Prefabricated tubular pile head core grouting construction method
By using wooden base plates and sandbags in prefabricated pipe piles to form a protective layer, combined with C35 micro-expanded concrete and insertion vibrator, the problem of corrosion of prefabricated pipe piles in humid environments is solved, and the stability of the core filling is improved. Service life.
Patent Information
- Application Number
- CN202411156859.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-22
- Publication Date
- 2024-11-26
AI Technical Summary
In humid environments, the steel cages of prefabricated pipe piles are easily corroded, resulting in limited service life of core-filled pipe piles, and prefabricated pipe piles that have not undergone core-filled treatment are difficult to achieve stability and quality.
The combination of wooden base plate and sandbags is used to tamp the sandbags in prefabricated pipe piles through iron wire to form a protective layer to isolate moisture, and C35 micro-expanded concrete and insert concrete vibrating rods are used when pouring concrete to improve stability and compactness.
It effectively avoids the concrete slurry leakage problem, reduces the corrosion risk of steel cages, improves the service life of prefabricated pipe piles and the stability of the dam reinforcement project.
Smart Images

Figure CN119021226A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pipe pile core filling construction, and more specifically, to a prefabricated pipe pile head core filling construction method. Background Art
[0002] The simplest way to reinforce a river bank is to raise and widen the bank surface to increase the water capacity when the river water rises and falls, and enhance the ability to resist floods. Heightening and widening can also be achieved by reinforcing the bank foot, widening and raising the bank foot to improve the overall stability of the river bank. When reinforcing a river bank, burying prefabricated pipe piles in the bank foot to improve the stability of the river bank is a common method.
[0003] Since the riprap depth at the foot of the river embankment is large, the construction environment is complex, and it is easily affected by tides and flood seasons, most of the precast pipe piles used at the foot of the embankment are not treated with core grouting like the precast pipe piles in the field of building foundation reinforcement. Precast pipe piles that have not been treated with core grouting often cannot achieve the quality and stability of precast pipe piles after core grouting treatment.
[0004] In addition, core pouring is a construction method used to improve the shear bearing capacity and stability of pipe piles. Specifically, a steel cage with a steel support plate at the bottom is placed in the pipe pile. The steel support plate is used as the bottom mold, and the inner wall of the pipe pile is used as the side mold to pour concrete into the pipe pile. For example, the prefabricated pipe piles after core pouring are used for embankment foot reinforcement. Due to the high water content at the embankment foot, the steel cage used for core pouring is also very easy to corrode, which limits the service life of the core pouring pipe piles. Summary of the invention
[0005] Aiming at the problem that the steel cage is easily corroded in a humid environment after the existing pipe pile core is poured, the object of the present invention is to provide a prefabricated pipe pile head core pouring construction method, which comprises the following steps:
[0006] S1. Select or process a wooden base plate, wherein the wooden base plate is a polygon whose circumscribed circle diameter is smaller than the inner diameter of the prefabricated pipe pile, or the wooden base plate is a circle whose diameter is smaller than the inner diameter of the prefabricated pipe pile. Connect a plurality of iron wires to the wooden base plate.
[0007] S2. Sandbags are placed on top of the wooden base plate. The sandbags are plastic bags filled with sand. The wooden base plate and the sandbags are placed on the inner side of the prefabricated pipe piles that have been vertically inserted into the ground through iron wires. The wooden base plate is made horizontal through the iron wires. The part of each iron wire away from the wooden base plate is fixed, and then the sandbags are compacted.
[0008] S3. Place a steel cage with a steel support plate at the bottom into the prefabricated pipe piles, wherein the steel cage is located above the sandbags.
[0009] S4. Pour concrete into the prefabricated pipe piles.
[0010] The present invention is further configured as follows: the wooden bottom plate is a regular polygon with an even number of sides, and a wire groove is provided at the center of each side and runs through the wooden bottom plate longitudinally. Every two mutually parallel sides of the regular polygon form a group, and each group corresponds to at most one iron wire. Each iron wire passes through the wire groove of its corresponding two sides, and the bottom of each iron wire is located at the bottom of the wooden bottom plate. Both ends of each iron wire extend from the top of the prefabricated pipe pile and are fixed relative to the position of the prefabricated pipe pile.
