High-altitude large-cantilever reinforced concrete structure formwork scaffold structure and construction method thereof

By setting up a cantilever support platform and layer-by-layer construction method in a high-altitude large cantilever reinforced concrete structure, the problems of difficulty in supporting the formwork vertical pole and safety risks of high-altitude operations are solved, and the construction safety and reliability and shortening cycles are achieved.

CN118997441APending Publication Date: 2024-11-22SHANGHAI CONSTRUCTION FIRST CONSTRUCTION (GROUP) CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411251119.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In the construction of high-altitude large cantilever reinforced concrete structures, the formwork vertical pole support is difficult to stand on the foot and the high-altitude side-side operation has high safety risks, resulting in high construction difficulty and long cycle.

Method used

The cantilever support platform, single-row protective frame and support scaffolding structure is adopted to erect the supporting platform through steel main beams, steel tie rod components, U-shaped steel rings, safety nets and wooden square components, and the layer-by-layer construction method is adopted to shorten it. Construction cycle.

Benefits of technology

It effectively reduces the difficulty of supporting vertical poles for high-altitude large cantilever reinforced concrete structure formwork formwork and the safety risks of edge operations, ensures safety and reliability of construction, and shortens the construction cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997441A_ABST
    Figure CN118997441A_ABST
Patent Text Reader

Abstract

The invention discloses a high-altitude large-cantilever reinforced concrete structure formwork erecting scaffold structure and a construction method thereof, the high-altitude large-cantilever reinforced concrete structure formwork erecting scaffold structure is erected and supported below a formwork of a to-be-poured cantilever concrete floor, and the high-altitude large-cantilever reinforced concrete structure formwork erecting scaffold structure comprises a single-row protection frame, a supporting scaffold and a cantilever formwork erecting platform; the overhanging formwork platform is provided with a plurality of profile steel main beams which are arranged on the shelving layer floor in a parallel, spaced and horizontally overhung mode and at least one profile steel connecting beam which is connected with the profile steel main beams in a crossing mode, and the overhanging portion of each profile steel main beam is provided with at least two steel pull rod assemblies which are connected to the upper pull layer floor in an obliquely upward mode in the overhanging extending direction. The bottoms of the supporting scaffold and the single-row protection frame are sequentially arranged on the cantilever part of the profile steel main beam in the cantilever extending direction. The construction risk of the formwork scaffold can be reduced, safe and reliable construction is guaranteed, and the construction period is shortened to a certain extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of high-altitude large cantilever concrete structure construction, and specifically relates to a high-altitude large cantilever reinforced concrete structure formwork scaffolding structure and a construction method thereof. Background Art

[0002] In order to pursue novel curtain wall facades, more and more high-rise or super-high-rise building structures tend to set up large-span cantilever structures in parts during the design process. In order to control project costs, cantilever structures may adopt traditional reinforced concrete structures. Due to the high clearance and heavy weight of large-span reinforced concrete cantilever structures, it is difficult to set up formwork poles during construction, and there are high safety risks in high-altitude edge operations.

[0003] For the construction of large-span reinforced concrete cantilever structures, the conventional construction method is to use a steel truss structure as the formwork platform. However, this construction method has defects such as a large amount of steel used, which makes the platform heavy, a large amount of high-altitude welding, which makes the construction difficult and quality assurance difficult, and a long construction period that occupies an absolute period of time. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a scaffolding structure for supporting the formwork of a high-altitude large cantilever reinforced concrete structure and a construction method thereof, which can effectively reduce the construction risks caused by the difficulty in setting up the uprights of the formwork of the high-altitude large cantilever reinforced concrete structure and the high safety risks of high-altitude edge operations, ensure safe and reliable construction, and shorten the construction period to a certain extent.

