Precast beam spraying maintenance system
By adopting the heat dissipation structure of the curing pipes and fins and an automatic cleaning system in the prefabricated beam spraying maintenance system, the problems of scale scale and concrete residue are solved, and the uniform heat dissipation of concrete and stable cleaning of the system are achieved, which improves the maintenance effect.
Patent Information
- Application Number
- CN202411155246.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing prefabricated beam spray curing system is prone to scale and scale in high temperature environments, which affects the heat transfer effect and temperature control stability. At the same time, the concrete residue is difficult to clean, affecting subsequent production.
A prefabricated beam spray maintenance system is designed, adopting a heat dissipation structure combining the maintenance pipe and fins, equipped with cleaning gear rings and scraper transmission components, and automatic cleaning of the spray pipe and the side wall of the cover is achieved through an electric screw and pulley system. .
It realizes uniform heat dissipation of concrete, prevents deformation or cracking, and effectively removes scale and concrete residue through automatic cleaning function, improving the stability and cleaning efficiency of the curing system.
Smart Images

Figure CN119017522A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of prefabricated beams, and in particular to a prefabricated beam spraying and curing system. Background Art
[0002] As an important component in modern bridge construction, the quality of precast beams is directly related to the safety and stability of the entire bridge. In order to ensure that the performance of precast beams meets the standards, the maintenance link is particularly important. The maintenance of precast beams is a systematic and delicate process, which aims to maintain the appropriate temperature and humidity conditions of the beam body through a series of measures to promote the hardening and strength growth of concrete. In this process, spray steam curing plays a key role.
[0003] Spray steam curing is an efficient and widely used precast beam curing technology. It uses the steam generated by the steam generator to be transported to the curing area through a pipeline, and then the steam is evenly sprayed on the surface of the precast beam through a special spray device. In this way, the steam can not only provide the necessary humidity for the concrete, but also create a warm curing environment for the concrete through the heat it carries. This curing method can significantly accelerate the hydration reaction of concrete, promote the rapid development of concrete strength, and reduce the risk of cracks caused by temperature gradients. Therefore, spray steam curing plays an irreplaceable role in improving the quality of precast beams and shortening the construction period.
[0004] Chinese patent CN117863332B discloses an intelligent spraying maintenance system for prefabricated beams, which includes a spraying device, a mobile trolley and a support platform, wherein a plurality of pedestals are arranged at intervals on the support platform, the mobile trolley is used to move along the length direction of the prefabricated beam, the spraying device is installed on the mobile trolley and moves along the length direction of the prefabricated beam with the mobile trolley, the spraying device includes a fixed semi-ring and a movable semi-ring, the fixed semi-ring is installed on the mobile trolley and is located above the prefabricated beam, the movable semi-ring is connected to the fixed semi-ring and is connected to a rotating device, the rotating device is used to drive the movable semi-ring to rotate relative to the fixed semi-ring, the centers of the movable semi-ring and the fixed semi-ring coincide, and a nozzle is provided on the movable semi-ring; when the movable semi-ring rotates out of the fixed semi-ring, the nozzle is used to be located below the prefabricated beam, a nozzle is installed on the fixed semi-ring, and the nozzle cooperates with the nozzle to spray the surrounding wall of the prefabricated beam. The present application has the advantages of enabling spraying on the surrounding wall of the prefabricated beam, thereby improving the maintenance effect of the prefabricated beam.
[0005] The above patents disclose a device for independently spraying and curing the produced prefabricated beams. However, in a long production line, there are more stringent requirements for the spraying and curing of prefabricated beams, that is, the temperature change of the prefabricated beams cannot be too fast to prevent them from deforming or cracking. For this reason, a thermal insulation curing mechanism is usually set up to ensure the stability of the temperature. However, in the actual spraying process, due to the high ambient temperature, the dissolved minerals in the natural water body, such as calcium, magnesium, bicarbonate ions, etc., will be partially precipitated as the temperature rises, and adhere to the surface of the spraying device and the curing mechanism in the form of scale. The thermal conductivity of these scales is much lower than that of metals. After scaling, it will seriously affect the heat transfer effect of the heating equipment, reduce the thermal efficiency, and then cause the thermal insulation effect of the curing mechanism to fail, making it impossible to maintain a balanced and stable temperature. What is more serious is that the scale is also easy to block the spray pipe, which has a direct impact on the spraying process, further exacerbating the instability of temperature control. Secondly, in the process of demoulding the concrete pipe piles, some concrete residues will be attached between the two side formworks, and the concrete residues will solidify on the surface of the side formworks, affecting the next concrete production. Summary of the invention
[0006] The object of the present invention is to provide a prefabricated beam spray curing system to solve the above-mentioned deficiencies in the prior art.