[0011] The present invention is further configured as follows: the wooden bottom plate is circular, an even number of wire grooves are opened on the side of the wooden bottom plate, all the wire grooves are evenly distributed around the axis of the wooden bottom plate, and every two wire grooves symmetrically distributed about the axis of the wooden bottom plate form a group, and each group corresponds to one iron wire. Each iron wire passes through its corresponding two wire grooves, and the bottom of each iron wire is located at the bottom of the wooden bottom plate. Both ends of each iron wire extend from the top of the prefabricated pipe pile and are fixed relative to the prefabricated pipe pile.
[0012] The present invention is further configured as follows: the wire groove penetrates the side of the wooden bottom plate in a direction away from the center of the wooden bottom plate, and the width of the wire groove in the direction away from the center of the wooden bottom plate is greater than the diameter of the iron wire.
[0013] The present invention is further configured as follows: the model of the iron wire is less than or equal to No. 12.
[0014] The present invention is further configured such that the height of the sandbag after compaction is 200-250 mm.
[0015] The present invention is further configured as follows: the wooden bottom plate is a multi-layer wooden board, and the thickness of the multi-layer wooden board is 13-15 mm.
[0016] The present invention is further configured as follows: the concrete in S4 is C35 slightly expansive concrete.
[0017] The present invention is further configured as follows: in S4, the concrete in the prefabricated pipe pile is vibrated and compacted using an inserted concrete vibrator. When the position of the inserted concrete vibrator in the concrete is changed, the inserted concrete vibrator is vertically pulled out and then vertically inserted into a predetermined change position. The vibration time of the inserted concrete vibrator in the concrete is 20-30s.
[0018] The present invention is further configured as follows: the steel cage in S3 includes a steel support plate, vertical steel bars, annular stirrups and radial steel bars, the steel support plate is circular, a plurality of vertical steel bars are evenly distributed around the axis of the steel support plate, and the bottom end of each vertical steel bar is welded to the steel support plate. A plurality of annular stirrups are arranged along the length direction of the vertical steel bars, and the inner side of each annular stirrup is welded to all vertical steel bars. A plurality of radial steel bars are arranged, and each radial steel bar is welded to the top annular stirrup, and each radial steel bar intersects with the axis of the steel cage, and each radial steel bar has two welding points with the top annular stirrup in its own length direction.
[0019] In summary, the present invention has the following beneficial effects compared with the prior art: the present invention first sets a protective layer in the prefabricated pipe pile through the wooden bottom plate and the sandbag, wherein the sandbag has strong plasticity and high flexibility, and can fit well to the inner wall of the prefabricated pipe pile after compaction and deformation, effectively avoiding the leakage problem that may exist in concrete pouring. At the same time, the sandbag can also isolate the moisture at the bottom of the prefabricated pipe pile from the steel cage, effectively reducing the risk of steel cage corrosion, and increasing the service life of the steel cage in the prefabricated pipe pile in the embankment foot reinforcement project. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A schematic diagram showing the positions of sandbags, iron wires and wooden bottom plates in the prefabricated pipe piles in the embodiment;
[0021] Figure 2 Schematic diagram of sandbags, iron wires and wooden bottom plates before the sandbags are compacted in the embodiment;
[0022] Figure 3 It is a schematic diagram of the bottom of the regular octagonal wooden bottom plate of the wire trough in the embodiment.
[0023] In the figure: 1. Prefabricated pipe piles; 2. Iron wire; 3. Sandbags; 4. Wooden base plate; 41. Cable duct; 5. Surface concrete cushion. DETAILED DESCRIPTION
[0024] The technical solution of the present invention will be clearly described below in conjunction with the accompanying drawings. Obviously, the described embodiments are not all embodiments of the present invention, and all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the invention.
[0025] It should be noted that the directions or positional relationships indicated by terms such as “center”, “up”, “down”, “horizontal”, “left”, “right”, “front”, “back”, “lateral” and “longitudinal” are based on the directions or positional relationships shown in the accompanying drawings and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0026] Example
[0027] like Figure 1-3 As shown, a preferred embodiment of the present invention provides a prefabricated pipe pile head core pouring construction method, which includes the following steps:
[0028] S1. Select or process a wooden base plate 4, wherein the wooden base plate 4 is a polygon whose circumscribed circle diameter is smaller than the inner diameter of the prefabricated pipe pile 1, or the wooden base plate 4 is a circle whose diameter is smaller than the inner diameter of the prefabricated pipe pile 1. Connect a plurality of iron wires 2 to the wooden base plate 4.
