nut which is located between the first nut and the third nut, wherein the second nut is located on the side, far away from the outer wall formwork, of the heat preservation plate, the third nut is located on the inner side of the outer wall formwork, and the outer wall formwork and the heat preservation plate are clamped and fixed through the second nut and the third nut. Compared with the prior art, the aluminum alloy formwork device has the advantages that the installing speed of the heat preservation plate is high, the building construction efficiency is high, the quality of an outer wall body is good, the installing cost of the heat preservation plate is low, and the workload of constructors is effectively reduced.
Owner:湖南好快省建筑科技有限公司

Electric climbing frame climbing speed control method, system and device and storage medium

The invention discloses an electric climbing frame climbing speed control method, system and device and a storage medium. The electric climbing frame climbing speed control method comprises the stepsthat position feature data of lifting mechanisms corresponding to a first electric climbing frame and a second electric climbing frame are obtained; if the position feature data of the lifting mechanisms corresponding to the first electric climbing frame and the second electric climbing frame are different, the positions of the lifting mechanisms corresponding to the first electric climbing frameand the second electric climbing frame are adjusted so that the first electric climbing frame and the second electric climbing frame are located at the same height; when the first electric climbing frame and the second electric climbing frame are located at the same height and tension values of the lifting mechanisms corresponding to the first electric climbing frame and the second electric climbing frame are the same, the climbing speed of the first electric climbing frame and the climbing speed of the second electric climbing frame are increased to the preset speed, and the first electric climbing frame and the second electric climbing frame are controlled to climb at the preset speed; and the climbing heights of the first electric climbing frame and the second electric climbing frame are obtained, and when the climbing heights reach the designated height, the climbing speeds of the first electric climbing frame and the second electric climbing frame are decreased. The climbing speedof the electric climbing frames is increased, and potential safety hazards in the climbing process can be reduced by regulating and controlling the climbing speed.
Owner:GUANGDONG BOZHILIN ROBOT CO LTD

Building structure wall and construction method for building structure wall

The invention discloses a building structure wall and a construction method for the building structure wall. The building structure wall comprises an outer formwork group, a reinforcing steel bar structure frame and an inner formwork group, wherein the outer formwork group and the inner formwork group are independently arranged on two sides of the reinforcing steel bar structure frame and are independently connected to the reinforcing steel bar structure frame; a pouring space is formed among the reinforcing steel bar structure frame, the outer formwork group and the inner formwork group; concrete is poured into the pouring space so as to form a wall body structure; each outer formwork and each inner formwork are both thermal insulation decoration integral disassembling-free formworks; a pre-connecting element is independently arranged between each outer formwork of the outer formwork group and the reinforcing steel bar structure frame as well as between each inner formwork of the inner formwork group and the reinforcing steel bar structure frame; each outer formwork and each inner formwork are independently connected to the formwork of the outer formwork group and the reinforcingsteel bar structure frame through each pre-connecting element; and the pre-connecting element can regulate the flatness of an outer wall surface and an inner wall surface. According to requirements, the flatness of the outer formwork group and the inner formwork group can be regulated, and therefore, the inner wall surface and the outer wall surface of the wall body have a better aesthetic degree.
Owner:武汉市政环境工程建设有限公司

Cloud construction big data management system and method thereof

ActiveCN113869887AAccurate calculationReduce the proportion of casualty incidentsFinanceOffice automationVideo monitoringSafety management systems
The invention discloses a cloud construction big data management system and method, and belongs to the technical field of building construction intellectualization. The system comprises a home page module, an asset distribution module, an asset growth trend module, an asset early warning module, an asset amount module, a safety management system, a safety inspection module, a safety monitoring module, a remote control module, a safety supervision module, and a video monitoring module. According to the cloud construction big data management system and method, centralized management is carried out on climbing frame project data, and a whole data application link from data access to data modeling and processing to data analysis and mining is broken through; the asset distribution module and the asset early warning module help a user to analyze and display climbing frame asset data, monitoring data and equipment operation data, and the user can quickly master all project assets and equipment conditions of the whole country, display all fixed assets of the platform and climbing frame data in an operation state in real time, and analyze and summarize the layout and use conditions of the projects and assets nationwide.
Owner:江苏鑫昇腾科技发展股份有限公司

Building material lifting anti-shaking device

The invention belongs to the field of building construction, and particularly relates to a building material lifting anti-shaking device. The building material lifting anti-shaking device is characterized in that the same transverse plate and the same cross beam are arranged at the sides, close to each other, of top vertical plates of two bases; a lifting component is fixedly arranged at the top of the cross beam; the bottom of the lifting component and the top of the transverse plate are fixedly arranged; a mounting plate is fixedly arranged at the bottom of the transverse plate; a lead screwis rotatably arranged on the inner wall of one side of a cavity of the mounting plate; a threaded block with a driving component is in threaded connection with the lead screw; the sides, away from each other, of driving plates at the two sides of the threaded block penetrate through the inner walls of the two sides of the cavity respectively and extend to the two sides of the mounting plate respectively; the same material barrel is rotatably arranged on the sides, close to each other, of the vertical plates at the bottoms of the two driving plates; and an overturning component arranged at oneside of one vertical plate is in transmission connection with the material barrel, so that shaking of materials in the lifting process can be avoided, automatic discharging of the materials can be achieved, the labor intensity is low, the automation degree is high, and the building construction efficiency is improved.
Owner:温州源铭振跃科技有限公司

Monitoring alarm equipment for building construction safety management and system thereof

