Quick-setting rubber asphalt waterproof paint spraying operation method suitable for subsurface tunnel
By using fast-greasing rubber asphalt waterproof coating spraying operation method in concealed tunnels, combined with high-density polyethylene sheets and geotextile pre-laying, the problem of poor waterproofing effect in the tunnel is solved, and higher structural strength and waterproof performance are achieved. Ensure the safe and stable operation of the tunnel.
Patent Information
- Application Number
- CN202411316511.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-26
AI Technical Summary
The existing concealed tunnels have poor waterproofing effects, especially when the joint points on the surface of the tunnel are prone to form leakage points, affecting the safety and structural stability of the tunnel.
The spraying operation method of fast-greasing rubber asphalt waterproof coating includes pre-laying of high-density polyethylene sheets and geotextile composite on the curved base surface of the tunnel in the concealed tunnel, spraying fast-greasing rubber asphalt waterproof coating, and ensuring the coating thickness through sampling inspection After the width of the overlapping edge meets the requirements, the construction of two-lined concrete will be carried out.
It effectively improves the structural strength and waterproof performance of the tunnel, ensures the safe and reliable operation of the tunnel, prevents water penetration and erosion, and enhances the sealing and stability of the connecting joints.
Smart Images

Figure CN119021723A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of tunnel waterproofing construction and treatment, and in particular to a method for spraying a quick-setting rubber asphalt waterproofing coating suitable for a dark tunnel. Background Art
[0002] A dark-cut tunnel refers to a tunnel main body project obtained by dark-cutting. The waterproofing effect of dark-cut tunnels in the prior art is relatively poor, but the waterproofing of dark-cut tunnels is related to the subsequent driving and construction safety of the tunnel, so it is very important.
[0003] Tunnel waterproofing is an important engineering link to ensure that the interior of the tunnel remains dry and prevent water from penetrating; the waterproofing effect of dark-cut tunnels in existing technologies is usually relatively good, but the specific effect depends on many factors, including geological conditions, tunnel design, construction methods, etc.
[0004] When a tunnel is excavated, a solid tunnel lining structure is formed in the ground or rock, for example using reinforced concrete or prefabricated tunnel lining. This lining can provide a certain waterproof effect and protect the tunnel from groundwater erosion. Tunnel waterproof coating: The inner surface of the tunnel is coated with waterproof materials, such as polymer coatings or waterproof asphalt. These coatings can prevent water from penetrating into the tunnel interior and provide an additional layer of protection.
[0005] However, research has found that existing dark-excavated tunnels simply coating with waterproof materials still cannot guarantee the waterproof effect of the tunnel, and especially the joints on the tunnel surface (such as longitudinal construction joints and circumferential construction joints) are prone to form leakage points. Summary of the invention
[0006] In order to improve the above problems, the present application provides a method for spraying a quick-setting rubber asphalt waterproof coating suitable for a dark tunnel.
[0007] The present application provides a method for spraying a quick-setting rubber asphalt waterproof coating suitable for a dark tunnel, which adopts the following technical solution: A method for spraying a quick-setting rubber asphalt waterproof coating suitable for a dark tunnel, characterized in that it comprises the following steps: S1: Film construction: On the original primary lining concrete base, multiple sheets are pre-laid along the inner tunnel curved surface of the dark excavated tunnel, and geotextiles are composited on the surface of the sheets; the sheets are high-density polyethylene sheets; S2: Waterproof construction: spray quick-setting rubber asphalt waterproof coating to form a 1.5 mm thick coating waterproof layer; perform sampling inspection on the coating waterproof layer; S3: Secondary lining concrete construction: After the coating waterproof layer passes the sampling inspection, the secondary lining concrete construction treatment is carried out on its surface.
[0008] Preferably, the pre-laid thickness of the high-density polyethylene sheet in S1 is 0.5 mm.
[0009] Preferably, the geotextile in S1 has a density of 80 g / ㎡.
[0010] Preferably, in S1, when multiple sheets are pre-laid along the inner tunnel curved surface base of the dark-excavated tunnel, the overlapping parts of adjacent sheets are overlapped by hot-melt welding or adhesive bonding, and the width of the overlapping edge is not less than 100 mm; and flat-head expansion bolts or nails are used for fixing at the overlapping edges.