[0029] S2. Sandbags 3 are placed above the wooden bottom plate 4. The sandbags 3 are plastic bags filled with sand. The wooden bottom plate 4 and the sandbags 3 are placed on the inner side of the prefabricated pipe piles 1 that have been vertically inserted into the ground through the iron wires 2. The wooden bottom plate 4 is leveled through the iron wires 2. The part of each iron wire 2 away from the wooden bottom plate 4 is fixed, and then the sandbags 3 are compacted.
[0030] S3, placing a steel cage with a steel support plate at the bottom in the prefabricated pipe pile 1, the steel cage is located above the sandbag 3. Figure 1 Not shown.
[0031] S4, pouring concrete into the prefabricated pipe pile 1.
[0032] The sandbags 3 in this embodiment have strong plasticity and high flexibility. After compaction and deformation, they can fit well on the inner wall of the prefabricated pipe pile 1, effectively avoiding the leakage problem that may exist in concrete pouring. At the same time, the sandbags 3 can also serve as a protective layer to isolate the moisture at the bottom of the prefabricated pipe pile 1 from the steel cage, effectively reducing the risk of steel cage corrosion and increasing the service life of the steel cage in the prefabricated pipe pile 1 in the embankment foot reinforcement project.
[0033] Specifically, during the pouring of concrete in S4, the top surface of the sandbag 3 needs to be compacted and leveled, and the silt, accumulated water and debris in the prefabricated pipe pile 1 should be cleared.
[0034] Specifically, when the wooden bottom plate 4 is a regular polygon, the diameter of the circumscribed circle of the wooden bottom plate 4 is 50 mm smaller than the inner diameter of the prefabricated pipe pile 1. When the wooden bottom plate 4 is a circle, the diameter of the wooden bottom plate 4 is 50 mm smaller than the inner diameter of the prefabricated pipe pile 1.
[0035] Specifically, the wooden bottom plate 4 is a regular polygon with an even number of sides, and a wire groove 41 is provided at the center of each side, which longitudinally penetrates the wooden bottom plate 4. Every two parallel sides of the regular polygon form a group, and each group corresponds to at most one iron wire 2. Each iron wire 2 passes through the wire grooves 41 of its corresponding two sides, and the bottom of each iron wire 2 is located at the bottom of the wooden bottom plate 4. Both ends of each iron wire 2 extend from the top of the prefabricated pipe pile 1 and are fixed relative to the prefabricated pipe pile 1. Alternatively, the wooden bottom plate 4 is circular, and an even number of wire grooves 41 are provided on the side of the wooden bottom plate 4, and all the wire grooves 41 are evenly distributed around the axis of the wooden bottom plate 4, and every two wire grooves 41 symmetrically distributed about the axis of the wooden bottom plate 4 form a group, and each group corresponds to one iron wire 2. Each iron wire 2 passes through its corresponding two wire grooves 41, and the bottom of each iron wire 2 is located at the bottom of the wooden bottom plate 4. Both ends of each iron wire 2 extend from the top of the prefabricated pipe pile 1 and are fixed relative to the prefabricated pipe pile 1.
[0036] Specifically, the wire groove 41 passes through the side of the wooden bottom plate 4 in a direction away from the center of the wooden bottom plate 4, so that the iron wire 2 can be embedded in the wire groove 41. The width of the wire groove 41 in the direction away from the center of the wooden bottom plate 4 is greater than the diameter of the iron wire 2 to reduce the possibility of the iron wire 2 escaping from the wire groove 41.
[0037] In this embodiment, the wooden bottom plate 4 is a regular octagon, and four wire grooves 41 are evenly arranged around the center of the wooden bottom plate 4. Two iron wires 2 are inserted into the four wire grooves 41 in a cross shape. Two workers each hold the ends of two adjacent iron wires 2, put the wooden floor and the sandbags 3 into the prefabricated pipe piles 1, adjust the position of the wooden bottom plate 4 by the iron wires 2, and fix the ends of the four iron wires 2 after the adjustment is completed, so as to carry out the compaction operation of the sandbags 3.