[0007] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a prefabricated beam spray curing system, comprising a side form inner plate and a cover body fixedly installed on the outside of the side form inner plate, a hollow placement groove is opened inside the side form inner plate, a curing pipe and a plurality of fins are fixedly installed inside the hollow placement groove, an insulation plate is arranged between the curing pipe and the side form inner plate, a plurality of spray pipes are fixedly installed on the side wall of the side form inner plate, a cleaning tooth ring is sleeved on the outside of the plurality of spray pipes, a scraper is arranged on the side wall of the cover body, and a transmission assembly is arranged between the cleaning tooth ring and the scraper.
[0008] As a further description of the above technical solution: the transmission assembly includes an electric screw and a limit block fixedly installed on the top end of the inner plate of the side mold, the electric screw is rotatably installed on the top end of the inner plate of the side mold, a lifting plate is threadedly installed on the electric screw, and first racks are fixedly installed on both ends of the lifting plate, two of the first racks pass through the limit block and are slidably connected to the limit block, a telescopic lifting assembly is arranged between the lifting plate and the scraper, and the telescopic lifting assembly is used for telescopic lifting and retracting of the scraper.
[0009] As a further description of the above technical solution: the transmission assembly also includes a rotating assembly and a moving ring for driving the cleaning gear ring to rotate, the side wall of the inner plate of the side mold is rotatably mounted with a second screw, the second screw is fixedly mounted with a first gear, two of the first racks are meshed with multiple first gears, multiple second screws are threadedly mounted with moving blocks, the moving blocks are fixedly connected to the moving ring, an annular groove is provided on the inner wall of the moving ring, the cleaning gear ring is rotatably connected to the moving ring through the annular groove, and multiple cleaning brushes are provided on the inner wall of the cleaning gear ring.
[0010] As a further description of the above technical solution: the rotating assembly includes a connecting plate and a ball screw, the ball screw is rotatably installed on the side wall of the inner plate of the side mold, the connecting plate is fixedly installed on the side wall of the movable ring, the connecting plate is slidingly connected to the ball screw, and the side wall of the connecting plate is rotatably installed with a second gear, and the second gear is threadedly connected to the ball screw.
[0011] As a further description of the above technical solution: the telescopic lifting assembly includes a limiting tube and a second rack fixedly installed on the top of the cover body, the limiting tube is fixedly installed on the side wall of the lifting plate, the second rack passes through the limiting tube, a rotating shaft is rotatably installed inside the limiting tube, a third gear set is arranged on the rotating shaft, and the third gear set is meshed with the second rack.
[0012] As a further description of the above technical solution: a lifting frame is fixedly installed on the other end of the limiting tube, and two pulleys are rotatably installed inside the lifting frame. A transmission belt is connected between the two pulleys, and the rotating shaft is fixedly connected to one of the pulleys. A fourth gear is fixedly installed on the other pulley, and a third rack is slidably installed inside the lifting frame. The third rack and the fourth gear are meshed with each other, and the third rack is fixedly connected to the top of the scraper.
[0013] As a further description of the above technical solution: the side wall of the spray pipe is connected to and installed with multiple spray rings, the diameters of the multiple spray rings decrease successively in the direction away from the inner plate of the side mold, and the side walls of the multiple spray rings and one end of the spray pipe are connected to and provided with spray heads.
[0014] As a further description of the above technical solution: the top ends of the two spray pipes arranged above the inner plate of the side mold are connected with an input pipe, and the two spray pipes arranged below the inner plate of the side mold are connected with the two spray pipes above by a connecting pipe.
[0015] As a further description of the above technical solution: both ends of the maintenance pipeline are respectively connected with connecting hoses.
