Intelligent management method and system for monitoring equipment of meadow

By calculating the abnormality value and equipment quality data of the enclosure status, intelligently managing grassland monitoring equipment has solved the problem of inflexible management in the existing technology, improved resource utilization and management efficiency, and ensured the health of grassland ecology.

CN119025826AInactive Publication Date: 2024-11-26INST OF ANIMAL HUSBANDRY & VETERINARY MEDICINE ANHUI ACAD OF AGRI SCI
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411128044.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The management of existing grassland monitoring equipment lacks flexibility and cannot be intelligently managed based on the actual situation of the enclosure, resulting in waste of resources and inefficient management.

Method used

By obtaining the characteristic data of the enclosure status and historical data, calculating the abnormality degree value, dividing the enclosure status as abnormal or normal, determining the type and number of monitoring equipment opening according to the abnormal feature type and equipment quality data, and realizing intelligent management.

Benefits of technology

It improves the flexibility of monitoring and management, saves resources, improves management efficiency, and can intelligently turn on monitoring equipment according to actual conditions to ensure the health of livestock and the long-term health of grassland ecology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119025826A_ABST
    Figure CN119025826A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent management method and system for monitoring equipment of a meadow, and particularly relates to the technical field of meadow management. The state of a target sub-colony house is divided into an abnormal state and a normal state; judging the starting type and the starting number of the monitoring equipment according to the actual colony house state characteristic data, obtaining the quality data of each piece of required monitoring equipment of the target sub-colony house, obtaining a quality coefficient according to the quality data, determining the monitoring equipment needing to be started in the target sub-colony house according to the quality coefficient, and starting the target sub-colony house according to the determined monitoring equipment. According to the embodiment of the invention, the monitoring equipment in the breeding house can be intelligently started and managed according to the actual state in the breeding house, so that the monitoring management flexibility of the breeding house is relatively high, resources are saved, and the management efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of grassland management, and in particular to an intelligent management method and system for grassland monitoring equipment. Background Art

[0002] In order to ensure the sustainable development of grassland ecosystems and the economic benefits of grassland animal husbandry, intelligent grassland management becomes particularly important, especially the monitoring of livestock on grasslands. By monitoring livestock on grasslands, we can timely discover and respond to livestock health problems, improve production efficiency, and prevent livestock from being lost or stolen. At the same time, these monitoring data can help optimize grazing strategies, prevent overuse and degradation of grasslands, ensure the long-term health of grassland ecosystems, and protect the ecological balance of grasslands.

[0003] Generally speaking, when monitoring livestock in pens, it is usually done by setting up monitoring equipment with different functions. For example, high-definition cameras are installed to monitor the behavioral details of livestock, such as eating, drinking, and resting; audio monitoring cameras are installed to monitor abnormal sounds in the pens; thermal imaging cameras are installed to monitor livestock health problems, such as fever or inflammation, and safety hazards such as overheating of detection equipment. By installing different types of monitoring equipment, livestock in the pens can be intelligently monitored;

[0004] Generally speaking, when monitoring livestock in pens, different types of monitoring equipment are turned on to monitor the livestock in the pens. The monitoring equipment in the pens cannot be turned on and managed intelligently according to the actual status in the pens, resulting in a lack of flexibility in monitoring management, waste of resources and low management efficiency. Summary of the invention

[0005] The purpose of the present invention is to solve the problem and to propose an intelligent management method and system for grassland monitoring equipment.

[0006] In a first aspect of the present invention, a method for intelligent management of grassland monitoring equipment is first proposed, the method comprising the following steps:

[0007] Acquire the state characteristics of the target pen through the currently running monitoring equipment, match the state characteristic data of the pen with the historical state characteristic data of the pen, determine the first abnormality degree value of the target pen, and divide the state of the target pen into an abnormal state and a normal state according to the first abnormality degree value of the target pen;

[0008] For a target stable in an abnormal state, obtaining an abnormal feature type and a second abnormality degree value corresponding to each abnormal feature type from the corresponding stable state feature data in a preset manner;

[0009] Determine the required monitoring equipment activation type and the activation quantity of each activation type of monitoring equipment for the target enclosure according to the abnormal feature type of the target enclosure and the second abnormality degree value corresponding to each abnormal feature type;

[0010] The quality data of each required monitoring device of the target enclosure is obtained, the quality coefficient is obtained according to the quality data, the monitoring device that needs to be turned on in the target enclosure is determined according to the quality coefficient, and the monitoring device of the target enclosure is managed; the monitoring device quality data includes the device current stability coefficient and the usage time coefficient.