[0038] Specifically, the size of the iron wire 2 is less than or equal to No. 12, that is, the iron wire 2 should be No. 12 iron wire 2 or a thicker iron wire 2 than No. 12 iron wire 2 to meet the bearing capacity requirements during compaction. In this embodiment, the iron wire 2 is No. 12 iron wire 2.
[0039] Specifically, the height of the sandbag 3 after compaction is 200-250 mm, so as to form a sufficiently thick protective layer to improve the isolation effect of moisture at the bottom of the prefabricated pipe pile 1 and the steel cage. In this embodiment, the height of the sandbag 3 before compaction is 300 mm.
[0040] Specifically, the wooden bottom plate 4 is a multi-layer wooden board, which is made of multiple layers of wooden boards glued together. Compared with a single-layer solid wooden board, the internal stress distribution of the multi-layer wooden board is more uniform, and the overall strength and compressive resistance of the multi-layer wooden board are also better. Therefore, the multi-layer wooden board has higher stability and durability in an underwater environment.
[0041] Specifically, the thickness of the multi-layer wood board is 13-15 mm.
[0042] Specifically, the concrete in S4 is C35 micro-expansive concrete, which has good waterproof and water-resistant chemical erosion resistance and is suitable for underwater engineering applications. The compressive strength of C35 micro-expansive concrete is 35MPa, which is sufficient to ensure stability and safety in underwater environments.
[0043] Specifically, in S4, an inserted concrete vibrator is used to vibrate and compact the concrete in the prefabricated pipe pile 1 to improve the strength and durability of the concrete. When the inserted concrete vibrator changes its position in the concrete, it should be pulled out vertically and then vertically inserted into the predetermined change position, and it should not be dragged horizontally in the concrete. The vibration time of the inserted concrete vibrator in the concrete is 20-30s.
[0044] Specifically, the steel cage in S3 includes a steel support plate, vertical steel bars, annular stirrups and radial steel bars. The steel support plate is circular, and multiple vertical steel bars are evenly distributed around the axis of the steel support plate. The bottom end of each vertical steel bar is welded to the steel support plate. Multiple annular stirrups are arranged along the length direction of the vertical steel bars, and the inner side of each annular stirrup is welded to all vertical steel bars. Multiple radial steel bars are arranged, and each radial steel bar is welded to the top annular stirrup. All radial steel bars intersect with the axis of the steel cage, and each radial steel bar has two welding points with the top annular stirrup in its own length direction.
[0045] Specifically, vertical steel bars, annular stirrups and radial steel bars should be straight and undamaged before use, with no cracks, oil stains, granular or flaky rust on the surface. In the steel cage, the cross-sectional area of the steel bar joints arranged in the "same section" shall not exceed 50% of the total steel bar area.
[0046] In this embodiment, the thickness of the steel support plate is 5 mm, the vertical steel bars are C18 steel bars, the annular stirrups are A8 steel bars, and the radial steel bars are C16 steel bars.
[0047] In summary, in this embodiment, a protective layer is first set in the prefabricated pipe pile 1 through the wooden bottom plate 4 and the sandbag 3, wherein the sandbag 3 has strong plasticity and high flexibility, and can fit well to the inner wall of the prefabricated pipe pile 1 after compaction and deformation, effectively avoiding the leakage problem that may exist in concrete pouring. At the same time, the sandbag 3 can also isolate the moisture at the bottom of the prefabricated pipe pile 1 from the steel cage, effectively reducing the risk of steel cage corrosion, and increasing the service life of the steel cage in the prefabricated pipe pile 1 in the embankment foot reinforcement project.