[0005] To achieve the above object, the present invention is implemented by adopting the following technical solutions:

[0006] On the one hand, the present invention provides a high-altitude large cantilever reinforced concrete structure formwork scaffolding structure, which is set up and supported under the formwork of the cantilever concrete floor to be poured, and includes:

[0007] Single row protective frame,

[0008] Support scaffolding,

[0009] And cantilevered formwork platform,

[0010] The cantilevered formwork platform is equipped with a number of parallel, spaced and horizontally cantilevered steel main beams arranged on the shelf floor and at least one steel connecting beam spanning and connecting the steel main beams. At least two steel tie rod assemblies obliquely connected to the upper pull layer floor are arranged on the cantilevered portion of the steel main beam along the cantilever extension direction. The bottoms of the supporting scaffolding and the single-row protective frame are respectively arranged on the cantilevered portion of the steel main beam in sequence along the cantilever extension direction.

[0011] Furthermore, the overlapping portion of each of the steel beams is passed through and fixed to a plurality of U-shaped steel rings pre-buried in the floor of the shelf layer, and the gap between the U-shaped steel ring and the steel beam is wedged tightly with hardwood wedges.

[0012] Furthermore, there are four U-shaped steel rings, two U-shaped steel rings with an interval of 200mm are arranged at a distance of not less than 300mm from the end of the overlapping portion of the steel main beam, one U-shaped steel ring is arranged at a distance of not less than 100mm from the edge of the floor of the shelf layer, and one U-shaped steel ring is arranged at the middle position of the overlapping portion of the steel main beam.

[0013] Furthermore, the steel main beam of the cantilever formwork platform is configured with a plurality of steel pipes spaced in parallel and arranged across the steel main beam, at least one layer of safety net is laid and fixed on the steel pipe, and a plurality of wooden planks spaced in parallel and arranged across the steel pipe are arranged on the safety net, and the formwork is laid on the wooden planks.

[0014] Furthermore, the steel tie rod assembly includes two adjustable tie rods, the bottom ends of the two adjustable tie rods are anchored to the ear plates at the same position of the steel main beam by high-strength bolts, and the top ends are anchored to two pre-buried steel sleeves at the same height of the upper tie layer floor by high-strength bolts respectively;

[0015] Furthermore, an adjustable flower basket is provided on the adjustable pull rod.

[0016] Furthermore, an inverted U-shaped top support is connected to the bottom of the uprights of the supporting scaffolding and the single-row protective frame, and an inverted clip is arranged on the top surface of the steel main beam; and a limiting steel bar is welded on the steel main beam and extends vertically and passes through the U-shaped top support and the bottom of the uprights.

[0017] Furthermore, a limiting steel section is welded below the steel main beam and is used to clamp against the side edge of the shelf layer floor.

[0018] Furthermore, the single-row protection frame includes protection vertical poles and protection horizontal poles overlapped in the form of longitudinal and transverse tube buckles along the vertical plane, and a vertically erected protection net. The single-row protection frame is connected to the supporting scaffolding through a plurality of cross bars.

[0019] On the other hand, the present invention provides a layer-by-layer construction advancement method for a cantilever concrete structure formwork scaffolding structure, for the formwork and external protection construction of the N-th floor high-altitude large cantilever concrete structure formwork in a high-rise or super-high-rise structure, the N-2 floor is used as a shelf floor for setting up a cantilever formwork platform, as a foundation for setting up a large cantilever concrete structure formwork frame, and the outer structural beam of the N-1 floor is used as an upper pull-layer floor for anchoring and connecting steel tie rod assemblies;

[0020] The layer-by-layer construction advancement method comprises the following steps:

[0021] Step S1: According to the construction drawings and design requirements, the required materials and components are purchased and prefabricated, including the steel main beam, steel tie rod assembly, high-strength bolts, U-shaped steel rings, limit steel, steel pipes, safety nets, wood, templates, scaffolding, etc.; and the ear plates, limit steel and limit steel bars of the steel main beam are positioned and welded in the factory, as well as the connecting plates at both ends of the steel tie rod;

[0022] Step S2: Before pouring the N-2 floor, determine the spacing position of the steel beam and the extension length of the cantilevered formwork platform, and mark and embed a number of U-shaped steel rings on the floor of the shelf layer, at least ensuring that two U-shaped steel rings with a spacing of 200 mm are set at a distance of not less than 300 mm from the end of the shelf overlap of the steel beam, one U-shaped steel ring is set at a distance of not less than 100 mm from the edge of the shelf floor, and one U-shaped steel ring is set at the middle position of the shelf overlap of the steel beam;

