By adopting a superimposed shear wall structure in modular buildings, using the combination of the first and second prefabricated wall leaves, steel mesh and rectangular tension, the structural strength and stability of the concrete edge module box are improved, and the solution is solved The problems of long construction cycles and large material losses in the prior art have been achieved, and more efficient building construction results have been achieved.
Patent Information
- Application Number
- CN202411161888.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-22
AI Technical Summary
In existing modular buildings, the structural strength of the concrete module box is insufficient, resulting in long construction cycles, large material losses and a lot of construction waste, and it is difficult to achieve rapid construction results.
A concrete edge module box is designed, adopting a superimposed shear wall structure, including the first and second prefabricated wall leaves, steel mesh and rectangular stretching. The rectangular stretching is provided between the wall leaves to increase strength. and stability, so that the overlapping shear wall can withstand greater force.
The structural strength and stability of the concrete edge module box are improved, the construction cycle and material losses are reduced, and more efficient building construction is achieved.
Smart Images

Figure CN118997337A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of prefabricated buildings, and in particular to a concrete edge module box. Background Art
[0002] Modular buildings integrate more than 90% of the construction processes in an automated factory system. It is the most integrated and industrialized form of prefabricated construction, and enables houses to be built in factories "like building cars." Its product characteristics perfectly fit the development direction of residential industrialization and are rapidly becoming one of the fastest growing markets in the construction industry.
[0003] Most existing modular buildings use cast-in-place shear wall structures. This feature makes the formwork (including truss bars) of the module box formwork only a permanent formwork and does not participate in structural calculations, which will cause the structure to be too rigid and heavy. However, the on-site cast-in-place construction process is cumbersome, requiring tying steel bars, supporting formwork, pouring concrete, maintaining and removing formwork, surface plastering, etc., resulting in a long construction period and a large number of on-site workers. At the same time, there are also problems such as loss of formwork and other materials and a lot of construction waste. It is still impossible to build a house on site "like building blocks".
[0004] The structural form of high-rise modular buildings is mostly affected by the market and industry of the project location, and the methods of prefabricated shear walls vary. According to the different ways of assembling shear walls, they can be divided into box formwork-cast-in-place shear wall system and box formwork-prefabricated shear wall system. Among them, the box formwork-cast-in-place shear wall system replaces the formwork with the formwork shell, which is an integral cast-in-place shear wall. The box formwork-prefabricated shear wall system integrates the shear wall longitudinal reinforcement with the box formwork, which is a prefabricated assembled shear wall.
[0005] In a building, some concrete module boxes are close to the center of the building, while others are close to the outermost side of the building. Depending on the location of the concrete module box in the building, the requirements for structural strength of the concrete module box are also different. In addition to being easy to construct, it is also necessary to ensure that its structural strength meets the requirements without being too conservative and resulting in excessive costs. Summary of the invention
[0006] The embodiment of the present application provides a concrete edge module box body, which can improve the structural strength of the concrete edge module box body. The technical solution is as follows:
[0007] An embodiment of the present application provides a concrete edge module box, which includes a floor, a floor slab and a composite shear wall, wherein the composite shear wall is connected between the floor and the floor slab, and includes a first prefabricated wall leaf, a second prefabricated wall leaf, two steel meshes and a plurality of rectangular tie bars, wherein the first prefabricated wall leaf and the second prefabricated wall leaf are arranged in parallel and spaced apart, and the first prefabricated wall leaf is located on the inner side of the concrete edge module box, and the second prefabricated wall leaf is located on the outer side of the concrete edge module box, and the orthographic projection of the first prefabricated wall leaf on the second prefabricated wall leaf is located outside the second prefabricated wall leaf, one of the steel meshes is located in the first prefabricated wall leaf, and the other of the steel meshes is located in the second prefabricated wall leaf, and the rectangular tie bars are respectively connected to the two steel meshes.
[0008] In some examples, the upper edge of the first precast wall leaf is flush with the floor slab, and the lower edge of the first precast wall leaf is flush with the floor;
[0009] An upper edge of the second prefabricated wall leaf is higher than the floor slab, and a lower edge of the second prefabricated wall leaf is higher than the floor.
[0010] In some examples, the concrete adjacent module box includes two of the composite shear walls, the two composite shear walls are arranged adjacent to each other, the first prefabricated wall leaves of the two composite shear walls are connected, and the second prefabricated wall leaves of the two composite shear walls are connected.
