Crane support system and method for palisade crane beam in underground powerhouse
By setting inclined rails and crane wheels on the top of the rock wall crane beam, horizontal thrust is generated to enhance the stability of the surrounding rock, and reducing the amount of steel used and improving safety through the maintenance system, the surrounding rock instability caused by traditional rock crane beams is solved. and maintenance problems.
Patent Information
- Application Number
- CN202411185399.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-26
AI Technical Summary
When traditional rock wall crane beams in underground factories bear vertical loads of cranes, the instability of surrounding rocks increases, and the load variation of crane beams increases the risk of surrounding rock instability, and lacks maintenance methods.
Inclined rails and inclined crane wheels are installed on the top of the rock wall crane beam to generate horizontal thrust to enhance the stability of the surrounding rock, and reduce the amount of steel used by crane beams through maintenance and safety rails and crane wheels and facilitate maintenance.
The tensile stress of the lower flange of the crane beam is reduced by horizontal thrust, the amount of steel is used, the stability of the surrounding rock is improved, and the system safety and maintenance are ensured through the maintenance system.
Smart Images

Figure CN119018779A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of industrial building structures, and in particular to a rock wall crane beam crane support system and method in an underground factory building. Background Art
[0002] The statements in this section merely provide background art related to the present invention and do not necessarily constitute prior art.
[0003] An underground powerhouse refers to a powerhouse in which key equipment such as generators, transformers, switch stations, etc. of a hydropower station or pumped-storage power station are installed inside a mountain or in underground space. Underground powerhouses are important facilities in water conservancy and hydropower projects and pumped-storage power stations. Their construction and layout are of great significance to improving the overall performance, safety, and environmental benefits of the project.
[0004] The main factory building and installation room of the underground factory building need to be equipped with a bridge crane with a larger lifting weight according to engineering requirements. The support of the bridge crane generally adopts the structure of a rock wall crane beam. The rock wall crane beam is attached to the upstream and downstream side walls of the factory building through anchor rods and its own cross-sectional shape. The upstream and downstream side walls of the factory building are very high, and the vertical load transmitted by the crane is very large at the rock wall crane beam. The vertical shearing of the side wall rock greatly increases the instability of the surrounding rock. Therefore, the vicinity of the rock wall crane beam is the main danger point for the stability of the surrounding rock of the underground factory building.
[0005] At present, the traditional rock wall crane beam in the underground powerhouse bears the vertical load of the crane system. The vertical load shears the side wall rock, which significantly increases the instability of the surrounding rock; the load variation of the crane beam is large, the surrounding rock stability analysis is difficult, and the stability of the surrounding rock under different lifting weights varies greatly, increasing the risk of surrounding rock instability; the span of the crane beam in the underground powerhouse is large, the traditional crane beam is a pure bending member, the cross-section of the steel beam is large, and the amount of steel used is large; the traditional crane system does not have a separate maintenance method for the rails and crane wheels. Summary of the invention
[0006] In order to address the deficiencies in the prior art, the present invention provides a crane support system and method for a rock wall crane beam in an underground factory building. Through the inclined rails and inclined crane wheels on the inclined surface at the top of the rock wall crane beam, horizontal thrust can be generated under the action of the vertical load of the crane, which is beneficial to enhancing the stability of the surrounding rock. At the same time, the tensile stress of the lower flange of the crane beam is reduced, the steel consumption of the crane beam is reduced, and the operation is safe and easy to maintain.
[0007] In order to achieve the above object, the present invention adopts the following technical solution:
[0008] In a first aspect, the present invention provides a crane support system for a rock wall crane beam in an underground plant.
[0009] A rock wall crane beam crane support system in an underground factory building, comprising: a rock wall crane beam for fixing on an inner wall of a surrounding rock, at least two rows of inclined rails and corresponding inclined crane wheels are arranged on the top inclined surface of the rock wall crane beam, and an inspection and safety rail and an inspection and safety crane wheel are arranged on the top horizontal surface of the rock wall crane beam;
[0010] The inclined crane wheel is used to move on the inclined track, and the inclined crane wheel is connected to the inclined lower flange of the end of the crane beam. The maintenance and safety crane wheel is used to move on the maintenance and safety track, and the maintenance and safety crane wheel is connected to the horizontal lower flange of the end of the crane beam;
[0011] An end maintenance boss is arranged on the top horizontal plane of the rock wall crane beam, and the maintenance and safety rail is located on the top surface of the end maintenance boss in the end maintenance area of the underground workshop.