[0023] Step S3: After the concrete strength of the N-2 floor reaches 30%, start placing the steel main beam on the pre-buried U-shaped steel ring in turn according to the design drawings, and ensure that the lower limit steel is just against the outer end surface of the floor of the placement layer, and use hardwood wedges to wedge the gap between the U-shaped steel ring and the steel main beam, and configure at least one steel connecting beam that spans and connects the steel main beam;

[0024] Step S4: Before pouring the concrete of the N-1 floor, a number of steel sleeves are embedded on the side end surface of the structural beam outside the upper pull-layer floor; after the concrete strength of the N-1 floor reaches 50%, the bottom connecting plate of the steel tie rod assembly is anchored to the ear plate of the steel main beam through high-strength bolts, and the top connecting plate is anchored to the embedded steel sleeve through high-strength bolts, and an adjustment basket is provided on the adjustable tie rod;

[0025] Step S5: After the concrete strength of the outer beam of the N-1 layer reaches 70%, a supporting scaffold and a single-row protection frame are sequentially arranged on the extended cantilevered portion of the steel main beam, and the bottom of the vertical poles of the supporting scaffold and the single-row protection frame are connected with an inverted U-shaped top bracket, which is inverted and clamped on the top surface of the steel main beam, and the central axis through pipe of the vertical pole and the U-shaped top bracket is limited and sleeved on the limit steel bar welded on the steel main beam;

[0026] Step S6: installing a number of parallel and spaced steel pipes on the main steel beam, laying a layer of horizontal safety net on the steel pipes, laying a number of parallel and spaced wooden planks on the nets, and laying templates on the wooden planks;

[0027] Step S7: pouring concrete at the cantilevered part of the Nth layer, and after the concrete strength of the Nth layer reaches 80%, pouring concrete at the cantilevered part of the N+1th layer; and pouring concrete at the N+2th layer and removing the formwork frame of the N-1th layer;

[0028] Step S8: When the concrete strength of the Nth layer and the N+1th layer reaches 100%, start to dismantle the Nth layer of formwork and the outer single-row protective frame synchronously;

[0029] Step S9: Repeat the above operation and move upward layer by layer, gradually pouring the upper concrete and removing the lower formwork; after all the concrete strength reaches 100%, simultaneously remove the N-layer formwork and the outer single-row protective frame to complete the entire construction process.

[0030] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the formwork scaffolding structure for the high-altitude large cantilever reinforced concrete structure of the present invention is erected and supported under the formwork of the cantilever concrete floor to be poured, and adopts specific structural relationship settings such as cantilever formwork platform, single-row protective frame, supporting scaffolding, etc., which effectively reduces the construction risks brought about by the difficulty in standing on the uprights of the high-altitude large cantilever reinforced concrete structure formwork and the high safety risks of high-altitude edge operations, ensures safe and reliable construction, and shortens the construction period to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 The present invention is a schematic structural diagram of a high-altitude large cantilever reinforced concrete structure formwork scaffolding structure provided according to an embodiment of the present invention.

[0032] Figure 2 It is a structural schematic diagram of a steel tie rod assembly provided according to an embodiment of the present invention.

[0033] Figure 3 It is a structural schematic diagram of a cantilever formwork platform provided according to an embodiment of the present invention.

[0034] Figure 4 It is a partial schematic diagram of a scaffold structure provided according to an embodiment of the present invention.

[0035] Figures 5 to 11 The present invention is a schematic diagram of a layer-by-layer construction advancement method of a cantilever concrete structure formwork scaffolding structure provided in accordance with an embodiment of the present invention.

