Construction method for pile foundation in super-thick saturated soft loess stratum of high-rise building

By lowering the steel casing in the pile foundation hole and monitoring the concrete height with an elevation detection device, construction difficulties and over-implantation problems in saturated soft loess formations are solved, and construction costs and efficiency are reduced.

CN119021201APending Publication Date: 2024-11-26CHINA RAILWAY GUANGZHOU ENG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411144971.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

When building pile foundations in saturated soft loess strata, the existing technology is difficult to effectively carry construction equipment, resulting in construction difficulties and over-irrigation, which increases costs.

Method used

The steel casing is first lowered in the pile foundation hole, and the concrete pouring height is monitored in real time through the elevation detection device to avoid overfilling and reduce manpower and material costs.

Benefits of technology

By blocking the soft loess formation and real-time monitoring of the infusion height, over-infusion is reduced, construction and manpower costs are reduced, and construction efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021201A_ABST
    Figure CN119021201A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method of a pile foundation in an ultra-thick saturated soft loess stratum of a high-rise building, which comprises the following construction method: excavating a pile foundation hole from the upper layer, then putting down steel casings section by section, and connecting the adjacent steel casings through a mounting assembly; lowering a reinforcement cage, and pouring concrete; an elevation detection device is installed at the topmost steel casing, and the concrete pouring height is detected by installing the elevation detection device; when it is detected that the concrete height reaches the pile foundation height, pouring is stopped; and after initial setting of the concrete, the steel casing is pulled out. The pile foundation construction method has the effect that the overall cost can be reduced on the basis that the pile foundation construction can be normally completed under the condition that the lower geology is a saturated soft loess layer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of pile foundation construction, in particular to a pile foundation construction method in an ultra-thick saturated soft loess stratum of a high-rise building. Background Art

[0002] At present, with the continuous development of society, high-rise or super-high-rise buildings have become the main trend of urban development. In some areas, the construction scenario is that the underlying geology is a saturated soft loess layer. During the construction process, the focus needs to be on how to meet the construction bearing requirements in the presence of saturated soft loess layers, especially in pile foundation construction.

[0003] In the existing construction of pile foundations where the underlying geological layer is saturated soft loess, if the upper layer is excavated to form a foundation pit before the pile foundation pit construction is carried out, the saturated soft loess layer will be difficult to bear the construction equipment, resulting in the inability to perform normal construction; if the pile foundation pit is excavated without excavating the upper layer, over-pouring will occur during the subsequent pouring of concrete, which will require the over-pouring part to be removed later, increasing the overall cost. Summary of the invention

[0004] In order to reduce the overall cost while normally completing the pile foundation construction when the underlying geological layer is a saturated soft loess layer, the present application provides a pile foundation construction method in an ultra-thick saturated soft loess layer of a high-rise building.

[0005] The present application provides a method for constructing a pile foundation in an ultra-thick saturated soft loess layer of a high-rise building, which adopts the following technical solution: A method for constructing a pile foundation in an ultra-thick saturated soft loess layer of a high-rise building, comprising the following construction methods: Step 1: excavate the pile foundation hole from the upper layer, then lower the steel casing section by section, and connect the adjacent steel casings by installing components; Step 2: Lower the steel cage and pour concrete; Step 3: Install an elevation detection device at the top of the steel casing to detect the concrete pouring height; Step 4: When it is detected that the concrete height reaches the pile foundation height, stop pouring; Step 5: After the concrete has initially set, pull out the steel casing.

