Safety production operator fatigue early warning system

By conducting a comprehensive analysis of the road, environment and construction actions of roadside construction workers and calculating the fatigue coefficient, the problem of insufficient analysis of complex road environments and construction types in the existing technology is solved, the accuracy and effectiveness of fatigue warning are improved, and the accuracy and effectiveness of fatigue warning are reduced. Errors and accidents caused by fatigue.

CN118982908AInactive Publication Date: 2024-11-19SHANDONG UNIV OF SCI & TECH

Patent Information

Application Number
CN202411418776.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2024-11-19
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing fatigue warning system for safety production workers ignores the consumption of attention and mental power in the fatigue warning of roadside construction workers, and cannot conduct comprehensive analysis based on the type of construction and construction duration, resulting in the accuracy of fatigue warning. and reduced effectiveness.

Method used

A fatigue warning system for safety production workers is designed, including road information monitoring module, information acquisition module, environmental monitoring module and action monitoring module. By conducting a comprehensive analysis of road conditions, construction personnel conditions, environmental information and construction actions at the construction site , calculate the fatigue lift coefficient and fatigue correction coefficient, and then conduct fatigue early warning analysis.

Benefits of technology

It improves the accuracy and effectiveness of fatigue warning for construction personnel, reduces errors and accidents caused by fatigue, and improves overall work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118982908A_ABST
    Figure CN118982908A_ABST
Patent Text Reader

Abstract

The invention discloses a safety production operator fatigue early warning system, which relates to the field of fatigue early warning and comprises a road information monitoring module, an information acquisition module, an environment monitoring module, an action monitoring module and a fatigue early warning analysis module. According to the method, the road information of the adjacent road corresponding to the target construction site and the environment information corresponding to the target construction site are comprehensively analyzed, so that the accuracy and the effectiveness of fatigue early warning of the constructors are effectively guaranteed, and specific analysis is performed according to the construction types of the constructors in the target construction site; and the road information of the adjacent road corresponding to the target construction site and the environment information corresponding to the target construction site are integrated for comprehensive evaluation, so that the accuracy of fatigue early warning of the constructors is improved, the overall working efficiency is improved, and errors and accidents caused by fatigue are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of fatigue warning, and in particular to a fatigue warning system for safety production workers. Background Art

[0002] The fatigue warning system for safe production workers is a modern solution that uses advanced technology and intelligent algorithms to monitor and prevent employee fatigue in real time. The role of this system is not only reflected in improving the safety of the working environment, but also helps to improve overall work efficiency and reduce errors and accidents caused by fatigue. However, the existing technology still has the following technical defects in fatigue warning for production workers on roadside construction: Existing technologies for fatigue warning of roadside workers often ignore the consumption of workers' attention and mental energy by complex road environments. Such consumption of attention and mental energy will accelerate workers' fatigue, making the accuracy of fatigue warning of workers on complex roads less accurate. Existing technologies often fail to conduct a comprehensive analysis based on the type of construction and duration of construction work, and lack analysis of environmental factors when analyzing and evaluating fatigue warnings for construction workers, further reducing the accuracy and effectiveness of fatigue warnings for construction workers. Summary of the invention

[0003] The purpose of the present invention is to provide a fatigue warning system for production safety workers to solve the problems raised in the above-mentioned background technology.

[0004] To achieve the above-mentioned purpose, the present invention provides the following technical solution: a fatigue warning system for production safety workers, comprising: Road information monitoring module: used to monitor the road conditions of the adjacent roads corresponding to the construction site and obtain the road information corresponding to the target construction road; Information acquisition module: used to analyze and acquire the construction status corresponding to the construction site and the personnel status of each construction worker corresponding to the construction site, and obtain the construction time information corresponding to the construction site and the basic information set of each construction worker corresponding to the construction site; Environmental monitoring module: used to monitor the construction environment of the construction site and obtain the corresponding construction environment information of the construction site; Action monitoring module: used to detect the construction status of each construction worker at the construction site, and obtain the number of completed construction actions and the completion frequency of each construction action corresponding to each construction worker at the target construction site; Fatigue warning analysis module: It is used to conduct a comprehensive analysis based on the basic information set of each construction worker corresponding to the construction site, the construction environment information corresponding to the construction site, and the number of completed construction actions and the completion frequency of each construction action corresponding to each construction worker in the target construction site, so as to obtain the fatigue warning results corresponding to each construction worker in the target construction site.