[0016] As a further description of the above technical solution: a sealing connection ring is provided between the connecting hose and the maintenance pipe.
[0017] As a further description of the above technical solution: a plurality of spray holes are opened on the side wall of the cover body, and electric push rods are fixedly installed on the top and bottom ends of the inner wall of the cover body respectively, and the output end of the electric push rod is transmission-connected with a fixed block, a sliding plate is arranged between the two fixed blocks, the sliding plate is slidably connected to the fixed block, a spring is elastically connected between the sliding plate and the fixed block, and a plurality of blocking blocks are fixedly installed on the side wall of the sliding plate, and the plurality of blocking blocks are staggered with the spray holes and adapted to each other.
[0018] The present invention provides a prefabricated beam spray curing system, which has the following beneficial effects:
[0019] 1. The present invention provides curing pipelines and fins to ensure uniform heat dissipation of concrete during curing, and the heat dissipation is smooth under the clamping of the insulation board, thereby preventing the concrete from deforming or cracking.
[0020] 2. The present invention can form a cooling area near the production line by setting a spray water pipe to spray steam for humidification, which helps to reduce the temperature while not being affected by the external ambient temperature, further smoothes the heat dissipation and facilitates monitoring and adjustment.
[0021] 3. The present invention can control the opening or closing of the maintenance system and the spraying system on time by setting up an externally configured control system connecting the spray water pipe and the maintenance pipeline. Combined with the monitoring data, it can ensure the smooth cooling of the concrete during the spraying maintenance process, thereby promoting high product quality and stable product performance.
[0022] 4. The present invention provides a scraper and a cleaning gear ring, as well as a transmission assembly for transmission between the scraper and the gear ring and a telescopic lifting assembly between the lifting plate and the scraper, so that the scale on the side wall of the spray pipe can be cleaned while the concrete residue on the side wall of the cover body can be cleaned, thereby achieving synchronous cleaning, increasing cleaning efficiency, effectively removing scale and concrete residue, and ensuring the normal performance of subsequent maintenance functions.
[0023] It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the disclosure.
[0024] This application document provides an overview of various implementations or examples of the technology described in the present disclosure, and is not a comprehensive disclosure of the entire scope or all features of the disclosed technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 A three-dimensional structural schematic diagram of a prefabricated beam spray curing system proposed by the present invention;
[0026] Figure 2 It is a schematic diagram of the internal three-dimensional structure of the side mold of the present invention;
[0027] Figure 3 It is a schematic diagram of the three-dimensional structure inside the hollow placement tank of the present invention;
[0028] Figure 4 It is a schematic diagram of the three-dimensional explosion structure inside the hollow placement groove of the present invention;
[0029] Figure 5 It is a schematic diagram of the three-dimensional explosion structure between the moving ring and the cleaning gear ring of the present invention;
[0030] Figure 6 It is a schematic diagram of the three-dimensional structure of the spray pipe, spray ring and spray head of the present invention;
[0031] Figure 7 It is a schematic diagram of the cross-sectional structure of the outer part of the cover body of the present invention;
[0032] Figure 8 It is a schematic cross-sectional structure diagram of a sealing block arranged inside the cover body of the present invention.
