Fuel gas flow regulation and control method and system for torch incandescent light
By calculating the instantaneous flow of fuel gas required by the torch and selecting the appropriate flow-limiting nozzle size, the automatic control system can achieve rapid and accurate adjustment of the fuel gas flow of the torch eternal lamp, solving the problems of difficulty and low efficiency of artificial adjustment, ensuring the stable supply of fuel gas and safe combustion reduces energy waste and environmental pollution.
Patent Information
- Application Number
- CN202310600572.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-25
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2043-05-25
AI Technical Summary
The existing torch eternal lamp fuel gas flow regulation based on artificial regulation has problems such as difficulty, low efficiency and low accuracy, which leads to waste of fuel gas usage and the inability to ignite natural gas with high hydrogen sulfide content, causing personnel injury and environmental pollution.
The instantaneous flow of fuel gas required by the natural gas instantaneous air discharge formula and the fuel gas calculation formula are obtained by obtaining the instantaneous flow rate of fuel gas required by the torch, and selecting the corresponding control branch according to the gas nozzle size relationship of the current limiting air nozzle to achieve fast and accurate flow regulation, and adopting series settings control The system and control branch, including a control valve and a flow-limiting air nozzle arranged in parallel, perform calculations using the processor to achieve automatic adjustment.
It realizes rapid and accurate adjustment of fuel gas flow, reduces operational difficulty and energy waste, ensures stable combustion of high-hydrogen sulfide natural gas, and reduces personnel injury and environmental pollution.
Smart Images

Figure CN119022322A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of gas production in high-acid gas fields, and in particular relates to a method and system for regulating the fuel gas flow rate of a torch pilot lamp. Background Art
[0002] The high-acid gas field production station uses fuel gas to supply the flare lamp to burn around the clock to ignite the high hydrogen sulfide gas (highly toxic) released from the gas station. The high hydrogen sulfide gas burns with oxygen in the air to produce carbon dioxide, sulfur dioxide (low toxicity) and water to reduce the toxicity of the burning high hydrogen sulfide gas. The pipeline containing high hydrogen sulfide gas can also be purged by switching the process to ensure the safety of the station equipment, personnel and environment.
[0003] When operators enter the site to adjust the fuel gas, they need to wear a positive pressure air respirator for safety protection. According to the station working conditions, weather, wind speed and other conditions, the fuel gas flow used by the torch pilot light is adjusted in time. However, manual adjustment can only determine whether to increase or decrease the fuel gas flow according to experience, and then slowly adjust the needle valve used to limit the fuel gas flow rate at the gas production station to achieve control of the fuel gas flow rate. Therefore, the efficiency of manual regulation is not high; and because the pipeline for the fuel gas to enter the torch pilot light is too long (about 300-400 meters), for the safety of manual adjustment, the needle valve used to limit the fuel gas flow rate at the gas production station is set at a position far away from the fuel gas inlet of the torch on the pipeline. Therefore, when adjusting the valve opening of the needle valve here, there is a delay until the valve opening affects the fuel gas inlet of the torch, which increases the difficulty of adjustment. Therefore, the process of manual adjustment of the valve is very slow, and because there is a delay in the result of the adjustment, the manual adjustment process cannot accurately control the gas flow and flow rate.
[0004] Therefore, the existing fuel gas flow control based on manual adjustment to achieve the torch long-lighting has the following problems: (1) the valve adjustment time is long and the operator's workload is high; (2) because manual adjustment is difficult to control, when the valve opening is too large, the fuel gas consumption will be too large, resulting in energy waste; if the valve opening is too small, the fuel gas flow is too small and it is blown out by wind, rain, and strong airflow, and the high hydrogen sulfide content natural gas cannot be ignited, causing personal injury and environmental pollution. Summary of the invention
[0005] The purpose of the present invention is to provide a method and system for regulating the fuel gas flow rate of a torch light, so as to solve the problem that the existing method based on artificial regulation of the fuel gas flow rate is difficult to control and difficult to regulate.