[0036] In the figure:

[0037] 1. Steel main beam; 2. Steel tie rod assembly; 3. Adjustment basket; 4. High-strength bolts; 5. U-shaped steel ring; 6. Limiting steel; 7. Steel connecting beam; 8. Steel pipe; 9. Safety net; 10. Wooden square; 11. Formwork; 12. Limiting steel bar; 13. Protective vertical pole; 14. Protective horizontal pole; 15. Protective net; 16. Steel casing; 17. Ear plate; 18. Shelving floor; 19. Upper pull-up floor; 20. Structural beam; 21. U-shaped top support; 22. Fasteners; 23. Cross bar; 24. Support scaffolding; 25. Cantilever concrete structure. DETAILED DESCRIPTION

[0038] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0039] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0040] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0041] like Figure 1 As shown, in an embodiment of the present invention, a high-altitude large cantilever reinforced concrete structure formwork scaffolding structure is provided, which is set up and supported under the formwork 11 of the cantilever concrete floor to be poured, and includes:

[0042] Single row protective frame,

[0043] Support scaffolding 24,

[0044] And cantilevered formwork platform,

[0045] The cantilever formwork platform is equipped with a number of parallel and spaced-apart horizontally cantilevered steel main beams 1 set on the shelf floor 18 and at least one steel connecting beam 7 spanning and connecting the steel main beams 1. At least two steel tie rod assemblies 2 obliquely connected to the upper pull layer floor 19 are set on the cantilevered part of the steel main beam 1 along the cantilever extension direction. The bottom of the supporting scaffolding 24 and the single-row protective frame are respectively arranged on the cantilevered part of the steel main beam 1 in sequence along the cantilever extension direction.

[0046] like Figure 1 As shown, in this embodiment, the overlapping portion of each steel main beam 1 is passed through and fixed to a plurality of U-shaped steel rings 5 ​​pre-buried in the floor 18 of the shelf layer, and the gap between the U-shaped steel ring 5 and the steel main beam 1 is wedged tightly with hardwood wedges.

[0047] Four U-shaped steel rings 5 ​​are configured, two U-shaped steel rings 5 ​​with an interval of 200mm are set at the end of the overlapping part of the steel main beam 1 not less than 300mm, one U-shaped steel ring 5 is set at the edge of the laying layer floor 18 not less than 100mm, and one U-shaped steel ring 5 is set at the middle position of the overlapping part of the steel main beam 1.

[0048] like Figure 3 As shown, the steel main beam 1 of the cantilever formwork platform is provided with a plurality of steel pipes 8 which are spaced in parallel and are arranged across the steel main beam 1, at least one layer of safety net 9 is laid and fixed on the steel pipe 8, and a plurality of wooden planks 10 which are spaced in parallel and are arranged across the steel pipe 8 are arranged on the safety net 9, and a formwork 11 is laid on the wooden planks 10.

[0049] like Figure 2 As shown, the steel tie rod assembly 2 includes two adjustable tie rods, the bottom ends of the two adjustable tie rods are anchored to the ear plate 17 at the same position of the steel main beam 1 through high-strength bolts 4, and the top ends are anchored to two pre-buried steel sleeves 16 at the same height of the upper tie layer floor 19 through high-strength bolts 4 respectively;

[0050] An adjusting flower basket 3 is arranged on the adjustable pull rod.

[0051] like Figure 4 As shown, an inverted U-shaped top support 21 is connected to the bottom of the vertical pole supporting the scaffolding 24 and the single-row protective frame, and the inverted clip is set on the top surface of the steel main beam 1; and a limiting steel bar 12 is welded on the steel main beam 1 and extends vertically through the U-shaped top support 21 and the bottom of the vertical pole.

[0052] A limiting steel section 6 is welded below the main steel beam 1 and is used to be clamped against the side edge of the floor 18 of the shelf layer.

[0053] like Figure 1 As shown, the single-row protection frame includes protection vertical poles 13 and protection horizontal poles 14 which are overlapped in the form of longitudinal and transverse tube buckles along the vertical plane, and a vertically erected protection net 15.

[0054] The single-row protection frame is connected to the supporting scaffold 24 via a plurality of cross bars 23 .