[0011] Preferably, when multiple sheets are pre-laid along the inner tunnel curved surface base of a dark-bored tunnel, an image acquisition device is used to acquire images of the overlapped portions of the sheets laid on the inner tunnel curved surface base of the dark-bored tunnel; an image preprocessing algorithm is used to perform denoising and enhancement processing on the acquired images; the Canny algorithm is applied to perform edge detection on the preprocessed images to identify the edges of the overlapped portions of the sheets; the width of the overlapped edges is determined by image analysis, and an alarm is issued if the detected width of the overlapped edges is less than 100 mm.
[0012] Preferably, in said S1, when pre-laying a plurality of sheets along the inner tunnel curved surface base of the dark-excavated tunnel, the sheets are gradually unfolded and pre-laid in sequence along the side walls and the vault of the inner wall of the dark-excavated tunnel.
[0013] Preferably, the sampling inspection of the paint waterproof layer is as follows: one spot is randomly inspected for every 100 m2 of the area of the paint waterproof layer, and 10 m2 of the area to be inspected is randomly inspected at each spot, and the total number of areas to be inspected is not less than 3.
[0014] Preferably, in S2, a spraying equipment is used to spray the quick-setting rubber asphalt waterproof coating, and the spraying equipment includes a mobile trolley, a spray gun and an adjustment mechanism. The mobile trolley moves in a direction along the length direction of the tunnel in the tunnel. The adjustment mechanism is arranged on the mobile trolley, and is used to adjust the muzzle angle and spraying position of the spray gun.
[0015] Preferably, the adjustment mechanism includes a rotating motor, a primary adjustment component and a secondary adjustment component, the rotating motor controls the rotation of the spray gun, the primary adjustment component is used to control the position of the rotating motor relative to the moving trolley, and the secondary adjustment component is used to control the distance of the spray gun relative to the rotating axis of the rotating motor.
[0016] The present application includes at least one of the following beneficial technical effects: 1. On the original primary lining concrete base, multiple sheets are pre-laid along the inner tunnel curved surface base of the current dark-cut tunnel, and geotextiles are composited on the surface of the sheets to avoid leakage points on the surface as much as possible; at the same time, when multiple sheets are pre-laid along the inner tunnel curved surface base of the current dark-cut tunnel, the overlapping parts of adjacent sheets are overlapped by hot-melt welding or adhesive bonding to ensure the waterproofness of the joints; 2. Detect the thickness of the coating waterproof layer. When it reaches the preset acceptance thickness, the second lining concrete is constructed to further strengthen and protect the inner tunnel curved surface base; 3. Through the above-mentioned operation steps of the quick-setting rubber asphalt waterproof coating spraying operation method applicable to the dark-excavated tunnel, the inner tunnel curved surface base surface of the current dark-excavated tunnel can be reinforced and waterproofed, thereby improving the structural strength and waterproof performance of the tunnel and ensuring the safe and reliable operation of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a flow chart of a method for spraying quick-setting rubber asphalt waterproof coating suitable for dark tunnels in an embodiment of the present application.
[0018] Figure 2 It is a schematic structural cross-sectional view of the tunnel cross section after the above-mentioned quick-setting rubber asphalt waterproof coating spraying operation method suitable for dark-excavated tunnels is adopted in the embodiment of the present application.
[0019] Figure 3 It is a structural schematic diagram of the equipment used to embody the spraying construction of quick-setting rubber asphalt waterproof coating in the embodiment of the present application.
[0020] Explanation of the reference numerals: 1. primary lining concrete layer; 11. isolation layer; 12. initial waterproof coating; 13. secondary lining concrete pouring layer; 2. mobile trolley; 21. spray gun; 3. adjustment mechanism; 31. rotating motor; 32. primary adjustment component; 321. mobile motor; 3211. driving gear; 322. push-pull cylinder; 323. adjustment block; 324. mounting table; 3241. rack structure; 33. secondary adjustment component; 331. connecting rod; 332. adjustment cylinder; 334. distance sensor. DETAILED DESCRIPTION
[0021] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0022] The present application embodiment discloses a method for spraying a quick-setting rubber asphalt waterproof coating suitable for a dark tunnel. Figure 1 , including the following steps in sequence: S1: Membrane construction: Clean the existing foundation layer to ensure that the surface of the inner wall curved surface of the tunnel is clean, so as to form the original primary lining concrete surface. On the original primary lining concrete surface, multiple sheets are pre-laid along the inner tunnel curved surface of the dark excavated tunnel, and geotextiles are composited on the surface of the sheets; the sheets are high-density polyethylene sheets; S2: Waterproof construction: spray quick-setting rubber asphalt waterproof coating to form a 1.5 mm thick coating waterproof layer; perform sampling inspection on the coating waterproof layer; S3: Secondary lining concrete construction: After the coating waterproof layer passes the sampling inspection, the secondary lining concrete construction treatment is carried out on its surface.
