Stacking body load shedding back pressure stability control design method
By calculating the neutral points of load reduction and backpressure in the stack, determining the partition and designing the corresponding surfaces, the problem of not considering the impact of seismic force in the existing technology is solved, and the accuracy and construction of the stack stability analysis are improved. Security.
Patent Information
- Application Number
- CN202411094104.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-08-09
AI Technical Summary
When designing the load reduction and backpressure reduction scheme for stacking bodies, the impact of load reduction excavation and backpressure filling on lateral seismic forces is not considered, resulting in a large calculation result and safety hazards.
By obtaining the characteristics and geological information of the stacking body, dividing typical sections, calculating load reduction and backpressure neutral points, determining load reduction and backpressure partitions, and designing load reduction and backpressure surfaces in these partitions to update the safety factor , consider the impact of seismic forces, adjust the design to improve stability.
The accuracy of stacking stability analysis is improved, the anti-slip torque is reduced, and the sliding torque is increased, making the calculation results more conservative and ensuring the safety and economical construction.
Smart Images

Figure CN119004613A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of geotechnical engineering and geological engineering application technology, and in particular to a stacking body load reduction back pressure stability control design method. Background Art
[0002] Load reduction and counterpressure refers to excavating and removing part of the sliding body at the rear edge of the pile, that is, the side close to the uphill direction of the pile, and then filling the soil at the front edge of the pile, that is, the side close to the downhill direction of the pile, so as to reduce the downward force of the pile and increase the anti-sliding force of the pile. This measure can quickly suppress the deformation of the pile. For the management of the pile, it is not only an emergency rescue measure, but also the most stable method in the long term among many management measures of the pile.
[0003] At present, the design method of the load-reducing and back-pressure prevention pile is mainly based on the classic load-reducing and back-pressure analysis method. This method first takes multiple typical sections along the sliding direction on the pile, divides the cross-section of the pile, and assumes that load reduction or back-pressure will not only cause changes in the gravity of the soil strip, but also cause changes in the pore water pressure (related to the pore pressure coefficient). Since the test of the pore pressure coefficient is very difficult, this method assumes that a point at the bottom of the sliding surface is the back-pressure neutral point, and the pore pressure coefficient at this point is equal to 1; it is assumed that a point on the sliding surface is the load-reducing neutral point, and the angle between the tangent line at this point and the horizontal line is in It represents the effective friction angle of the sliding surface where the bottom edge of the strip is located, F0 represents the safety factor of the typical section, and the pore pressure coefficient is equal to 0. The load-reducing neutral points of each typical section are connected to obtain the load-reducing neutral line, and the back-pressure neutral points of each stacking body section are connected to obtain the back-pressure neutral line, thereby determining the load-reducing partition and the back-pressure partition.
[0004] However, this method has certain limitations. In the specific practice, it was found that although this method takes into account the impact of soil excavation and filling on pore water pressure and introduces the pore pressure coefficient, in the actual process of load reduction and back pressure construction, the soil is slowly excavated and slowly filled, which will not cause the cumulative change of pore water pressure. When the load reduction and back pressure construction is completed, the excess pore water pressure has basically dissipated, and there will be no significant change in the pore water pressure compared with the original pile. On the other hand, this method ignores the impact of the soil excavated by load reduction and the soil filled by back pressure on the lateral seismic force. After the soil is filled, the seismic force on the soil strip increases, which makes the anti-sliding force of the soil strip decrease, the sliding force increases, and the stability of the slope decreases. Therefore, the original calculation method will lead to a larger calculation result of the stability of the pile, which is not conservative and is not suitable for actual engineering design. Summary of the invention
[0005] The purpose of the present invention is to overcome the shortcomings of the prior art in which the load-reducing and back-pressure schemes for stacking bodies are designed without taking into account the influence of the soil excavated for load reduction and the soil filled for back-pressure on the lateral seismic force, resulting in the calculation results being unconservative and the existence of potential safety hazards, and to provide a design method for the stability control of load-reducing and back-pressure stacking bodies.
[0006] In a first aspect, the present invention provides a method for designing a stack load reduction back pressure stability control, comprising the following steps:
[0007] S1. Obtaining characteristics and geological information of the stockpile; dividing the stockpile according to the characteristics and geological information of the stockpile to obtain a plurality of typical sections, each of which contains a plurality of strips;
[0008] S2. Obtain the safety factor of each typical section, and obtain the load reduction neutral point of each typical section according to the safety factor of each typical section; obtain the reverse pressure neutral point of each typical section;
[0009] S3. Obtain a load-reducing neutral line according to the connection line of the load-reducing neutral points of multiple typical sections, and obtain a reverse-pressure neutral line according to the connection line of the reverse-pressure neutral points of multiple typical sections; divide the stacking body into load-reducing partitions and reverse-pressure partitions according to the load-reducing neutral line and the reverse-pressure neutral line;
[0010] S4. Design the load-reducing surface in the load-reducing zone, and design the back-pressure surface in the back-pressure zone; update each typical section and re-divide the strips and blocks according to the load-reducing surface and the back-pressure surface, and re-obtain the safety factor of each typical section;
[0011] S5. Determine whether the safety factor of each typical section meets the design requirements. If not, return to step S4 and modify the design of the load reduction surface and / or the back pressure surface; if so, complete the design.
[0012] The load-reducing and back-pressure stability control design method of the stacking body of the present invention considers the influence of the load-reducing soil at the rear edge of the stacking body and the back-pressure soil at the front edge of the stacking body on the gravity and seismic force exerted on the soil of the stacking body, and ignores the influence on the pore water pressure, and proposes an improved calculation method for the neutral point of load-reducing and back-pressure neutral point. On this basis, the load-reducing neutral line and back-pressure neutral line determination method of the stacking body and the load-reducing and back-pressure zoning of the stacking body are clarified, and a stability calculation method and design analysis process of the load-reducing and back-pressure prevention stacking body are further proposed, thereby improving the current design method of the classic load-reducing and back-pressure prevention stacking body, which considers the change of pore water pressure but ignores the influence of seismic force, resulting in the problem that the calculation results are too large and tend to be unsafe. Compared with the classic method, the parameters of the method of the present invention are relatively simple, easy to understand, and quick to calculate, which is convenient for promotion and application.