[0011] In some examples, the concrete edge module box also includes a connecting core column, which is located at the connection of two adjacently arranged composite shear walls and is arranged along the height direction of the composite shear walls. One end of the connecting core column is located between the first prefabricated wall leaf and the second prefabricated wall leaf, and the other end extends out of the lower edge of the first prefabricated wall leaf and the lower edge of the second prefabricated wall leaf.
[0012] In some examples, the steel mesh includes a plurality of horizontal steel bars arranged in parallel and a plurality of vertical steel bars arranged in parallel, the plurality of horizontal steel bars and the plurality of vertical steel bars are cross-arranged in a mesh shape, and the horizontal steel bars are connected to the vertical steel bars at the intersection;
[0013] Each of the rectangular tie bars is cross-welded to the outer sides of the vertical reinforcement bars.
[0014] In some examples, the plane where the rectangular tie rods are located is perpendicular to the first prefabricated wall leaf.
[0015] In some examples, the plane where the rectangular tie bar is located is perpendicular to the vertical steel bars, and the same rectangular tie bar is coplanar and connected to each horizontal steel bar in the two steel meshes.
[0016] In some examples, the plane where the rectangular tie bar is located is perpendicular to the horizontal steel bar, and the same rectangular tie bar is coplanar and connected to one vertical steel bar in each of the two steel meshes.
[0017] In some examples, the concrete edge module box also includes a floor slab and a plurality of zigzag connecting ribs, wherein the zigzag connecting ribs are arranged along the height direction of the composite shear wall, and the middle parts of the plurality of zigzag connecting ribs are respectively connected to the floor slab, and the floor slab is located between the first prefabricated wall leaf and the second prefabricated wall leaf, and one end of the zigzag connecting rib is located between the first prefabricated wall leaf and the second prefabricated wall leaf, and the other end of the zigzag connecting rib extends out of the edge of the first prefabricated wall leaf and the second prefabricated wall leaf.
[0018] In some examples, the concrete edge module box also includes a blocking mold, which includes a first mold, a second mold and a connecting piece, the connecting piece connecting the first mold and the second mold, the first mold is located on the outside of the first prefabricated wall leaf, that is, away from the side of the second prefabricated wall leaf, and can move along the height direction of the composite shear wall, and the second mold is located on the outside of the second prefabricated wall leaf, that is, away from the side of the first prefabricated wall leaf, and can move along the height direction of the composite shear wall.
[0019] The beneficial effects brought by the technical solution provided by the embodiment of the present application include at least:
[0020] By setting the composite shear wall of the concrete adjacent module box to include a first prefabricated wall leaf and a second prefabricated wall leaf, and respectively arranging steel meshes in the first prefabricated wall leaf and the second prefabricated wall leaf, the strength and stability of the first prefabricated wall leaf and the second prefabricated wall leaf can be improved. By arranging a plurality of rectangular tie bars between the first prefabricated wall leaf and the second prefabricated wall leaf, the rectangular tie bars are connected to the two steel meshes, so that when one of the first prefabricated wall leaf and the second prefabricated wall leaf is subjected to a horizontal force, a part of the force can be dispersed to the steel mesh in the other of the first prefabricated wall leaf and the second prefabricated wall leaf through the plurality of rectangular tie bars, so that the composite shear wall can withstand a larger force, thereby making the composite shear wall of the concrete adjacent module box more stable and making the concrete adjacent module box have a higher structural strength. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0022] Figure 1 It is a schematic diagram of a partial structure of a modular building provided in an embodiment of the present application;
[0023] Figure 2 It is a structural schematic diagram of a concrete edge module box provided in an embodiment of the present application;
[0024] Figure 3 It is a structural schematic diagram of a composite shear wall provided in an embodiment of the present application;
[0025] Figure 4 It is a schematic diagram of the decomposed structure of a composite shear wall provided in an embodiment of the present application;
[0026] Figure 5 It is a partial structural schematic diagram of a concrete edge module box provided in an embodiment of the present application;
[0027] Figure 6 It is a partial structural schematic diagram of a concrete edge module box provided in an embodiment of the present application;
[0028] Figure 7 It is a schematic diagram of the local structure of a composite shear wall provided in an embodiment of the present application;
[0029] Figure 8 It is a schematic diagram of the local structure of a composite shear wall provided in an embodiment of the present application;
[0030] Fig. 9 It is a structural schematic diagram of a floor slab and a circular connecting rib provided in an embodiment of the present application;
[0031] Fig.10 It is a structural schematic diagram of a plugging mold provided in an embodiment of the present application;
[0032] Fig.11 It is a structural schematic diagram of a blocking mold provided in an embodiment of the present application.