[0055] In addition, if Figures 5 to 11As shown, the embodiment of the present invention also provides a layer-by-layer construction advancement method for a cantilever concrete structure formwork scaffolding structure, for the formwork 11 and external protection construction of the N-th floor high-altitude large cantilever concrete structure formwork in a high-rise or super-high-rise structure, the N-2 floor is used as a shelf floor 18 for setting up a cantilever formwork platform as a foundation for setting up a large cantilever concrete structure formwork frame, and the outer structural beam 20 of the N-1 floor is used as an upper pull-layer floor 19 for anchoring and connecting the steel tie rod assembly 2;

[0056] The layer-by-layer construction advancement method comprises the following steps:

[0057] Step S1: According to the construction drawings and design requirements, the required material components are purchased and prefabricated, including the steel main beam 1, the steel tie rod assembly 2, the high-strength bolts 4, the U-shaped steel ring 5, the limit steel 6, the steel pipe 8, the safety net 9, the wood 10, the template 11, the scaffolding, etc.; and the ear plate 17, the limit steel 6 and the limit steel bar 12 of the steel main beam 1 are positioned and welded in the factory, and the connecting plates at both ends of the steel tie rod are welded;

[0058] Step S2: Before pouring the N-2 floor, determine the spacing position of the steel main beam 1 and the extension length of the cantilevered formwork platform, and mark and embed a number of U-shaped steel rings 5 ​​on the shelf floor 18, at least ensuring that two U-shaped steel rings 5 ​​with a spacing of 200 mm are provided at the end of the shelf overlap of the steel main beam 1 not less than 300 mm, one U-shaped steel ring 5 is provided at the edge of the shelf floor 18 not less than 100 mm, and one U-shaped steel ring 5 is provided at the middle position of the shelf overlap of the steel main beam 1;

[0059] Step S3: After the concrete strength of the N-2 floor reaches 30%, start placing the steel main beam 1 on the embedded U-shaped steel ring 5 in sequence according to the design drawings, and ensure that the lower limit steel 6 just abuts against the outer end surface of the floor 18 of the placement layer, and use hardwood wedges to wedge the gap between the U-shaped steel ring 5 and the steel main beam 1, and configure at least one steel connecting beam that spans and connects the steel main beam 1;

[0060] Step S4: Before pouring the concrete of the N-1 floor, a plurality of steel sleeves 16 are embedded in the side end surface of the outer structural beam 20 of the upper pull-layer floor 19; after the concrete strength of the N-1 floor reaches 50%, the bottom connecting plate of the steel tie rod assembly 2 is anchored to the ear plate 17 of the steel main beam 1 through high-strength bolts 4, and the top connecting plate is anchored to the embedded steel sleeve 16 through high-strength bolts 4, and an adjusting basket 3 is provided on the adjustable tie rod;

[0061] Step S5: After the concrete strength of the N-1 layer outer beam reaches 70%, a supporting scaffold 24 and a single-row protection frame are sequentially arranged on the extended cantilevered portion of the steel main beam 1, and the bottom of the vertical poles of the supporting scaffold 24 and the single-row protection frame are connected with an inverted U-shaped top bracket 21, which is inverted and clamped on the top surface of the steel main beam 1, and the central axis through pipe of the vertical pole and the U-shaped top bracket 21 is limited and sleeved on the limit steel bar 12 welded on the steel main beam 1;

[0062] Step S6: Install a plurality of parallel and spaced steel pipes 8 on the steel main beam 1, lay a layer of horizontal safety net 9 on the steel pipe 8, and lay a plurality of parallel and spaced wooden planks 10 on the net that span the steel pipe 8. Specifically, lay the wooden planks 10 at intervals of 200 mm, and lay a template 11 on the wooden planks 10;

[0063] Step S7: pouring concrete at the cantilevered part of the Nth layer, and after the concrete strength of the Nth layer reaches 80%, pouring concrete at the cantilevered part of the N+1th layer; and pouring concrete at the N+2th layer and removing the formwork frame of the N-1th layer;

[0064] Step S8: When the concrete strength of the Nth layer and the N+1th layer reaches 100%, start to dismantle the Nth layer of formwork and the outer single-row protective frame synchronously;

[0065] Step S9: Repeat the above operation and move upward layer by layer, gradually pouring the upper concrete and removing the lower formwork; after all the concrete strength reaches 100%, simultaneously remove the N-layer formwork and the outer single-row protective frame to complete the entire construction process.