[0013] At the same time, the present invention reduces the anti-sliding moment in the stability calculation of the pile body and increases the sliding moment by considering the influence of the unloaded soil and the counter-pressure soil on the seismic force, making the stability calculation result conservative and effectively improving the accuracy of the pile body stability analysis.
[0014] Preferably, in step S4, the load reduction surface and the back pressure surface are designed according to the following steps:
[0015] Draw the slope load reduction line in the area enclosed by the load reduction neutral line and the perimeter and close to the uphill side; draw the sliding surface load reduction line in the area enclosed by the slope load reduction line and the perimeter and close to the uphill side; the area enclosed by the slope load reduction line, the sliding surface load reduction line and the perimeter is the load reduction surface;
[0016] A slope surface back pressure line is drawn in the area enclosed by the back pressure neutral line and the perimeter and close to the downhill side. An outer slope back pressure line is drawn outside the area enclosed by the perimeter and close to the downhill side. The area enclosed by the slope surface back pressure line and the outer slope back pressure line is the back pressure surface.
[0017] For the unloaded neutral point, if soil excavation is carried out in the area above the unloaded neutral point, that is, on the side of the unloaded neutral point close to the uphill direction, that is, unloading, it will help to improve the safety factor of the confrontation; for the counter-pressure neutral point, if soil ballasting is carried out in the area below the counter-pressure neutral point, that is, on the side of the counter-pressure neutral point close to the downhill direction, that is, counter-pressure, it will also help to improve the safety factor of the confrontation; based on this, this scheme sets the unloaded surface on the unloaded neutral line, that is, the area on the uphill side of the line connecting the unloaded neutral points, and sets the counter-pressure surface on the counter-pressure neutral line, that is, the area on the downhill side of the line connecting the counter-pressure neutral points; unloading within the unloaded surface and counter-pressure within the counter-pressure surface can improve the safety factor of the stacking body.
[0018] Preferably, in step S4, each typical section is updated according to the following steps:
[0019] Project the intersection of the slope load shedding line and the typical section onto the slope to obtain the corresponding slope load shedding point; project the intersection of the sliding surface load shedding line and the typical section onto the sliding surface to obtain the corresponding sliding surface load shedding point; connect the slope projection point and the sliding surface projection point to obtain the corresponding typical section load shedding line;
[0020] Project the intersection of the slope surface counterpressure line and the typical section onto the slope surface to obtain the corresponding slope surface counterpressure point; project the intersection of the slope outer counterpressure line and the typical section onto the slope surface to obtain the corresponding slope outer counterpressure point; obtain the counterpressure line of the corresponding typical section; connect the slope surface counterpressure point and the slope outer counterpressure point with an arc, the center of the arc is located between the slope surface counterpressure point and the slope outer counterpressure point along the longitudinal slope direction, and the center of the arc is located below the slope surface counterpressure point and the slope outer counterpressure point along the plumb bob direction to obtain the counterpressure line of the corresponding typical section;
[0021] Extend the end of the sliding surface close to the downslope to the inside of the counter-pressure line to obtain the extended sliding surface;
[0022] The area enclosed by the load reduction line, counter-pressure line, extended sliding surface and slope surface is taken as the updated typical section.
[0023] It should be noted that projection onto the slope refers to projection along the plumb line.
[0024] This solution provides a specific operation method for updating the typical cross-section, which can make the shape of the typical cross-section of the stacking body more consistent with the cross-section shape after load reduction and back pressure, so that subsequent calculations are more consistent with actual conditions.
[0025] Preferably, after step S5, the following steps are further included:
[0026] S6. Repeat steps S4 to S5 to obtain multiple alternatives and corresponding safety factors, wherein the load reduction surface and / or back pressure surface of each alternative is designed differently; and obtain the excavation volume and backfill volume of each alternative;
[0027] S7. Select the best option from among the alternative options based on their safety factor, excavation volume and backfill volume.
[0028] The present invention obtains multiple load-reducing and counter-pressure alternative schemes and corresponding stockpile safety factors, excavation volumes and backfill volumes by multiple cycles of steps S3 to S5, and obtains the alternative scheme with the highest cost-effectiveness as the optimal scheme through comprehensive comparison. For example, the alternative scheme with the least excavation volume and backfill volume is selected to reduce construction costs, or the alternative scheme with the highest safety factor is selected to ensure construction safety, thereby ensuring the economy and safety of the construction; at the same time, multiple cycles of selection can also make the load-reducing surface and counter-pressure surface obtained by the present invention more reliable.
[0029] Preferably, when obtaining the load-reducing neutral point of each typical section in step S2, the influence of the average height of the strips on the slope stability is ignored.
[0030] When obtaining the unloading neutral point of each typical section, it is necessary to calculate the slope stability, but the equation of slope stability is very difficult to solve. The inventors of the present invention found that if the average height of the bars in the slope stability equation is omitted, not only can the slope stability be easily solved, but it will also cause the calculation result of the slope stability to be reduced, thereby making the calculation of the safety factor more conservative, that is, more safe. Therefore, this scheme chooses to ignore the average height of the bars, which can both simplify the calculation and ensure the safety of the calculation results.
[0031] Preferably, in step S2, the load shedding neutral point of each typical section is obtained according to the following formula:
[0032]
[0033] In the formula, α n It indicates the angle between the tangent line at a point on the sliding surface corresponding to the load-reducing neutral point and the horizontal line; K represents the effective friction angle of the sliding surface where the bottom edge of the block numbered i is located; s represents the earthquake influence coefficient; F0 represents the safety factor of the corresponding typical section; i represents the number of the strip, i=1, 2, 3...