[0012] As a further limitation of the first aspect of the present invention, the maintenance and safety crane wheel is separated from the maintenance and safety track by a certain distance when in operation.
[0013] As a further limitation of the first aspect of the present invention, the inclined lower flange at the end of the crane beam is provided with a plurality of inclined stiffening ribs at the connection point of the inclined crane wheel.
[0014] As a further limitation of the first aspect of the present invention, a vertical stiffening rib is provided at the connection between the horizontal lower flange at the end of the crane beam and the maintenance and safety crane wheel.
[0015] As a further limitation of the first aspect of the present invention, multiple rows of inclined tracks are arranged in parallel.
[0016] As a further limitation of the first aspect of the present invention, the inclined lower flange at the end of the crane beam is adjacent to the horizontal lower flange at the end of the crane beam.
[0017] As a further limitation of the first aspect of the present invention, the surrounding rock includes a middle vertical plane and an inner inclined surface at the bottom, the outer bottom of the rock wall crane beam is inclined and is fixedly connected to the inner inclined surface at the bottom, and the outer vertical plane of the rock wall crane beam is fixedly connected to the middle vertical plane.
[0018] As a further limitation of the first aspect of the present invention, the inclined track and the maintenance and safety track are both steel rails.
[0019] As a further limitation of the first aspect of the present invention, the cross-section of the end inspection boss is trapezoidal.
[0020] In a second aspect, the present invention provides a method for inspecting and repairing a rock wall crane beam and crane support system in an underground plant.
[0021] A method for inspecting and repairing a crane support system for a rock wall crane beam in an underground powerhouse, using the crane support system for a rock wall crane beam in an underground powerhouse described in the first aspect of the present invention, comprises the following process:
[0022] When the crane support system is under maintenance, the crane system moves to the maintenance area at the end of the underground plant through the operation of the inclined track and the inclined crane wheels;
[0023] As the end maintenance boss and the maintenance and safety rails are slowly raised, the maintenance and safety crane wheels begin to contact the maintenance and safety rails. Then, relying on the operation of the maintenance and safety crane wheels, the crane beam begins to rise, and the inclined rails and the inclined crane wheels gradually separate. Until the crane runs to the horizontal maintenance area, the maintenance and safety crane wheels are locked for maintenance.
[0024] Compared with the prior art, the present invention has the following beneficial effects:
[0025] 1. The present invention innovatively proposes a crane support system for a rock wall crane beam in an underground factory building. The crane support system can generate horizontal thrust under the action of the vertical load of the crane through the inclined track and inclined crane wheels on the inclined surface at the top of the rock wall crane beam. The horizontal thrust squeezes the rock wall through the rock wall crane beam, which is beneficial to the stability of the surrounding rock.
[0026] 2. The present invention innovatively proposes a crane support system for a rock wall crane beam in an underground factory building. By adjusting the angle of the inclined surface at the top of the rock wall crane beam, the relative sizes of the vertical load and the horizontal thrust can be designed. When the vertical load is large, the stability of the surrounding rock is weakened. The weakening of the surrounding rock stability is reduced by increasing the horizontal thrust in proportion, thereby achieving relative stability of the surrounding rock stability under different lifting weights.
[0027] 3. The present invention innovatively proposes a crane support system for a rock wall crane beam in an underground factory building. The lower flange of the crane beam is subjected to a reaction force from the horizontal thrust of the support. The reaction force compresses the lower flange of the crane beam, thereby reducing the tensile stress of the lower flange of the crane beam, optimizing the design of the crane beam, and reducing the amount of steel used in the crane beam.
[0028] 4. The present invention innovatively proposes a crane support system for a rock wall crane beam in an underground factory building. The crane support system can inspect and repair the inclined rails and crane wheels in the crane support system through the inspection and safety rails and the inspection and safety crane wheels.