[0005] In the preferred embodiment of this scheme, the specific implementation method of the road information monitoring module is as follows: By detecting the adjacent roads corresponding to the construction site with monitoring equipment preset on the adjacent roads, road information of the adjacent roads corresponding to the construction site is obtained, which is recorded as the road information of the target road, wherein the road information includes the traffic volume and vehicle type corresponding to the target road; The vehicle types include small vehicles, medium vehicles, and large vehicles, and the traffic volume is expressed as the number of vehicles passing the construction site in a unit time period; By calculating the formula , calculate the fatigue improvement coefficient corresponding to the target road ,in Expressed as traffic flow, Expressed as the number of small cars, Expressed as the number of medium-sized vehicles, Expressed as the number of large vehicles, Expressed as a preset fatigue enhancement coefficient influence factor.

[0006] In a preferred embodiment of this scheme, the specific implementation method of the information acquisition module is as follows: Establishing a data extraction relationship between the information acquisition module and the database, extracting the construction plan corresponding to the target construction site stored in the database, wherein the construction plan includes time information corresponding to the target construction site, wherein the time information refers to the start time of the construction; Extracting the registered personnel information set stored in the database, wherein the registered personnel information set includes an identification information set and a basic information set, wherein the identification information set includes a facial feature recognition data set and a body contour model corresponding to the facial contour of each registered personnel, and the basic information set includes the construction type and skill level corresponding to each registered personnel, wherein the facial feature recognition data set includes various types of facial recognition data; By performing image detection on each construction worker in the target construction site using an image detection device preset at the construction site, a full-view image of each construction worker in the target construction site is obtained, and the full-view image of each construction worker in the target construction site is screened to obtain a facial image set of each construction worker in the target construction site, and each facial image in the facial image set of each construction worker is fully scanned using a preset contour scanner to establish each facial contour model corresponding to each construction worker, and facial feature recognition data is extracted from each facial contour model corresponding to each construction worker using a preset facial feature recognition data extraction method to obtain various types of feature recognition data corresponding to each facial contour model of each construction worker; The weighted average values ​​of various feature recognition data of the facial contour model of each construction worker are obtained through preliminary calculations, and the formula is used to calculate , calculate the facial profile similarity of each construction worker to each registered person ,in It is represented as the weighted average of various feature recognition data of each construction worker’s corresponding facial contour model. Various facial recognition data corresponding to each registered person, Expressed as correction factors for various feature recognition data, , It represents the number of various feature recognition data. It is expressed as the number of types of feature recognition data, Indicates the number of each filing person. It represents the number of each construction worker; A body contour model corresponding to each construction worker is established through the omnidirectional images of each construction worker in the target construction site, and a model similarity analysis is performed between the body contour model corresponding to each construction worker and the body contour model corresponding to each registered person, so as to obtain the model similarity between the body contour model corresponding to each construction worker and the body contour model corresponding to each registered person; By calculating the formula , calculate the matching degree of each construction worker to each registered person , select the registered personnel with the maximum matching degree and record them as the corresponding personnel of each construction personnel, and obtain the basic information set corresponding to each construction personnel by screening, where It is represented by the model similarity between the body contour model corresponding to each construction worker and the body contour model corresponding to each registered person. Represented as a preset matching influence factor.

[0007] In the preferred embodiment of this scheme, the specific implementation method of the environmental monitoring module is as follows: The environment of the construction site is detected by an environmental monitoring device preset at the construction site to obtain environmental information of the construction site, wherein the environmental information includes noise intensity, air temperature, visibility, wind speed and rainfall.