[0033] Figure Number:
[0034] Wall body: 10; concrete edge module box: 100; floor: 1001; composite shear wall: 1002; first prefabricated wall leaf: 11; second prefabricated wall leaf: 12; steel mesh: 20; rectangular tie: 30; horizontal steel bar: 21; vertical steel bar: 22; first rectangular tie: 301; second rectangular tie: 302; floor: 41; round connecting bar: 42; connecting core column: 60; groove: 601; first mold: 51: second mold: 52; connecting piece: 53; first strip groove: 10a; vertical part: 511; horizontal part: 512; bolt: 54; nut: 55; block: 56; slot: 56a; second strip groove: 511a. DETAILED DESCRIPTION
[0035] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.
[0036] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0037] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
[0038] It should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0039] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.
[0040] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways. "Multiple" means two or more.
[0041] Figure 1is a schematic diagram of a partial structure of a modular building provided in an embodiment of the present application, such as Figure 1 Shown is a top view, the modular building comprises a plurality of concrete module boxes 100 . Figure 1 Only a part of one layer of a modular building is shown in the figure. In the height direction, the concrete module boxes 100 can also be stacked. The multiple concrete module boxes 100 can be divided into concrete edge module boxes, referred to as edge modules, and concrete in-plane module boxes, referred to as in-plane modules, according to different distribution positions. The edge module refers to the concrete module box 100 that is closest to the outermost side of the building, for example Figure 1 The in-plane modules refer to the concrete module boxes 100 located near the center of the building, for example Figure 1 Two concrete module boxes 100 located inside.
[0042] Figure 2 1 is a structural schematic diagram of a concrete module box provided in an embodiment of the present application. The concrete module box may be the outermost concrete module box in a modular building, that is, a concrete edge module box.
[0043] like Figure 2 As shown, the concrete edge module box includes a floor, a floor slab 1001 and a plurality of wall leaves, and the plurality of wall leaves are connected between the floor and the floor slab 1001. One of the wall leaves is a composite shear wall 1002, and the composite shear wall 1002 is connected between the floor and the floor slab 1001.
[0044] The floor slab 1001 and the floor are arranged parallel to each other, and the composite shear wall 1002 is between the floor slab 1001 and the floor. A plurality of wall leaves, the floor slab 1001 and the floor enclose a box space. Some of the wall leaves may be provided with doors or windows. As an example, the concrete edge module box may include four wall leaves, and the floor, the floor slab 1001 and the four wall leaves enclose a rectangular box space.
[0045] Figure 3 Schematic diagram of a composite shear wall structure provided by an embodiment of the present application. Figure 3 As shown, the composite shear wall 1002 includes a wall body 10. The wall body 10 includes a first prefabricated wall leaf 11 and a second prefabricated wall leaf 12.
[0046] Figure 4 Schematic diagram of the decomposition structure of a composite shear wall provided in an embodiment of the present application. Figure 4 As shown, the composite shear wall further includes two steel mesh sheets 20 and a plurality of rectangular tie bars 30 . Figure 4 In order to show the steel mesh 20, at least a part of the first prefabricated wall leaf 11 and a part of the second prefabricated wall leaf 12 are omitted.
[0047] The first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 are arranged in parallel and spaced apart, and the first prefabricated wall leaf 11 is located on the inner side of the concrete adjacent module box, and the second prefabricated wall leaf 12 is located on the outer side of the concrete adjacent module box. When the composite shear wall is constructed on site, the space between the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 is used for pouring concrete. The orthographic projection of the first prefabricated wall leaf 11 on the second prefabricated wall leaf 12 is located outside the second prefabricated wall leaf 12.
[0048] One steel mesh 20 is located in the first prefabricated wall leaf 11, and the other steel mesh 20 is located in the second prefabricated wall leaf 12. Rectangular tie bars 30 are connected to the two steel meshes 20, respectively.
[0049] By setting the composite shear wall 1002 of the concrete adjacent module box to include a first prefabricated wall leaf 11 and a second prefabricated wall leaf 12, and respectively arranging steel meshes in the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12, the strength and stability of the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 can be improved. By arranging a plurality of rectangular tie bars 30 between the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12, the rectangular tie bars 30 are connected to the two steel meshes 20, so that when one of the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 is subjected to a horizontal force, a part of the force can be dispersed to the steel mesh 20 in the other of the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 through the plurality of rectangular tie bars 30, so that the wall body 10 can withstand a larger force, thereby making the composite shear wall of the concrete adjacent module box more stable and making the concrete adjacent module box have a higher structural strength.