[0033] Legend:
[0034] 1. Side mold inner plate; 2. Maintenance pipe; 3. Fin; 4. Sealing connection ring; 5. Connecting hose; 6. Insulation board; 7. Hollow placement groove; 8. Limit block; 9. First rack; 10. Lifting plate; 11. Electric screw; 14. First gear; 15. Second screw; 16. Moving block; 17. Moving ring; 18. Annular groove; 19. Cleaning gear ring; 20. Cleaning brush; 21. Connecting plate; 22. Second gear; 23. Ball screw; 2 4. Input pipe; 25. Spray pipe; 26. Spray ring; 27. Spray head; 28. Connecting pipe; 29. Limiting pipe; 30. Second rack; 31. Third gear set; 32. Lifting frame; 33. Rotating shaft; 34. Pulley; 35. Transmission belt; 36. Fourth gear; 37. Third rack; 38. Scraper; 39. Cover; 40. Spray hole; 41. Electric push rod; 42. Fixed block; 43. Spring; 44. Sliding plate; 45. Blocking block. DETAILED DESCRIPTION
[0035] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0036] Reference Figure 1-8A prefabricated beam spray curing system comprises a side form inner plate 1 and a cover body 39 fixedly mounted on the outside of the side form inner plate 1, a hollow placement groove 7 is opened inside the side form inner plate 1, a curing pipe 2 and a plurality of fins 3 are fixedly mounted inside the hollow placement groove 7, an insulation plate 6 is arranged between the curing pipe 2 and the side form inner plate 1, a plurality of spray pipes 25 are fixedly mounted on the side wall of the side form inner plate 1, a cleaning tooth ring 19 is sleeved on the outside of the plurality of spray pipes 25, a scraper 38 is arranged on the side wall of the cover body 39, and a transmission assembly is arranged between the cleaning tooth ring 19 and the scraper 38; the side form inner plate 1 and the cover body 39 fixedly mounted on the outside of the side form inner plate 1 form the whole of the side formwork, which is used for casting and forming of concrete piles, wherein the spray pipe 25 and the curing pipe 2 inside the side form inner plate 1 are connected to the outside configuration The control system is used to move the precast beam to the middle of the two side form inner plates 1 during the maintenance process, and the precast beam is sprayed and maintained through the spray pipe 25. Steam is sprayed for humidification, and a cooling area can be formed near the production line to help cool down without being affected by the external ambient temperature, further smoothing the heat dissipation and facilitating monitoring and adjustment. At the same time, the maintenance pipelines and fins 3 arranged inside the side form inner plate 1 ensure that the concrete dissipates heat evenly during the maintenance process, and the heat dissipation is smooth under the clamping of the insulation board 6, thereby preventing the concrete from deforming or cracking. In addition, the configured control system can control the opening or closing of the maintenance system and the spraying system on time, and combine the monitoring data to ensure the smooth cooling of the concrete during the spraying maintenance process, thereby promoting high product quality and stable product performance.
[0037] However, if the maintenance device is used for too long, it is easy to cause a certain amount of scale on the surface of the spray pipe 25, and during the demolding process, concrete residues will remain on the side wall of the cover body 39. In order to remove the scale and concrete residues, the scraper 38 can be controlled by the transmission component to clean the concrete residues on the surface of the cover body 39. Under the action of the transmission component, multiple cleaning tooth rings 19 can clean the side walls of multiple spray pipes 25, and clean the scale on the spray pipes 25 at the same time, so that the side walls of the cover body 39 are cleaned and the surfaces of multiple spray pipes 25 are cleaned at the same time, thereby increasing the cleaning efficiency and ensuring that the subsequent maintenance process can be carried out stably.
[0038] As the preferred technical solution of this embodiment, the transmission assembly includes an electric screw 11 and a limit block 8 fixedly installed on the top of the side mold inner plate 1. The electric screw 11 is rotatably installed on the top of the side mold inner plate 1. A lifting plate 10 is threadedly installed on the electric screw 11. First racks 9 are fixedly installed on both ends of the lifting plate 10. The two first racks 9 pass through the limit block 8 and are slidably connected with the limit block 8. A telescopic lifting assembly is arranged between the lifting plate 10 and the scraper 38. The telescopic lifting assembly is used for the telescopic lifting and retracting of the scraper 38. The electric screw 11 can rotate, and then the lifting plate 10 moves downward under the action of the electric screw 11, driving the two first racks 9 to move downward. Under the action of the telescopic lifting assembly, the concrete residue on the surface of the cover body 39 is cleaned.
[0039] As the preferred technical solution of this embodiment, the transmission assembly also includes a rotating assembly and a moving ring 17 for driving the cleaning gear ring 19 to rotate. A second screw 15 is rotatably installed on the side wall of the inner plate 1 of the side mold, and a first gear 14 is fixedly installed on the second screw 15. The two first racks 9 are meshed with multiple first gears 14, and a moving block 16 is threadedly installed on multiple second screws 15. The moving block 16 is fixedly connected to the moving ring 17. An annular groove 18 is provided on the inner wall of the moving ring 17. The cleaning gear ring 19 is rotatably connected to the moving ring 17 through the annular groove 18, and a plurality of cleaning brushes 20 are provided on the inner wall of the cleaning gear ring 19; when the first rack 9 moves downward, it drives the first gear 14 to rotate, and the first gear 14 drives the second screw 15 to rotate. Under the action of the rotation of the second screw 15, the moving block 16 can drive the moving ring 17 to move, so that the moving ring 17 moves on the spray pipe 25, and the moving ring 17 drives the cleaning gear ring 19 to brush the side wall of the spray pipe 25.