[0034] This scheme provides a specific calculation formula for the angle between the tangent line and the horizontal line at a point on the sliding surface corresponding to the load-shedding neutral point when the average height of the bars is ignored, which is used to accurately determine the position of the load-shedding neutral point.
[0035] Preferably, in step S2, the back pressure neutral point of each typical section is obtained according to the following steps:
[0036] A point on the sliding surface along the horizontal direction of the tangent line is selected as the neutral point of the back pressure.
[0037] For the unloading neutral point, if the load is piled below the unloading neutral point, that is, on the side of the unloading neutral point close to the downhill direction, the safety factor will continue to increase. Recalculating the unloading neutral point based on the safety factor will find that the unloading neutral point will move downward. Theoretically, when the safety factor tends to infinity, the unloading neutral point will move to the lowest point of the sliding surface, that is, the position where the tangent of a point on the sliding surface is horizontal. Therefore, this scheme selects the point on the sliding surface where the tangent is along the horizontal direction as the neutral point of the counterpressure to improve the efficiency of the counterpressure in improving the safety factor.
[0038] Preferably, in step S1, the stack is divided according to the following steps:
[0039] A plurality of typical sections are divided on the stacking body along the transverse slope, and the typical sections are all parallel to the longitudinal slope and the plumb direction; a plurality of strips are divided along the longitudinal slope, and the dividing lines between two adjacent strips are all along the plumb direction.
[0040] This solution provides a specific method for dividing the stacking body.
[0041] Preferably, in step S1, the characteristics and geological information of the pile body include the perimeter, sliding surface and shear outlet of the pile body, the internal friction angle, cohesion and natural density of the pile body and the surrounding rock and soil, the effective internal friction angle and effective cohesion of the sliding surface of the pile body, and the distribution of infiltration lines within the pile body.
[0042] This solution provides the specific deposit characteristics and geological information that should be collected in step S1.
[0043] Preferably, in step S1, the safety factor of each typical section is obtained according to the following steps:
[0044] According to the characteristics of the strips and blocks and the infiltration line, the body strength, seismic force, pore water pressure at the bottom of the strips, and the angle between the bottom of the strips and the horizontal plane of each strip are obtained; according to the body strength, seismic force, pore water pressure at the bottom of the strips, the angle between the bottom of the strips and the horizontal plane and the effective internal friction angle and effective cohesion of the sliding surface, the sum of the anti-sliding moments of the corresponding typical section is obtained, and then the safety factor of the corresponding typical section is obtained.
[0045] This solution provides the calculation process of the safety factor of a typical section.
[0046] Compared with the prior art, the present invention has the following beneficial effects:
[0047] The present invention provides a design method for load-reducing and back-pressure stability control of a pile body. By considering the influence of the load-reducing soil at the rear edge of the pile body and the back-pressure soil at the front edge of the pile body on the gravity and seismic force exerted on the soil of the pile body, and ignoring the influence on the pore water pressure, an improved calculation method for the neutral point of load-reducing and back-pressure neutral point is proposed. On this basis, the load-reducing neutral line and back-pressure neutral line determination method of the pile body and the load-reducing partition and back-pressure partition of the pile body are clarified, and a stability calculation method and design analysis process of the load-reducing and back-pressure prevention pile body are further proposed, thereby improving the current design method of the classic load-reducing and back-pressure prevention pile body, which considers the change of pore water pressure but ignores the influence of seismic force, resulting in the problem that the calculation results are too large and tend to be unsafe. Compared with the classic method, the parameters in the method of the present invention are relatively simple, easy to understand, quick to calculate, and easy to promote and apply.
[0048] At the same time, the present invention reduces the anti-sliding moment in the stability calculation of the pile body and increases the sliding moment by considering the influence of the unloaded soil and the counter-pressure soil on the seismic force, making the stability calculation result conservative and effectively improving the accuracy of the pile body stability analysis. BRIEF DESCRIPTION OF THE DRAWINGS
[0049] Figure 1 It is a flow chart of a stacking body load reduction back pressure stability control design method of the present invention;
[0050] Figure 2 is a characteristic schematic diagram of the stacking body in Example 1;
[0051] Figure 3 is a schematic diagram of the wetting line of the stacked body in Example 1;
[0052] Figure 4 It is a typical cross-sectional schematic diagram of the stacking body in Example 1;
[0053] Figure 5It is a schematic diagram of the strip division of the stacking body in Example 1, as well as the geometric dimensions and force of the strips;
[0054] Figure 6 is a schematic diagram of the geometric dimensions of the bars in the stack in Example 1;
[0055] Figure 7 is a schematic diagram of the forces acting on the bars in the stacking body in Example 1;
[0056] Figure 8 Schematic diagram of the load-reducing neutral point and the reverse-pressure neutral point of the stack in Example 1;
[0057] Fig. 9 Schematic diagram of the load-reducing neutral line and the reverse-pressure neutral line of the stack in Example 1;
[0058] Fig.10 is a schematic cross-sectional view of the stacking body in Example 1 after the typical cross-section is updated and the strips are re-divided;
[0059] Fig.11 is a schematic diagram of the corresponding relationship between the load-reducing surface and the back-pressure surface of the stacking body in Example 1 and the load-reducing line and the back-pressure line in the typical cross section; DETAILED DESCRIPTION
[0060] The present invention is further described in detail below in conjunction with test examples and specific implementation methods. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0061] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all expressions based on the orientation or position relationship shown in the drawings, or the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, rather than indicating or implying that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.
[0062] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.
[0063] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.