[0006] In order to solve the above technical problems, the present invention provides a method for controlling the fuel gas flow rate of a torch pilot lamp, comprising the following steps:
[0007] 1) Obtain the instantaneous flow rate of fuel gas required by the flare through the calculation formula of the instantaneous venting volume of natural gas and the calculation formula of fuel gas; the calculation formula of the instantaneous venting volume of natural gas is established based on the corresponding relationship between the gas parameters of natural gas and the parameters of the venting pipeline and the instantaneous venting volume of natural gas, and the calculation formula of fuel gas is established based on the corresponding relationship between the instantaneous venting volume of natural gas and the instantaneous flow rate of fuel gas required by the flare;
[0008] 2) according to the obtained instantaneous flow rate of fuel gas required by the torch, and the corresponding relationship between the instantaneous flow rate of fuel gas required by the torch and the nozzle size of the flow limiting nozzle required for regulation, the required nozzle size of the flow limiting nozzle is obtained;
[0009] 3) According to the required nozzle size of the flow limiting nozzle, select the branch where the flow limiting nozzle corresponding to the nozzle size is located, and control the branch to be turned on.
[0010] Its beneficial effects are: in order to avoid the problems of great difficulty in adjustment, low adjustment efficiency and low adjustment accuracy in the method of manually adjusting the fuel gas flow rate of the torch light, the required fuel gas flow rate is first obtained in the process of fuel gas volume control, and the required gas nozzle size is obtained based on the calculated fuel gas flow control system, and then the control branch where the corresponding control device is located is selected to realize the fuel gas volume control process. That is, a control system for quickly and accurately switching different flow rates is established, which has certain versatility and a control strategy that reduces workload. And the method based on the present invention only performs pre-calculation before regulation to obtain specific control information, and the control information is actually the information of the control branch being turned on or off, and based on this control branch being turned on or off, the fuel gas flow rate of the torch light can be adjusted to the required flow value. Therefore, the implementation process of the method of the present invention is simple and accurate, and the adjustment difficulty is low and the adjustment efficiency is high.
[0011] Furthermore, the calculation formula for the instantaneous natural gas release volume is: Among them, W 1 is the instantaneous discharge volume of natural gas; M is the molar mass of gas; Z 1 is the natural gas compression factor at the cross section; T 1 M is the vent inlet temperature; ach1 is the gas Mach number at the inlet section; P 1 is the vent inlet pressure; d is the inner diameter of the vent pipeline; γ is the gas isentropic index; R is the gas constant.
[0012] Furthermore, the fuel gas calculation formula is: 2 =μW 1 , where W 2 is the maximum instantaneous amount of fuel gas required by the flare; μ is the preset parameter.
[0013] Furthermore, the corresponding relationship between the instantaneous flow rate of the fuel gas required by the torch and the size of the gas nozzle of the flow limiting gas nozzle required for regulation is:
[0014]
[0015] Where D is the nozzle diameter; γ g is the relative density of natural gas; k is the thermal insulation coefficient of natural gas; p 1 Equal to the operating pressure before venting.
[0016] In order to solve the above technical problems, the present invention also provides a fuel gas flow control system for a torch ever-burning lamp, comprising a control system and a control branch arranged in series, the control branch comprising a No. 1 control device and a No. 2 control device arranged in parallel, the No. 1 control device comprising a No. 1 regulating valve and a No. 1 flow limiting gas nozzle arranged in series, the No. 2 control device comprising a No. 2 regulating valve and a No. 2 flow limiting gas nozzle arranged in series, and the gas nozzle sizes of the No. 1 flow limiting gas nozzle and the No. 2 flow limiting gas nozzle are different; the control system comprises a memory and a processor, the processor is used to execute instructions to implement the fuel gas flow control method of the torch ever-burning lamp introduced above, and achieve the same beneficial effect as the method.
[0017] Furthermore, it also includes gate valves respectively arranged at the front and rear ends of the No. 1 flow limiting air nozzle, and gate valves respectively arranged at the front and rear ends of the No. 2 flow limiting air nozzle.
[0018] The system of the present invention also has gate valves arranged before and after the No. 1 flow limiting air nozzle, and gate valves are also arranged before and after the No. 2 flow limiting air nozzle, so that when the flow limiting air nozzle fails and needs to be replaced, the front and rear valves of the corresponding flow limiting air nozzle can be closed to repair and replace the air nozzle.
[0019] Furthermore, the gate valve provided at the front end of the No. 1 flow limiting air nozzle and the gate valve provided at the front end of the No. 2 flow limiting air nozzle form a main valve, and the main valve is arranged in series between the control system and the regulation system.