[0006] By adopting the above technical scheme, since the construction site is a saturated soft loess layer in the lower geological layer, the large-scale equipment used for construction can only be placed on the hard plane of the upper layer. However, according to the conventional construction method, directly pouring concrete after lowering the steel cage will cause the soft loess layer to mix with the concrete, affecting the molding effect; and over-pouring will occur. When the foundation pit is subsequently excavated to the saturated soft loess layer, a large amount of manpower and material resources are required to break the over-pouring part of the solidified concrete; and the reason why pouring must be carried out by over-pouring is that the actual height of the poured concrete cannot be judged. Therefore, the present application firstly lowers the steel casing after the pile foundation hole is dug out to block the soft loess layer, so as to prevent the soft loess layer from collapsing into the pile foundation hole during the subsequent concrete pouring process; then, during the process of pouring concrete, the height of the poured concrete is detected by the elevation detection device; thereby, it can be stopped when the pile foundation height is reached, which greatly reduces the over-pouring amount, not only reduces the cost of manpower and material resources, but also greatly reduces the construction cost.

[0007] Preferably, the elevation detection device in step three includes a mounting frame, a float rod and a float ball, the mounting frame is fixedly mounted on the steel casing, the float rod is slidably mounted on the mounting frame in a vertical direction, and the float ball is mounted on the downward end of the float rod; a scale bar is provided on the outer side wall of the float rod; the density of the float rod and the density of the float ball are both greater than the density of the mud and the density of the slag, and the density of the float rod and the float ball are both less than the density of the concrete.

[0008] By adopting the above technical scheme, when pouring concrete, the mounting frame is fixedly installed on the steel casing, and then the float rod and the float ball are placed in the casing. Since the density of the float rod and the float ball is greater than the density of the mud and the density of the scum, but less than the density of the concrete; therefore, the float ball will sink into the mud layer and the scum layer, and float on the top surface of the concrete layer; when pouring concrete continuously, the pouring position of the concrete can be judged by checking the scale bar on the float rod, so as to stop the pouring in time; the physical structure detection method is used for detection, which improves the detection accuracy, greatly reduces the over-pouring amount, and reduces the cost.

[0009] Preferably, the floating rod comprises a plurality of sub-rods, the plurality of sub-rods are spaced apart in the sliding direction, and two adjacent sub-rods are detachably connected via a connecting assembly; and a disassembly assembly for assisting in the installation or removal of the floating rod is installed on the mounting frame.

[0010] By adopting the above technical solution, since this application is aimed at the construction of high-rise buildings, the foundation pit depth is large, and thus the length of the float rod is also long. Therefore, the float rod is designed to be detachably connected by multiple sub-rods; the installation or removal of the float rod is assisted by the disassembly and assembly components, thereby improving the construction convenience.

[0011] Preferably, the connecting assembly includes a plug-in block, a locking rod, a linkage rod, a pushing rod and an elastic member, the plug-in block is installed at one end of the sub-rod and a plug-in groove is opened at the other end, the plug-in block of one sub-rod is plugged into the plug-in groove of the adjacent sub-rod; a first sliding groove and a second sliding groove are vertically spaced apart in one end of the sub-rod with the plug-in groove, a connecting groove is opened between the first sliding groove and the second sliding groove, the first sliding groove is connected to the plug-in groove, and the second sliding groove is connected to the outside of the sub-rod; the locking rod is slidably installed in the first sliding groove, the pushing rod is slidably installed in the second sliding groove, and the elastic member is installed at a position between the pushing rod and the bottom of the second sliding groove; the plug-in block is opened at a position corresponding to the locking rod, and the locking rod is plugged into the locking groove; the linkage rod is rotatably installed in the connecting groove, and the two ends of the linkage rod are respectively slidably and rotatably installed on the locking rod and the pushing rod.

[0012] By adopting the above technical solution, when installing the sub-rods, first press the push rod, and drive the locking rod to leave the plug-in slot through the action of the linkage rod, then insert the plug-in block on the adjacent sub-rod into the plug-in slot, release the push rod, and the locking rod can be plugged into the locking slot through the action of the elastic member, thereby achieving the installation of the two adjacent sub-rods; when the two adjacent sub-rods need to be disassembled, directly press the push rod, and drive the locking rod to leave the plug-in slot through the action of the linkage rod, and the disassembly can be completed; compared with the use of bolts and other methods, this operation is simple and convenient, and it also lays a foundation for the subsequent disassembly and assembly of components to better assist in disassembly and assembly.