[0011] Optionally, matching the pen state characteristic data with the historical pen state characteristic data to determine a first abnormality degree value of the target pen, and dividing the state of the target pen into an abnormal state and a normal state according to the first abnormality degree value of the target pen includes:

[0012] Preprocessing the pen status characteristic data and historical pen normal status characteristic data;

[0013] Construct a distance matrix where each element is the distance between a data point and a historical data point;

[0014] Use dynamic programming algorithm to calculate the shortest path in the distance matrix to find the best match between the data sequence and the historical data sequence;

[0015] Align the data sequence with the historical data sequence based on the calculated shortest path;

[0016] According to the aligned data sequence and the historical data sequence, the similarity between them is calculated, and the similarity is used as the first abnormality degree value of the target enclosure;

[0017] Comparing the first abnormality level value of the target enclosure with a preset first abnormality level threshold, and if the first abnormality level value is not less than the preset first abnormality level threshold, classifying the target enclosure as a normal state;

[0018] If the first abnormality level value is less than the preset first abnormality level threshold, the target enclosure is classified as a normal state.

[0019] Optionally, for a target stable in an abnormal state, obtaining an abnormal feature type and a second abnormality degree value corresponding to each abnormal feature type by using corresponding stable state feature data in a preset manner includes:

[0020] The processing steps of the default method are:

[0021] The current state characteristic data of the target pen is defined as the input item of the fuzzy rule and classified into the fuzzy set;

[0022] The abnormal feature type and the second abnormal degree value corresponding to each abnormal feature type are divided into different fuzzy sets as output variables;

[0023] Formulate fuzzy rules to describe the influence of input variables on different output variables;

[0024] Fuzzy reasoning is performed according to fuzzy rules to output the abnormal feature type of the target enclosure and the second abnormal degree value corresponding to each abnormal feature type.

[0025] Optionally, the method for obtaining the device current stability coefficient is:

[0026] Obtain the actual current value of each monitoring device at different times during the preset time period, and calibrate the current value as I 实 z , z represents the actual current value sequence number of each monitoring device at different times in the preset time period, z∈[1,p], p is the actual current value I obtained 实 z , and p is a positive integer;

[0027] Calculate the current value I within the preset time period 实 z The standard deviation is used as the device current stability coefficient of the monitoring device. The calculation formula is:

[0028]

[0029] in, The average value of the actual current value of each monitoring device at different times in the preset time period is obtained by the expression: Optionally

[0030] Optionally, the method for obtaining the usage time coefficient is:

[0031] Obtain the total usage time, preset usable time, average maintenance interval, and the time interval from the current time to the last maintenance of each monitoring device. According to the total usage time, preset usable time, average maintenance interval, and the time interval from the current time to the last maintenance, the usage time coefficient of the monitoring device is obtained. The calculation formula is:

[0032]

[0033] Where Dsw is the usage time coefficient, gd, fd, kl, and kh are the total usage time of the monitoring equipment, the preset usable time, the average maintenance interval, and the time interval from the current time to the last maintenance, respectively, and a1 and a2 are the preset influencing factors.

[0034] Optionally, the method of obtaining the quality coefficient according to the quality data includes:

[0035] The equipment current stability coefficient and the usage time coefficient are normalized, and the quality coefficient is obtained according to the normalized equipment current stability coefficient and the usage time coefficient.

[0036] Optionally, the monitoring equipment that needs to be turned on in the target enclosure determined according to the quality coefficient includes:

[0037] Determine the required monitoring equipment activation type and activation quantity of each activation type of monitoring equipment in the target enclosure as the preset activation type and the corresponding preset activation quantity;

[0038] The monitoring devices corresponding to each opening type are opened in the order of the quality coefficient from small to large. When the number of the monitoring devices corresponding to each opening type that are opened reaches the corresponding preset opening number, the opening of other monitoring devices of the same type is stopped;

[0039] Turn on all the required monitoring equipment types and corresponding numbers of monitoring equipment in the target enclosure to monitor the target enclosure.