[0020] In the present invention, a main valve is arranged between the control system and the regulating branch, and the main valve is used for the switch of the entire system, that is, the gate valve at the same end of the No. 1 flow limiting air nozzle and the No. 2 flow limiting air nozzle is a common main valve. Compared with setting a gate valve at the front end of the No. 1 flow limiting air nozzle and another gate valve at the front end of the No. 2 flow limiting air nozzle, this setting reduces the setting of the gate valve, thereby reducing the complexity of the system, the complexity of control is correspondingly reduced, and the cost of the system is reduced.
[0021] Furthermore, it also includes a pressure gauge and a thermometer installed on the branch where the No. 1 control device is located and the branch where the No. 2 control device is located.
[0022] In the present invention, a pressure gauge and a thermometer are provided in each branch so as to obtain the pressure and temperature data of each branch through the pressure gauge and the thermometer.
[0023] Furthermore, the control branch also includes a manual control process, which is connected in parallel with the No. 1 control device and also in parallel with the No. 2 control device, so that when manual control is required, the branch where the manual control process is located can be connected through the control system; the manual control process includes a regulating valve for controlling the fuel gas flow rate of the branch where the manual control process is located.
[0024] The system of the present invention sets the manual control process in parallel with the No. 1 control device and the No. 2 control device, that is, the No. 1 control device, the No. 2 control device and the manual control process are three parallel branches. Specifically, the manual control process includes a regulating valve for realizing manual adjustment, so that when it is necessary to manually increase the purge volume, the branch where the manual control process is located is controlled to be conductive, and the regulating valve in the manual control process is manually adjusted to make the fuel gas flow of the torch permanent lamp reach the required gas volume. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a flow chart of a calculation model of a fuel gas quantity control system of a torch light of the present invention;
[0026] Figure 2 It is a structural schematic diagram of the fuel gas quantity control system of the torch light of the present invention.
[0027] Among them, 1. Control system; 2. No. 1 regulating device; 3. Manual control process; 4. No. 2 regulating device; 5. No. 1 regulating valve; 6. No. 2 regulating valve; 7. No. 1 flow limiting air nozzle; 8. Regulating valve; 9. No. 2 flow limiting air nozzle; 10. No. 2 gate valve; 11. No. 1 gate valve; 12. Ball valve; 13. Pressure regulating system. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention is further described in detail below with reference to the accompanying drawings and embodiments.
[0029] Example of fuel gas flow control system for torch lighting:
[0030] In order to avoid the problems of difficult adjustment, low adjustment efficiency and low adjustment accuracy in manually adjusting the fuel gas flow rate of the torch light, the system in this embodiment is designed with a control system and at least two control devices including flow limiting gas nozzles, and the multiple control devices are arranged in parallel. Then, in the process of fuel gas quantity control, the required fuel gas flow rate is first obtained through the fuel gas flow demand calculation model of the control system, and the required gas nozzle size is obtained based on the calculated fuel gas flow control system, and then the control branch where the corresponding control device is located is selected to realize the fuel gas quantity control process.
[0031] like Figure 2 As shown, it is a system structure diagram of this embodiment. The system in this embodiment is arranged at the front end of the fuel gas pipeline entering the torch, and specifically includes a control system 1 and a control branch arranged in series. The control branch in this embodiment includes a No. 1 control device 2 and a No. 2 control device 4 arranged in parallel. The No. 1 control device 2 includes a No. 1 regulating valve 5 and a No. 1 flow-limiting gas nozzle 7 arranged in series. The control system 1 controls the No. 1 regulating valve 5 to realize the on-off state of the No. 1 control device and the size of the fuel gas flow when it is turned on. The No. 2 control device 4 includes a No. 2 regulating valve 6 and a No. 2 flow-limiting gas nozzle 9 arranged in series. The control system 1 controls the No. 2 regulating valve 6 to realize the on-off state of the No. 2 control device 4 and the size of the fuel gas flow when it is turned on. In addition, the gas nozzle size of the No. 1 flow-limiting gas nozzle and the No. 2 flow-limiting gas nozzle in this embodiment is different. The gas nozzle size of the No. 1 flow-limiting gas nozzle is larger than the gas nozzle size of the No. 2 flow-limiting gas nozzle. The gas nozzle size range of the No. 1 flow-limiting gas nozzle is 5-8 mm, and the gas nozzle size range of the No. 2 flow-limiting gas nozzle is 1-3 mm.