[0066] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A high-altitude large cantilever reinforced concrete structure formwork scaffolding structure, which is set up and supported under the formwork of the cantilever concrete floor to be poured, characterized in that: include: Single row protective frame, Support scaffolding, And cantilevered formwork platform, The cantilevered formwork platform is equipped with a number of parallel, spaced and horizontally cantilevered steel main beams arranged on the shelf floor and at least one steel connecting beam spanning and connecting the steel main beams. At least two steel tie rod assemblies obliquely connected to the upper pull layer floor are arranged on the cantilevered portion of the steel main beam along the cantilever extension direction. The bottoms of the supporting scaffolding and the single-row protective frame are respectively arranged on the cantilevered portion of the steel main beam in sequence along the cantilever extension direction.

2. The high altitude large cantilever reinforced concrete structure formwork scaffolding structure according to claim 1 is characterized in that: The laying overlapped part of each steel main beam is passed through and fixed to a plurality of U-shaped steel rings pre-buried in the floor of the laying layer, and the gap between the U-shaped steel ring and the steel main beam is wedged tightly with hardwood wedges.

3. The high altitude large cantilever reinforced concrete structure formwork scaffolding structure according to claim 2 is characterized in that: There are four U-shaped steel rings, two U-shaped steel rings with an interval of 200mm are arranged at not less than 300mm at the end of the overlapping part of the steel main beam, one U-shaped steel ring is arranged at not less than 100mm at the edge of the floor of the laying layer, and one U-shaped steel ring is arranged at the middle position of the overlapping part of the steel main beam.

4. The high altitude large cantilever reinforced concrete structure formwork scaffolding structure according to claim 2 is characterized in that: The steel main beam of the cantilever formwork platform is equipped with a plurality of steel pipes which are spaced in parallel and arranged across the steel main beam, at least one layer of safety net is laid and fixed on the steel pipe, and a plurality of wooden planks which are spaced in parallel and arranged across the steel pipe are arranged on the safety net, and the formwork is laid on the wooden planks.

5. The high altitude large cantilever reinforced concrete structure formwork scaffolding structure according to claim 4 is characterized in that: The steel tie rod assembly includes two adjustable tie rods, the bottom ends of the two adjustable tie rods are anchored to the ear plates at the same position of the steel main beam by high-strength bolts, and the top ends are anchored to two pre-buried steel sleeves at the same height of the upper tie layer floor by high-strength bolts.

6. The high altitude large cantilever reinforced concrete structure formwork scaffolding structure according to claim 5 is characterized in that: An adjusting flower basket is arranged on the adjustable pull rod.

7. The high altitude large cantilever reinforced concrete structure formwork scaffolding structure according to claim 2 is characterized in that: The bottom of the vertical poles of the supporting scaffolding and the single-row protective frame are connected to an inverted U-shaped top bracket, which is inverted and clamped on the top surface of the steel main beam; and a limiting steel bar is welded on the steel main beam and extends vertically and passes through the U-shaped top bracket and the bottom of the vertical pole.

8. The high altitude large cantilever reinforced concrete structure formwork scaffolding structure according to claim 7 is characterized in that: A limiting steel section is welded below the main steel beam and is used for clamping against the side edge of the shelving layer floor.

9. The high altitude large cantilever reinforced concrete structure formwork scaffolding structure according to claim 8 is characterized in that: The single-row protection frame comprises protection vertical poles and protection horizontal poles which are overlapped in the form of longitudinal and transverse tube buckles along the vertical plane, and a vertically erected protection net; the single-row protection frame is connected to the supporting scaffolding through a plurality of transverse poles.