[0040] As the preferred technical solution of this embodiment, the rotating assembly includes a connecting plate 21 and a ball screw 23. The ball screw 23 is rotatably installed on the side wall of the inner plate 1 of the side mold, and the connecting plate 21 is fixedly installed on the side wall of the moving ring 17. The connecting plate 21 is slidably connected to the ball screw 23. The side wall of the connecting plate 21 is rotatably installed with a second gear 22, and the second gear 22 is threadedly connected to the ball screw 23. During the movement of the moving ring 17, the connecting plate 21 is driven to move, so that the connecting plate 21 drives the second gear 22 to move on the ball screw 23. Since the second gear 22 is threadedly connected to the ball screw 23, the second gear 22 can rotate during the sliding process on the ball screw 23. The rotation of the second gear 22 drives the cleaning gear ring 19 to rotate, thereby realizing that the cleaning gear ring 19 rotates to clean the spray pipe 25, thereby increasing the cleaning efficiency.
[0041] As the preferred technical solution of this embodiment, the telescopic lifting assembly includes a limiting tube 29 and a second rack 30 fixedly installed on the top of the cover body 39. The limiting tube 29 is fixedly installed on the side wall of the lifting plate 10. The second rack 30 passes through the limiting tube 29. A rotating shaft 33 is rotatably installed inside the limiting tube 29. A third gear set 31 is provided on the rotating shaft 33. The third gear set 31 and the second rack 30 are meshed with each other.
[0042] As a preferred technical solution of this embodiment, a lifting frame 32 is fixedly installed on the other end of the limiting tube 29, and two pulleys 34 are rotatably installed inside the lifting frame 32. A transmission belt 35 is connected between the two pulleys 34. The rotating shaft 33 is fixedly connected to one of the pulleys 34, and a fourth gear 36 is fixedly installed on the other pulley 34. A third rack 37 is slidably installed inside the lifting frame 32, and the third rack 37 and the fourth gear 36 are meshed with each other. The third rack 37 is fixedly connected to the top of the scraper 38; when the lifting plate 10 is descending, the third gear set 31 inside the limiting tube 29 is driven to mesh and rotate with the second rack 30, and the scraper 38 first The upper part of the cover body 39 is scraped to remove the residue. During the rotation of the third gear set 31, the rotating shaft 33 is driven to rotate. The rotating shaft 33 drives the pulley 34 above the lifting frame 32 to rotate. Under the action of the transmission belt 35, the pulley 34 below the lifting frame 32 drives the fourth gear 36 to rotate, so that the third rack 37 is slid downward, and the scraper 38 can continue to move downward to clean the residue on the side wall of the cover body 39. The function of the telescopic lifting assembly is that the scraper 38 can scrape and clean the residue on the side wall of the entire cover body 39 without setting the scraper 38 at a very high position. In the process of the lifting plate 10 moving downward a short distance, the scraper 38 can be used to scrape and clean the residue.
[0043] As the preferred technical solution of this embodiment, a plurality of spray rings 26 are installed on the side wall of the spray pipe 25, and the diameters of the plurality of spray rings 26 decrease successively in the direction away from the side form inner plate 1, and a nozzle 27 is provided on the side wall of the plurality of spray rings 26 and one end of the spray pipe 25; the spray pipe 25 sprays the spray liquid through the nozzles 27 on the plurality of spray rings 26, thereby realizing the function of cooling the concrete pipe piles between the side formworks, and the plurality of spray rings 26 can increase the spraying area, making the spraying more comprehensive.
[0044] As the preferred technical solution of this embodiment, the top ends of the two spray pipes 25 arranged above the side mold inner plate 1 are connected with an input pipe 24, and the two spray pipes 25 arranged below the side mold inner plate 1 are connected with the two spray pipes 25 above via a connecting pipe 28; multiple spray pipes 25 can be simultaneously injected with water and sprayed through the input pipe 24 and the connecting pipe 28.