[0032] In this embodiment, the No. 1 control device 2 is used when the torch light needs to increase the gas supply. The No. 1 control device receives the control signal and switches the process to the No. 1 control device, and accurately increases the gas volume to the required flow rate through the flow-limiting gas nozzle; the No. 2 control device 4 is used for the supply of the minimum continuous gas volume for daily combustion of the torch light. That is, when the torch light control system is normally put into use, the control system 1 performs model calculation, switches the process to the No. 2 control device, the No. 2 regulating valve 6 and the No. 2 gate valve 10 are in the open state, the regulating valve 8, the No. 1 regulating valve 5, and the No. 1 gate valve 11 are in the closed state, and the fuel gas provides the torch light with the minimum continuous gas volume through the flow-limiting gas nozzle 9 and the pressure regulating system 13, ensuring the good operation of the light. When bad weather is detected and the gas volume of the ever-burning lamp needs to be adjusted quickly, the control system 1 performs model calculations and switches the process to the No. 1 control device. The No. 1 control valve 5 and the No. 1 gate valve 11 are in the open state, and the control valve 8, the No. 2 control valve 6, and the purge inlet ball valve 12 are in the closed state. Through the flow-limiting gas nozzle 7, the gas volume rises rapidly and accurately reaches a stable flow rate. The control system 1 is used to obtain the instantaneous flow rate of the fuel gas required by the torch during the venting period, and based on the instantaneous flow rate of the fuel gas required by the torch, the gas nozzle size value of the corresponding flow-limiting gas nozzle in this case is obtained, and then the corresponding control device is selected through the calculated gas nozzle size value, so that the branch where the control device is located is turned on, thereby realizing rapid and accurate control of the fuel gas flow reaching the fuel gas inlet of the torch.
[0033] The system in this embodiment also has gate valves set before and after the No. 1 flow limiting gas nozzle 7, and gate valves are also set before and after the No. 2 flow limiting gas nozzle 9, so that when the flow limiting gas nozzle fails and needs to be replaced, the front and rear valves of the corresponding flow limiting gas nozzle can be closed to repair and replace the gas nozzle. Figure 2 As shown, by setting a main valve between the control system 1 and the control branch, the main valve is used for the switch of the entire system, that is, the gate valves at the same end of the No. 1 flow-limiting air nozzle 7 and the No. 2 flow-limiting air nozzle 9 are a common main valve, the gate valve at the other end of the No. 1 flow-limiting air nozzle 7 is the No. 1 gate valve 11, and the gate valve at the other end of the No. 2 flow-limiting air nozzle 9 is the No. 2 gate valve 10. When the No. 1 flow-limiting air nozzle 7 fails, the No. 1 flow-limiting air nozzle 7 is replaced by closing the main valve and the No. 1 gate valve 11, and when the No. 2 flow-limiting air nozzle 9 fails, the No. 2 flow-limiting air nozzle 9 is replaced by closing the main valve and the No. 2 gate valve 10.
[0034] The system in this embodiment is also provided with pressure gauges (such as Figure 2 PG in) and thermometers (such as Figure 2 TI in the figure) to obtain the pressure and temperature data of each branch through the pressure gauge and thermometer.
[0035] The control branch in this embodiment also includes a manual control process 3, which is connected in parallel with the No. 1 control device and the No. 2 control device, that is, the No. 1 control device, the No. 2 control device and the manual control process are three parallel branches. Specifically, the manual control process 3 includes a regulating valve 8 for realizing manual adjustment. When it is necessary to manually increase the purge volume, the control device controls the No. 2 regulating valve 6, the No. 2 gate valve 10, the No. 1 regulating valve 5, and the No. 1 gate valve 11 to be in a closed state, and the regulating valve 8 and the inlet ball valve 12 are in an open state, so that the fuel gas enters the manual control process 3 and reaches the required gas volume through manual adjustment. By retaining the manual control branch, when manual control is required, the branch is turned on to realize corresponding control.
[0036] Based on the system of this embodiment, the process of the method for controlling the fuel gas volume of the torch light specifically includes:
[0037] 1) Obtain the required nozzle size based on real-time data;
[0038] like Figure 1 As shown, the control system 1 mainly selects the size of the flow-limiting gas nozzle according to the gas nozzle and the fuel gas flow demand model.