10. A layer-by-layer construction method for a cantilevered concrete structure formwork scaffolding structure, characterized in that: For the formwork and external protection construction of the N-th floor high-altitude large cantilever concrete structure formwork in a high-rise or super-high-rise structure, the N-2 floor is used as a shelf floor to set up a cantilever formwork platform, as a foundation for setting up a large cantilever concrete structure formwork frame, and the outer structural beam of the N-1 floor is used as an upper pull-up floor to anchor and connect the steel tie rod assembly; the layer-by-layer construction advancement method includes the following steps: Step S1: According to the construction drawings and design requirements, the required materials and components are purchased and prefabricated, including the steel main beam, steel tie rod assembly, high-strength bolts, U-shaped steel rings, limit steel, steel pipes, safety nets, wood, templates, scaffolding, etc.; and the ear plates, limit steel and limit steel bars of the steel main beam are positioned and welded in the factory, as well as the connecting plates at both ends of the steel tie rod; Step S2: Before pouring the N-2 floor, determine the spacing position of the steel beam and the extension length of the cantilevered formwork platform, and mark and embed a number of U-shaped steel rings on the floor of the shelf layer, at least ensuring that two U-shaped steel rings with a spacing of 200 mm are set at a distance of not less than 300 mm from the end of the shelf overlap of the steel beam, one U-shaped steel ring is set at a distance of not less than 100 mm from the edge of the shelf floor, and one U-shaped steel ring is set at the middle position of the shelf overlap of the steel beam; Step S3: After the concrete strength of the N-2 floor reaches 30%, start placing the steel main beam on the pre-buried U-shaped steel ring in turn according to the design drawings, and ensure that the lower limit steel is just against the outer end surface of the floor of the placement layer, and use hardwood wedges to wedge the gap between the U-shaped steel ring and the steel main beam, and configure at least one steel connecting beam that spans and connects the steel main beam; Step S4: Before pouring the concrete of the N-1 floor, a number of steel sleeves are embedded on the side end surface of the structural beam outside the upper pull-layer floor; after the concrete strength of the N-1 floor reaches 50%, the bottom connecting plate of the steel tie rod assembly is anchored to the ear plate of the steel main beam through high-strength bolts, and the top connecting plate is anchored to the embedded steel sleeve through high-strength bolts, and an adjustment basket is provided on the adjustable tie rod; Step S5: After the concrete strength of the outer beam of the N-1 layer reaches 70%, a supporting scaffold and a single-row protection frame are sequentially arranged on the extended cantilevered portion of the steel main beam, and the bottom of the vertical poles of the supporting scaffold and the single-row protection frame are connected with an inverted U-shaped top bracket, which is inverted and clamped on the top surface of the steel main beam, and the central axis through pipe of the vertical pole and the U-shaped top bracket is limited and sleeved on the limit steel bar welded on the steel main beam; Step S6: installing a number of parallel and spaced steel pipes on the main steel beam, laying a layer of horizontal safety net on the steel pipes, laying a number of parallel and spaced wooden planks on the nets, and laying templates on the wooden planks; Step S7: pouring concrete at the cantilevered part of the Nth layer, and after the concrete strength of the Nth layer reaches 80%, pouring concrete at the cantilevered part of the N+1th layer; and pouring concrete at the N+2th layer and removing the formwork frame of the N-1th layer; Step S8: When the concrete strength of the Nth layer and the N+1th layer reaches 100%, start to dismantle the Nth layer of formwork and the outer single-row protective frame synchronously; Step S9: Repeat the above operation and move upward layer by layer, gradually pouring the upper layer concrete and removing the lower layer formwork; After all concrete strength reaches 100%, the N-layer formwork and the outer single-row protective frame are removed simultaneously to complete the entire construction process.

Citation Information

Patent Citations

  • Support system of roof inclined beam and slab cantilever structure and construction method of support system

    CN103993735A

  • Cantilever structure construction method

    CN108104453A

  • Construction method of high-altitude double-layer super-long cantilever reinforced concrete structure

    CN111910902A

  • Cast-in-place reinforced concrete supporting leg cantilever scaffold construction platform and construction method

    CN113756554A

  • Pull rod type external wall cantilever discharging platform setting-up structure

    CN202370233U