[0008] In the preferred embodiment of this scheme, the specific implementation method of the fatigue warning analysis module is as follows: Get fatigue warning analysis time; According to the construction start time and fatigue warning analysis time corresponding to the target construction site, the corresponding working hours of each construction worker in the target construction site are calculated; Establish a data extraction relationship between the fatigue warning analysis module and the database, extract the fatigue value of each construction action corresponding to each preset construction type stored in the database, extract the fatigue correction coefficient of each construction type corresponding to each construction level stored in the database, and obtain the fatigue correction coefficient of each construction worker corresponding to each construction type according to the basic information set corresponding to each construction worker; Extract the fatigue influence coefficient of each construction type corresponding to each environmental data model stored in the database, where the environmental data model includes noise intensity, air temperature, visibility, wind speed and rainfall, and screen according to the noise intensity, air temperature, visibility, wind speed and rainfall corresponding to the construction site to obtain the fatigue influence coefficient of each construction type corresponding to the construction site; By calculating the formula , calculate the fatigue coefficient corresponding to each construction worker ,in It is represented by the working hours of each construction worker in the target construction site. It is represented by the number of completed construction actions of each construction worker. It is expressed as the completion frequency of various construction actions, It is expressed as the fatigue correction coefficient of each construction worker corresponding to each construction type, It is expressed as the fatigue influence coefficient of each construction worker corresponding to each construction type, Expressed as a preset fatigue correction factor, Expressed as the preset fatigue coefficient influence factor, , It is represented by the number of each construction action corresponding to each construction type. It is expressed as the number of various construction actions, Expressed as a natural constant; The fatigue coefficient corresponding to each construction worker is compared and analyzed with the preset fatigue coefficient threshold. If the fatigue coefficient corresponding to the construction worker is less than or equal to the preset fatigue coefficient threshold, it means that the construction worker has no obvious abnormality and is not fatigued. If the fatigue coefficient corresponding to the construction worker is greater than the preset fatigue coefficient threshold, it means that the construction worker is fatigued. The construction workers who are fatigued are counted and fatigue warnings are issued. The construction workers who are fatigued are recorded as the fatigue warning results corresponding to the construction site.

[0009] Compared with the prior art, the present invention has the following beneficial effects: The present invention effectively ensures the accuracy and effectiveness of fatigue warning for construction workers by comprehensively analyzing the road information of the adjacent roads corresponding to the target construction site and the environmental information corresponding to the target construction site; The present invention conducts a specific analysis based on the construction type of each construction worker at the target construction site, and conducts a comprehensive evaluation based on the road information of the adjacent roads corresponding to the target construction site and the environmental information corresponding to the target construction site, thereby improving the accuracy of fatigue warning for construction workers, helping to improve overall work efficiency and reduce errors and accidents caused by fatigue. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.

[0011] Figure 1 This is a schematic diagram of module connection according to an embodiment of the present invention. DETAILED DESCRIPTION

[0012] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0013] See also Figure 1 The present invention provides a fatigue warning system for production safety workers, which includes a road information monitoring module, an information acquisition module, an environment monitoring module, a motion monitoring module and a fatigue warning analysis module: The road information monitoring module is connected to the fatigue warning analysis module, the information acquisition module is connected to the fatigue warning analysis module, the information acquisition module is connected to the fatigue warning analysis module, the environment monitoring module is connected to the fatigue warning analysis module, the motion monitoring module and the fatigue warning analysis module.

[0014] Road information monitoring module: used to monitor the road conditions of the adjacent roads corresponding to the construction site and obtain the road information corresponding to the target construction road; Furthermore, the specific implementation of the road information monitoring module is as follows: By detecting the adjacent roads corresponding to the construction site with monitoring equipment preset on the adjacent roads, road information of the adjacent roads corresponding to the construction site is obtained, which is recorded as the road information of the target road, wherein the road information includes the traffic volume and vehicle type corresponding to the target road; The vehicle types include small vehicles, medium vehicles, and large vehicles, and the traffic volume is expressed as the number of vehicles passing the construction site in a unit time period; By calculating the formula , calculate the fatigue improvement coefficient corresponding to the target road ,in Expressed as traffic flow, Expressed as the number of small cars, Expressed as the number of medium-sized vehicles, Expressed as the number of large vehicles, Expressed as a preset fatigue enhancement coefficient influence factor.

