Drainage pipeline construction process based on prefabricated open caisson and horizontal directional drilling
Through the prefabricated caisson and drill bit height tracking system, the problem of insufficient elevation accuracy in drainage pipeline construction is solved, and higher construction accuracy and long-term stability are achieved, avoiding the problems of pipeline blockage and poor drainage.
Patent Information
- Application Number
- CN202411028744.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-22
AI Technical Summary
Horizontal directional drilling method is difficult to meet the elevation accuracy requirements of drainage pipes, resulting in poor drainage and blockage of pipelines.
The prefabricated caisson and drill bit height tracking system is used to design and install the caisson by determining the preset track lines and starting position coordinates, and real-time monitoring and adjustment of drill bit control parameters during the drilling guide hole process to ensure the elevation accuracy of the drill bit.
The elevation accuracy of horizontal directional drilling construction is improved, the problems of pipeline blockage and poor drainage are reduced, and the smooth progress of construction and the long-term stability of pipelines are ensured.
Smart Images

Figure CN118997301A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of horizontal directional drilling construction, and in particular to a drainage pipeline construction process based on prefabricated caisson and horizontal directional drilling. Background Art
[0002] With the rapid development of urbanization, the urban population density continues to increase, and the discharge of various pollutants such as domestic sewage and industrial sewage is increasing, resulting in increasingly severe challenges to the water environment. In recent years, various regions have been improving sewage collection systems through measures such as separating rainwater and sewage and building new drainage pipelines, intensifying sewage treatment work, and the workload of building new drainage pipelines has greatly increased.
[0003] At present, the main construction method used for drainage pipes is open-cut method. Open-cut method is to directly dig up the road surface where the pipes need to be laid, and then pave the road surface after laying the pipes. The construction speed is fast and the cost is low. However, open-cut method has a great impact on the surrounding environment. For example, when laying pipes on sections of roads crossing urban areas, it is necessary to close the traffic on the sections in batches before construction, which brings inconvenience to nearby residents and affects the traffic and nearby living environment. Horizontal directional drilling technology is an underground crossing construction technology that combines traditional highway drilling and oil field directional drilling technology. It is mostly used for crossing rivers and waterways, large-scale oil and gas pipeline network construction, urban gas, water supply, power supply and other projects. It is also widely used in highways, railways, airports, coasts, islands, and crossing construction in densely populated buildings and pipeline areas, which greatly reduces the impact on the surrounding environment and facilitates construction.
[0004] However, horizontal directional drilling is generally not suitable for the construction of drainage pipes. The main reason is that drainage pipes are gravity flow pipes, which require the pipes to follow the slope and have accurate elevation requirements. However, the elevation control of horizontal directional drilling is difficult and cannot meet the elevation accuracy requirements of drainage pipes. When they are put into operation in the later stage, the pipes will have poor drainage and blockage over time. Summary of the invention
[0005] The purpose of the present invention is to provide a drainage pipeline construction process based on prefabricated caisson and horizontal directional drilling to solve the following technical problems:
[0006] How to improve the elevation accuracy requirements of horizontal directional drilling.
[0007] The purpose of the present invention can be achieved through the following technical solutions:
[0008] A drainage pipeline construction process based on prefabricated caisson and horizontal directional drilling includes the following steps:
[0009] S1: Determine the trajectory: determine the preset trajectory line of the directional hole, and determine the starting position coordinates and the caisson area of the preset trajectory line;
[0010] S2: Caisson design: Design the size of the caisson according to the caisson area, and design a reserved opening on the caisson according to the starting position coordinates of the preset trajectory line, the size of the caisson and the direction of the preset trajectory line;
[0011] S3: Prefabricated caisson: prefabricated caisson according to caisson design;
[0012] S4: Installing the caisson: installing the prefabricated caisson in the caisson area, and making the reserved opening of the caisson located at the starting position coordinate of the preset trajectory line;
[0013] S5: Install the drilling rig: connect the drill rod to the drill bit; place the drill rod on the drilling rig, and place the drill bit in the reserved hole of the caisson;
[0014] S6; drilling a pilot hole: starting the drill rig and the drill bit to drill the pilot hole, and obtaining real-time monitoring data through the monitoring module of the drill bit height tracking system during the drilling of the pilot hole; the analysis and control module analyzes the real-time monitoring data and the preset trajectory line, and adjusts the drill bit control parameters according to the analysis results;
[0015] S7: Hole expansion: After the pilot hole is completed, use a hole expander to expand the hole diameter;
[0016] S8: Pull back the pipeline: Connect one end of the reamer to the drill pipe, and the other end to the finished pipeline through a rotary joint; start the drilling rig to pull back from the reserved hole to complete the pipeline installation.