[0023] In the above process, the pre-laid thickness of the high-density polyethylene sheet is preferably 0.5mm. The geotextile is preferably a geotextile with a density of 80g / ㎡. The use of 0.5mm thick high-density polyethylene sheets for pre-laying can provide a preliminary protective layer for the inner wall of the tunnel to prevent water penetration and erosion, while providing a stable foundation for subsequent construction. The 80g / m² geotextile is compounded on the surface of the high-density polyethylene sheet to increase the tensile strength and durability of the material. At the same time, the pore structure of the geotextile helps to drain water and prevent moisture accumulation.
[0024] When multiple sheets are pre-laid along the inner tunnel curved surface of the current dark excavated tunnel, the overlapping parts of adjacent high-density polyethylene sheets are overlapped by hot-melt welding or adhesive bonding, and the width of the overlapping edge is not less than 100 mm; and flat-head expansion bolts or nails are used for fixing at the overlapping edge. The overlapping of adjacent sheets by hot-melt welding or adhesive bonding ensures the sealing between the sheets and prevents moisture penetration as much as possible. The overlapping edge width of not less than 100 mm ensures the firmness of the overlap. The use of flat-head expansion bolts or nails for fixing also further enhances the stability of the overlap.
[0025] After the sheet is pre-laid, an image acquisition device is used to acquire images of the overlapped areas of the sheet laid on the curved surface of the tunnel in the dark excavated tunnel; an image preprocessing algorithm is used to denoise and enhance the acquired images; the Canny algorithm is used to perform edge detection on the preprocessed images to identify the edges of the overlapped areas of the sheet; the width of the overlapped edge is determined by image analysis to ensure that it is not less than 100 mm, and an alarm is issued if the detected width does not meet the requirements; the image recognition results are used to guide the fixing operation of flat head expansion bolts or nails to ensure that the fixing of the overlapped edge meets the requirements. Among them, the image acquisition device can be a high-resolution camera, the image preprocessing algorithm can include filtering, contrast enhancement and other steps, and the edge detection algorithm can be selected and optimized according to the actual application scenario.
[0026] A plurality of sheets are pre-laid along the inner tunnel curved surface base of the current dark-excavated tunnel, and the sheets are gradually unfolded and pre-laid in the order of the side wall and the arch of the inner wall of the current dark-excavated tunnel.
[0027] After the 1.5mm thick coating waterproof layer formed by spraying quick-setting rubber asphalt waterproof coating is sprayed, the coating waterproof layer is sampled and inspected to ensure the construction quality: one spot is randomly inspected every 100㎡ according to the area of the coating waterproof layer, and each spot is randomly inspected with an area of 10㎡ to be inspected, and the total number of areas to be inspected shall not be less than 3. This inspection method can ensure the uniformity and reliability of the waterproof layer. After the coating waterproof layer is inspected and qualified, the second lining concrete is constructed, which not only enhances the structural stability of the tunnel, but also provides an additional waterproof and protective layer.
[0028] The quick-setting rubber asphalt waterproof coating consists of two components, namely, agent A and agent B; wherein, agent A is a quick-setting liquid rubber waterproof and anti-seepage material emulsion, which is composed of anionic rubber latex and emulsified asphalt; wherein, the rubber latex contains chloroprene latex, styrene butadiene latex or carboxylated styrene butadiene latex, and all are water-based spray materials; agent B is a curing agent, which is an aqueous solution with a concentration of 5.0% to 30.0% prepared from metal salt electrolytes.
[0029] Through the above-mentioned operation steps of the quick-setting rubber asphalt waterproof coating spraying operation method applicable to dark-cut tunnels, the reinforcement (primary lining concrete layer), cleaning and waterproofing of the inner tunnel curved surface base of the current dark-cut tunnel can be achieved, thereby improving the structural strength and waterproof performance of the tunnel and ensuring the safe and reliable operation of the tunnel. A quick-setting rubber asphalt waterproof coating spraying operation method applicable to dark-cut tunnels in an embodiment of the present invention can ensure that the waterproof performance and structural stability are significantly improved after the treatment is implemented.