[0013] Preferably, the mounting frame comprises a vertical frame, an upper bracket and a lower bracket, and the upper bracket and the lower bracket are installed on the vertical frame at intervals in the vertical direction; the upper bracket and the lower bracket are both provided with a through hole for the floating rod to pass through and slide.

[0014] By adopting the above technical solution, the structure is simple and can play a guiding and limiting role for the floating rod to slide in the vertical direction.

[0015] Preferably, the disassembly and assembly component includes a winder, a connecting block and a locking block, the winder is installed at a position of the upper bracket corresponding to the through hole, the connecting block structure is consistent with the plug-in block structure, and the connecting block is installed at the end of the winding rope of the winder; the locking block is horizontally slidably installed at a position of the lower bracket corresponding to the through hole, the locking block is at a position corresponding to the second sliding groove, and an unlocking block is installed at the position of the locking block corresponding to the second sliding groove, and the disassembly and assembly component also includes a first driving member for driving the locking block to slide.

[0016] By adopting the above technical scheme, when the inspection is completed, the sub-rod outside the steel casing is first removed, and then the winder is installed at the position of the through hole corresponding to the upper bracket, and then the connecting block is plugged into the plug-in slot, and the connecting block is locked by the locking rod; then the winder is started, and the floating rod in the pile foundation hole is pulled until a section of the sub-rod is pulled out, and the first driving member is started to drive the locking block to slide and abut against the floating rod still in the pile foundation hole, and at the same time, the pushing rod is pushed by the unlocking block to unlock the extended section of the sub-rod, and the section of the sub-rod is continued to be pulled so that the plug-in block leaves the plug-in slot, so that one sub-rod can be stably removed, and the unlocking block extends into the second sliding slot to improve the locking of the floating rod still in the pile foundation hole; subsequently, all removals are completed in the above manner, and this removal method is efficient, convenient and stable to operate.

[0017] Preferably, the upper bracket is rotatably mounted on the vertical frame, and the vertical frame is equipped with a second driving member for driving the upper bracket to rotate.

[0018] By adopting the above technical solution, when the plug-in block leaves the plug-in slot, the second driving member can be started to drive the upper bracket to rotate until it leaves the position facing the lower support rod, so that the sub-rod can be detached smoothly.

[0019] Preferably, the elevation detection device further comprises a base, a placement frame rotatably mounted on the base and a third driving member for driving the placement frame to rotate, and the placement frame is provided with a plurality of placement holes along the circumferential direction for the sub-rods to pass through.

[0020] By adopting the above technical solution, after the upper bracket is rotated away from the lower bracket, the sub-rod is facing the placement hole; the winder is started to lower the sub-rod until it is placed in the placement rack; then the third driving member is started to rotate the next placement hole to the corresponding position; and when the floating rod needs to be installed, the upper bracket is first rotated to the corresponding placement hole position, the corresponding sub-rod is connected through the connecting block, the winder is started to pull it up, and then the sub-rod is rotated to the corresponding lower bracket through-hole position to install the sub-rod; the whole process can make the installation and disassembly process of the sub-rod more convenient and improve convenience.

[0021] Preferably, the outer wall of one end of the steel casing in step one is provided with an outer adaption groove along the circumferential direction, and the inner wall of the other end is provided with an inner adaption groove along the circumferential direction, and one end of the steel casing is inserted into the inner adaption groove of the adjacent steel casing through the outer adaption groove.

[0022] By adopting the above technical solution, the traditional connection and installation between steel casings is to set flanges at positions where adjacent steel casings are close to each other, so that the connection thickness of the steel casing is relatively thick. When the steel casing is subsequently pulled out of the pile foundation hole, the resistance is too large and it is difficult to pull it out; therefore, by designing the outer adapter groove and the inner adapter groove to cooperate with each other, after the two adjacent steel casings are plugged into each other, the outer surfaces of the steel casings are flush, the structure that generates resistance is reduced, and the smoothness of the subsequent pulling out of the steel casing is improved.