[0064] Example 1
[0065] like Figure 1 As shown, a stack load reduction back pressure stability control design method includes the following steps:
[0066] S1. Obtaining characteristics and geological information of the stockpile; dividing the stockpile according to the characteristics and geological information of the stockpile to obtain a plurality of typical sections, each of which contains a plurality of strips;
[0067] S2. Obtain the safety factor of each typical section, and obtain the load reduction neutral point of each typical section according to the safety factor of each typical section; obtain the reverse pressure neutral point of each typical section;
[0068] S3. Obtain a load-reducing neutral line according to the connection line of the load-reducing neutral points of multiple typical sections, and obtain a reverse-pressure neutral line according to the connection line of the reverse-pressure neutral points of multiple typical sections; divide the stacking body into load-reducing partitions and reverse-pressure partitions according to the load-reducing neutral line and the reverse-pressure neutral line;
[0069] S4. Design the load-reducing surface in the load-reducing zone, and design the back-pressure surface in the back-pressure zone; update each typical section and re-divide the strips and blocks according to the load-reducing surface and the back-pressure surface, and re-obtain the safety factor of each typical section;
[0070] S5. Determine whether the safety factor of each typical section meets the design requirements. If not, return to step S4 and modify the design of the load reduction surface and / or the back pressure surface; if so, complete the design.
[0071] In an optional implementation, in step S1, in order to ensure the reliability of the calculation results and the prevention and control design of the pile body, it is necessary to obtain the key parameters related to the stability of the pile body as accurately as possible. Therefore, the characteristics of the pile body at least include the perimeter of the pile body, the sliding surface, the shear outlet, the pile body wall, and the pile body bed; the geological information of the pile body at least includes the rock and soil characteristics of each stratum, such as the internal friction angle, cohesion, and natural density of the pile body and the surrounding rock and soil; and the mechanical parameters of the sliding surface of the pile body, such as the effective internal friction angle and effective cohesion of the sliding surface, and the distribution of infiltration lines in the pile body also need to be collected. The meaning of the characteristics of the pile body is as follows: Figure 2 and Figure 3 shown.
[0072] In an optional implementation manner, step S1 includes:
[0073] S1A. Obtain the perimeter, sliding surface, shear outlet and other features of the stockpile; the acquisition methods include on-site investigation, stockpile displacement monitoring, drilling and coring and other technical means.
[0074] S1B. Obtain the internal friction angle, cohesion, natural density and other stratigraphic information of the stockpile and surrounding rock and soil; for example, first obtain soil or rock samples of the stockpile and surrounding rock and soil through coring, and then conduct direct shear tests or triaxial tests.
[0075] S1C. Obtain the effective internal friction angle and effective cohesion of the sliding surface; for example, obtain soil or rock samples of the sliding surface by coring through drilling holes, and then conduct direct shear tests or triaxial tests.
[0076] S1D, obtain the infiltration line in the stack; for example Figure 3 As shown, water level sensors are arranged in the cored holes, and the water level lines of the holes in the same typical section are connected to form an infiltration line.
[0077] It should be noted that there is no fixed order among S1A, S1B, S1C, and S1D. They can be performed in sequence of S1A, S1B, S1C, and S1D, or they can be performed simultaneously, or the order of some steps can be swapped.
[0078] In an optional implementation manner, when dividing the stockpile according to the characteristics of the stockpile and the geological information in step S1, dividing the stockpile based on the Swedish strip method comprises the following steps:
[0079] S11. Multiple typical sections are divided at intervals on the stockpile along the transverse slope. The typical sections are parallel to the longitudinal slope (i.e., the main sliding direction) and the plumb bob direction. Considering that when performing stability analysis and calculation, the safety factor of some typical sections may be less than the target safety factor, while some may be greater than the target safety factor. Therefore, the number of typical sections is generally not less than 3, and the typical sections are not easy to be too close to the two sides of the stockpile perimeter. For example, Figure 4 As shown, in this embodiment, three typical sections are selected on the stacking body and are labeled as Ⅰ, Ⅱ, and Ⅲ respectively.
[0080] S12. Divide the typical section into multiple strips of the same width along the longitudinal slope, and the dividing lines between two adjacent strips are along the plumb direction (parallel to the direction of gravity); the number of strips can be selected arbitrarily, but is generally required to be greater than or equal to 10 and less than or equal to 100, because when the number of strips is too small, the accuracy of the calculation results is lower; when the number of strips is too large, the calculation time increases significantly, and the improvement in the accuracy of the calculation results is limited.
[0081] In an optional implementation, when obtaining the safety factor of each typical section in step S2, the sum of the sliding moment and the sum of the anti-sliding moment of each bar in each typical section are calculated respectively, and finally the safety factor of the corresponding typical section is calculated. This method assumes that the resultant force between the bars is parallel to the bottom edge of the bar and does not affect the bottom reaction force of the bar. When calculating the safety factor, only the balance of the moment of the sliding force and the moment of the anti-sliding force is considered, which includes the following steps:
[0082] S21. Obtain the body force, seismic force, pore water pressure at the bottom of the block, and the angle between the bottom of the block and the horizontal plane of each block according to the block characteristics and the infiltration line; the meanings of body force, seismic force, pore water pressure at the bottom of the block, and the angle between the bottom of the block and the horizontal plane are as follows: Figures 5 to 7 As shown, in addition, S i Indicates the anti-sliding force of the soil strip; where:
[0083] The formula for physical strength can be expressed as:
[0084]
[0085] Where i represents the number of the strip, i = 1, 2, 3, ...; W i represents the physical strength of the bar numbered i; γ si represents the natural density of the bar numbered i; a i It represents the area of the strip numbered i. The unit can be international units, such as W i Take kN / m, γ si Take kN / m 3 , a i Take m 2 .
[0086] The reaction force at the bottom of the bar can be expressed as:
[0087] N i =W i cosα i -K s W i sinα i +Q i cos(α i -θ i )
[0088] Where N i Represents the reaction force at the bottom of the bar numbered i; αi 表 K represents the angle between the lower boundary of the block numbered i and the horizontal plane; s It represents the earthquake influence coefficient, which is a dimensionless parameter and can be determined according to the relevant provisions of the Code for Seismic Design of Buildings; Q i represents the external load of the bar numbered i; θ i Indicates Q i The angle between the normal line of the upper boundary of the bar numbered i and the normal line of the upper boundary of the bar numbered i. The units can be international units, such as N i and Q i Take kN / m, θ i Take °.