[0017] As a further solution of the present invention: the drill height tracking system comprises:
[0018] A monitoring module is provided on the drill bit and is used to obtain monitoring data of the drill bit;
[0019] The analysis and control module is used to analyze the preset trajectory line, basic parameters of the drill bit and monitoring data of the drill bit, and adjust the preset control parameters of the drill bit according to the preset adjustment rules.
[0020] As a further solution of the present invention: the analysis process of the analysis control module is:
[0021] S10: Identify the preset trajectory line and obtain the coordinates of each point on the preset trajectory line; then analyze the basic parameters of the drill bit to obtain the preset control parameters of the drill bit corresponding to each coordinate point;
[0022] S20: Identify the preset trajectory line, obtain the inclined trajectory line segment and the horizontal trajectory line segment of the preset trajectory line; and use the absolute value of the ordinate of the horizontal trajectory line segment as the preset depth of the horizontal pipeline;
[0023] S30: obtaining the real-time position coordinates of the drill bit with the starting position coordinates of the preset trajectory line as the origin through the monitoring module;
[0024] S40: Analyze the real-time position coordinates and the coordinates of each point on the preset trajectory line according to the preset adjustment rules, and adjust the preset control parameters of the drill bit.
[0025] As a further solution of the present invention: The control parameter adjustment rules include:
[0026] When |Y t | < Y0, calculate the trajectory offset index P through the formula ; i
[0027] Wherein, F(X) is the change curve of the ordinate of the preset trajectory line with respect to the abscissa; X t is the abscissa of the real-time position coordinates; Y t is the ordinate of the real-time position coordinates; σ1 is the first adjustment coefficient; Y0 is the preset depth.
[0028] As a further solution of the present invention: The control parameter adjustment rules include comparing the trajectory offset index P i with the first preset value R1;
[0029] When P i < R1, continue to work according to the preset control parameters;
[0030] When P i ≥ R1, adjust the preset control parameters according to the first adjustment strategy.
[0031] As a further solution of the present invention: The preset control parameters include the preset drill bit inclination angle; The first adjustment strategy includes:
[0032]
[0033] Wherein, σ2 is the first adjustment coefficient; The θ0 coordinate is the preset drill bit inclination angle corresponding to (X t , Y t ); θ is the adjusted drill bit inclination angle.
[0034] As a further solution of the present invention: The control parameter adjustment rules further include:
[0035] When |Y t | ≥ Y0, calculate the trajectory offset index P through the formula ; i
[0036] As a further solution of the present invention: Compare the trajectory offset index P i with the second preset value R2, R1 > R2;
[0037] When Pi When it is less than R2, continue to work according to the preset control parameters;
[0038] When P i ≥R2, adjust the preset control parameters according to the second adjustment strategy. The second adjustment strategy includes:
[0039] Among them, △X is the preset base value of the abscissa.
[0040] Advantages of the present invention:
[0041] By setting a preset caisson at the starting position, the present invention ensures that the soil around the starting position will not collapse due to the influence of mud, guarantees the smooth progress of the horizontal directional drilling, and through the bit height tracking system, ensures real-time adjustment of the bit during the bit's travel, improving the elevation accuracy during the construction of the horizontal directional drilling. Description of the Drawings
[0042] The present invention will be further described below with reference to the drawings.
[0043] Figure 1 It is a process flow chart of an embodiment of the present invention. Detailed Embodiments
[0044] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all of the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present invention without creative efforts shall fall within the protection scope of the present invention.