[0050] like Figure 3 As shown, taking the state after the installation of the composite shear wall as an example, the lower edge of the first prefabricated wall leaf 11 is lower than the lower edge of the second prefabricated wall leaf 12; the upper edge of the first prefabricated wall leaf 11 is lower than the upper edge of the second prefabricated wall leaf 12, that is, the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 are staggered in the vertical direction, and the edges of the two are not flush. The first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 are staggered to facilitate the splicing of different composite shear walls. Similarly, the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 are also staggered in the horizontal direction, and the vertical side of the first prefabricated wall leaf 11 is not flush with the vertical side of the second prefabricated wall leaf 12.
[0051] The first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 can both be prefabricated concrete panels, for example, they can be prefabricated by a mold. In the process of preparing the first prefabricated wall leaf 11, the steel mesh 20 is placed in the mold in advance, and after the concrete poured into the mold solidifies, it forms a whole with the first prefabricated wall leaf 11. The preparation method of the second prefabricated wall leaf 12 can be the same as that of the first prefabricated wall leaf 11.
[0052] like Figure 2 As shown, the upper edge of the first prefabricated wall leaf 11 is flush with the floor 1001, and the lower edge of the first prefabricated wall leaf 11 is flush with the floor. The upper edge of the second prefabricated wall leaf 12 is higher than the floor 1001, and the lower edge of the second prefabricated wall leaf 12 is higher than the floor.
[0053] Modular buildings usually have two or more floors, that is, during construction, multiple layers of concrete edge module boxes are stacked together. The second prefabricated wall leaf 12 located outside the concrete edge module box is set higher, while the first prefabricated wall leaf 11 located inside is set to be flush with the floor slab 1001 and the floor, which makes it more convenient to construct the concrete edge module boxes when they are stacked.
[0054] Figure 5 1 is a partial structural diagram of a concrete edge module box provided in an embodiment of the present application, showing two adjacent wall leaves, at least omitting the floor 1001 and the floor. Figure 5 As shown, in this example, the concrete adjacent module box includes two composite shear walls 1002, the two composite shear walls 1002 are arranged adjacent to each other, and the first prefabricated wall leaves 11 of the two composite shear walls 1002 are connected, and the second prefabricated wall leaves 12 of the two composite shear walls 1002 are connected.
[0055] Two adjacent superimposed shear walls 1002 are provided so that the concrete edge module box can withstand large horizontal forces in two directions, and are suitable for being arranged at the outer corner of the modular building.
[0056] like Figure 5 As shown, the concrete edge module box also includes a connecting core column 60, which is located at the connection of two adjacently arranged superimposed shear walls 1002 and arranged along the height direction of the wall body 10. One end of the connecting core column 60 is located between the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12, and the other end extends out of the lower edge of the first prefabricated wall leaf 11 and the lower edge of the second prefabricated wall leaf 12.
[0057] When the concrete edge module boxes are stacked, the connecting core column 60 can be inserted into the concrete edge module box located at the lower layer, so that the two adjacent layers of concrete edge module boxes are connected as one.
[0058] Figure 6 is a partial structural diagram of a concrete edge module box provided in an embodiment of the present application, Figure 6 In the example shown, concrete has been poured between the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12. Figure 6As shown, the top surface of the poured concrete between the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 may have a groove 601 , which is located at the connection between two adjacently arranged composite shear walls 1002 and arranged along the height direction of the wall body 10 .
[0059] When the concrete edge module boxes are stacked, the connection core column 60 of the upper concrete edge module box is inserted into the groove 601, so that the composite shear walls 1002 of the two adjacent layers of concrete edge module boxes are connected more tightly.
[0060] like Figure 4 As shown, the steel mesh 20 includes a plurality of horizontal steel bars 21 arranged in parallel and a plurality of vertical steel bars 22 arranged in parallel. The plurality of horizontal steel bars 21 and the plurality of vertical steel bars 22 are cross-arranged to form a mesh, and the horizontal steel bars 21 and the vertical steel bars 22 are connected at the intersection.
[0061] Exemplarily, the horizontal steel bars 21 and the vertical steel bars 22 may be connected at the intersection by at least one of welding and bundling.