[0089] The pore water pressure at the bottom of the strip can be expressed as:
[0090]
[0091] Where U i represents the pore water pressure at the bottom of the strip numbered i; γ w Indicates the weight of water; h wi represents the water level of the boundary of the block numbered i close to the uphill side; h wi+1 represents the water level of the border of the strip numbered i on the downhill side; b represents the width of the strip; units can be international units, such as U i Take kN / m, γ w Take kN / m 3 ,h wi and h wi+1 Take m.
[0092] S22. According to the body force of each strip, seismic force, pore water pressure at the bottom of the strip, the angle between the bottom of the strip and the horizontal plane, and the effective internal friction angle and effective cohesion of the sliding surface, the sum of the anti-sliding moments of the corresponding typical section is obtained, and then the safety factor of the corresponding typical section is obtained. Among them:
[0093] The total anti-slip torque can be expressed as:
[0094]
[0095] Where M r represents the total anti-slip moment; R represents the radius of the arc-shaped sliding surface; n represents the total number of bars in the corresponding typical section; c` i represents the effective cohesion of the sliding surface where the bottom edge of the strip numbered i is located; l i Indicates the length of the bottom side of the bar numbered i; It represents the effective friction angle of the sliding surface where the bottom edge of the block numbered i is located; the units can be international units, such as R and l i Take m, Take °, c` i Take kPa, M r Take kN.
[0096] The total sliding moment can be expressed as:
[0097]
[0098] Where, X i represents the horizontal distance from the center of gravity of the bar numbered i to the center of the sliding surface; Y i represents the longitudinal distance from the center of gravity of the bar numbered i to the center of the sliding surface; X qi represents the lateral distance between the center point of the top of the bar numbered i and the center of the sliding surface when the external load acts on it; Y qi It represents the longitudinal distance between the center point of the top of the bar numbered i and the center of the sliding surface where the external load acts; the unit can be international units, such as X i , Y i , X qi , Y qi Take m, M s Take kN.
[0099] The safety factor corresponding to the typical section can be expressed as the ratio of the sum of the anti-slip moment to the sum of the sliding moment:
[0100]
[0101] In the formula, F0 represents the safety factor corresponding to the typical section and is a dimensionless parameter.
[0102] Substitute M r and M s The expression of can be obtained:
[0103]
[0104] or
[0105]
[0106] S23. Calculate the corresponding safety factors for all typical sections according to the steps from S21 to S22 to obtain the safety factors of each typical section and add corresponding subscripts to them. For example, the safety factors of the typical sections numbered Ⅰ, Ⅱ, and Ⅲ are recorded as F 0Ⅰ 、F 0Ⅱ 、F 0Ⅲ …
[0107] Correspondingly, when the safety factor of the typical section needs to be re-obtained in step S4, the calculation can also be performed according to steps S21 to S23.
[0108] In an optional implementation, the use of load shedding and counter pressure to prevent and control the pile is actually to excavate and reduce the rock and soil at the rear edge of the pile, and to pile up the rock and soil at the front edge of the pile, thereby reducing the sliding force and increasing the anti-sliding force, thereby improving the stability of the pile. For load shedding and counter pressure, there are two neutral points, that is, load shedding or excavation at this point will not affect the stability of the pile, so they are defined as the load shedding neutral point and the counter pressure neutral point, respectively, such as Figure 8 As shown, N C It represents the load-shedding neutral point, N L It represents the neutral point of the reverse pressure; for different typical sections, in N C and N L Then add the corresponding subscript to distinguish them, for example Fig. 9 As shown, N CⅠ , N CⅡ , N CⅢ Respectively represent the load-shedding neutral points of typical sections numbered Ⅰ, Ⅱ, and Ⅲ, N LⅠ , N LⅡ , N LⅢ Respectively represent the respective back-pressure neutral points of the typical sections numbered Ⅰ, Ⅱ, and Ⅲ; correspondingly, when obtaining the load reduction neutral point of each typical section and obtaining the back-pressure neutral point of each typical section according to the safety factor of each typical section in step S2, the following steps are included:
[0109] S24. Obtain the load-reducing neutral point of each typical section according to the safety factor of each typical section. The derivation process can be referred to as follows:
[0110] For load reduction or back pressure on the pile, the weight of the soil is changed, which is ΔW. In the load reduction part, ΔW is a negative value, and in the back pressure part, ΔW is a positive value. Under the condition of moment balance, the stability of the slope after load reduction and back pressure at a block numbered i in the pile can be expressed as:
[0111]
[0112] In the formula, F1 represents the stability of the slope and is a dimensionless parameter; h i It represents the average height of the bar numbered i; the unit can be international units, such as h i Take m.
[0113] If the load reduction counter pressure is carried out at the position corresponding to the load reduction neutral point, the safety factor remains unchanged, that is, So it can be expressed as:
[0114]
[0115] By simplifying, the above formula can be expressed as:
[0116]
[0117] For this formula, due to the existence of h i This makes the equation difficult to solve, so in an optional implementation, h i Ignore, make The denominator in the formula increases, that is, F1 decreases. The safety factor F1 obtained in this way is relatively safe and easier to calculate. i After that, the above formula can be simplified to:
[0118]
[0119] The angle between the tangent line and the horizontal line at a point on the sliding surface corresponding to the load-reducing neutral point can be expressed as:
[0120]
[0121] In the formula, α n It represents the angle between the tangent line at a point on the sliding surface corresponding to the load reduction neutral point and the horizontal line.
[0122] It can be seen that when the earthquake influence coefficient K s When α is equal to 0, n equal As the earthquake influence coefficient K s The increase of α n Gradually decreases, that is, the neutral point of load reduction gradually moves downward; for this neutral point of load reduction, excavation of rock and soil in the area above it, that is, "load reduction" will help to improve the safety factor of the pile, that is, improve the stability of the pile, so that this point can be used as the neutral point of load reduction.