[0040] In a second aspect of the present invention, an intelligent management system for monitoring equipment of a grassland is provided, the system comprising:

[0041] Classification module: obtain the pen status characteristics of the target pen through the currently running monitoring equipment, match the pen status characteristic data with the historical pen status characteristic data, determine the first abnormality degree value of the target pen, and classify the state of the target pen into an abnormal state and a normal state according to the first abnormality degree value of the target pen;

[0042] Abnormal module: for target pens in abnormal state, obtain the abnormal characteristic type and the second abnormal degree value corresponding to each abnormal characteristic type through the corresponding pen state characteristic data in a preset manner;

[0043] Equipment activation module: determining the required monitoring equipment activation type of the target enclosure and the number of monitoring equipment activations of each activation type according to the abnormal feature type of the target enclosure and the second abnormality degree value corresponding to each abnormal feature type;

[0044] Management module: obtain the quality data of each required monitoring device of the target pen, obtain the quality coefficient according to the quality data, determine the monitoring device that needs to be turned on in the target pen according to the quality coefficient, and manage the monitoring device of the target pen; the monitoring device quality data includes the equipment current stability coefficient and the usage time coefficient.

[0045] Beneficial effects of the present invention:

[0046] The present invention proposes an intelligent management method and system for grassland monitoring equipment. The method divides the status of a target enclosure into an abnormal status and a normal status. For a target enclosure in an abnormal status, the activation type and activation quantity of the monitoring equipment are determined according to actual enclosure status characteristic data, and corresponding management is performed. In this way, the activation management of the monitoring equipment in the enclosure can be intelligently performed according to the actual status in the enclosure, thereby making the monitoring management of the enclosure more flexible, saving resources and improving management efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] The present invention will be further described below in conjunction with the accompanying drawings.

[0048] Figure 1 A flowchart of a method for intelligent management of grassland monitoring equipment provided by the present invention;

[0049] Figure 2 A framework diagram of an intelligent management system for grassland monitoring equipment provided by the present invention. DETAILED DESCRIPTION

[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0051] Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without making any creative work shall fall within the scope of protection of the present invention.

[0052] The embodiment of the present invention provides a method for intelligent management of grassland monitoring equipment. Figure 1 , Figure 1 A flowchart of a method for intelligent management of grassland monitoring equipment provided by an embodiment of the present invention. The method comprises the following steps:

[0053] Acquire the state characteristics of the target pen through the currently running monitoring equipment, match the state characteristic data of the pen with the historical state characteristic data of the pen, determine the first abnormality degree value of the target pen, and divide the state of the target pen into an abnormal state and a normal state according to the first abnormality degree value of the target pen;

[0054] For a target stable in an abnormal state, obtaining an abnormal feature type and a second abnormality degree value corresponding to each abnormal feature type from the corresponding stable state feature data in a preset manner;

[0055] Determine the required monitoring equipment activation type and the activation quantity of each activation type of monitoring equipment for the target enclosure according to the abnormal feature type of the target enclosure and the second abnormality degree value corresponding to each abnormal feature type;

[0056] The quality data of each required monitoring device of the target enclosure is obtained, the quality coefficient is obtained according to the quality data, the monitoring device that needs to be turned on in the target enclosure is determined according to the quality coefficient, and the monitoring device of the target enclosure is managed.

[0057] It should be noted that the currently running monitoring equipment refers to various types of monitoring equipment that have been turned on and in use inside the target pen, such as a high-definition camera, an audio monitoring device, a thermal imaging camera, etc.; these devices are pre-set by professional staff at the beginning, and can cover the monitoring of the pens more comprehensively, and can provide some more comprehensive data on the status monitoring inside the pens for subsequent analysis.

[0058] Based on the intelligent management method of grassland monitoring equipment provided by the embodiment of the present invention, the state of the target pen is divided into abnormal state and normal state in the above manner. For the target pen in abnormal state, the activation type and activation quantity of the monitoring equipment are determined according to the actual pen state characteristic data, and corresponding management is performed. In this way, the monitoring equipment in the pen can be intelligently activated and managed according to the actual state in the pen, so that the monitoring management of the pen is more flexible, resources are saved and management efficiency is improved.