[0030] See also Figure 2 , a rendering of a quick-setting rubber asphalt waterproof coating spraying operation method suitable for a dark-excavated tunnel in an embodiment of the present invention at a construction site; the figure schematically shows a primary lining concrete layer 1, an isolation layer 11 (high-density polyethylene sheet), an initial waterproof coating 12 (quick-setting rubber asphalt waterproof coating layer) and a secondary lining concrete pouring layer 13.
[0031] See also Figure 3 The embodiment of the present application also discloses a spraying device for spraying quick-setting rubber asphalt waterproof coating in S2 waterproof construction, which includes a mobile trolley 2, a spray gun 21 and an adjustment mechanism 3. A raw material tank (not shown in the figure) for spraying raw materials is fixedly installed on the mobile trolley 2. The spray gun 21 is connected to the raw material tank, and the coating in the raw material tank is pumped to the spray gun 21. The adjustment mechanism 3 is arranged on the mobile trolley 2, which is used to automatically adjust the muzzle angle and spraying position of the spray gun 21.
[0032] See also Figure 3 The mobile trolley 2 moves in a directional manner along the length direction of the tunnel in the tunnel. The adjustment mechanism 3 includes a primary adjustment component 32 and a secondary adjustment component 33. The primary adjustment component 32 includes a mobile motor 321, a push-pull cylinder 322, an adjustment block 323 and a mounting platform 324. The mobile motor 321 is installed on the mobile trolley 2, and the mounting platform 324 slides vertically relative to the mobile trolley 2. A driving gear 3211 is coaxially connected to the output shaft of the mobile motor 321. A rack structure 3241 for meshing with the driving gear 3211 is formed on the mounting platform 324. When the driving gear 3211 rotates, the mounting platform 324 can slide vertically relative to the mobile trolley 2. The push-pull cylinder 322 is installed on the mounting platform 324, and the adjusting block 323 slides horizontally relative to the mounting platform 324 and the sliding direction is perpendicular to the length direction of the tunnel. The piston rod end of the push-pull cylinder 322 is fixedly connected to the adjusting block 323, thereby controlling the movement of the adjusting block 323, that is, with the cooperation of the moving motor 321 and the push-pull cylinder 322, the adjusting block 323 can move in two dimensions in a plane perpendicular to the length direction of the tunnel.
[0033] like Figure 3 As shown, the adjustment mechanism 3 also includes a rotating motor 31, which is mounted on the adjustment block 323, and the axial direction of its output shaft is consistent with the length direction of the tunnel; the secondary adjustment component 33 includes a connecting rod 331, an adjusting cylinder 332 and a distance sensor 334, the spray gun 21 is slidably connected to the connecting rod 331, the sliding direction is consistent with the length direction of the connecting rod 331, one end of the connecting rod 331 is fixedly connected to the output shaft of the rotating motor 31, and the length direction of the connecting rod 331 is the radial direction of the output shaft of the rotating motor 31. The cylinder body of the adjusting cylinder 332 is fixed on the connecting rod 331, the piston rod is fixedly connected to the spray gun 21, and the adjusting cylinder 332 can adjust the position of the spray gun 21 on the connecting rod 331. The distance sensor 334 is fixed beside the nozzle of the spray gun 21, which is used to detect the distance between the nozzle of the spray gun 21 and the inner wall of the tunnel, and feed back the detection result to the control system of the adjusting cylinder 332.
[0034] like Figure 3As shown, according to the profile of the tunnel cross section, the specific working mechanism of the first-level adjustment component 32 is preset, the mobile trolley 2 is centered and slowly travels in the middle of the tunnel bottom wall, the first-level adjustment component 32 first makes the output shaft of the rotating motor 31 be approximately located in the middle of the tunnel space, after starting the rotating motor 31, the connecting rod 331 and the spray gun 21 make a circular motion, and the nozzle of the spray gun 21 can be oriented to various positions of the inner wall of the tunnel, during which the first-level adjustment component 32 continuously adjusts the position of the rotating motor 31 to keep the distance between the muzzle of the spray gun 21 and the designed inner wall surface of the tunnel stable. The distance sensor 334 is located on one side of the rotation direction of the spray gun 21. During the rotation of the connecting rod 331, the distance sensor 334 detects the actual distance between the nozzle of the spray gun 21 and the inner wall of the tunnel in real time, and the regulating cylinder 332 fine-tunes the specific position of the spray gun 21 through the feedback result of the distance sensor 334, further improving the stability of the distance between the nozzle of the spray gun 21 and the inner wall of the tunnel.