[0023] Preferably, the installation assembly in step one includes a screw and a twisting head, and a plurality of the screws are arranged at intervals along the circumference of the steel casing. The screws are arranged at corresponding plug-in positions of the steel casing, and the screws are simultaneously passed through adjacent steel casings and threadedly connected to the steel casings; the twisting head is installed at the outward end of the screw, and the cross-section of the twisting head is semi-elliptical.

[0024] By adopting the above technical solution, since the cross section of the twisting head is semi-elliptical, the steel casing can be pulled out of the pile foundation hole more smoothly.

[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. After the pile foundation hole is dug, the steel casing is first lowered to block the soft loess layer, preventing the soft loess layer from collapsing into the pile foundation hole during the subsequent concrete pouring process; then, during the concrete pouring process, the height of the poured concrete is detected by the elevation detection device; thus, the concrete can be stopped when the pile foundation height is reached, greatly reducing the over-pouring amount, which not only reduces the cost of manpower and material resources, but also greatly reduces the construction cost; 2. During the continuous pouring of concrete, the pouring position of concrete can be judged by checking the scale bar on the float rod, so as to stop the pouring in time; the physical structure detection method is used for detection to improve the detection accuracy, greatly reduce the over-pouring amount and reduce the cost; 3. First, remove the sub-rod outside the steel casing, then install the winder at the position of the corresponding through hole of the upper bracket, then insert the connecting block into the plug-in slot, and lock the connecting block through the locking rod; then start the winder, pull the floating rod in the pile foundation hole, until a section of the sub-rod is pulled out, start the first driving member, drive the locking block to slide and abut the floating rod still in the pile foundation hole, and at the same time push the pushing rod through the unlocking block to unlock the extended section of the sub-rod, continue to pull the section of the rod, so that the plug-in block leaves the plug-in slot, so that one sub-rod can be stably removed, and the unlocking block extends into the second sliding slot to improve the locking of the floating rod still in the pile foundation hole; subsequently, complete all the removals in the above manner, which is efficient, convenient and stable to operate; 4. Since the cross section of the twisting head is semi-elliptical, it is smoother to pull the steel casing out of the pile foundation hole. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a flow chart of the construction method of an embodiment of the present application.

[0027] Figure 2 It is a schematic diagram of the structure of the elevation detection device according to an embodiment of the present application.

[0028] Figure 3 It is a cross-sectional view of the floating rod installation structure of an embodiment of the present application.

[0029] Figure 4 yes Figure 3 A partial enlarged view of middle A.

[0030] Figure 5 yes Figure 3 A partial enlarged view of B.

[0031] Figure 6 It is a schematic diagram of the structure of the placement rack of an embodiment of the present application.

[0032] Figure 7 It is a cross-sectional view of the connection structure between two adjacent steel casings in an embodiment of the present application.

[0033] Description of reference numerals: 1. Steel casing; 11. External adapting groove; 12. Internal adapting groove; 2. Elevation detection device; 21. Mounting frame; 211. Vertical frame; 212. Upper bracket; 213. Lower bracket; 214. Through hole; 215. Guide wheel; 216. Second driving member; 22. Floating rod; 221. Sub-rod; 222. Plug-in groove; 223. First sliding groove; 224. Second sliding groove; 225. Connecting groove; 23. Floating ball; 2 4. Winder; 25. Connecting block; 26. Locking block; 27. First driving member; 28. Base; 29. ​​Placement rack; 291. Placement hole; 20. Third driving member; 3. Connecting assembly; 31. Plug-in block; 311. Locking groove; 32. Locking rod; 321. Sliding column; 33. Linking rod; 331. Sliding groove; 34. Push rod; 35. Elastic member; 4. Mounting assembly; 41. Screw rod; 42. Twist head. DETAILED DESCRIPTION

[0034] The following is combined with Figure 1-7 This application is described in further detail.