[0015] Information acquisition module: used to analyze and acquire the construction status corresponding to the construction site and the personnel status of each construction worker corresponding to the construction site, and obtain the construction time information corresponding to the construction site and the basic information set of each construction worker corresponding to the construction site; Furthermore, the specific implementation of the information acquisition module is as follows: Establishing a data extraction relationship between the information acquisition module and the database, extracting the construction plan corresponding to the target construction site stored in the database, wherein the construction plan includes time information corresponding to the target construction site, wherein the time information refers to the start time of the construction; Extracting the registered personnel information set stored in the database, wherein the registered personnel information set includes an identification information set and a basic information set, wherein the identification information set includes a facial feature recognition data set and a body contour model corresponding to the facial contour of each registered personnel, and the basic information set includes the construction type and skill level corresponding to each registered personnel, wherein the facial feature recognition data set includes various types of facial recognition data; By performing image detection on each construction worker in the target construction site using an image detection device preset at the construction site, a full-view image of each construction worker in the target construction site is obtained, and the full-view image of each construction worker in the target construction site is screened to obtain a facial image set of each construction worker in the target construction site, and each facial image in the facial image set of each construction worker is fully scanned using a preset contour scanner to establish each facial contour model corresponding to each construction worker, and facial feature recognition data is extracted from each facial contour model corresponding to each construction worker using a preset facial feature recognition data extraction method to obtain various types of feature recognition data corresponding to each facial contour model of each construction worker; The weighted average values ​​of various feature recognition data of the facial contour model of each construction worker are obtained through preliminary calculations, and the formula is used to calculate , calculate the facial profile similarity of each construction worker to each registered person ,in It is represented as the weighted average of various feature recognition data of each construction worker’s corresponding facial contour model. Various facial recognition data corresponding to each registered person, Expressed as correction factors for various feature recognition data, , It represents the number of various feature recognition data. It is expressed as the number of types of feature recognition data, Indicates the number of each filing person. It represents the number of each construction worker; A body contour model corresponding to each construction worker is established through the omnidirectional images of each construction worker in the target construction site, and a model similarity analysis is performed between the body contour model corresponding to each construction worker and the body contour model corresponding to each registered person, so as to obtain the model similarity between the body contour model corresponding to each construction worker and the body contour model corresponding to each registered person; By calculating the formula , calculate the matching degree of each construction worker to each registered person , select the registered personnel with the maximum matching degree and record them as the corresponding personnel of each construction personnel, and obtain the basic information set corresponding to each construction personnel by screening, where It is represented by the model similarity between the body contour model corresponding to each construction worker and the body contour model corresponding to each registered person. Represented as a preset matching influence factor.

[0016] Environmental monitoring module: used to monitor the construction environment of the construction site and obtain the corresponding construction environment information of the construction site; Furthermore, the specific implementation of the environment monitoring module is as follows: The environment of the construction site is detected by an environmental monitoring device preset at the construction site to obtain environmental information of the construction site, wherein the environmental information includes noise intensity, air temperature, visibility, wind speed and rainfall.

[0017] Action monitoring module: used to detect the construction status of each construction worker at the construction site, and obtain the number of completed construction actions and the completion frequency of each construction action corresponding to each construction worker at the target construction site; Furthermore, the specific execution mode of the action monitoring module is as follows: The construction actions of each construction worker in the target construction site are tracked by using the action tracking equipment preset at the construction site to obtain the number of completed construction actions and the completion frequency of each construction action corresponding to each construction worker in the target construction site.

[0018] Fatigue warning analysis module: It is used to conduct a comprehensive analysis based on the basic information set of each construction worker corresponding to the construction site, the construction environment information corresponding to the construction site, and the number of completed construction actions and the completion frequency of each construction action corresponding to each construction worker in the target construction site, so as to obtain the fatigue warning results corresponding to each construction worker in the target construction site.

[0019] Furthermore, the specific implementation of the fatigue warning analysis module is as follows: Get fatigue warning analysis time; According to the construction start time and fatigue warning analysis time corresponding to the target construction site, the corresponding working hours of each construction worker in the target construction site are calculated; Establish a data extraction relationship between the fatigue warning analysis module and the database, extract the fatigue value of each construction action corresponding to each preset construction type stored in the database, extract the fatigue correction coefficient of each construction type corresponding to each construction level stored in the database, and obtain the fatigue correction coefficient of each construction worker corresponding to each construction type according to the basic information set corresponding to each construction worker; Extract the fatigue influence coefficient of each construction type corresponding to each environmental data model stored in the database, where the environmental data model includes noise intensity, air temperature, visibility, wind speed and rainfall, and screen according to the noise intensity, air temperature, visibility, wind speed and rainfall corresponding to the construction site to obtain the fatigue influence coefficient of each construction type corresponding to the construction site; By calculating the formula , calculate the fatigue coefficient corresponding to each construction worker ,in It is represented by the working hours of each construction worker in the target construction site. It is represented by the number of completed construction actions of each construction worker. It is expressed as the completion frequency of various construction actions, It is expressed as the fatigue correction coefficient of each construction worker corresponding to each construction type, It is expressed as the fatigue influence coefficient of each construction worker corresponding to each construction type, Expressed as a preset fatigue correction factor, Expressed as the preset fatigue coefficient influence factor, , It is represented by the number of each construction action corresponding to each construction type. It is expressed as the number of various construction actions, Expressed as a natural constant; The fatigue coefficient corresponding to each construction worker is compared and analyzed with the preset fatigue coefficient threshold. If the fatigue coefficient corresponding to the construction worker is less than or equal to the preset fatigue coefficient threshold, it means that the construction worker has no obvious abnormality and is not fatigued. If the fatigue coefficient corresponding to the construction worker is greater than the preset fatigue coefficient threshold, it means that the construction worker is fatigued. The construction workers who are fatigued are counted and fatigue warnings are issued. The construction workers who are fatigued are recorded as the fatigue warning results corresponding to the construction site.