[0048] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for core filling of prefabricated pipe pile heads. Features: The steps include: S1. Select or process a wooden base plate (4), wherein the wooden base plate (4) is a polygon whose circumscribed circle has a diameter smaller than the inner diameter of the prefabricated pipe pile (1), or the wooden base plate (4) is a circle whose diameter is smaller than the inner diameter of the prefabricated pipe pile (1); connect a plurality of iron wires (2) to the wooden base plate (4); S2, placing sandbags (3) above the wooden bottom plate (4), wherein the sandbags (3) are plastic bags filled with sand, placing the wooden bottom plate (4) and the sandbags (3) on the inner side of the prefabricated pipe piles (1) that have been vertically inserted into the ground through the iron wires (2), making the wooden bottom plate (4) horizontal through the iron wires (2), fixing the part of each iron wire (2) away from the wooden bottom plate (4), and then compacting the sandbags (3); S3, placing a steel cage with a steel support plate at the bottom inside the prefabricated pipe pile (1), wherein the steel cage is located above the sandbag (3); S4, pouring concrete into the prefabricated pipe pile (1).
2. A prefabricated pipe pile head core pouring construction method according to claim 1, Features: The wooden bottom plate (4) is a regular polygon with an even number of sides, and a wire groove (41) is provided at the center of each side and runs longitudinally through the wooden bottom plate (4); every two mutually parallel sides of the regular polygon form a group, and each group corresponds to at most one iron wire (2); each iron wire (2) passes through the wire groove (41) of its corresponding two sides, and the bottom of each iron wire (2) is located at the bottom of the wooden bottom plate (4); both ends of each iron wire (2) extend from the top of the prefabricated pipe pile (1) and are fixed relative to the prefabricated pipe pile (1).
3. A prefabricated pipe pile head core pouring construction method according to claim 1, Features: The wooden bottom plate (4) is circular, and an even number of wire grooves (41) are opened on the side of the wooden bottom plate (4), and all the wire grooves (41) are evenly distributed around the axis of the wooden bottom plate (4), and every two wire grooves (41) symmetrically distributed about the axis of the wooden bottom plate (4) form a group, and each group corresponds to an iron wire (2); each iron wire (2) passes through its corresponding two wire grooves (41), and the bottom of each iron wire (2) is located at the bottom of the wooden bottom plate (4); both ends of each iron wire (2) extend from the top of the prefabricated pipe pile (1) and are fixed relative to the prefabricated pipe pile (1).
4. A prefabricated pipe pile head core pouring construction method according to claim 2 or 3, Features: The wire groove (41) penetrates the side of the wooden bottom plate (4) in a direction away from the center of the wooden bottom plate (4), and the width of the wire groove (41) in the direction away from the center of the wooden bottom plate (4) is greater than the diameter of the iron wire (2).
5. A prefabricated pipe pile head core pouring construction method according to claim 2 or 3, Features: The model of the iron wire (2) is less than or equal to No.
12.
6. A prefabricated pipe pile head core pouring construction method according to any one of claims 1 to 3, Features: The height of the sandbag (3) after compaction is 200-250 mm.
7. A prefabricated pipe pile head core pouring construction method according to any one of claims 1 to 3, Features: The wooden bottom plate (4) is a multi-layer wooden board, and the thickness of the multi-layer wooden board is 13-15 mm.
8. A prefabricated pipe pile head core pouring construction method according to any one of claims 1 to 3, Features: The concrete in S4 is C35 slightly expansive concrete.
9. A method for constructing a prefabricated pipe pile head core filling according to any one of claims 1 to 3, Features: In S4, the concrete in the prefabricated pipe pile (1) is vibrated and compacted using an inserted concrete vibrator rod; when the position of the inserted concrete vibrator rod in the concrete is changed, the inserted concrete vibrator rod is vertically pulled out and then vertically inserted into a predetermined change position; the vibration time of the inserted concrete vibrator rod in the concrete is 20-30 seconds.
10. A prefabricated pipe pile head core pouring construction method according to any one of claims 1 to 3, Features: The steel cage in S3 includes a steel support plate, vertical steel bars, annular stirrups and radial steel bars. The steel support plate is circular, and a plurality of vertical steel bars are evenly distributed around the axis of the steel support plate, and the bottom end of each vertical steel bar is welded to the steel support plate; a plurality of annular stirrups are arranged along the length direction of the vertical steel bars, and the inner side of each annular stirrup is welded to all vertical steel bars; a plurality of radial steel bars are arranged, and each radial steel bar is welded to the top annular stirrup, and each radial steel bar intersects with the axis of the steel cage, and each radial steel bar has two welding points with the top annular stirrup in its own length direction.