[0035] The present application discloses a method for constructing a pile foundation in an ultra-thick saturated soft loess layer for a high-rise building. Figure 1 , the construction method includes the following steps: S10: excavating a pile foundation hole from the upper layer, then lowering the steel casing 1 section by section, and connecting adjacent steel casings 1 through the installation assembly 4; S20: lower the steel cage and pour concrete; S30: installing an elevation detection device 2 at the top of the steel casing 1, and detecting the concrete pouring height by installing the elevation detection device 2; S40: When it is detected that the concrete height reaches the pile foundation height, the pouring is stopped; S50: After the concrete has initially set, the steel casing 1 is pulled out.

[0036] Among them, refer to Figure 2 The elevation detection device 2 in step S30 includes a mounting frame 21, a floating rod 22 and a floating ball 23. The mounting frame 21 includes a vertical frame 211, an upper bracket 212 and a lower bracket 213. The vertical frame 211 is fixedly mounted on the side wall of the topmost steel casing 1 by bolts. The upper bracket 212 and the lower bracket 213 are installed on the vertical frame 211 from top to bottom in a spaced manner. The ends of the upper bracket 212 and the lower bracket 213 away from the vertical frame 211 are both provided with a through hole 214. The floating rod 22 is fixedly mounted on the side wall of the topmost steel casing 1 by bolts. The upper bracket 212 and the lower bracket 213 are installed on the vertical frame 211 in a spaced manner from top to bottom in a vertical direction. The ends of the upper bracket 212 and the lower bracket 213 away from the vertical frame 211 are both provided with a through hole 214. The float rod 22 is extended through the through hole 214 and is simultaneously penetrated by the upper bracket 212 and the lower bracket 213. The outer wall of the float rod 22 is provided with a scale bar. The float ball 23 is fixedly installed at the downward end of the float rod 22. The density of the float rod 22 and the float ball 23 are both greater than the density of the mud and the density of the slag, and the density of the float rod 22 and the float ball 23 are both less than the density of the concrete. Therefore, in the process of pouring concrete, the height of the pouring can be judged by the floating of the float ball 23 and the float rod 22, thereby greatly reducing the over-pouring amount.

[0037] Reference Figure 3 and Figure 4 The floating rod 22 includes a plurality of sub-rods 221, and the plurality of sub-rods 221 are arranged at intervals in the vertical direction. Two adjacent sub-rods 221 are detachably connected through a connecting assembly 3, and the connecting assembly 3 includes a plug-in block 31, a locking rod 32, a linkage rod 33, a push rod 34 and an elastic member 35. The plug-in block 31 is fixedly installed at one end of the sub-rod 221, and a plug-in slot 222 is opened at the other end. The plug-in block 31 of one sub-rod 221 is plugged into the plug-in slot 222 of an adjacent sub-rod 221, so that the adjacent two sub-rods 221 are connected. Initial positioning; a first sliding groove 223 and a second sliding groove 224 are spaced apart in the vertical direction at one end of the sub-rod 221 with the plug-in groove 222, and the first sliding groove 223 and the second sliding groove 224 both extend in the horizontal direction, and a connecting groove 225 is further provided between the first sliding groove 223 and the second sliding groove 224, and the connecting groove 225 is connected to the first sliding groove 223 and the second sliding groove 224; the first sliding groove 223 is connected to the plug-in groove 222, and the second sliding groove 224 is connected to the outside of the sub-rod 221.