[0045] As a preferred technical solution of this embodiment, both ends of the maintenance pipe 2 are respectively connected with a connecting hose 5; the connecting hose 5 can realize the series connection of the maintenance pipe 2 between multiple side mold inner plates 1, and the maintenance pipe 2 is connected to an externally configured control system through the connecting hose 5 to control the temperature inside the maintenance pipe 2.
[0046] As a preferred technical solution of this embodiment, a sealing connection ring 4 is provided between the connecting hose 5 and the maintenance pipe 2; the sealing connection ring 4 can increase the sealing of the maintenance pipes 2 connected through the connecting hose to prevent leakage.
[0047] As a preferred technical solution of this embodiment, a plurality of spray holes 40 are provided on the side wall of the cover body 39, and a pipeline for avoiding the spray holes 40 is provided inside the cover body 39 entity, and hot water can be passed into the pipeline for concrete curing; an electric push rod 41 is fixedly installed on the top and bottom ends of the inner wall of the cover body 39, and a fixed block 42 is transmission-connected to the output end of the electric push rod 41, and a sliding plate 44 is provided between the two fixed blocks 42, and the sliding plate 44 is slidably connected to the fixed block 42, and a spring 43 is elastically connected between the sliding plate 44 and the fixed block 42, and a plurality of blocking blocks 45 are fixedly installed on the side wall of the sliding plate 44, and a plurality of blocking blocks 45 are fixedly installed on the side wall of the sliding plate 44. The blocks 45 are staggered and matched with the spray holes 40; the water sprayed from the spray pipe 25 is sprayed out through the spray holes 40 to spray and maintain the concrete pipe piles; however, when concrete pouring and molding is required, the spray holes 40 need to be blocked, at which time the fixed block 42 is pushed by the electric push rod 41, and the fixed block 42 drives the sliding plate 44 and the blocking block 45 to move forward. The surface of the blocking block 45 is wedge-shaped, and when the blocking block 45 contacts the spray hole 40, it can drive the sliding plate 44 to slide and compress the spring 43, so that the blocking block 45 can finally block the spray hole 40 without affecting the normal concrete pouring and molding process.
[0048] The working principle of cleaning the scale on the spray pipe 25 and the concrete on the side wall of the cover body 39 is as follows: the electric screw 11 can rotate, and then the lifting plate 10, under the action of the electric screw 11, drives the third gear set 31 inside the limiting tube 29 to mesh and rotate with the second rack 30, and the scraper 38 first scrapes the residue on the upper half of the cover body 39. During the rotation of the third gear set 31, the rotating shaft 33 is driven to rotate, and the rotating shaft 33 drives the pulley 34 above the lifting frame 32 to rotate. Under the action of the transmission belt 35, the pulley 34 under the lifting frame 32 drives the fourth gear 36 to rotate, so that the third rack 37 is slid downward, which can make the scraper 38 continue to move downward, The residue on the side wall of the cover body 39 is cleaned, and when the first rack 9 moves downward, it drives the first gear 14 to rotate, and the first gear 14 drives the second screw 15 to rotate. The rotation of the second screw 15 can make the moving block 16 drive the moving ring 17 to move, and in the process of the moving ring 17 moving, it drives the connecting plate 21 to move, so that the connecting plate 21 drives the second gear 22 to move on the ball screw 23. Since the second gear 22 is threadedly connected to the ball screw 23, the second gear 22 can rotate during the sliding process on the ball screw 23. The rotation of the second gear 22 drives the cleaning tooth ring 19 to rotate, so that the cleaning tooth ring 19 rotates to clean the spray pipe 25.
[0049] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A prefabricated beam spray curing system, comprising a side form inner plate (1) and a cover (39) fixedly mounted on the outside of the side form inner plate (1), characterized in that: A hollow placement groove (7) is provided inside the side mold inner plate (1), a maintenance pipe (2) and a plurality of fins (3) are fixedly installed inside the hollow placement groove (7), a heat preservation plate (6) is arranged between the maintenance pipe (2) and the side mold inner plate (1), a plurality of spray pipes (25) are fixedly installed on the side wall of the side mold inner plate (1), a cleaning tooth ring (19) is sleeved on the outside of the plurality of spray pipes (25), a scraper (38) is provided on the side wall of the cover body (39), and a transmission component is arranged between the cleaning tooth ring (19) and the scraper (38).
