Installation method for large-line type sectional row outboard pipe

By determining the center point coordinates of the outer tube in the 3D model of the hull and accurately positioning the opening on the outer plate, the installation problem at the large section of the outer plate was solved, realizing the precise installation of the outer tube and improving the construction efficiency.

CN118992049AActive Publication Date: 2024-11-22HUDONG ZHONGHUA SHIPBUILDINGGROUP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411221500.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-22
Estimated Expiration
2044-09-02

AI Technical Summary

Technical Problem

In sections with large outer plate lines, it is difficult to locate the opening position of the outer hull tube, which leads to installation difficulties.

Method used

By determining the coordinates of the center point in the three-dimensional model of the hull structure, and using the XYZ three-axis coordinate system, combined with a total station or measuring ruler to measure the actual position of the reference point on the segmented outer plate, the center point of the opening is accurately located. Then, the initial through hole and the enlarged opening are made, and finally the outer pipe is welded and fixed.

Benefits of technology

It enables precise positioning and installation of the outer hull tubes in sections with large outer plate shapes, improving construction efficiency and reducing the difficulty of hole positioning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118992049A_ABST
    Figure CN118992049A_ABST
Patent Text Reader

Abstract

The invention relates to a method for installing a large-line type segmented row outboard pipe. The method comprises the following steps: step 1, confirming coordinates (x1, y1 and z1) of a central point of a hole formed in a segmented outer plate of the row outboard pipe; 2, finding a first section which is x1 away from the plane where the Y axis and the Z axis are located and a second section which is z1 away from the plane where the X axis and the Y axis are located; 3, finding a nearest first component on the first section, and finding a nearest second component on the second section; selecting a reference point on each of the first component and the second component, and calculating the distance between the reference point and the central point; 4, measuring the actual three-dimensional coordinates of the reference point, and determining the actual position of the central point on the segmented outer plate according to the reference point; and 5, tapping is conducted according to the actual position of the center point, and an outboard discharging pipe is installed according to the tapping position. The positions of the first component and the second component close to the center point are measured in the subsection to determine the position of the center point of the opening, and the problem that the opening positioning difficulty of the row outboard pipe at the outer plate is large is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of shipbuilding, and in particular to a large linear segmented outboard pipe. Background Art

[0002] The function of the outboard pipe in the hull structure is to discharge the water in the hull out of the ship by extending the outboard pipe from the hull outer plate. The outboard pipe is set in the side area. In the process of ship construction, in order to improve the integrity of the intermediate product, the outboard pipe is usually pre-installed in place at the segmentation stage, and the opening position of the outboard pipe is found on the outer plate, and then the hole is drilled, and then the outboard pipe is installed according to the opening position.

[0003] For sections with larger outer plate lines, the difficulty in installing the outboard tube lies in how to accurately find the opening position of the outboard tube on the outer plate. Summary of the invention

[0004] In order to solve the problem of difficulty in locating the opening position of the outboard tube at the outer plate segment with a larger linear shape, the present invention provides a method for installing the large linear segmented outboard tube. The method can achieve accurate positioning of the opening position to ensure the precise installation of the outboard tube. In addition to meeting the accurate positioning of the opening of the outboard tube at the outer plate segment with a larger linear shape, the positioning of the opening of the outboard tube at the outer plate segment with a smaller linear shape is also applicable.

[0005] The technical objectives of the present invention are achieved through the following technical solutions:

[0006] A method for installing a large linear segmented outboard tube, the method comprising:

[0007] Step 1. According to the installation drawing of the upper row of outboard tubes, confirm that the center point of the hole of the row of outboard tubes on the outer plate of the segment is at the coordinate (x1, y1, z1) of the XYZ three-axis coordinate system, along the length of the ship as the X axis of the coordinate system, along the width of the ship as the Y axis of the coordinate system, and along the height of the ship as the Z axis of the coordinate system;

[0008] Step 2: Find the first section whose distance from the plane where the Y axis and the Z axis are located is x1 in the three-dimensional model of the hull structure;

[0009] Find the second section with a distance z1 from the plane where the X-axis and the Y-axis are located in the three-dimensional model of the hull structure;

[0010] Step 3, find the first component closest to the center point on the segmented outer plate according to the first section, and find the second component closest to the center point on the segmented outer plate according to the second section;

[0011] Select a reference point on the first component and the second component respectively, obtain the coordinate position of the reference point on the XYZ three-axis coordinate system from the hull three-dimensional model, and calculate the distance between the reference point and the center point respectively;

[0012] Step 4: Measure the actual three-dimensional coordinates of the reference point on the segment, and determine the actual position of the center point on the segment outer plate according to the distance between the reference point and the center point;

[0013] Step 5: Drill a hole according to the actual position of the center point on the segmented outer plate, and install the outboard pipe according to the hole position.

[0014] Furthermore, in step 5, an initial through hole is opened through the outer plate according to the position of the center point of the segmented outer plate, the diameter of the initial through hole does not exceed 50 mm, the position of the initial through hole is re-inspected, and the initial through hole is expanded after passing the re-inspection.