[0123] S25. Obtain the back pressure neutral point of each typical section:
[0124] For the unloading neutral point, if the load is piled below the unloading neutral point, that is, on the side of the unloading neutral point close to the downhill direction, the safety factor will continue to increase. Recalculating the unloading neutral point based on the safety factor will find that the unloading neutral point will move downward. Theoretically, when the safety factor tends to infinity, the unloading neutral point will move to the lowest point of the sliding surface, that is, the position where the tangent of a point on the sliding surface is horizontal. Therefore, this scheme selects the point on the sliding surface where the tangent is along the horizontal direction as the neutral point of the counterpressure to improve the efficiency of the counterpressure in improving the safety factor.
[0125] In an optional implementation manner, step S3 comprises the following steps:
[0126] S31, obtain the load-reducing neutral line according to the connection line of the load-reducing neutral points of multiple typical sections, and obtain the reverse pressure neutral line according to the connection line of the reverse pressure neutral points of multiple typical sections; since the load-reducing neutral point and the reverse pressure neutral point are fixed points on the typical section of the stacking body, Fig. 9 As shown, by connecting the load-shedding neutral point and the reverse-pressure neutral point in each typical section, the load-shedding neutral line and the reverse-pressure neutral line can be obtained; the specific form of the connection includes but is not limited to a broken line and a curve.
[0127] S32, dividing the stack into load-reducing partitions and back-pressure partitions according to the load-reducing neutral line and the back-pressure neutral line; Fig. 9 As shown, the two ends of the load-reducing neutral line and the counter-pressure neutral line obtained by connecting the load-reducing neutral point and the counter-pressure neutral point respectively are extended so that they intersect with the opposite perimeter. The area enclosed by the perimeter can be divided into three areas, which are the load-reducing zone, the middle zone and the counter-pressure zone from uphill to downhill. During subsequent construction, load reduction should be carried out in the load-reducing zone, and counter-pressure should be carried out in the counter-pressure zone. Load reduction or counter-pressure in the middle zone has little effect on the safety factor, so no engineering measures are required in the middle zone.
[0128] It should be noted that the form of the load-reducing neutral line and the reverse pressure neutral line is related to factors such as the sliding surface and does not necessarily appear as Fig. 9 The saddle shape shown may even cause the load-reduced neutral line and the reverse-pressure neutral line to be parallel. Therefore, the neutral line needs to be drawn and partitioned according to the specific neutral point calculation results.
[0129] In an optional implementation manner, step S4 includes:
[0130] S4A. Draw the slope load reduction line in the area surrounded by the load reduction neutral line and the perimeter and close to the uphill side, that is, the excavation line on the surface of the stockpile; draw the sliding surface load reduction line in the area surrounded by the slope load reduction line and the perimeter and close to the uphill side, that is, the rear edge limit of the sliding surface excavation; the area surrounded by the slope load reduction line, the sliding surface load reduction line and the perimeter is the load reduction surface; Fig.10As shown, the slope load relief line and the sliding surface load relief line can be drawn on the top view of the stacking body with the load relief neutral line.
[0131] S4B, draw the slope surface back pressure line in the area enclosed by the back pressure neutral line and the perimeter and close to the downslope side, that is, the back pressure boundary line of the stockpile surface; draw the slope outer back pressure line outside the area enclosed by the perimeter and close to the downslope side, that is, the outer edge limit of the back pressure soil body; the area enclosed by the slope surface back pressure line and the slope outer back pressure line is the back pressure surface; Fig.10 As shown, the slope surface back pressure line and the off-slope back pressure line can be drawn on the top view of the stacking body with the back pressure neutral line.
[0132] This embodiment can control the safety factor of the stacking body by controlling the unloading surface and the back pressure surface on the stacking body. When the unloading surface and the back pressure surface are selected appropriately, only a small amount of earthwork can be unloaded and back pressured to achieve a significant improvement in the safety factor of the stacking body.
[0133] It should be noted that there is no fixed order between S4A and S4B. S4A and S4B can be performed sequentially or simultaneously, or the order of some steps can be swapped.
[0134] In an optional implementation manner, in step S4, each typical section is updated according to the following steps:
[0135] S41. Project the intersection of the slope unloading line and the typical section onto the slope to obtain the corresponding slope unloading point; project the intersection of the sliding surface unloading line and the typical section onto the sliding surface to obtain the corresponding sliding surface unloading point; connect the slope projection point and the sliding surface projection point to obtain the corresponding typical section unloading line.
[0136] S42. Project the intersection of the slope back pressure line and the typical section onto the slope to obtain the corresponding slope back pressure point; project the intersection of the slope outer back pressure line and the typical section onto the slope to obtain the corresponding slope outer back pressure point; according to the fill side slope slope of 1:1.5 and the backfill top surface slope of 1:25, connect the slope surface back pressure point and the slope outer back pressure point with a multi-segment line to obtain the back pressure line of the corresponding typical section.
[0137] S43, extending the end of the sliding surface close to the downslope to the inside of the counter-pressure line to obtain an extended sliding surface; Fig.11 As shown, the sliding surface is an arc shape. By extending it toward the counter-pressure line until it intersects with the counter-pressure line, an extension line of the sliding surface can be obtained. The sum of the original sliding surface and the extension line of the sliding surface is the extended sliding surface.
[0138] S44. The area enclosed by the load reduction line, the counter pressure line, the extended sliding surface, and the slope surface is taken as the updated typical section. Fig.11 As shown, when the safety factor of the typical section is subsequently obtained again, the updated typical section should be divided into strips and blocks and the safety factor should be calculated.