[0062] The steel mesh 20 may include a single-layer steel mesh, or may include a multi-layer steel mesh formed by stacking a plurality of steel meshes. In the example where the steel mesh 20 includes a single-layer steel mesh, the horizontal steel bar 21 may be a single steel bar, and the vertical steel bar 22 may also be a single steel bar; in the example where the steel mesh 20 includes a multi-layer steel mesh, the horizontal steel bar 21 may include a plurality of steel bars connected together, and the plurality of steel bars in the horizontal steel bar 21 may be welded or tied together; the vertical steel bar 22 may also include a plurality of steel bars connected together, and the plurality of steel bars in the vertical steel bar 22 may be welded or tied together.
[0063] The number of steel meshes included in the steel mesh 20 can be set according to the structural strength requirements of the composite shear wall. Usually, in situations where the structural strength requirements are different, the number of steel meshes included in the steel mesh 20 is larger in the composite shear wall with higher structural strength requirements.
[0064] like Figure 4 As shown, the connection point between each rectangular tie bar 30 and at least one steel mesh 20 is located at the intersection of the horizontal steel bar 21 and the vertical steel bar 22 .
[0065] Connecting the rectangular tie bars 30 at the intersection of the horizontal steel bars 21 and the vertical steel bars 22 can better disperse the force of the rectangular tie bars 30 on the steel mesh 20 to various parts of the steel mesh 20, which is beneficial to further improve the ability of the composite shear wall to withstand horizontal loads.
[0066] Optionally, each rectangular tie bar 30 is cross-welded to the outer side of the vertical steel bar 22 , and the outer side of the vertical steel bar 22 of the steel mesh 20 refers to the side away from another steel mesh 20 .
[0067] In some examples, the plane where the rectangular tie rods 30 are located is perpendicular to the first prefabricated wall leaf 11 .
[0068] The first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 are arranged in parallel, and the plane where the rectangular tie rod 30 is located may be perpendicular to the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 .
[0069] The rectangular tie rod 30 may be a steel bar bent into a rectangular frame, and both ends of the steel bar may be connected to form a rectangular frame structure.
[0070] As an example, the rectangular tie bar 30 may include a single steel bar bent into a rectangular frame, or may include a plurality of stacked steel bars bent into a rectangular frame. In the example where the rectangular tie bar 30 includes a plurality of stacked steel bars bent into a rectangular frame, the plurality of steel bars bent into a rectangular frame may be welded or tied to each other.
[0071] The plane where the rectangular tie rod 30 is located is perpendicular to the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12, so that when the composite shear wall is subjected to horizontal loads, the force exerted by the rectangular tie rod 30 on the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 is perpendicular to the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12.
[0072] As an example, the plane where the rectangular tie bars 30 are located is perpendicular to the vertical reinforcement 22. That is, the rectangular tie bars 30 are arranged horizontally.
[0073] Figure 7 is a schematic diagram of a partial structure of a wall body provided in an embodiment of the present application, such as Figure 7 As shown, the same rectangular tie rod 30 is connected to each horizontal steel bar 21 in the two steel meshes 20 .
[0074] The horizontal steel bars 21 in the two steel meshes 20 are arranged horizontally, and the same rectangular tie bar 30 and each horizontal steel bar 21 in the two steel meshes 20 can be arranged in the same plane, that is, the two horizontal steel bars 21 connected to the same rectangular tie bar 30 are arranged at the same height. One side of the rectangular tie bar 30 can be overlapped and connected with one of the horizontal steel bars 21, and the other side of the rectangular tie bar 30 can be overlapped and connected with another horizontal steel bar 21, which is conducive to forming a larger range of connection between the rectangular tie bar 30 and the steel mesh 20, thereby further improving the structural stability and strength of the composite shear wall.
[0075] In some examples, the rectangular tie bars 30 are at least placed outside two adjacent vertical steel bars 22 in one steel mesh 20 .
[0076] In this example, a portion of the rectangular tie bars 30 are sleeved outside the vertical steel bars 22 of the steel mesh 20 located in the first prefabricated wall leaf 11, and another portion of the rectangular tie bars 30 are sleeved outside the vertical steel bars 22 of the steel mesh 20 located in the second prefabricated wall leaf 12.
[0077] The rectangular tie bars 30 are sleeved outside the vertical steel bars 22 so that the rectangular tie bars 30 can exert a large pulling force on the steel mesh 20 without causing damage to the connection.