[0015] Furthermore, when expanding the opening according to the initial through hole, the opening data of the outboard tube at the outer plate is used to make a hole template, the hole template is attached to the segmented outer plate to determine the outer contour line of the expanded opening, and the hole is expanded along the outer contour line.

[0016] Furthermore, when the position of the initial through hole is re-inspected, the actual three-dimensional coordinates of the center of the initial through hole are measured, and the actual distance from the center of the initial through hole to the reference point is calculated. If the actual distance from the center of the initial through hole to the reference point is equal to the distance from the center point in the three-dimensional model of the hull to the reference point, the re-inspection is qualified.

[0017] Furthermore, when selecting reference points, edge, center, angle, root, and vertex positions are selected.

[0018] Furthermore, a gap of 1-5 mm is reserved between the outboard tube and the edge of the opening, and when installing the outboard tube, the outboard tube is passed through the opening and then fixed by welding.

[0019] Furthermore, before welding the outboard tube to the opening, a welding groove is provided at the edge of the opening, and after welding is completed, the weld of the outboard tube to the opening is polished and inspected.

[0020] Compared with the prior art, the present invention determines the position of the center point of the opening in the segment by measuring the positions of the first component and the second component near the center point of the opening, thereby solving the problem of difficulty in locating the opening of the outboard tube at the segmented outer plate with a larger outer plate line shape, reducing the difficulty of locating the opening and being able to quickly determine the center of the opening, which is beneficial to improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a first cross-sectional schematic diagram in an embodiment of the present invention.

[0022] Figure 2 It is a second cross-sectional schematic diagram in the embodiment of the present invention.

[0023] Figure 3Schematic diagram of the distance between the center point and the reference point A at the first section in an embodiment of the present invention.

[0024] Figure 4 Schematic diagram of the distance between the center point and the reference point B at the second section in an embodiment of the present invention. DETAILED DESCRIPTION

[0025] The technical solution of the present invention is further described below in conjunction with specific embodiments:

[0026] A method for installing a large linear segmented outboard tube, the method comprising:

[0027] Step 1. According to the installation drawing of the upper row of outboard tubes, confirm that the center point of the hole of the row of outboard tubes on the outer plate of the segment is at the coordinate (x1, y1, z1) of the XYZ three-axis coordinate system, along the length of the ship as the X axis of the coordinate system, along the width of the ship as the Y axis of the coordinate system, and along the height of the ship as the Z axis of the coordinate system.

[0028] Step 2: Find the first section in the 3D model of the hull structure whose distance from the plane where the Y axis and the Z axis are located is x1, such as Figure 1 As shown;

[0029] In the three-dimensional model of the hull structure, find the second section whose distance from the plane where the X-axis and the Y-axis are located is z1, such as Figure 2 shown.

[0030] Step 3: In the first section, find the first component closest to the center point on the segmented outer plate 1. Figure 1 The T-shaped material closest to the center point is located above the center point 2. A reference point is selected on the T-shaped material. When selecting the reference point, the edge, center, angle, root, and vertex are selected. These position features are obviously convenient for finding and measuring in the segment. In this embodiment, the lower edge of the panel of the T-shaped material in the first section is used as the first reference point A, and the coordinates of point A are expressed as (x2, y2, z2); the distances between the center point 2 and the reference point A in the Y-axis direction and the Z-axis direction in the three-dimensional model of the hull are determined by calculation to be d1 and d2 respectively, as shown in FIG. Figure 3 As shown;

[0031] According to the second section, find the second component on the segmented outer plate 1 that is closest to the center point 2. Figure 2 The closest point to the center point 2 is a T-shaped material on the left side of the center point 2. The second reference point B is selected at the root of the web of the T-shaped material. The coordinates of point B are expressed as (x3, y3, z3). The distances between the center point 2 and the reference point B in the 3D model of the hull in the X-axis direction and the Y-axis direction are determined by calculation as d3 and d4, respectively. Figure 4 shown.

[0032] Step 5: Measure the actual three-dimensional coordinates of the reference point on the segment, and determine the actual position of the center point on the segment outer plate according to the distance between the reference point and the center point.

[0033] This embodiment provides two methods:

[0034] The first method is to use a total station to offset point A along the Y and Z axis directions by distances d1 and d2 respectively to obtain the position of the center point on the outer plate along the X axis direction; the total station is used to offset point B along the X and Y axis directions by distances d3 and d4 respectively to obtain the position of the center point on the outer plate along the Z axis direction. Since the position in the Y axis direction is on the outer plate, it does not need to be determined separately.

[0035] The second method is to use a measuring ruler to measure the distances d1 and d2 along the Y-axis and Z-axis directions with point A as the reference, and obtain the position of the center point on the outer plate along the X-axis direction; use a total station to measure the distances 3 and d4 along the X-axis and Y-axis directions with point B as the reference, and obtain the position of the center point on the outer plate along the Z-axis direction.

[0036] Step 6: Drill a hole according to the actual position of the center point on the segmented outer plate, and install the outboard pipe according to the hole position.

[0037] More specifically, when drilling a hole, an initial through hole is first opened through the outer plate according to the position of the center point of the segmented outer plate. The diameter of the initial through hole does not exceed 50 mm. The position of the initial through hole is re-inspected, and the initial through hole is expanded after passing the re-inspection.