[0059] In one embodiment, matching the pen state feature data with the historical pen state feature data to determine the first abnormality degree value of the target pen, and dividing the state of the target pen into an abnormal state and a normal state according to the first abnormality degree value of the target pen includes:

[0060] Preprocessing the pen status characteristic data and historical pen normal status characteristic data;

[0061] Construct a distance matrix where each element is the distance between a data point and a historical data point;

[0062] Use dynamic programming algorithm to calculate the shortest path in the distance matrix to find the best match between the data sequence and the historical data sequence;

[0063] Align the data sequence with the historical data sequence based on the calculated shortest path;

[0064] According to the aligned data sequence and the historical data sequence, the similarity between them is calculated, and the similarity is used as the first abnormality degree value of the target enclosure;

[0065] Comparing the first abnormality level value of the target enclosure with a preset first abnormality level threshold, and if the first abnormality level value is not less than the preset first abnormality level threshold, classifying the target enclosure as a normal state;

[0066] If the first abnormality level value is less than the preset first abnormality level threshold, the target enclosure is classified as a normal state.

[0067] It should be noted that the pen status characteristic data in the target pen may include data such as livestock behavior, diet, rest, exercise, sound, body temperature, etc. within the current time period; the current time period is a time period set by professionals, and is used to monitor the pen status characteristic data in the target pen within this time period, and the time period is set relatively evenly, and measures taken on the livestock in the pen will not be taken late due to a long time period, nor will the pen status monitoring data in the target pen be more accidental due to a short time period; the historical pen normal status characteristic data includes the same type of data over a period of time in the past, and these data have been judged by professionals, reflecting that the status of the pen is normal.

[0068] It should be noted that the preprocessed data and historical data:

[0069] First, the pen status characteristic data in the target pen and the historical pen normal status characteristic data are preprocessed to ensure the consistency and comparability of the data. The preprocessing steps may include data cleaning, outlier processing, data smoothing or normalization, etc.

[0070] Construct a distance matrix: Use the selected distance measurement method (such as Euclidean distance, Manhattan distance, or dynamic time warping distance, etc.) to calculate the distance between each data point and the historical data point and construct a distance matrix. Let the distance matrix be, where represents the distance between the data point and the historical data point.

[0071] Dynamic programming to calculate the shortest path: Use dynamic programming algorithms (such as dynamic time warping, DTW) to calculate the shortest path in the distance matrix. Dynamic time warping allows time alignment in local areas and finds the best matching path between the data series and the historical data series.

[0072] Align the data sequence with the historical data sequence: Align the data sequence with the historical data sequence based on the shortest path obtained by the dynamic programming algorithm. The alignment operation will ensure that the corresponding data points on the time axis can be used for subsequent similarity calculations.

[0073] Calculate similarity: Calculate the similarity between the aligned data sequence and the historical data sequence. Various methods can be used to calculate similarity, such as cosine similarity, correlation coefficient, or other distance measurement methods based on the aligned sequence.

[0074] Compare similarity with threshold: Finally, compare the calculated similarity with the preset similarity threshold. If the similarity is greater than the set threshold, it is considered that the pen status feature data is within the normal range; if the similarity is less than or equal to the threshold, it indicates that the pen status of the target pen is abnormal.

[0075] In one implementation method, through the above method, data processing, distance calculation, dynamic programming and similarity analysis methods are combined to calculate the pen status characteristic data in the current target pen and the historical pen normal status characteristic data, calculate their similarity, and divide the current target pen into a normal state or an abnormal state according to the similarity. In this way, the abnormal situation of the target pen can be effectively evaluated and managed, and the health or behavioral abnormalities of livestock in the pen can be discovered and responded to in time, which helps to improve the efficiency of grassland management and the quality of livestock production.

[0076] It should be noted that if the target enclosure is in a normal state, the previously operated monitoring equipment is still used to monitor the corresponding target enclosure.