[0029] 5. The present invention innovatively proposes a crane support system for a rock wall crane beam in an underground factory building. The crane support system is provided with maintenance and safety rails and maintenance and safety crane wheels. When the inclined rails and crane wheels fail, the maintenance and safety crane wheels are in contact with the maintenance and safety rails to ensure the safety of the crane beam.
[0030] 6. The present invention innovatively proposes a rock wall crane beam crane support system in an underground factory building. The inclined track and inclined crane wheel are more suitable for bearing braking loads, reducing the shear force generated by the track and crane wheel, and lowering the setting requirements for the track and crane wheel.
[0031] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0033] Figure 1 A schematic cross-sectional view of a crane beam and a crane support system for a rock wall in an underground plant provided by the present invention;
[0034] Figure 2 A schematic cross-sectional view of the maintenance and elevation area at the end of the rock wall crane beam and crane support system in the underground plant provided by the present invention;
[0035] Figure 3 A longitudinal schematic diagram of the maintenance and lifting area at the end of the rock wall crane beam provided by the present invention;
[0036] Among them, 1. Rock wall crane beam; 11. End maintenance boss; 2. Inclined rails and crane wheels; 21. Inclined rails; 22. Inclined crane wheels; 3. Maintenance and safety rails; 4. Maintenance and safety crane wheels; 5. Crane beam; 51. Vertical stiffening ribs; 52. Inclined stiffening ribs. DETAILED DESCRIPTION
[0037] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0038] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0039] In this implementation, a crane support system for a rock wall crane beam in an underground plant is proposed, such as Figure 1 , Figure 2 and Figure 3 As shown, it comprises: a rock wall crane beam 1 for fixing on the inner wall of the surrounding rock, at least two rows of inclined steel rails and crane wheels 2 (including inclined steel rails 21 and corresponding inclined crane wheels 22) are arranged on the top inclined surface of the rock wall crane beam 1, and a maintenance and safety steel rail 3 and a maintenance and safety crane wheel 4 are arranged on the top horizontal surface of the rock wall crane beam 1;
[0040] The inclined crane wheel 22 is used to move on the inclined rail 21, and the inclined crane wheel 22 is connected to the inclined lower flange of the end of the crane beam 5. The maintenance and safety crane wheel 4 is used to move on the maintenance and safety rail 3, and the maintenance and safety crane wheel 4 is connected to the horizontal lower flange of the end of the crane beam 5;
[0041] An end maintenance boss 11 is arranged on the top horizontal plane of the rock wall crane beam 1, and the maintenance and safety rail 3 is located on the top surface of the end maintenance boss 11 in the end maintenance area of the underground workshop.
[0042] In this implementation, preferably, the maintenance and safety crane wheel 4 is separated from the maintenance and safety rail 3 by a certain distance when in operation.
[0043] In this implementation, preferably, a plurality of inclined stiffening ribs 52 are provided at the connection between the inclined lower flange at the end of the crane beam 5 and the inclined crane wheel 22 to ensure the stability of the connection between the crane beam 5 and the inclined crane wheel 22 .
[0044] In this implementation, preferably, a vertical stiffening rib 51 is provided at the connection between the horizontal lower flange at the end of the crane beam 5 and the maintenance and safety crane wheel 4 to ensure the stability of the connection between the crane beam 5 and the maintenance and safety crane wheel 4.
[0045] In this implementation, preferably, multiple rows of inclined rails 21 are arranged in parallel. In this implementation, two rows are preferably provided. It can be understood that in some other implementations, multiple rows may also be provided in order to adapt to the size of the crane beam 5 or to further improve stability.
[0046] In this implementation, preferably, the inclined lower flange at the end of the crane beam 5 is adjacent to the horizontal lower flange at the end of the crane beam.
[0047] In this implementation, preferably, the surrounding rock includes a middle vertical plane and an inner inclined surface at the bottom, the outer bottom of the rock wall crane beam 1 is inclined and is fixedly connected to the inner inclined surface at the bottom, and the outer vertical plane of the rock wall crane beam 1 is fixedly connected to the middle vertical plane.
[0048] In the present implementation, preferably, the cross-section of the end inspection boss 11 is trapezoidal, which can effectively ensure the stability of the end inspection boss 11.