[0078] Optionally, the plurality of rectangular tie bars 30 include a first rectangular tie bar 301 and a second rectangular tie bar 302. The first rectangular tie bar 301 is a rectangular tie bar 30 sleeved outside two adjacent vertical steel bars 22 in one steel mesh 20, and the second rectangular tie bar 302 is a rectangular tie bar 30 sleeved outside two adjacent vertical steel bars 22 in another steel mesh 20.
[0079] By putting a part of the rectangular tie rods 30 outside the vertical steel bars 22 of the steel mesh 20 located in the first prefabricated wall leaf 11 and putting another part of the rectangular tie rods 30 outside the vertical steel bars 22 of the steel mesh 20 located in the second prefabricated wall leaf 12, it is ensured that no matter the composite shear wall is subjected to a force directed from the first prefabricated wall leaf 11 to the second prefabricated wall leaf 12 or a force directed from the second prefabricated wall leaf 12 to the first prefabricated wall leaf 11, there is always a part of the rectangular tie rods 30 that can withstand a larger tensile force.
[0080] As an example, one side of the first rectangular tie rod 301 at least partially overlaps and is connected to one side of the second rectangular tie rod 302 .
[0081] By making one side of the first rectangular tie rod 301 partially overlap with one side of the second rectangular tie rod 302 and connect them together, when the composite shear wall is subjected to horizontal force, the force can be better transmitted between the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 through the rectangular tie rod 30, so that the force can be more dispersed, thereby improving the stability of the composite shear wall.
[0082] Figure 8 is a schematic diagram of a partial structure of a wall body provided in an embodiment of the present application, such as Figure 8 As shown, in this example, one side of the first rectangular tie rod 301 completely overlaps with one side of the second rectangular tie rod 302, which can further improve the stability of the composite shear wall.
[0083] In some other examples, the plane where the rectangular tie rod 30 is located is perpendicular to the horizontal steel bar 21. The same rectangular tie rod 30 is coplanar with and connected to one vertical steel bar 22 in each of the two steel mesh sheets 20.
[0084] That is to say, the rectangular tie bars 30 can also be placed vertically. There will be certain differences in the mechanical properties of the composite shear wall when the rectangular tie bars 30 are placed vertically and horizontally, for example, there will be certain differences in anti-bending and anti-torsion. The appropriate arrangement can be selected according to different occasions.
[0085] like Figure 4 As shown, the composite shear wall further includes a plurality of loop-shaped connecting ribs 42 . Fig. 9 is a schematic diagram of the structure of a floor slab and a circular connecting rib provided in an embodiment of the present application, such as Fig. 9 As shown, the meandering connecting ribs 42 are arranged along the height direction of the wall body 10, and the middle parts of the plurality of meandering connecting ribs 42 are respectively connected to the floor slab 41. The floor slab 41 is located between the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12. One end of the meandering connecting rib 42 is located between the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12, and the other end of the meandering connecting rib 42 extends out of the edge of the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12. The floor slab 41 can be the top plate of the concrete edge module box of the lower layer.
[0086] During construction, different concrete edge module boxes will be connected. For example, the concrete edge module box located in the middle layer of the building will be connected to the concrete edge module box of the adjacent lower layer and the concrete edge module box of the adjacent upper layer. A plurality of circular connecting ribs 42 are used to connect the wall bodies 10 of adjacent composite shear walls 1002 into one.
[0087] As an example, during on-site construction, for two adjacent layers of concrete edge module boxes, one end of the circular connecting rib 42 of the upper layer of concrete edge module boxes extending out of the edge of the first precast wall leaf 11 and the second precast wall leaf 12 is inserted into the wall body 10 of the lower layer of concrete edge module boxes. In the lower layer of concrete edge module boxes, after the concrete between the first precast wall leaf 11 and the second precast wall leaf 12 is poured and cured, the circular connecting rib 42 is fixed in the wall body 10 of the lower layer. Then, concrete is poured between the first precast wall leaf 11 and the second precast wall leaf 12 of the upper layer of concrete edge module boxes.
[0088] like Figure 4 As shown, the concrete edge module box also includes a plugging mold. The plugging mold includes a first mold 51, a second mold 52 and a connecting member 53. The connecting member 53 connects the first mold 51 and the second mold 52. The first mold 51 is located on a side of the first prefabricated wall leaf 11 away from the second prefabricated wall leaf 12, and the first mold 51 can move along the height direction of the wall body 10. The second mold 52 is located on a side of the second prefabricated wall leaf 12 away from the first prefabricated wall leaf 11, and the second mold 52 can move along the height direction of the wall body 10.