2. A prefabricated beam spray curing system according to claim 1, characterized in that: The transmission assembly comprises an electric screw (11) and a limit block (8) fixedly mounted on the top of the side mold inner plate (1); the electric screw (11) is rotatably mounted on the top of the side mold inner plate (1); a lifting plate (10) is threadedly mounted on the electric screw (11); first racks (9) are fixedly mounted on both ends of the lifting plate (10); two first racks (9) penetrate the limit block (8) and are slidably connected to the limit block (8); a telescopic lifting assembly is arranged between the lifting plate (10) and the scraper (38); the telescopic lifting assembly is used for telescopic lifting and retracting the scraper (38).
3. A prefabricated beam spray curing system according to claim 2, characterized in that: The transmission assembly also includes a rotating assembly and a moving ring (17) for driving the cleaning toothed ring (19) to rotate. A second screw (15) is rotatably mounted on the side wall of the side mold inner plate (1). A first gear (14) is fixedly mounted on the second screw (15). Two of the first racks (9) are meshed with a plurality of first gears (14). A moving block (16) is threadedly mounted on the plurality of second screws (15). The moving block (16) is fixedly connected to the moving ring (17). An annular groove (18) is provided on the inner wall of the moving ring (17). The cleaning toothed ring (19) is rotatably connected to the moving ring (17) via the annular groove (18). A plurality of cleaning brushes (20) are provided on the inner wall of the cleaning toothed ring (19).
4. A prefabricated beam spray curing system according to claim 3, characterized in that: The rotating assembly comprises a connecting plate (21) and a ball screw (23); the ball screw (23) is rotatably mounted on the side wall of the side mold inner plate (1); the connecting plate (21) is fixedly mounted on the side wall of the movable ring (17); the connecting plate (21) is slidably connected to the ball screw (23); a second gear (22) is rotatably mounted on the side wall of the connecting plate (21); and the second gear (22) is threadedly connected to the ball screw (23).
5. The prefabricated beam spray curing system according to claim 2, characterized in that: The telescopic lifting assembly comprises a limiting tube (29) and a second rack (30) fixedly mounted on the top of a cover body (39); the limiting tube (29) is fixedly mounted on the side wall of the lifting plate (10); the second rack (30) penetrates the limiting tube (29); a rotating shaft (33) is rotatably mounted inside the limiting tube (29); a third gear set (31) is arranged on the rotating shaft (33); the third gear set (31) and the second rack (30) are meshed with each other.
6. A prefabricated beam spray curing system according to claim 5, characterized in that: A lifting frame (32) is fixedly installed on the other end of the limiting tube (29), two pulleys (34) are rotatably installed inside the lifting frame (32), a transmission belt (35) is connected between the two pulleys (34), the rotating shaft (33) is fixedly connected to one of the pulleys (34), a fourth gear (36) is fixedly installed on the other pulley (34), a third rack (37) is slidably installed inside the lifting frame (32), the third rack (37) and the fourth gear (36) are meshed with each other, and the third rack (37) is fixedly connected to the top of the scraper (38).
7. The prefabricated beam spray curing system according to claim 1, characterized in that: The side wall of the spray pipe (25) is connected to a plurality of spray rings (26) installed thereon, the diameters of the plurality of spray rings (26) gradually decrease in a direction away from the side mold inner plate (1), and the side walls of the plurality of spray rings (26) and one end of the spray pipe (25) are both connected to a spray head (27).
8. The prefabricated beam spray curing system according to claim 7, characterized in that: The top ends of the two spray pipes (25) arranged above the side mold inner plate (1) are connected to an input pipe (24), and a connecting pipe (28) is connected between the two spray pipes (25) arranged below the side mold inner plate (1) and the two spray pipes (25) above.
9. The prefabricated beam spray curing system according to claim 1, characterized in that: Both ends of the maintenance pipeline (2) are respectively connected to a connecting hose (5).
10. A prefabricated beam spray curing system according to claim 9, characterized in that: A sealing connection ring (4) is provided between the connecting hose (5) and the maintenance pipeline (2).