[0077] In one embodiment, for a target stable in an abnormal state, obtaining an abnormal feature type and a second abnormality degree value corresponding to each abnormal feature type by using the corresponding stable state feature data in a preset manner includes:

[0078] The processing steps of the default method are:

[0079] The current state characteristic data of the target pen is defined as the input item of the fuzzy rule and classified into the fuzzy set;

[0080] The abnormal feature type and the second abnormal degree value corresponding to each abnormal feature type are divided into different fuzzy sets as output variables;

[0081] Formulate fuzzy rules to describe the influence of input variables on different output variables;

[0082] Fuzzy reasoning is performed according to fuzzy rules to output the abnormal feature type of the target enclosure and the second abnormal degree value corresponding to each abnormal feature type.

[0083] It should be noted that the processing steps of the preset method may be:

[0084] Input variables and fuzzy sets: Assume that the monitored barn status characteristic data includes three variables:

[0085] Nutritional problems; health problems; behavioral abnormalities; the second abnormality level value of each abnormal characteristic type can be divided into: mild, moderate, severe;

[0086] Formulate fuzzy rules: Fuzzy rules can describe the impact of input variables on output variables. For example:

[0087] If eating times are low and water intake is low and exercise times are low, then there is a serious nutrition problem.

[0088] If eating times are moderate and drinking times are moderate and exercise times are moderate, then health problems are moderate.

[0089] If the eating times are high and the drinking times are high and the exercise times are high, the behavioral abnormalities are mild.

[0090] Fuzzy reasoning: Through fuzzy reasoning, the abnormal feature type of the target enclosure and the second abnormality degree value corresponding to each abnormal feature type can be determined.

[0091] For example, suppose there are the following pen status characteristic data: eating time: 10 minutes; drinking water times: 2 times; exercise time: 5 minutes (Low);

[0092] 1. Fuzzification of input variables:

[0093] According to the input data, the variables are classified into fuzzy sets: eating time: low (Low); drinking water frequency: medium (Medium); exercise time: low (Low)

[0094] 2. Fuzzy rule matching: According to the fuzzy rules: if the eating time is low and the drinking time is medium and the exercise time is low, the nutrition problem is medium.

[0095] 3. Fuzzy reasoning: Through fuzzy reasoning, we can get: the abnormal feature type is nutritional problem, and the corresponding second abnormality level value is medium.

[0096] Similarly, other abnormal feature types and corresponding second abnormality degree values, such as health problems, behavioral abnormalities, environmental problems, etc., can also be output in the same manner, and specific examples will not be given here for explanation.

[0097] In one implementation, through the above method, by utilizing fuzzy logic to obtain the abnormal feature type of the target pen and the second abnormality degree value corresponding to each abnormal feature type, this method can help grassland managers more accurately identify and handle abnormal situations in the pen, thereby improving management efficiency and livestock health levels.

[0098] In one embodiment, it should be noted that the required monitoring equipment types and the number of monitoring equipment of each type to be turned on for the target pen can be determined based on the abnormal feature type of the target pen and the second abnormality degree value corresponding to each abnormal feature type. For example, if a nutritional problem is detected and the degree is serious, multiple high-definition cameras need to be turned on to observe the livestock's eating behavior and intake in detail; if a health problem is detected and the degree is serious, multiple thermal imaging cameras need to be turned on to monitor the livestock's body temperature and physiological indicators in real time; for behavioral abnormalities, multiple panoramic cameras and audio monitoring equipment may need to be turned on to comprehensively capture and analyze the livestock's behavior and sounds. Secondly, the number of monitoring equipment is determined based on the pen area and the spatial distribution of abnormalities to ensure that all areas that need to be monitored are covered to avoid monitoring blind spots. In this way, the monitoring equipment can be intelligently managed and turned on according to the actual pen status, so as to achieve accurate monitoring and effective management of the livestock in the pen.

[0099] In one embodiment, the quality data of each required monitoring device in the target enclosure is obtained, and the quality coefficient is obtained according to the quality data. The monitoring device quality data includes the device current stability coefficient and the use time coefficient. The method for obtaining the device current stability coefficient is:

[0100] Obtain the actual current value of each monitoring device at different times during the preset time period, and calibrate the current value as I 实 z , z represents the actual current value sequence number of each monitoring device at different times in the preset time period, z∈[1,p], p is the actual current value I obtained 实 z , and p is a positive integer;

[0101] Calculate the current value I within the preset time period 实 z The standard deviation is used as the device current stability coefficient of the monitoring device. The calculation formula is:

[0102]

[0103] in, The average value of the actual current value of each monitoring device at different times in the preset time period is obtained by the expression:

[0104] It should be noted that the preset time period is set by professionals according to actual conditions and is not specifically limited; in addition, the actual current value of each monitoring device at different times during the preset time period can be directly obtained by retrieving the historical operation record of the monitoring device, or by other methods, which are not specifically limited;

[0105] It should be noted that the relationship between the device current stability coefficient and the quality of the monitoring device is that when the device current stability coefficient is smaller, the current of the monitoring device is more stable, and the quality of the monitoring device is better; when the device current stability coefficient is larger, the current of the monitoring device is more unstable, and the quality of the monitoring device is worse.