[0039] The venting of natural gas needs to take into account the frictional adiabatic during the venting process, and the hydraulic calculation should use the Fano equation for the frictional adiabatic one-dimensional flow of compressible fluid. Therefore, in this embodiment, the instantaneous venting volume and fuel gas calculation formula are first used to calculate the instantaneous venting volume of natural gas:
[0040]
[0041] Among them, W 1 is the instantaneous discharge volume of natural gas, in kg / s; M is the molar mass of gas, in kg / mol; Z 1 is the natural gas compression factor at the cross section; T 1 is the vent inlet temperature, in K; M ach1 is the gas Mach number at the inlet cross section, which is 0.5 in this embodiment; P1 is the venting inlet pressure, in MPa; d is the inner diameter of the venting pipeline, in mm; γ is the gas isentropic index, which is 1.23 in this embodiment; R is the gas constant, in kJ / (kg·K); where M is based on the high-sulfur natural gas composition, and is 21.27 in this embodiment; Z 1 The GERG-2008 equation was used to calculate the value of 0.82 under high-sulfur natural gas composition; R was 466.19 according to the high-sulfur natural gas composition;
[0042] Secondly, according to the instantaneous flow rate W of fuel gas required by the flare during the venting period 2 The calculation is as follows:
[0043] W2 =μW 1 ;
[0044] Wherein μ is a preset parameter, and the value of μ is different under different weather conditions to achieve correction of the fuel gas volume.
[0045] The specific values of μ used in this embodiment are shown in Table 1 below:
[0046] Table 1
[0047] Serial number Sunny weather Strong wind below level 5 Strong winds above level 5 μ <![CDATA[1×10 -4 ]]> <![CDATA[5×10 -4 ]]> <![CDATA[8×10 -4 ]]>
[0048] Finally, use the nozzle size calculation formula to calculate the nozzle size:
[0049]
[0050] Where D is the nozzle diameter, in mm; W 2 Z is the maximum instantaneous amount of fuel gas required by the flare; 1 is the natural gas compression factor at the cross section; T 1 is the vent inlet temperature, in K; γ g is the relative density of natural gas, and the value of high-sulfur natural gas is 0.74; k is the adiabatic coefficient of natural gas, and the value of polyatomic natural gas containing hydrogen sulfide is 1.3; W 1 is the instantaneous gas volume at the initial venting, i.e. p 1 Equal to the operating pressure before venting.
[0051] 2) According to the acquired size of the air nozzle, one of the control device No. 1 and the control device No. 2 is selected to be turned on, and the other is controlled to be blocked, that is, the system automatically selects a flow-limiting air nozzle of appropriate size, and transmits the signal to the valve through the control system to realize rapid switching of the process. Specifically, when the air nozzle size calculated in step 1) does not exceed the set value, the control device No. 2 is selected to be turned on, and the control device No. 1 is controlled to be blocked; when the air nozzle size calculated in step 1) exceeds the set value, the control device No. 1 is selected to be turned on, and the control device No. 2 is controlled to be blocked.
[0052] The system design of this embodiment is simple and easy to operate. Through the torch permanent lamp control system, it solves the problems in the prior art such as inaccurate fuel gas quantity control, fuel gas energy waste or too small fuel gas flow rate, which is blown out by wind, rain and strong airflow and cannot ignite high hydrogen sulfide natural gas, causing personal injury and environmental pollution, thereby achieving the effect of reducing control time, low labor intensity, energy saving and environmental protection.
[0053] Embodiment of the method for controlling the fuel gas flow rate of the torch light:
[0054] The method in this embodiment obtains the instantaneous flow rate of fuel gas required by the torch through the calculation formula of the instantaneous gas release volume of natural gas and the calculation formula of fuel gas; obtains the required nozzle size of the flow limiting nozzle according to the obtained instantaneous flow rate of fuel gas required by the torch and the corresponding relationship between the instantaneous flow rate of fuel gas required by the torch and the nozzle size of the flow limiting nozzle required for regulation; selects the branch where the flow limiting nozzle corresponding to the nozzle size is located according to the required nozzle size of the flow limiting nozzle, and controls the conduction of this branch. Specifically, the fuel gas flow rate control method of the torch ever-burning lamp can be implemented by the fuel gas flow rate control system of the torch ever-burning lamp, and the process of the fuel gas flow rate control system of the torch ever-burning lamp to implement the fuel gas flow rate control method of the torch ever-burning lamp has been introduced in detail in the embodiment of the fuel gas flow rate control system of the torch ever-burning lamp, which will not be repeated here.
[0055] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. The patent protection scope of the present invention shall be based on the claims. All equivalent structural changes made using the contents of the description and drawings of the present invention should also be included in the protection scope of the present invention.