[0045] Please refer to Figure 1 As shown, in one embodiment, a drainage pipeline construction process based on a precast caisson and horizontal directional drilling is provided, including the following steps:
[0046] S1: Determine the trajectory: Determine the preset trajectory line of the directional hole, and determine the starting position coordinates and the caisson area of the preset trajectory line;
[0047] S2: Caisson design: Design the size of the caisson according to the caisson area, and design a reserved hole on the caisson according to the starting position coordinates of the preset trajectory line, the size of the caisson, and the direction of the preset trajectory line;
[0048] S3: Precast caisson: Precast the caisson according to the caisson design;
[0049] S4: Install the caisson: Install the precast caisson in the caisson area, and make the reserved hole of the caisson located at the starting position coordinates of the preset trajectory line;
[0050] S5: Install the drilling rig: connect the drill rod to the drill bit; place the drill rod on the drilling rig, and place the drill bit in the reserved hole of the caisson;
[0051] S6; drilling a pilot hole: starting the drill rig and the drill bit to drill the pilot hole, and obtaining real-time monitoring data through the monitoring module of the drill bit height tracking system during the drilling of the pilot hole; the analysis and control module analyzes the real-time monitoring data and the preset trajectory line, and adjusts the drill bit control parameters according to the analysis results;
[0052] S7: Hole expansion: After the pilot hole is completed, use a hole expander to expand the hole diameter;
[0053] S8: Pull back the pipeline: connect one end of the reamer to the drill pipe, and the other end to the finished pipeline through a rotary joint; start the drilling rig to pull back from the reserved hole to complete the pipeline installation;
[0054] Through the above technical scheme, the present embodiment determines the preset trajectory line of the directional hole and determines the starting position coordinates of the preset trajectory line and the caisson area; then designs the size of the caisson according to the caisson area, and designs a reserved hole on the caisson according to the starting position coordinates of the preset trajectory line, the size of the caisson and the direction of the preset trajectory line; prefabricates the caisson according to the caisson design; installs the prefabricated caisson in the caisson area, and makes the reserved hole of the caisson located at the starting position coordinates of the preset trajectory line; then connects the drill rod with the drill bit; places the drill rod on the drilling rig, and places the drill bit in the reserved hole of the caisson; then starts the drilling rig and the drill bit to drill the guide hole, and in the process of drilling the guide hole, the drill bit height tracking system is used to track the position of the drill bit. The monitoring module obtains real-time monitoring data; the analysis and control module analyzes the real-time monitoring data and the preset trajectory line, and adjusts the drill control parameters according to the analysis results; after the guide hole is completed, the hole diameter is enlarged using a reamer; finally, one end of the reamer is connected to the drill rod, and the other end is connected to the finished pipe through a rotary joint; the drilling rig is started to pull back from the reserved hole to complete the pipeline installation; by setting a preset caisson at the starting position, it is ensured that the soil around the starting position will not collapse due to the influence of mud, thereby ensuring the smooth progress of horizontal directional drilling; through the drill height tracking system, it is ensured that the drill bit is adjusted in real time during the movement of the drill bit, thereby improving the elevation accuracy during the horizontal directional drilling construction.
[0055] As an embodiment of the present invention, the drill height tracking system comprises:
[0056] A monitoring module is provided on the drill bit and is used to obtain monitoring data of the drill bit;
[0057] An analysis and control module is used to analyze the preset trajectory line, basic parameters of the drill bit and monitoring data of the drill bit, and adjust the preset control parameters of the drill bit according to the preset adjustment rules;
[0058] Through the above technical solution, the drill bit height tracking system in this embodiment obtains the monitoring data of the drill bit by setting the monitoring module on the drill bit; analyzes the preset trajectory line, the basic parameters of the drill bit, and the monitoring data of the drill bit through the analysis and control module, and adjusts the preset control parameters of the drill bit according to the preset adjustment rules; thereby improving the elevation accuracy during horizontal directional drilling construction.
[0059] As an implementation manner of the present invention, the analysis process of the analysis and control module is as follows:
[0060] S10: Identify the preset trajectory line to obtain the coordinates of each point on the preset trajectory line; then analyze in combination with the basic parameters of the drill bit to obtain the preset control parameters of the drill bit corresponding to each coordinate point;
[0061] S20: Identify the preset trajectory line to obtain the inclined trajectory segment and the horizontal trajectory segment of the preset trajectory line; take the absolute value of the ordinate of the horizontal trajectory segment as the preset depth of the horizontal pipeline;
[0062] S30: Obtain the real-time position coordinates of the drill bit with the starting position coordinates of the preset trajectory line as the origin through the monitoring module;
[0063] S40: Analyze the real-time position coordinates and the coordinates of each point on the preset trajectory line according to the preset adjustment rules, and adjust the preset control parameters of the drill bit;
[0064] Through the above technical solution, in this embodiment, the preset trajectory line is identified to obtain the coordinates of each point on the preset trajectory line; then analyzed in combination with the basic parameters of the drill bit to obtain the preset control parameters of the drill bit corresponding to each coordinate point; then the preset trajectory line is identified to obtain the inclined trajectory segment and the horizontal trajectory segment of the preset trajectory line; take the absolute value of the ordinate of the horizontal trajectory segment as the preset depth of the horizontal pipeline; then obtain the real-time position coordinates of the drill bit with the starting position coordinates of the preset trajectory line as the origin through the monitoring module; then analyze the real-time position coordinates and the coordinates of each point on the preset trajectory line according to the preset adjustment rules, and adjust the preset control parameters of the drill bit; thereby improving the elevation accuracy during horizontal directional drilling construction;
[0065] It should be noted that identifying the preset trajectory line to obtain the inclined trajectory segment and the horizontal trajectory segment of the preset trajectory line, identifying the preset trajectory line to obtain the coordinates of each point on the preset trajectory line; then analyzing in combination with the basic parameters of the drill bit to obtain the preset control parameters of the drill bit corresponding to each coordinate point are prior arts and will not be elaborated here.