[0038] Preferably, in order to ensure the accuracy of the opening position, the position of the initial through hole can be re-inspected before the opening is expanded, and the actual three-dimensional coordinates of the center of the initial through hole can be measured, and the actual distance from the center of the initial through hole to the reference point can be calculated. If the actual distance from the center of the initial through hole to the reference point is equal to the distance from the center point in the three-dimensional model of the hull to the reference point, the re-inspection is qualified.

[0039] If the re-inspection fails, the position of the initial through hole can be re-measured and determined. Since the aperture of the initial through hole is relatively small, the re-determined position of the initial through hole and the position of the initial through hole determined last time will eventually be within the range of the enlarged opening.

[0040] When expanding the opening according to the initial through hole, the opening data of the outboard tube at the outer plate is used to lay out and make an opening template. The opening template is provided with a hole of the same size corresponding to the initial through hole. The hole of the opening template is aligned with the initial through hole. The opening template is attached to the segmented outer plate to determine the outer contour line of the expanded opening. The opening is expanded along the outer contour line, and a gap of 1-5mm is reserved between the outboard tube and the edge of the opening.

[0041] After the hole is opened, a welding groove is opened at the edge of the hole. The angle of the welding groove is 30-45 degrees. The outboard pipe is passed through the hole for welding. After welding, the weld between the outboard pipe and the hole is polished and inspected to avoid welding defects at the weld.

[0042] This embodiment is only a further explanation of the present invention, not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to this embodiment as needed, but as long as it is within the scope of the claims of the present invention, it will be protected by the patent law.

Claims

1. A method for installing a large linear segmented outboard tube, characterized in that: The method includes: Step 1. According to the installation drawing of the upper row of outboard tubes, confirm that the center point of the hole of the row of outboard tubes on the outer plate of the segment is at the coordinate (x1, y1, z1) of the XYZ three-axis coordinate system, along the length of the ship as the X axis of the coordinate system, along the width of the ship as the Y axis of the coordinate system, and along the height of the ship as the Z axis of the coordinate system; Step 2: Find the first section whose distance from the plane where the Y axis and the Z axis are located is x1 in the three-dimensional model of the hull structure; Find the second section with a distance z1 from the plane where the X-axis and the Y-axis are located in the three-dimensional model of the hull structure; Step 3: Find the first component closest to the center point on the segmented outer plate according to the first section, and find the second component closest to the center point on the segmented outer plate according to the second section; Select a reference point on the first component and the second component respectively, obtain the coordinate position of the reference point on the XYZ three-axis coordinate system from the hull three-dimensional model, and calculate the distance between the reference point and the center point respectively; Step 4: Measure the actual three-dimensional coordinates of the reference point on the segment, and determine the actual position of the center point on the segment outer plate according to the distance between the reference point and the center point; Step 5: Drill a hole according to the actual position of the center point on the segmented outer plate, and install the outboard pipe according to the hole position.

2. A method for installing a large linear segmented outboard tube according to claim 1, characterized in that: In step 5, an initial through hole is first opened through the outer plate according to the position of the center point of the segmented outer plate, the diameter of the initial through hole does not exceed 50 mm, the position of the initial through hole is re-inspected, and the initial through hole is expanded after passing the re-inspection.

3. A method for installing a large linear segmented outboard tube according to claim 2, characterized in that: When expanding the opening according to the initial through hole, the opening data of the outboard tube at the outer plate is used to make a hole template, the hole template is attached to the segmented outer plate to determine the outer contour line of the expanded opening, and the hole is expanded along the outer contour line.

4. A method for installing a large linear segmented outboard tube according to claim 2, characterized in that: When re-inspecting the position of the initial through hole, measure the actual three-dimensional coordinates of the center of the initial through hole, calculate the actual distance from the center of the initial through hole to the reference point, and if the actual distance from the center of the initial through hole to the reference point is equal to the distance from the center point in the three-dimensional model of the hull to the reference point, the re-inspection is qualified.

5. A method for installing a large linear segmented outboard tube according to claim 1, characterized in that: When selecting the reference points, the edge, center, angle, root, and vertex positions are selected.

6. A method for installing a large linear segmented outboard tube according to claim 1, characterized in that: A gap of 1-5mm is reserved between the edge of the outboard tube and the opening. When installing the outboard tube, pass the outboard tube through the opening and then weld it in place.

7. A method for installing a large linear segmented outboard tube according to claim 6, characterized in that: Before welding the outboard tube to the opening, a welding groove is provided at the edge of the opening. After welding is completed, the weld of the outboard tube to the opening is polished and inspected.

Citation Information

Patent Citations

  • Mounting method for plastic coating and corrosion prevention of ship outboard exhaust pipe

    CN112009640A

  • Ship structure installation information labeling method and system, medium and electronic equipment

    CN113888729A

  • Large assembly installation method for ship curved outer plate and ship

    CN115320803A

  • Centralized arrangement method for discharging outboard pipelines and valves

    CN118419225A

  • Device for determining position of discharging outboard pipe in outer plate hole

    CN219192521U