[0020] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A fatigue warning system for production safety workers, characterized by: include: Road information monitoring module: used to monitor the road conditions of the adjacent roads corresponding to the construction site and obtain the road information corresponding to the target construction road; Information acquisition module: used to analyze and acquire the construction status corresponding to the construction site and the personnel status of each construction worker corresponding to the construction site, and obtain the construction time information corresponding to the construction site and the basic information set of each construction worker corresponding to the construction site; Environmental monitoring module: used to monitor the construction environment of the construction site and obtain the corresponding construction environment information of the construction site; Action monitoring module: used to detect the construction status of each construction worker at the construction site, and obtain the number of completed construction actions and the completion frequency of each construction action corresponding to each construction worker at the target construction site; Fatigue warning analysis module: It is used to conduct a comprehensive analysis based on the basic information set of each construction worker corresponding to the construction site, the construction environment information corresponding to the construction site, and the number of completed construction actions and the completion frequency of each construction action corresponding to each construction worker in the target construction site, so as to obtain the fatigue warning results corresponding to each construction worker in the target construction site.

2. A fatigue warning system for production safety workers according to claim 1, characterized in that: The specific implementation method of the road information monitoring module is as follows: By detecting the adjacent roads corresponding to the construction site with monitoring equipment preset on the adjacent roads, road information of the adjacent roads corresponding to the construction site is obtained, which is recorded as the road information of the target road, wherein the road information includes the traffic volume and vehicle type corresponding to the target road; The vehicle types include small vehicles, medium vehicles, and large vehicles, and the traffic volume is expressed as the number of vehicles passing the construction site in a unit time period; By calculating the formula , calculate the fatigue improvement coefficient corresponding to the target road ,in Expressed as traffic flow, Expressed as the number of small cars, Expressed as the number of medium-sized vehicles, Expressed as the number of large vehicles, Expressed as a preset fatigue enhancement coefficient influence factor.

3. A fatigue warning system for production safety workers according to claim 1, characterized in that: The specific implementation method of the information acquisition module is as follows: Establishing a data extraction relationship between the information acquisition module and the database, extracting the construction plan corresponding to the target construction site stored in the database, wherein the construction plan includes time information corresponding to the target construction site, wherein the time information refers to the start time of the construction; Extracting the registered personnel information set stored in the database, wherein the registered personnel information set includes an identification information set and a basic information set, wherein the identification information set includes a facial feature recognition data set and a body contour model corresponding to the facial contour of each registered personnel, and the basic information set includes the construction type and skill level corresponding to each registered personnel, wherein the facial feature recognition data set includes various types of facial recognition data; By performing image detection on each construction worker in the target construction site using an image detection device preset at the construction site, a full-view image of each construction worker in the target construction site is obtained, and the full-view image of each construction worker in the target construction site is screened to obtain a facial image set of each construction worker in the target construction site, and each facial image in the facial image set of each construction worker is fully scanned using a preset contour scanner to establish each facial contour model corresponding to each construction worker, and facial feature recognition data is extracted from each facial contour model corresponding to each construction worker using a preset facial feature recognition data extraction method to obtain various types of feature recognition data corresponding to each facial contour model of each construction worker; The weighted average values ​​of various feature recognition data of the facial contour model of each construction worker are obtained through preliminary calculations, and the formula is used to calculate , calculate the facial profile similarity of each construction worker to each registered person ,in It is represented as the weighted average of various feature recognition data of each construction worker’s corresponding facial contour model. Various facial recognition data corresponding to each registered person, Expressed as correction factors for various feature recognition data, , It represents the number of various feature recognition data. It is expressed as the number of types of feature recognition data, Indicates the number of each filing person. It represents the number of each construction worker; A body contour model corresponding to each construction worker is established through the omnidirectional images of each construction worker in the target construction site, and a model similarity analysis is performed between the body contour model corresponding to each construction worker and the body contour model corresponding to each registered person, so as to obtain the model similarity between the body contour model corresponding to each construction worker and the body contour model corresponding to each registered person; By calculating the formula , calculate the matching degree of each construction worker to each registered person , select the registered personnel with the maximum matching degree and record them as the corresponding personnel of each construction personnel, and obtain the basic information set corresponding to each construction personnel by screening, where It is represented by the model similarity between the body contour model corresponding to each construction worker and the body contour model corresponding to each registered person. Represented as a preset matching influence factor.