[0066] As an implementation manner of the present invention, the control parameter adjustment rules include:
[0067] When |Y t | < Y0, through the formula Calculate the trajectory deviation index P i ;
[0068] where F(X) is the curve of the ordinate of the preset trajectory line changing with the abscissa; X t is the abscissa of the real-time position coordinate; Y t is the ordinate of the real-time position coordinate; σ1 is the first adjustment coefficient; Y0 is the preset depth;
[0069] The control parameter adjustment rule includes comparing the trajectory deviation index P i with the first preset value R1;
[0070] When P i < R1, continue to work according to the preset control parameters;
[0071] When P i ≥ R1, adjust the preset control parameters according to the first adjustment strategy;
[0072] The preset control parameters include the preset drill bit inclination angle; the first adjustment strategy includes:
[0073]
[0074] where σ2 is the first adjustment coefficient; the θ0 coordinate is the preset drill bit inclination angle corresponding to (X t , Y t ); θ is the adjusted drill bit inclination angle;
[0075] Through the above technical solution, in this embodiment, when |Y t | < Y0, calculate the trajectory deviation index P ; F(X i ) is the corresponding ordinate of the preset trajectory line when the abscissa is X t ; |F(X t ) - Y t | is the difference between the corresponding ordinate of the preset trajectory line when the abscissa is X t and the ordinate of the real-time position coordinate; when |F(X t ) - Y t | is larger, the trajectory deviation index P t is larger; compare the trajectory deviation index P i with the first preset value R1; when P i < R1, it means that Y i is within the error range of F(X t ); continue to work according to the preset control parameters; therefore, continue to work according to the preset control parameters; when P t ≥ R1, it means that Y i ≥ R1, it means that Y tOutside the error range of F(X t ); Therefore, adjust the preset bit inclination angle according to ; |F(X t )| - |Y t | is the absolute value of the difference between the corresponding ordinate of the preset trajectory line at the abscissa X t and the ordinate of the real-time position coordinate; |F(X t )| - |Y t | > 0, the adjusted bit inclination angle θ > θ0; |F(X t )| - |Y t | < 0, the adjusted bit inclination angle θ < θ0; Adjust the bit inclination angle in real time, thereby improving the elevation accuracy during horizontal directional drilling construction.
[0076] As an implementation manner of the present invention, the control parameter adjustment rule further includes:
[0077] When |Y t | ≥ Y0, calculate the trajectory deviation index P through the formula i ;
[0078] Compare the trajectory deviation index P i with the second preset value R2, R1 > R2;
[0079] When P i < R2, continue to work according to the preset control parameters;
[0080] When P i ≥ R2, adjust the preset control parameters according to the second adjustment strategy;
[0081] The second adjustment strategy includes:
[0082] Wherein, △X is the preset base value of the abscissa;
[0083] Through the above technical solution, in this embodiment, when |Y t | ≥ Y0, calculate the trajectory deviation index P through the formula i ; |Y0 - |Y t || is the absolute value of the difference between the preset depth and the absolute value of the ordinate of the real-time position coordinate; When |Y0 - |Y t || is larger, the trajectory deviation index P i is larger; Compare the trajectory deviation index P i with the second preset value R2, when P i < R2, it means that Y tWithin the error range of Y0; continue to work according to the preset control parameters; when P i ≥R2, indicating that Y t is outside the error range of Y0; therefore, according to Adjust the preset drill bit inclination angle; is the ratio of the absolute value of the difference between the preset depth and the absolute value of the ordinate of the real-time position coordinate to the preset base value; The inclination angle θ of the drill bit after adjustment can be calculated; Determine the direction of θ, clockwise rotation is the positive direction, counterclockwise rotation is the negative direction; adjust the drill bit inclination in real time to ensure that the drill bit remains level within the predetermined height. This method can quickly and accurately install the pipe at the required depth. The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equal changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. A drainage pipeline construction process based on prefabricated caisson and horizontal directional drilling, characterized in that: The following steps are involved: S1: Determine the trajectory: determine the preset trajectory line of the directional hole, and determine the starting position coordinates and the caisson area of the preset trajectory line; S2: Caisson design: Design the size of the caisson according to the caisson area, and design a reserved opening on the caisson according to the starting position coordinates of the preset trajectory line, the size of the caisson and the direction of the preset trajectory line; S3: Prefabricated caisson: prefabricated caisson according to caisson design; S4: Installing the caisson: installing the prefabricated caisson in the caisson area, and making the reserved opening of the caisson located at the starting position coordinate of the preset trajectory line; S5: Install the drilling rig: connect the drill rod to the drill bit; place the drill rod on the drilling rig, and place the drill bit in the reserved hole of the caisson; S6; drilling a pilot hole: starting the drill rig and the drill bit to drill the pilot hole, and obtaining real-time monitoring data through the monitoring module of the drill bit height tracking system during the drilling of the pilot hole; the analysis and control module analyzes the real-time monitoring data and the preset trajectory line, and adjusts the drill bit control parameters according to the analysis results; S7: Hole expansion: After the pilot hole is completed, use a hole expander to expand the hole diameter; S8: Pull back the pipeline: Connect one end of the reamer to the drill pipe, and the other end to the finished pipeline through a rotary joint; start the drilling rig to pull back from the reserved hole to complete the pipeline installation.