[0035] The above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit them. A person skilled in the art may modify the technical solutions described in the above embodiments, or replace part or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for spraying a quick-setting rubber asphalt waterproof coating suitable for a dark tunnel, characterized in that: The steps include: S1: Film construction: On the original primary lining concrete base, multiple sheets are pre-laid along the inner tunnel curved surface of the dark excavated tunnel, and geotextiles are composited on the surface of the sheets; the sheets are high-density polyethylene sheets; S2: Waterproof construction: spray quick-setting rubber asphalt waterproof coating to form a 1.5 mm thick coating waterproof layer; perform sampling inspection on the coating waterproof layer; S3: Secondary lining concrete construction: After the coating waterproof layer passes the sampling inspection, the secondary lining concrete construction treatment is carried out on its surface.
2. The method for spraying quick-setting rubber asphalt waterproof coating suitable for dark-dig tunnels according to claim 1 is characterized in that: The pre-laid thickness of the high-density polyethylene sheet in S1 is 0.5 mm.
3. The method for spraying quick-setting rubber asphalt waterproof coating suitable for dark-dig tunnels according to claim 1 is characterized in that: The density of the geotextile in S1 is 80g / ㎡.
4. The method for spraying quick-setting rubber asphalt waterproof coating suitable for dark-dig tunnels according to claim 1 is characterized in that: In S1, when multiple sheets are pre-laid along the inner tunnel curved surface base of the dark-excavated tunnel, the overlapping parts of adjacent sheets are overlapped by hot-melt welding or adhesive bonding, and the width of the overlapping edge is not less than 100 mm; and flat-head expansion bolts or nails are used for fixing at the overlapping edges.
5. The method for spraying quick-setting rubber asphalt waterproof coating suitable for dark-dig tunnels according to claim 1 is characterized in that: When multiple sheets are pre-laid along the inner curved surface of the dark-excavated tunnel, an image acquisition device is used to acquire images of the overlapped portions of the sheets laid on the inner curved surface of the dark-excavated tunnel; an image preprocessing algorithm is used to perform denoising and enhancement processing on the acquired images; The Canny algorithm is used to perform edge detection on the preprocessed image to identify the edges of the overlapped sheets; The width of the overlap is determined by image analysis and an alarm is sounded if the detected overlap width is less than 100mm.
6. The method for spraying quick-setting rubber asphalt waterproof coating suitable for dark-dig tunnels according to claim 1 is characterized in that: In the above S1, when a plurality of sheets are pre-laid along the inner curved surface of the dark-excavated tunnel, the sheets are gradually unfolded and pre-laid in sequence along the side walls and the vault of the inner wall of the dark-excavated tunnel.
7. The method for spraying quick-setting rubber asphalt waterproof coating suitable for dark-dig tunnels according to claim 1 is characterized in that: Sampling inspection of the paint waterproof layer: according to the area of the paint waterproof layer, one spot is randomly inspected for every 100㎡, and 10㎡ of the area to be inspected is randomly inspected at each spot, and the total number of areas to be inspected is not less than 3.
8. The method for spraying quick-setting rubber asphalt waterproof coating suitable for dark-dig tunnels according to claim 1 is characterized in that: In S2, a spraying device is used to spray a quick-setting rubber asphalt waterproof coating. The spraying device comprises a mobile trolley (2), a spray gun (21) and an adjustment mechanism (3). The mobile trolley (2) moves in a directional manner along the length direction of the tunnel in the tunnel. The adjustment mechanism (3) is arranged on the mobile trolley (2) and is used to adjust the muzzle angle and spraying position of the spray gun (21).
9. The method for spraying quick-setting rubber asphalt waterproof coating suitable for dark-dig tunnels according to claim 8, characterized in that: The adjustment mechanism (3) comprises a rotating motor (31), a primary adjustment component (32) and a secondary adjustment component (33); the rotating motor (31) controls the rotation of the spray gun (21); the primary adjustment component (32) is used to control the position of the rotating motor (31) relative to the moving trolley (2); and the secondary adjustment component (33) is used to control the distance between the spray gun (21) and the rotating axis of the rotating motor (31).