4. A fatigue warning system for production safety workers according to claim 1, characterized in that: The specific implementation of the environment monitoring module is as follows: The environment of the construction site is detected by an environmental monitoring device preset at the construction site to obtain environmental information of the construction site, wherein the environmental information includes noise intensity, air temperature, visibility, wind speed and rainfall.

5. The fatigue warning system for production safety workers according to claim 1 is characterized by: The specific implementation of the action monitoring module is as follows: The construction actions of each construction worker in the target construction site are tracked by using the action tracking equipment preset at the construction site to obtain the number of completed construction actions and the completion frequency of each construction action corresponding to each construction worker in the target construction site.

6. A fatigue warning system for production safety workers according to claim 5, characterized in that: The specific implementation method of the fatigue warning analysis module is as follows: Get fatigue warning analysis time; According to the construction start time and fatigue warning analysis time corresponding to the target construction site, the corresponding working hours of each construction worker in the target construction site are calculated; Establish a data extraction relationship between the fatigue warning analysis module and the database, extract the fatigue value of each construction action corresponding to each preset construction type stored in the database, extract the fatigue correction coefficient of each construction type corresponding to each construction level stored in the database, and obtain the fatigue correction coefficient of each construction worker corresponding to each construction type according to the basic information set corresponding to each construction worker; Extract the fatigue influence coefficient of each construction type corresponding to each environmental data model stored in the database, where the environmental data model includes noise intensity, air temperature, visibility, wind speed and rainfall, and screen according to the noise intensity, air temperature, visibility, wind speed and rainfall corresponding to the construction site to obtain the fatigue influence coefficient of each construction type corresponding to the construction site; By calculation formula: , calculate the fatigue coefficient corresponding to each construction worker ,in It is represented by the working hours of each construction worker in the target construction site. It is represented by the number of completed construction actions of each construction worker. It is expressed as the completion frequency of various construction actions, It is expressed as the fatigue correction coefficient of each construction worker corresponding to each construction type, It is expressed as the fatigue influence coefficient of each construction worker corresponding to each construction type, Expressed as a preset fatigue correction factor, Expressed as the preset fatigue coefficient influence factor, , It is represented by the number of each construction action corresponding to each construction type. It is expressed as the number of various construction actions, Expressed as a natural constant; The fatigue coefficient corresponding to each construction worker is compared and analyzed with the preset fatigue coefficient threshold. If the fatigue coefficient corresponding to the construction worker is less than or equal to the preset fatigue coefficient threshold, it means that the construction worker has no obvious abnormality and is not fatigued. If the fatigue coefficient corresponding to the construction worker is greater than the preset fatigue coefficient threshold, it means that the construction worker is fatigued. The construction workers who are fatigued are counted and fatigue warnings are issued. The construction workers who are fatigued are recorded as the fatigue warning results corresponding to the construction site.

Citation Information

Patent Citations

  • Drive assist device and drive assist method

    CN109795413A

  • Construction process optimization method and system based on fatigue

    CN112508258A

  • Construction machinery operator fatigue operation detection system and method based on machine vision

    CN112528767A

  • Infrastructure project engineering construction site safety intelligent supervision, monitoring, analysis and early warning system

    CN114821373A

  • Method for realizing assault worker real-name system rapid management authentication through cloud network

    CN114943069A

Cited By

  • Tunnel constructor management system and method

    CN121189774A