[0139] In the optional implementation manner, since the measures for reducing the load and counter-pressure prevention and treatment of the stacking body need to consider not only the safety factor itself, but also the engineering economy and the difficulty of construction; and when the safety factor of a typical section is much greater than the target safety factor, there is a problem that the load reduction surface and the counter-pressure surface may be too conservative, and the amount of earth excavation or backfill may be too large, thereby resulting in excessively high engineering costs; therefore, the following steps are also included after step S5:
[0140] S6. Repeat steps S4 to S5 to obtain multiple alternatives and corresponding safety factors, wherein the load reduction surface and / or back pressure surface of each alternative is designed differently; obtain the excavation volume and backfill volume of each alternative; wherein:
[0141] The volume of excavation and backfill can be expressed as:
[0142]
[0143] In the formula, G c Indicates the amount of excavated earth; G L represents the backfill volume; j represents the number of the typical section, m represents the total number of typical sections; A Cj Indicates the load reduction area; A Lj Indicates the back pressure area; the unit can be international units, such as G c and G L Take m 3 , A Cj and A Lj Take m 2 .
[0144] S7. Select the best option from among the alternative options based on their safety factor, excavation volume and backfill volume; for example, select the alternative with the least excavation volume and backfill volume to reduce construction costs, or select the alternative with the highest safety factor to ensure construction safety, thereby ensuring the economy and safety of the construction.
[0145] Example 2
[0146] Based on Example 1, this example provides a calculation example containing specific data, including the following steps:
[0147] S1. Obtain the characteristics and geological information of the pile; obtain the perimeter, sliding surface, shear outlet and other characteristics of the pile through on-site geological survey; obtain the internal friction angle of the soil inside the pile to be 23.5°, the cohesion to be 6.5kPa, and the natural density to be 14.8kN / m3 through core sampling of the pile and surrounding rock and soil and conducting direct shear tests; obtain the friction angle of the soil outside the pile to be 25.8°, the cohesion to be 8.2kPa, and the natural density to be 15.2kN / m3; obtain the effective internal friction angle of the sliding surface soil to be 16.7° and the effective cohesion to be 2.4kPa through direct shear tests. Obtain the infiltration line distribution curve in the slope by measuring the groundwater level.
[0148] The deposit body is divided according to its characteristics and geological information to obtain multiple typical sections, each of which contains multiple strips. Three typical sections are selected on the deposit body parallel to the sliding direction, and the section numbered Ⅰ is divided into 17 strips, the section numbered Ⅱ is divided into 22 strips, and the section numbered Ⅲ is divided into 19 strips.
[0149] S2, obtain the safety factor of each typical section; calculate the safety factor of each typical section numbered Ⅰ, Ⅱ, Ⅲ according to steps S21 to S23 in Example 1 and record them as F 0Ⅰ 、F 0Ⅱ 、F 0Ⅲ ; Among them, the earthquake influence coefficient K s According to the Code for Seismic Design of Buildings, take 0.16 and calculate F 0Ⅰ =1.09, F 0Ⅱ =1.03, F 0Ⅲ =1.07.
[0150] Obtain the load-reducing neutral point of each typical section according to the safety factor of each typical section; according to the formula in step S24 It can be calculated that the load-reducing neutral point N of the section numbered Ⅰ is CⅠ Alpha n =6.29°, the load-reducing neutral point N of the section numbered Ⅱ CⅡ Alpha n =7.15°, the load-reducing neutral point N of the section numbered Ⅲ CⅢ Alpha n =6.57°.
[0151] Obtain the back pressure neutral point of each typical section; according to step S25, the decompression neutral point of each typical section is the point along the horizontal direction of the tangent line on the corresponding sliding surface, that is, the lowest point.
[0152] S3. Obtain a load-reducing neutral line based on the connection of load-reducing neutral points of multiple typical sections, and obtain a reverse-pressure neutral line based on the connection of reverse-pressure neutral points of multiple typical sections; divide the stacking body into load-reducing partitions and reverse-pressure partitions based on the load-reducing neutral line and the reverse-pressure neutral line.
[0153] S4. Design the load reduction surface within the load reduction zone and design the back pressure surface within the back pressure zone.
[0154] According to the unloading surface and the back pressure surface, each typical section is updated and re-divided into strips and blocks, and the safety factor of each typical section is re-obtained; when the safety factor of each typical section is re-obtained, the operation of steps S21 to S23 is still followed, and the updated F 0Ⅰ =1.28, F 0Ⅱ =1.23, F 0Ⅲ =1.29.
[0155] S5. Determine whether the safety factor of each typical section is greater than or equal to the target safety factor. In this embodiment, the target safety factor is 1.3. Therefore, it is necessary to return to S4 and modify the design of the unloading surface and / or the back pressure surface until the safety factor of each typical section is greater than or equal to the target safety factor. The design is completed and this solution can be used as an alternative solution.
[0156] S6. Repeat steps S4 to S5 to obtain multiple alternatives and corresponding safety factors. The load reduction surface and / or back pressure surface of each alternative are designed differently; obtain the excavation volume and backfill volume of each alternative. In this embodiment, steps S4 to S5 are repeated until there are at least five different alternatives. The safety factor and total volume (the sum of the excavation volume and the backfill volume) of each alternative are shown in the following table:
[0157] Table 1: Alternative solutions for load shedding and back pressure
[0158]
[0159] S7. Based on the safety factor, excavation volume and backfill volume of each alternative plan, the best plan is selected from the alternative plans as Plan 3, which has the least volume of earthwork when the safety factor meets the target safety factor of 1.3.
[0160] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for designing the back pressure stability control of a stacked body under load reduction, characterized in that: The following steps are included: S1. Obtaining characteristics and geological information of the stockpile; dividing the stockpile according to the characteristics and geological information of the stockpile to obtain a plurality of typical sections, each of which contains a plurality of strips; S2. Obtain the safety factor of each typical section, and obtain the load reduction neutral point of each typical section according to the safety factor of each typical section; obtain the reverse pressure neutral point of each typical section; S3. Obtain a load-reducing neutral line according to the connection line of the load-reducing neutral points of multiple typical sections, and obtain a reverse-pressure neutral line according to the connection line of the reverse-pressure neutral points of multiple typical sections; divide the stacking body into load-reducing partitions and reverse-pressure partitions according to the load-reducing neutral line and the reverse-pressure neutral line; S4. Design the load-reducing surface in the load-reducing zone, and design the back-pressure surface in the back-pressure zone; update each typical section and re-divide the strips and blocks according to the load-reducing surface and the back-pressure surface, and re-obtain the safety factor of each typical section; S5. Determine whether the safety factor of each typical section meets the design requirements. If not, return to step S4 and modify the design of the load reduction surface and / or the back pressure surface; if so, complete the design.