[0089] When the superimposed shear walls 1002 of two adjacent layers of concrete edge module boxes are spliced together and concrete is poured between the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 of the upper layer of the concrete edge module box, concrete may overflow from the joints between the two adjacent layers. Setting a blocking mold can shield the joints.
[0090] Since the first mold 51 can move along the height direction of the wall body 10, and the second mold 52 can move along the height direction of the wall body 10, in the process of splicing the composite shear wall 1002 of two adjacent layers of concrete adjacent module boxes, the first mold 51 and the second mold 52 can be moved first to expose the joint, which is convenient for observing the joint and improving the splicing quality of the composite shear wall 1002 of two adjacent layers of concrete adjacent module boxes. After the joints are in place, the first mold 51 and the second mold 52 are moved again to cover the joints.
[0091] The connecting piece 53 connects the first mold 51 and the second mold 52 , which can prevent the first mold 51 from being separated from the first prefabricated wall leaf 11 , and prevent the second mold 52 from being separated from the second prefabricated wall leaf 12 .
[0092] Fig.10 is a schematic diagram of the structure of a plugging mold provided in an embodiment of the present application. As an example, Fig.10 As shown, the first mold 51 is an L-shaped steel, that is, a steel material with an L-shaped cross section, and one side of the first mold 51 fits the first prefabricated wall leaf 11, and the second mold 52 is a square steel, and one side of the second mold 52 fits the second prefabricated wall leaf 12. The connecting member 53 can be a bolt.
[0093] Fig.10 A portion of the first prefabricated wall leaf 11 is shown by a dotted line. As an example, the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 can have a first strip groove 10a, and the connecting member 53 is located in the first strip groove 10a and can slide along the first strip groove 10a, so that the first mold 51 and the second mold 52 can move along the height direction of the wall body 10.
[0094] In order to reduce leakage at the first strip groove 10a during concrete pouring, the first strip groove 10a can be set to be smaller, and the first strip groove 10a can be blocked during pouring.
[0095] The first mold 51 includes a vertical portion 511 and a horizontal portion 512, and the vertical portion 511 fits with the first prefabricated wall leaf 11. The horizontal portion 512 can be connected with a plurality of bolts 54, and two nuts 55 can be sleeved outside the bolts 54, and the horizontal portion 512 is located between the two nuts 55. The blocking mold can also include a plurality of blocks 56, and the blocks 56 have a slot 56a. The blocks 56 are stuck between the horizontal portion 512 and the nut 55 located below the horizontal portion 512 through the slot 56a, so that the blocks 56 are against the surface of the first prefabricated wall leaf 11, and the nut 55 is tightened. The friction between the blocks 56 and the first prefabricated wall leaf 11 keeps the first mold 51 stable. After the blocks 56 are removed, there is a lack of support below the first mold 51, so that the first mold 51 can be moved downward.
[0096] Fig.11 Schematic diagram of the structure of a plugging mold provided in an embodiment of the present application. Fig.11 In the example shown, the first mold 51 may have a second strip groove 511a, and the connecting member 53 can move in the second strip groove 511a relative to the first mold 51. When the position of the first mold 51 needs to be locked, the nut connected to the connecting member 53 can be tightened to clamp the first mold 51 between the nut and the first prefabricated wall leaf 11; when the position of the first mold 51 needs to be adjusted, the nut connected to the connecting member 53 can be loosened, and the first mold 51 can be moved along the second strip groove 511a, and the nut connected to the connecting member 53 can be tightened after the first mold 51 is moved into place. That is, in this example, the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12 do not need to be provided with the first strip groove 10a, so there is no need to perform a blocking operation before pouring.
[0097] The connector 53 may be sleeved with a sleeve, such as a plastic sleeve, and the sleeve is located between the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12. After pouring, the first mold 51, the second mold 52 and the connector 53 may be removed, and the sleeve may be retained between the first prefabricated wall leaf 11 and the second prefabricated wall leaf 12.
[0098] The cooperation between the second mold 52 and the connecting member 53 may be the same as the cooperation between the first mold 51 and the connecting member 53 .
[0099] A hanging rod 521 may also be connected to the top of the second mold 52. The hanging rod 521 may be used to be connected to a lifting device. After the second mold 52 is disassembled, the second mold 52 may be lifted.