[0038] The locking rod 32 is slidably installed in the first sliding groove 223, and the pushing rod 34 is slidably installed in the second sliding groove 224; the elastic member 35 is a spring, and the elastic member 35 is fixedly installed at a position between the pushing rod 34 and the bottom of the second sliding groove 224. When the elastic member 35 is in a natural state, the end of the pushing rod 34 away from the elastic member 35 is flush with the outer side wall of the sub-rod 221; the plug-in block 31 is provided with a locking groove 311 at a position corresponding to the locking rod 32, and the locking rod 32 is plugged into the locking groove 311. The end of the locking rod 32 inserted into the locking groove 311 and facing the notch of the plug-in groove 222 is provided with an inclined surface The middle position of the linkage rod 33 is rotatably installed in the connecting groove 225, and a slide groove 331 is provided at both ends of the linkage rod 33, and the slide groove 331 extends in the length direction of the linkage rod 33. The locking rod 32 and the pushing rod 34 are fixedly installed with a slide column 321, and the slide column 321 on the locking rod 32 and the slide column 321 on the pushing rod 34 are respectively slid and rotatably installed at the two ends of the linkage rod 33 through the slide grooves 331 at both ends of the linkage rod 33; therefore, when the pushing rod 34 is pressed, the locking rod 32 can be driven to leave the locking groove 311 through the action of the linkage rod 33, thereby completing the disassembly of the two adjacent sub-rods 221.

[0039] Reference Figure 3 , Figure 4 and Figure 5 The elevation detection device 2 also includes a disassembly assembly for assisting the installation or disassembly of the floating rod 22, the disassembly assembly includes a winder 24, a connecting block 25, a locking block 26 and a first driving member 27, the winder 24 is fixedly installed at a position of the upper bracket 212 near the through hole 214 by bolts, and a guide wheel 215 is mounted on the upper bracket 212 at a position directly above the through hole 214; the structure of the connecting block 25 is consistent with that of the plug-in block 31, and the connecting block 25 is fixedly installed at the winding of the winder 24 The end of the winding rope; when the floating rod 22 needs to be disassembled, the sub-rod 221 outside the pile foundation hole is first removed, and then the winder 24 and the guide wheel 215 are fixed to the corresponding positions of the upper bracket 212, and then the winding rope is passed through the through hole 214 of the upper bracket 212, and the connecting block 25 is inserted into the plug-in groove 222 on the sub-rod 221 located at the top at this time; starting the winder 24 can pull out the floating rod 22 in the pile foundation hole, and then the next sub-rod 221 can be removed.

[0040] The locking block 26 is horizontally slidably installed at the position of the lower bracket 213 corresponding to the through hole 214, and the locking block 26 is at the position corresponding to the second sliding groove 224, and the unlocking block is fixedly installed at the position of the locking block 26 corresponding to the second sliding groove 224; the first driving member 27 is a cylinder, the first driving member 27 is fixedly installed in the lower bracket 213, and the piston rod of the first driving member 27 is fixedly installed on the locking block 26; when the winder 24 pulls a sub-rod 221 to the upper bracket 212, the first driving member 27 is started, driving the locking block 26 to clamp the upper end of the next sub-rod 221, and at the same time, the unlocking block is inserted into the second sliding groove 224, pressing the push rod 34 to complete the unlocking of the two adjacent sub-rods 221, and because the unlocking block is inserted into the second sliding groove 224, the floating rod 22 that has not been removed can also be locked.

[0041] Reference Figure 2 and Figure 6 , the upper bracket 212 is rotatably mounted on the stand 211, and the stand 211 is fixedly mounted with a second drive member 216, which is a motor, and the output shaft of the second drive member 216 is fixedly connected to the rotating shaft of the upper bracket 212; the elevation detection device 2 also includes a base 28, a placement frame 29 and a third drive member 20, the base 28 is located on one side of the steel casing 1, the placement frame 29 is rotatably mounted on the base 28, and a plurality of placement holes 291 are evenly spaced along the circumferential direction on the placement frame 29; when the sub-rod 221 is detached, the second drive member 216 is started to drive the upper bracket 212 to rotate to the top of the placement frame 29 and correspond to one of the through holes 214, and then the detached sub-rod 221 can be placed in the placement frame 29 by lowering it; the third drive member 20 is a motor, the third drive member 20 is fixedly mounted in the base 28, and the output shaft of the third drive member 20 is fixedly mounted on the rotating shaft of the placement frame 29, so that the position of the placement hole 291 of the placement frame 29 can be adjusted.