The invention discloses a monitoring alarm device for building construction safety management and a system thereof. The unmanned aerial vehicle comprises a main body, a bottom plate, rollers, a protective shell, an electric push rod, a wing plate, a sealing strip, a solar panel, an extension rod, a supporting plate, a driving motor, a lead screw, a connecting plate, a transverse rod, a through hole, a guide rod, a shell, a baffle, a storage battery, a fixing plate, an air cylinder, a conveying plate, an unmanned aerial vehicle unit, a transverse partition plate, a vertical partition plate, a rotating door, a mounting box, a rotating motor, a fixing base, a rotating head, a camera and a voice prompt unit. The system comprises an alarm unit, a display screen, a monitoring unit, an image acquisition module, an image storage module, an image recognition module, an image comparison module, a signal transceiving module, a control unit, a control module, a positioning module, an analysis module, a thermal sensing module and a man-machine interaction module. The building construction monitoring device has the advantages that the monitoring device can move in real time in the construction process, effective monitoring is facilitated, the safety of building construction personnel is guaranteed, and the supervision function is achieved.
Owner:CHINA RAILWAY SIGNAL & COMM SHANGHAI ENG BUREAU GRP

Retractable beam used for elevator shaft formwork platform

A retractable beam used for an elevator shaft formwork platform comprises a fixing beam, an adjusting beam and automatic resetting pawls installed at one end of the adjusting beam. I steel at one end of the fixing beam is installed between two steel channels of the adjusting beam in a sleeved mode, a first lower pressing block is welded to the bottom of the adjusting beam, a first upper pressing block is locked to the top of the adjusting beam through a bolt assembly, and a second upper pressing block and a second lower pressing block are locked to the top and the bottom of the I steel of the fixing beam through bolt assemblies respectively. Each automatic resetting pawl comprises vertical plates, a balancing weight and a rolling wheel, wherein the balancing weight and the rolling wheel are installed at the two ends of the vertical plates respectively. The middle portions of the vertical plates are connected with the adjusting beam at the end of the retractable beam through pin shaft assemblies. The length of the beam can be freely adjusted within a certain range, the beam is adapted to constructing tube type cast-in-place shearing walls of different shapes and section sizes and can be lifted inside an elevator shaft and achieve stable positioning landing on each layer, in this way, efficiency of building construction is greatly improved, manpower and material resources are saved, repeated using can be achieved, and the safety coefficient is high.
Owner:HUNAN YUANDA CONSTR ENG CO LTD

Aluminum alloy formwork device for external wall insulation

The invention provides an aluminum alloy formwork device for outer wall heat preservation. The aluminum alloy formwork device comprises an outer wall formwork, a heat preservation plate located on the inner side of the outer wall formwork, and a plurality of connecting bolts used for fixing the outer wall formwork and the heat preservation plate. Each connecting bolt comprises a connecting screw extending from the side, far away from the outer wall formwork, of the heat preservation plate and penetrating through the heat preservation plate and the outer wall formwork in sequence, a first nut fixed to the connecting screw in a sleeving mode, a third nut and a second nut which is located between the first nut and the third nut, wherein the second nut is located on the side, far away from the outer wall formwork, of the heat preservation plate, the third nut is located on the inner side of the outer wall formwork, and the outer wall formwork and the heat preservation plate are clamped and fixed through the second nut and the third nut. Compared with the prior art, the aluminum alloy formwork device has the advantages that the installing speed of the heat preservation plate is high, the building construction efficiency is high, the quality of an outer wall body is good, the installing cost of the heat preservation plate is low, and the workload of constructors is effectively reduced.
Owner:湖南好快省建筑科技有限公司

Building Attached Lifting Scaffolding Lifting Device

The invention discloses a lifting device for a building-attached lifting scaffold (commonly known as 'climbing frame') or a building construction operation platform. The lifting device comprises a base, a lifting main machine, power boosting pulley blocks, a hinge, a tensioning mechanism and a chain. In the construction process, the base is fixed to the lower portion of a main frame of the attached lifting scaffold, the main machine is installed on the base, and the chain is wound across the power boosting pulley blocks and the lifting main machine. The number of the power boosting pulley blocks is two, and one power boosting pulley block is connected with a support of the attached lifting scaffold through the hinge. The tensioning mechanism is installed on the upper portion of the attached lifting scaffold. The lifting device can be matched with the universal attached lifting scaffold on the market, and ascends and descends along with a scaffold body. During construction, manual carrying is not needed, chain reversing is not needed, repeated wire disconnection and connection are not needed, the fault rate of equipment is reduced, the labor intensity of workers is relieved, the loss of the equipment is lowered, and the construction efficiency of a whole building is improved.
Owner:广东华坚金属制品有限公司

A non-porous disassembled aluminum formwork

The invention provides a non-porous disassembled aluminum formwork, which belongs to the field of building formwork, and includes a formwork body and a back corrugation. An accommodating cavity for accommodating the back corrugation is provided on the outside of the formwork main body. The accommodating cavity consists of a top plate, The bottom plate is composed of a baffle plate arranged on the bottom plate, the bottom plate is fixedly connected with the formwork main body, the top plate is slidably connected with the formwork main body along the height direction of the formwork main body, a group of first through grooves are arranged on the bottom plate along the width direction, and a connecting rod is provided at the bottom of the baffle plate and the stopper, the upper end of the connecting rod is fixedly connected with the bottom of the baffle, the lower end of the connecting rod is fixedly connected with the stopper, the connecting rod passes through the first through groove, the stopper is arranged at the bottom of the bottom plate, and the back groove is arranged in the accommodating cavity, adjacent The top panels or baffles of the two formwork bodies are connected by fasteners. The aluminum formwork can be installed with different types of back flutes in a non-porous manner according to needs, to meet the support strength requirements, so that the structural performance of the poured concrete castings is better.
Owner:中铁一局集团建筑安装工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products