[0106] In one implementation, through the above method, the current stability coefficient of the monitoring device can be obtained more accurately, and the quality of the monitoring device can be evaluated more accurately.

[0107] In one embodiment, the method for obtaining the usage time coefficient is:

[0108] Obtain the total usage time, preset usable time, average maintenance interval, and the time interval from the current time to the last maintenance of each monitoring device. According to the total usage time, preset usable time, average maintenance interval, and the time interval from the current time to the last maintenance, the usage time coefficient of the monitoring device is obtained. The calculation formula is:

[0109]

[0110] Where Dsw is the usage time coefficient, gd, fd, kl, kh are the total usage time of the monitoring equipment, the preset usable time, the average maintenance interval time and the time interval from the current time to the last maintenance, respectively, and a1 and a2 are the preset influencing factors;

[0111] Methods for obtaining quality coefficients based on quality data include:

[0112] The equipment current stability coefficient and the usage time coefficient are normalized, and the quality coefficient is obtained according to the normalized equipment current stability coefficient and the usage time coefficient.

[0113] It should be noted that a1 and a2 are set by professionals according to actual conditions and are not limited to any specific conditions.

[0114] It should be noted that, for example, the present invention can use the following formula to calculate the quality coefficient, and the calculation expression is:

[0115]

[0116] In the formula, Bvy is the quality coefficient, Wax is the equipment current stability coefficient, Dsw is the use time coefficient, f1 and f2 are the proportional coefficients of the equipment current stability coefficient and the use time coefficient, and f1 and f2 are both greater than 0;

[0117] It should be noted that the total usage time, average maintenance interval and the time interval from the current time to the last maintenance of each monitoring device can be obtained based on the maintenance log of the monitoring device, or other methods, which are not specifically limited; in addition, the preset usable time can be obtained based on the factory log of the monitoring device, or other methods, which are not specifically limited.

[0118] It should be noted that the relationship between the usage time coefficient and the quality of the monitoring equipment is that when the usage time coefficient is smaller, the quality of the monitoring equipment is better; when the equipment current stability coefficient is larger, the quality of the monitoring equipment is worse.

[0119] It should be noted that when the quality coefficient of the monitoring device is smaller, it means that the quality of the monitoring device is better, and when the quality coefficient of the monitoring device is larger, it means that the quality of the monitoring device is worse.

[0120] It should be noted that selecting the equipment current stability coefficient and the usage time coefficient to determine the quality of the monitoring equipment has the following benefits: the equipment current stability coefficient can directly reflect the working status of the equipment and the stability of its electrical performance, avoiding monitoring errors and equipment damage due to current fluctuations; the usage time coefficient provides a comprehensive assessment of the equipment's life and maintenance status, predicts the equipment's reliability and future failure risks, and can comprehensively and accurately reflect the actual quality and stability of the monitoring equipment, thereby ensuring the effective operation of the equipment and the long-term stability of the monitoring system in a complex monitoring environment.

[0121] In one embodiment, the monitoring equipment that needs to be turned on in the target enclosure is determined according to the quality coefficient, including:

[0122] Determine the required monitoring equipment activation type and activation quantity of each activation type of monitoring equipment in the target enclosure as the preset activation type and the corresponding preset activation quantity;

[0123] The monitoring devices corresponding to each opening type are opened in the order of the quality coefficient from small to large. When the number of the monitoring devices corresponding to each opening type that are opened reaches the corresponding preset opening number, the opening of other monitoring devices of the same type is stopped;

[0124] Turn on all the required monitoring equipment types and corresponding numbers of monitoring equipment in the target enclosure to monitor the target enclosure.