[0042] Reference Figure 7 In step one, an outer adaption groove 11 is opened in the circumferential direction on the outer side wall of one end of the steel casing 1, and an inner adaption groove 12 is opened in the circumferential direction on the inner side wall of the other end. One end of a steel casing 1 is inserted into the inner adaption groove 12 of an adjacent steel casing 1 through the outer adaption groove 11. The inner side walls and outer side walls of the two adjacent steel casings 1 are flush, which improves the smoothness of pulling the subsequent steel casing 1 out of the pile foundation hole.

[0043] In addition, the installation assembly 4 in step one includes a screw 41 and a twisting head 42. A number of screws 41 are arranged at equal intervals along the circumference of the steel casing 1. The screws 41 are arranged at the corresponding plug-in positions of the steel casing 1. The screws 41 are arranged horizontally. The screws 41 are simultaneously penetrated through adjacent steel casings 1 and threadedly connected to the steel casing 1. One end of the screw 41 facing the inside of the steel casing 1 extends to be flush with the inner wall of the steel casing 1; the twisting head 42 is installed at the outward end of the screw 41, and the cross-section of the twisting head 42 is semi-elliptical, which can greatly reduce the resistance to pulling the steel casing 1 out of the pile foundation hole.

[0044] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A method for constructing pile foundations in ultra-thick saturated soft loess layers of high-rise buildings, characterized in that: The construction methods include: Step 1: excavating a pile foundation hole from the upper layer, then lowering the steel casing (1) section by section, and connecting adjacent steel casings (1) by means of an installation assembly (4); Step 2: Lower the steel cage and pour concrete; Step 3: Installing a height detection device (2) at the top of the steel casing (1) to detect the concrete pouring height by installing the height detection device (2); Step 4: When it is detected that the concrete height reaches the pile foundation height, stop pouring; Step 5: After the concrete has initially set, pull out the steel casing (1).

2. A method for constructing a pile foundation in an ultra-thick saturated soft loess layer of a high-rise building according to claim 1, characterized in that: The elevation detection device (2) in step three comprises a mounting frame (21), a floating rod (22) and a floating ball (23), wherein the mounting frame (21) is fixedly mounted on the steel casing (1), the floating rod (22) is slidably mounted on the mounting frame (21) in a vertical direction, and the floating ball (23) is mounted on the downward end of the floating rod (22); a scale bar is provided on the outer wall of the floating rod (22); the density of the floating rod (22) and the density of the floating ball (23) are both greater than the density of the mud and the density of the slag, and the density of the floating rod (22) and the floating ball (23) are both less than the density of the concrete.

3. A method for constructing pile foundation in ultra-thick saturated soft loess stratum of a high-rise building according to claim 2, characterized in that: The floating rod (22) comprises a plurality of sub-rods (221), the plurality of sub-rods (221) being arranged at intervals in the sliding direction, and two adjacent sub-rods (221) being detachably connected via a connecting assembly (3); and a disassembly assembly for assisting in the installation or removal of the floating rod (22) is installed on the mounting frame (21).