2. A drainage pipeline construction process based on prefabricated caisson and horizontal directional drilling according to claim 1, characterized in that: The drill bit height tracking system comprises: A monitoring module is provided on the drill bit and is used to obtain monitoring data of the drill bit; The analysis and control module is used to analyze the preset trajectory line, basic parameters of the drill bit and monitoring data of the drill bit, and adjust the preset control parameters of the drill bit according to the preset adjustment rules.
3. A drainage pipeline construction process based on prefabricated caisson and horizontal directional drilling according to claim 2, characterized in that: The analysis process of the analysis control module is: S10: Identify the preset trajectory line and obtain the coordinates of each point on the preset trajectory line; then analyze the basic parameters of the drill bit to obtain the preset control parameters of the drill bit corresponding to each coordinate point; S20: Identify the preset trajectory line, obtain the inclined trajectory line segment and the horizontal trajectory line segment of the preset trajectory line; and use the absolute value of the ordinate of the horizontal trajectory line segment as the preset depth of the horizontal pipeline; S30: obtaining the real-time position coordinates of the drill bit with the starting position coordinates of the preset trajectory line as the origin through the monitoring module; S40: Analyze the real-time position coordinates and the coordinates of each point on the preset trajectory line according to the preset adjustment rules, and adjust the preset control parameters of the drill bit.
4. A drainage pipeline construction process based on prefabricated caisson and horizontal directional drilling according to claim 3, characterized in that: The control parameter adjustment rules include: When |Y t | < Y0, the trajectory deviation index P is calculated by the formula ; i ; Among them, F(X) is the curve of the change of the vertical coordinate of the preset trajectory line with the horizontal coordinate; X t Y is the horizontal coordinate of the real-time position coordinate; t is the ordinate of the real-time position coordinate; σ1 is the first adjustment coefficient; Y0 is the preset depth.
5. A drainage pipeline construction process based on prefabricated caisson and horizontal directional drilling according to claim 4, characterized in that: The control parameter adjustment rule includes setting the trajectory deviation index P i Compare with the first preset value R1; When P i <is less than R1, continue to work according to the preset control parameters; When P i ≥R1, the preset control parameters are adjusted according to the first adjustment strategy.
6. A drainage pipeline construction process based on prefabricated caisson and horizontal directional drilling according to claim 5, characterized in that: The preset control parameters include a preset drill bit inclination angle; The first adjustment strategy includes: Among them, σ2 is the first adjustment coefficient; θ0 coordinate is (X t , Y t ) corresponds to the preset drill bit inclination angle; θ is the adjusted drill bit inclination angle.
7. A drainage pipeline construction process based on prefabricated caisson and horizontal directional drilling according to claim 6, characterized in that: The control parameter adjustment rules also include: When |Y t |≥Y0, by the formula Calculate the trajectory deviation index P i .
8. A drainage pipeline construction process based on prefabricated caisson and horizontal directional drilling according to claim 7, characterized in that: The trajectory is shifted by index P i Compared with the second preset value R2, R1>R2; When P i <When it is less than R2, continue to work according to the preset control parameters; When P i ≥R2, the preset control parameter is adjusted according to a second adjustment strategy. The second adjustment strategy includes: Wherein, ΔX is the preset basic value of the horizontal axis.