[0049] When the rock wall crane beam crane support system in the underground factory building of the present invention is under maintenance, the crane beam 5 moves to the end maintenance area of the underground factory building through the operation of the inclined rails and the crane wheels 2 (including the inclined rails 21 and the corresponding inclined crane wheels 22), and as the end maintenance boss 11 and the maintenance and safety rails 3 are slowly raised, the maintenance and safety crane wheels 4 begin to contact the maintenance and safety rails 3, and then relying on the operation of the maintenance and safety crane wheels 4, the crane beam 5 begins to rise, and the inclined rails and crane wheels gradually separate, until the crane runs to the horizontal maintenance area, the maintenance and safety crane wheels 4 are locked, and the rock wall crane beam crane support system in the underground factory building is maintained.
[0050] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A crane support system for a rock wall crane beam in an underground plant, characterized in that: It comprises: a rock wall crane beam used for fixing on the inner wall of the surrounding rock, at least two rows of inclined tracks and corresponding inclined crane wheels are arranged on the top inclined surface of the rock wall crane beam, and a maintenance and safety track and a maintenance and safety crane wheel are arranged on the top horizontal surface of the rock wall crane beam; The inclined crane wheel is used to move on the inclined track, and the inclined crane wheel is connected to the inclined lower flange of the end of the crane beam. The maintenance and safety crane wheel is used to move on the maintenance and safety track, and the maintenance and safety crane wheel is connected to the horizontal lower flange of the end of the crane beam; An end maintenance boss is arranged on the top horizontal plane of the rock wall crane beam, and the maintenance and safety rail is located on the top surface of the end maintenance boss in the end maintenance area of the underground workshop.
2. The rock wall crane beam crane support system in the underground powerhouse as claimed in claim 1, characterized in that: The wheels of the maintenance and safety crane are separated from the maintenance and safety track by a certain distance when in operation.
3. The rock wall crane beam crane support system in the underground powerhouse as claimed in claim 1 or 2, characterized in that: The inclined lower flange at the end of the crane beam is provided with a plurality of inclined stiffening ribs at the connection point of the inclined crane wheel.
4. The rock wall crane beam crane support system in the underground powerhouse as claimed in claim 1 or 2, characterized in that: Vertical stiffening ribs are arranged at the connection between the horizontal lower flange at the end of the crane beam and the maintenance and safety crane wheel.
5. The rock wall crane beam crane support system in the underground powerhouse as claimed in claim 1 or 2, characterized in that: Multiple rows of inclined tracks are arranged in parallel.
6. The rock wall crane beam crane support system in the underground powerhouse as claimed in claim 1 or 2, characterized in that: The inclined lower flange at the end of the crane beam is adjacent to the horizontal lower flange at the end of the crane beam.
7. The rock wall crane beam crane support system in the underground powerhouse as claimed in claim 1 or 2, characterized in that: The surrounding rock includes a middle vertical plane and an inner inclined surface at the bottom. The outer bottom of the rock wall crane beam is inclined and is fixedly connected to the inner inclined surface at the bottom. The outer vertical plane of the rock wall crane beam is fixedly connected to the middle vertical plane.
8. The rock wall crane beam crane support system in the underground powerhouse as claimed in claim 1 or 2, characterized in that: The inclined track and the maintenance and safety track are both steel rails.
9. The rock wall crane beam crane support system in an underground powerhouse as claimed in claim 1 or 2, characterized in that: The cross section of the end inspection boss is trapezoidal.
10. A method for inspecting and repairing a rock wall crane beam and crane support system in an underground plant, characterized in that: Using the rock wall crane beam crane support system in an underground powerhouse as described in any one of claims 1 to 9, The process includes: When the crane support system is under maintenance, the crane system moves to the maintenance area at the end of the underground plant through the operation of the inclined track and the inclined crane wheels; As the end maintenance boss and the maintenance and safety rails are slowly raised, the maintenance and safety crane wheels begin to contact the maintenance and safety rails. Then, relying on the operation of the maintenance and safety crane wheels, the crane beam begins to rise, and the inclined rails and the inclined crane wheels gradually separate. Until the crane runs to the horizontal maintenance area, the maintenance and safety crane wheels are locked for maintenance.