4. A method for constructing a pile foundation in an ultra-thick saturated soft loess layer of a high-rise building according to claim 3, characterized in that: The connecting assembly (3) comprises a plug-in block (31), a locking rod (32), a linkage rod (33), a pushing rod (34) and an elastic member (35); the plug-in block (31) is installed at one end of the sub-rod (221), and a plug-in slot (222) is provided at the other end; the plug-in block (31) of one sub-rod (221) is plugged into the plug-in slot (222) of an adjacent sub-rod (221); a first sliding slot (223) and a second sliding slot (224) are vertically spaced apart in one end of the sub-rod (221) where the plug-in slot (222) is provided; a connecting slot (225) is provided between the first sliding slot (223) and the second sliding slot (224); the first sliding slot (223) is connected to the plug-in slot (222), the second sliding groove (224) is connected to the outside of the sub-rod (221); the locking rod (32) is slidably installed in the first sliding groove (223), the pushing rod (34) is slidably installed in the second sliding groove (224), and the elastic member (35) is installed at a position between the pushing rod (34) and the bottom of the second sliding groove (224); the plug-in block (31) is provided with a locking groove (311) at a position corresponding to the locking rod (32), and the locking rod (32) is plugged into the locking groove (311); the linkage rod (33) is rotatably installed in the connecting groove (225), and the two ends of the linkage rod (33) are respectively slidably and rotatably installed on the locking rod (32) and the pushing rod (34).

5. A method for constructing pile foundation in ultra-thick saturated soft loess strata of a high-rise building according to claim 4, characterized in that: The mounting frame (21) comprises a vertical frame (211), an upper frame (212) and a lower frame (213); the upper frame (212) and the lower frame (213) are installed on the vertical frame (211) at intervals in the vertical direction; the upper frame (212) and the lower frame (213) are both provided with a through hole (214) for the floating rod (22) to pass through and slide.

6. A method for constructing a pile foundation in an ultra-thick saturated soft loess layer of a high-rise building according to claim 5, characterized in that: The disassembly and assembly component comprises a reel (24), a connecting block (25) and a locking block (26); the reel (24) is mounted at a position of the upper bracket (212) corresponding to the through hole (214); the connecting block (25) has a structure consistent with that of the plug-in block (31); the connecting block (25) is mounted on the end of the reeling rope of the reel (24); the locking block (26) is horizontally slidably mounted at a position of the lower bracket (213) corresponding to the through hole (214); the locking block (26) is located at a position corresponding to the second sliding groove (224); an unlocking block is mounted at a position of the locking block (26) corresponding to the second sliding groove (224); and the disassembly and assembly component further comprises a first driving member (27) for driving the locking block (26) to slide.

7. A method for constructing a pile foundation in an ultra-thick saturated soft loess layer of a high-rise building according to claim 6, characterized in that: The upper bracket (212) is rotatably mounted on the vertical bracket (211), and the vertical bracket (211) is provided with a second driving member (216) for driving the upper bracket (212) to rotate.

8. A method for constructing a pile foundation in an ultra-thick saturated soft loess layer of a high-rise building according to claim 7, characterized in that: The elevation detection device (2) further comprises a base (28), a placement frame (29) rotatably mounted on the base (28), and a third driving member (20) for driving the placement frame (29) to rotate, wherein the placement frame (29) is provided with a plurality of placement holes (291) along the circumferential direction for the sub-rods (221) to pass through.

9. A method for constructing a pile foundation in an ultra-thick saturated soft loess layer of a high-rise building according to claim 1, characterized in that: The outer wall of one end of the steel casing (1) in step 1 is provided with an outer adaption groove (11) along the circumferential direction, and the inner wall of the other end is provided with an inner adaption groove (12) along the circumferential direction. One end of the steel casing (1) is inserted into the inner adaption groove (12) of the adjacent steel casing (1) through the outer adaption groove (11).

10. A method for constructing a pile foundation in an ultra-thick saturated soft loess layer of a high-rise building according to claim 9, characterized in that: The installation assembly (4) in step one comprises a screw (41) and a screwing head (42), wherein a plurality of screws (41) are arranged at intervals along the circumference of the steel casing (1), wherein the screw (41) is arranged at a corresponding plug-in position of the steel casing (1), and the screw (41) is simultaneously passed through an adjacent steel casing (1) and is threadedly connected to the steel casing (1); the screwing head (42) is installed at an outward end of the screw (41), and the cross-section of the screw head (42) is semi-elliptical.