[0125] In one embodiment, after determining the on status of the monitoring equipment of each target pen, the monitoring equipment of the target pen is managed in the same manner, so that the management of the monitoring equipment of the target pen is flexible enough to timely and accurately detect the status of the livestock in the pen, and take relevant measures in a timely manner, so that the management efficiency of the livestock in the pen is higher.

[0126] In one implementation, through the above method, the monitoring equipment in the enclosure can be intelligently turned on and managed according to the actual status in the enclosure, so that the monitoring and management of the enclosure is more flexible, saving resources and improving management efficiency.

[0127] Based on the same inventive concept, the present invention also provides an intelligent management system for monitoring equipment of grassland. Figure 2 , Figure 2 A schematic diagram of the structure of an intelligent management system for monitoring equipment of a grassland provided by an embodiment of the present invention, the system comprising:

[0128] Classification module: obtain the pen status characteristics of the target pen through the currently running monitoring equipment, match the pen status characteristic data with the historical pen status characteristic data, determine the first abnormality degree value of the target pen, and classify the state of the target pen into an abnormal state and a normal state according to the first abnormality degree value of the target pen;

[0129] Abnormal module: for target pens in abnormal state, obtain the abnormal characteristic type and the second abnormal degree value corresponding to each abnormal characteristic type through the corresponding pen state characteristic data in a preset manner;

[0130] Equipment activation module: determining the required monitoring equipment activation type of the target enclosure and the number of monitoring equipment activations of each activation type according to the abnormal feature type of the target enclosure and the second abnormality degree value corresponding to each abnormal feature type;

[0131] Management module: obtain the quality data of each required monitoring device in the target pen, obtain the quality coefficient based on the quality data, determine the monitoring equipment that needs to be turned on in the target pen based on the quality coefficient, and manage the monitoring equipment in the target pen.

[0132] An intelligent management system for grassland monitoring equipment provided by an embodiment of the present invention divides the status of a target pen into an abnormal status and a normal status. For a target pen in an abnormal status, the activation type and activation quantity of the monitoring equipment are determined according to actual pen status characteristic data, and corresponding management is performed. In this way, the activation management of the monitoring equipment in the pen can be intelligently performed according to the actual status in the pen, thereby making the monitoring management of the pen more flexible, saving resources and improving management efficiency.

[0133] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A method for intelligent management of grassland monitoring equipment, characterized in that: The method comprises the following steps: Acquire the state characteristics of the target pen through the currently running monitoring equipment, match the state characteristic data of the pen with the historical state characteristic data of the pen, determine the first abnormality degree value of the target pen, and divide the state of the target pen into an abnormal state and a normal state according to the first abnormality degree value of the target pen; For a target stable in an abnormal state, obtaining an abnormal feature type and a second abnormality degree value corresponding to each abnormal feature type from the corresponding stable state feature data in a preset manner; Determine the required monitoring equipment activation type and the activation quantity of each activation type of monitoring equipment for the target enclosure according to the abnormal feature type of the target enclosure and the second abnormality degree value corresponding to each abnormal feature type; The quality data of each required monitoring device of the target enclosure is obtained, the quality coefficient is obtained according to the quality data, the monitoring device that needs to be turned on in the target enclosure is determined according to the quality coefficient, and the monitoring device of the target enclosure is managed; the monitoring device quality data includes the device current stability coefficient and the usage time coefficient.

2. The method for intelligent management of grassland monitoring equipment according to claim 1, characterized in that: Matching the pen state characteristic data with the historical pen state characteristic data to determine the first abnormality degree value of the target pen, and dividing the state of the target pen into an abnormal state and a normal state according to the first abnormality degree value of the target pen includes: Preprocessing the pen status characteristic data and historical pen normal status characteristic data; Construct a distance matrix where each element is the distance between a data point and a historical data point; Use dynamic programming algorithm to calculate the shortest path in the distance matrix to find the best match between the data sequence and the historical data sequence; Align the data sequence with the historical data sequence based on the calculated shortest path; According to the aligned data sequence and the historical data sequence, the similarity between them is calculated, and the similarity is used as the first abnormality degree value of the target enclosure; Comparing the first abnormality level value of the target enclosure with a preset first abnormality level threshold, and if the first abnormality level value is not less than the preset first abnormality level threshold, classifying the target enclosure as a normal state; If the first abnormality level value is less than the preset first abnormality level threshold, the target enclosure is classified as a normal state.