[0100] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A concrete edge module box, characterized in that: The invention comprises a floor, a slab (1001) and a composite shear wall (1002), wherein the composite shear wall (1002) is connected between the floor and the slab (1001), and the composite shear wall (1002) comprises a first prefabricated wall leaf (11), a second prefabricated wall leaf (12), two steel mesh sheets (20) and a plurality of rectangular tie bars (30), wherein the first prefabricated wall leaf (11) and the second prefabricated wall leaf (12) are arranged in parallel and spaced apart, and the first prefabricated wall leaf (11) is located between the concrete The second prefabricated wall leaf (12) is located on the inner side of the adjacent module box, the second prefabricated wall leaf (12) is located on the outer side of the concrete adjacent module box, the orthographic projection of the first prefabricated wall leaf (11) on the second prefabricated wall leaf (12) is located outside the second prefabricated wall leaf (12), one of the steel mesh sheets (20) is located in the first prefabricated wall leaf (11), the other of the steel mesh sheets (20) is located in the second prefabricated wall leaf (12), and the rectangular tie bars (30) are respectively connected to the two steel mesh sheets (20).
2. The concrete edge module box according to claim 1, characterized in that: The upper edge of the first prefabricated wall leaf (11) is flush with the floor slab (1001), and the lower edge of the first prefabricated wall leaf (11) is flush with the floor; The upper edge of the second prefabricated wall leaf (12) is higher than the floor slab (1001), and the lower edge of the second prefabricated wall leaf (12) is higher than the floor.
3. The concrete edge module box according to claim 1, characterized in that: The concrete edge module box includes two of the composite shear walls (1002), which are arranged adjacent to each other, and the first prefabricated wall leaves (11) of the two composite shear walls (1002) are connected, and the second prefabricated wall leaves (12) of the two composite shear walls (1002) are connected.
4. The concrete edge module box according to claim 3, characterized in that: It also includes a connecting core column (60), which is located at the connection between two adjacently arranged composite shear walls (1002) and is arranged along the height direction of the composite shear walls (1002), one end of the connecting core column (60) is located between the first prefabricated wall leaf (11) and the second prefabricated wall leaf (12), and the other end extends out of the lower edge of the first prefabricated wall leaf (11) and the lower edge of the second prefabricated wall leaf (12).
5. The concrete edge module box according to claim 1, characterized in that: The steel mesh (20) comprises a plurality of horizontal steel bars (21) arranged in parallel and a plurality of vertical steel bars (22) arranged in parallel, the plurality of horizontal steel bars (21) and the plurality of vertical steel bars (22) are arranged crosswise to form a mesh, and the horizontal steel bars (21) and the vertical steel bars (22) are connected at the intersection; Each of the rectangular tie bars (30) is cross-welded to the outer sides of the vertical steel bars (22).
6. The concrete edge module box according to claim 5, characterized in that: The plane where the rectangular tie bars (30) are located is perpendicular to the first prefabricated wall leaf (11).
7. The concrete edge module box according to claim 5, characterized in that: The plane where the rectangular tie bars (30) are located is perpendicular to the vertical steel bars (22), and the same rectangular tie bars (30) are coplanar and connected to each of the horizontal steel bars (21) in the two steel mesh sheets (20).
8. The concrete edge module box according to claim 5, characterized in that: The plane where the rectangular tie bars (30) are located is perpendicular to the horizontal steel bars (21), and the same rectangular tie bars (30) are coplanar and connected with one vertical steel bar (22) in each of the two steel mesh sheets (20).
9. The concrete edge module box according to any one of claims 1 to 8, characterized in that: It also includes a plurality of meander-shaped connecting bars (42), wherein the meander-shaped connecting bars (42) are arranged along the height direction of the composite shear wall (1002), one end of the meander-shaped connecting bar (42) is located between the first prefabricated wall leaf (11) and the second prefabricated wall leaf (12), and the other end of the meander-shaped connecting bar (42) extends out of the edges of the first prefabricated wall leaf (11) and the second prefabricated wall leaf (12).
10. The concrete edge module box according to any one of claims 1 to 8, characterized in that: It also includes a blocking mold, the blocking mold including a first mold (51), a second mold (52) and a connecting piece (53), the connecting piece (53) connecting the first mold (51) and the second mold (52), the first mold (51) being located on the outside of the first prefabricated wall leaf (11) and being able to move along the height direction of the composite shear wall (1002), and the second mold (52) being located on the outside of the second prefabricated wall leaf (12) and being able to move along the height direction of the composite shear wall (1002).