Claims
1. A method for controlling the fuel gas flow rate of a torch light, characterized in that: The steps include: 1) Obtain the instantaneous flow rate of fuel gas required by the flare through the calculation formula of the instantaneous venting volume of natural gas and the calculation formula of fuel gas; the calculation formula of the instantaneous venting volume of natural gas is established based on the corresponding relationship between the gas parameters of natural gas and the parameters of the venting pipeline and the instantaneous venting volume of natural gas, and the calculation formula of fuel gas is established based on the corresponding relationship between the instantaneous venting volume of natural gas and the instantaneous flow rate of fuel gas required by the flare; 2) according to the obtained instantaneous flow rate of fuel gas required by the torch and the corresponding relationship between the instantaneous flow rate of fuel gas required by the torch and the nozzle size of the flow limiting nozzle required for regulation, the required nozzle size of the flow limiting nozzle is obtained; 3) According to the required nozzle size of the flow limiting nozzle, select the branch where the flow limiting nozzle corresponding to the nozzle size is located, and control the branch to be turned on.
2. The method for controlling the fuel gas flow rate of a torch pilot lamp according to claim 1, characterized in that: The calculation formula for the instantaneous natural gas release volume is: Where W1 is the instantaneous discharge volume of natural gas; M is the gas molar mass; Z1 is the natural gas compression factor at the cross section; T1 is the discharge inlet temperature; M ach1 is the gas Mach number at the inlet section; P1 is the venting inlet pressure; d is the inner diameter of the venting pipeline; γ is the gas isentropic index; R is the gas constant.
3. The method for controlling the fuel gas flow rate of a torch pilot lamp according to claim 2, characterized in that: The fuel gas calculation formula is: W2=μW1, where W2 is the maximum instantaneous amount of fuel gas required by the torch; μ is a preset parameter.
4. The method for controlling the fuel gas flow rate of a torch pilot lamp according to claim 3, characterized in that: The corresponding relationship between the instantaneous flow rate of the fuel gas required by the torch and the size of the flow-limiting gas nozzle required for regulation is: Where D is the nozzle diameter; γ g is the relative density of natural gas; k is the thermal insulation coefficient of natural gas; 1 is equal to the operating pressure before venting.
5. A fuel gas flow control system for a torch light, characterized in that: It comprises a control system and a control branch arranged in series, the control branch comprises a No. 1 control device and a No. 2 control device arranged in parallel, the No. 1 control device comprises a No. 1 regulating valve and a No. 1 flow limiting gas nozzle arranged in series, the No. 2 control device comprises a No. 2 regulating valve and a No. 2 flow limiting gas nozzle arranged in series, and the gas nozzle sizes of the No. 1 flow limiting gas nozzle and the No. 2 flow limiting gas nozzle are different; the control system comprises a memory and a processor, the processor is used to execute instructions to implement the fuel gas flow control method of the torch permanent lamp as described in any one of claims 1 to 4.
6. The fuel gas flow control system of the torch pilot lamp according to claim 5, characterized in that: It also includes gate valves respectively arranged at the front and rear ends of the No. 1 flow limiting air nozzle, and gate valves respectively arranged at the front and rear ends of the No. 2 flow limiting air nozzle.
7. The fuel gas flow control system of the torch pilot lamp according to claim 6, characterized in that: The gate valve arranged at the front end of the No. 1 flow limiting air nozzle and the gate valve arranged at the front end of the No. 2 flow limiting air nozzle form a main valve, and the main valve is arranged in series between the control system and the regulation system.
8. The fuel gas flow control system of the torch pilot lamp according to claim 5, characterized in that: It also includes pressure gauges and thermometers installed on the branch where the No. 1 control device is located and the branch where the No. 2 control device is located.
9. The fuel gas flow control system of the torch pilot lamp according to claim 5, characterized in that: The control branch also includes a manual control process, which is connected in parallel with the No. 1 control device and the No. 2 control device, so that when manual control is required, the branch where the manual control process is located can be connected through the control system; the manual control process includes a regulating valve for controlling the fuel gas flow rate of the branch where the manual control process is located.
Citation Information
Patent Citations
Three-phase separator, oil and gas well testing and measuring system and combustion control method of oil and gas well testing and measuring system
CN107355208A
Intelligent ignition device and method for radiation tube nozzle
CN109357283A
Gas consumption detection device
CN207050796U
Automatic control system for flame size of ground torch incandescent light
CN217329831U
Regulating or control device for ignition gas