2. A stacking body load reduction back pressure stability control design method according to claim 1, characterized in that: In step S4, the load relief surface and the back pressure surface are designed according to the following steps: Draw the slope load reduction line in the area enclosed by the load reduction neutral line and the perimeter and close to the uphill side; draw the sliding surface load reduction line in the area enclosed by the slope load reduction line and the perimeter and close to the uphill side; the area enclosed by the slope load reduction line, the sliding surface load reduction line and the perimeter is the load reduction surface; A slope surface back pressure line is drawn in the area enclosed by the back pressure neutral line and the perimeter and close to the downhill side. An outer slope back pressure line is drawn outside the area enclosed by the perimeter and close to the downhill side. The area enclosed by the slope surface back pressure line and the outer slope back pressure line is the back pressure surface.
3. A stacking body load reduction back pressure stability control design method according to claim 2, characterized in that: In step S4, each typical section is updated according to the following steps: Project the intersection of the slope load shedding line and the typical section onto the slope to obtain the corresponding slope load shedding point; project the intersection of the sliding surface load shedding line and the typical section onto the sliding surface to obtain the corresponding sliding surface load shedding point; connect the slope projection point and the sliding surface projection point to obtain the corresponding typical section load shedding line; Project the intersection of the slope surface counterpressure line and the typical section onto the slope surface to obtain the corresponding slope surface counterpressure point; project the intersection of the slope outer counterpressure line and the typical section onto the slope surface to obtain the corresponding slope outer counterpressure point; obtain the counterpressure line of the corresponding typical section; connect the slope surface counterpressure point and the slope outer counterpressure point with an arc, the center of the arc is located between the slope surface counterpressure point and the slope outer counterpressure point along the longitudinal slope direction, and the center of the arc is located below the slope surface counterpressure point and the slope outer counterpressure point along the plumb bob direction to obtain the counterpressure line of the corresponding typical section; Extend the end of the sliding surface close to the downslope to the inside of the counter-pressure line to obtain the extended sliding surface; The area enclosed by the load reduction line, counter-pressure line, extended sliding surface and slope surface is taken as the updated typical section.
4. A stacking body load reduction back pressure stability control design method according to claim 1, characterized in that: After step S5, the following steps are also included: S6. Repeat steps S4 to S5 to obtain multiple alternatives and corresponding safety factors, wherein the load reduction surface and / or back pressure surface of each alternative is designed differently; and obtain the excavation volume and backfill volume of each alternative; S7. Select the best option from among the alternative options based on their safety factor, excavation volume and backfill volume.
5. A stacking body load reduction back pressure stability control design method according to any one of claims 1 to 4, characterized in that: When obtaining the load-reducing neutral point of each typical section in step S2, the influence of the average height of the strips on the slope stability is ignored.
6. A stacking body load reduction back pressure stability control design method according to claim 5, characterized in that: In step S2, the load shedding neutral point of each typical section is obtained according to the following formula: In the formula, α n It indicates the angle between the tangent line at a point on the sliding surface corresponding to the load-reducing neutral point and the horizontal line; K represents the effective friction angle of the sliding surface where the bottom edge of the block numbered i is located; s represents the earthquake influence coefficient; F0 represents the safety factor of the corresponding typical section; i represents the number of the strip, i=1, 2, 3...
7. A stacking body load reduction back pressure stability control design method according to any one of claims 1 to 4, characterized in that: In step S2, the back pressure neutral point of each typical section is obtained according to the following steps: A point on the sliding surface along the horizontal direction of the tangent line is selected as the neutral point of the back pressure.
8. A stacking body load reduction back pressure stability control design method according to any one of claims 1 to 4, characterized in that: In step S1, the stack is divided according to the following steps: A plurality of typical sections are divided on the stacking body along the transverse slope, and the typical sections are all parallel to the longitudinal slope and the plumb direction; a plurality of strips are divided along the longitudinal slope, and the dividing lines between two adjacent strips are all along the plumb direction.
9. A stacking body load reduction back pressure stability control design method according to any one of claims 1 to 4, characterized in that: In step S1, the characteristics and geological information of the pile body include the perimeter, sliding surface and shear outlet of the pile body, the internal friction angle, cohesion and natural density of the pile body and the surrounding rock and soil, the effective internal friction angle and effective cohesion of the sliding surface of the pile body, and the distribution of infiltration lines within the pile body.
10. A stacking body load reduction back pressure stability control design method according to claim 9, characterized in that: In step S1, the safety factor of each typical section is obtained according to the following steps: According to the characteristics of the strips and blocks and the infiltration line, the body strength, seismic force, pore water pressure at the bottom of the strips, and the angle between the bottom of the strips and the horizontal plane of each strip are obtained; according to the body strength, seismic force, pore water pressure at the bottom of the strips, the angle between the bottom of the strips and the horizontal plane and the effective internal friction angle and effective cohesion of the sliding surface, the sum of the anti-sliding moments of the corresponding typical section is obtained, and then the safety factor of the corresponding typical section is obtained.
Citation Information
Patent Citations
Large-area deep soft foundation graded filling construction stability control method
CN110016905A
Construction method for improving stability of tunnel portal easy to collapse
CN117365537A
Construction method for channel slope concrete replacement and anti-slide pile combination
CN117604975A
Method for computing factor of safety of a slope
US11460603B1
Method for reinforcing slope reverse analysis technique
US20030082014A1