3. The method for intelligent management of grassland monitoring equipment according to claim 1, characterized in that: For a target stable in an abnormal state, obtaining an abnormal feature type and a second abnormality degree value corresponding to each abnormal feature type by using the corresponding stable state feature data in a preset manner includes: The processing steps of the default method are: The current state characteristic data of the target pen is defined as the input item of the fuzzy rule and classified into the fuzzy set; The abnormal feature type and the second abnormal degree value corresponding to each abnormal feature type are divided into different fuzzy sets as output variables; Formulate fuzzy rules to describe the influence of input variables on different output variables; Fuzzy reasoning is performed according to fuzzy rules to output the abnormal feature type of the target enclosure and the second abnormal degree value corresponding to each abnormal feature type.

4. The method and system for intelligent management of grassland monitoring equipment according to claim 1, characterized in that: The method for obtaining the current stability coefficient of the device is: Obtain the actual current value of each monitoring device at different times during the preset time period, and calibrate the current value as I 实 z , z represents the actual current value sequence number of each monitoring device at different times in the preset time period, z∈[1,p], p is the actual current value I obtained 实 z , and p is a positive integer; Calculate the current value I within the preset time period 实 z The standard deviation is used as the device current stability coefficient of the monitoring device. The calculation formula is: in, The average value of the actual current value of each monitoring device at different times in the preset time period is obtained by the expression:

5. The method for intelligent management of grassland monitoring equipment according to claim 4, characterized in that: The method for obtaining the usage time coefficient is: Obtain the total usage time, preset usable time, average maintenance interval, and the time interval from the current time to the last maintenance of each monitoring device. According to the total usage time, preset usable time, average maintenance interval, and the time interval from the current time to the last maintenance, the usage time coefficient of the monitoring device is obtained. The calculation formula is: Where Dsw is the usage time coefficient, gd, fd, kl, and kh are the total usage time of the monitoring equipment, the preset usable time, the average maintenance interval, and the time interval from the current time to the last maintenance, respectively, and a1 and a2 are the preset influencing factors.

6. The method for intelligent management of grassland monitoring equipment according to claim 1, characterized in that: Methods for obtaining quality coefficients based on quality data include: The equipment current stability coefficient and the usage time coefficient are normalized, and the quality coefficient is obtained according to the normalized equipment current stability coefficient and the usage time coefficient.

7. The method for intelligent management of grassland monitoring equipment according to claim 1, characterized in that: The monitoring equipment that needs to be turned on in the target pen based on the quality coefficient includes: Determine the required monitoring equipment activation type and activation quantity of each activation type of monitoring equipment in the target enclosure as the preset activation type and the corresponding preset activation quantity; The monitoring devices corresponding to each opening type are opened in the order of the quality coefficient from small to large. When the number of the monitoring devices corresponding to each opening type that are opened reaches the corresponding preset opening number, the opening of other monitoring devices of the same type is stopped; Turn on all the required monitoring equipment types and corresponding numbers of monitoring equipment in the target enclosure to monitor the target enclosure.

8. An intelligent management system for grassland monitoring equipment, characterized in that: The system comprises: Classification module: obtain the pen status characteristics of the target pen through the currently running monitoring equipment, match the pen status characteristic data with the historical pen status characteristic data, determine the first abnormality degree value of the target pen, and classify the state of the target pen into an abnormal state and a normal state according to the first abnormality degree value of the target pen; Abnormal module: for target pens in abnormal state, obtain the abnormal characteristic type and the second abnormal degree value corresponding to each abnormal characteristic type through the corresponding pen state characteristic data in a preset manner; Equipment activation module: determining the required monitoring equipment activation type of the target enclosure and the number of monitoring equipment activations of each activation type according to the abnormal feature type of the target enclosure and the second abnormality degree value corresponding to each abnormal feature type; Management module: obtain the quality data of each required monitoring device of the target pen, obtain the quality coefficient according to the quality data, determine the monitoring device that needs to be turned on in the target pen according to the quality coefficient, and manage the monitoring device of the target pen; the monitoring device quality data includes the equipment current stability coefficient and the usage time coefficient.