Monitoring system and method for computer room of internet of things

Through the Internet of Things computer room monitoring system, the computer room and equipment modeling and simulation of operating loads is solved, and the problems of difficulty in monitoring and early warning in the existing technology are realized, real-time monitoring and early warning of computer room equipment is achieved, and equipment life is extended.

CN119026352AActive Publication Date: 2024-11-26CHANGZHOU LIU GUOJUN HIGHER VOCATIONAL & TECH SCHOOL (CHANGZHOU LIU GUOJUN VOCATIONAL EDUCATION CENT)
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411132132.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-26
Estimated Expiration
2044-08-19

AI Technical Summary

Technical Problem

The prior art is difficult to monitor and warn of temperature and environment changes caused by various equipment in different operating stages in the computer room in real time, resulting in the equipment being at high temperature and high load, which in turn affects the life of the equipment.

Method used

A computer room monitoring system in the Internet of Things was designed, including a computer room modeling unit, an operation simulation unit, an operation analysis unit and a monitoring and early warning unit. By establishing a computer room and equipment model, the operation load is simulated, and whether the equipment exceeds the set requirements, and the When it exceeds the temperature, the cold environment will be issued and the warning will be adjusted.

Benefits of technology

Real-time centralized monitoring and early warning of computer room equipment is realized, high temperature and overload operation are avoided, and equipment life is extended.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026352A_ABST
    Figure CN119026352A_ABST
Patent Text Reader

Abstract

The invention provides a monitoring system and method for an Internet of Things computer room, and relates to the technical field of computer room monitoring, and the system comprises a computer room modeling unit which builds a computer room model for the computer room and builds a device model for each device in the computer room; the operation simulation unit is used for acquiring a control instruction for each device in the computer room and performing operation simulation on the device model; and the operation analysis unit judges whether the operation load of each device under the current control instruction exceeds a set requirement or not based on the operation simulation and the refrigeration environment processing state, if not, the operation instruction is controlled to continue to be executed, and the corresponding device with the operation load exceeding the set requirement after the operation instruction is executed is obtained through prediction. According to the machine room monitoring system provided by the invention, real-time centralized simulation monitoring can be carried out in each stage of equipment operation in the machine room, and corresponding operation load early warning can be carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of computer room monitoring, and in particular to a monitoring system and method for an Internet of Things computer room. Background Art

[0002] The computer room includes various important equipment such as switches, air conditioners, routers, servers, network cabinets, power supplies, etc. During the operation of each device, it is often necessary to create a good temperature environment to ensure the normal operation of each device.

[0003] In the existing computer room equipment monitoring, it is difficult to achieve centralized monitoring and early warning of temperature changes in the area around the computer room caused by the operating load at different operating stages of each operating device in the computer room. As a result, it is difficult to determine whether the equipment is working at high temperature and high load, which can easily cause damage to the equipment in the computer room or shorten the life of the equipment in the computer room. Summary of the invention

[0004] In view of the shortcomings of the prior art described above, the purpose of the present invention is to provide an Internet of Things computer room monitoring system and method, which is used to solve the problem that when the prior art monitors the computer room equipment, it is difficult to achieve centralized monitoring and early warning of temperature environment changes in the surrounding area of ​​the computer room caused by the operating load of each operating equipment in the computer room at different operating stages, which makes it difficult to determine whether the equipment is working in high temperature and high load, which can easily cause damage to the equipment in the computer room or affect the life of the equipment in the computer room.

[0005] To achieve the above-mentioned purpose and other related purposes, the present invention provides a monitoring system for an Internet of Things computer room, comprising: a computer room modeling unit, which establishes a computer room model for a computer room and establishes a device model for each device in the computer room; an operation simulation unit, which obtains control instructions for each device in the computer room and performs operation simulation on the device model; an operation analysis unit, which determines whether the operating load of each device under the current control instruction exceeds the set requirement based on the operation simulation and the refrigeration environment processing status, and if not, controls to continue to execute the operation instruction, and predicts the corresponding device that meets the load setting requirement after executing the operation instruction, and if it exceeds, controls to directly send an alarm to the manual end; and a monitoring and early warning unit, which controls to mark and warn the predicted device model of the corresponding device, and regulates the refrigeration environment.

[0006] In one embodiment of the present invention, the computer room modeling unit includes: a construction modeling module, which establishes a room model R based on the size of the computer room and an outlet model based on the outlet position of the refrigeration equipment in the computer room according to the computer room construction. 1 ,Win 2 , ..., Wini ]; and the equipment modeling module, the equipment modeling module is based on all the equipment in the computer room [S 1 , S 2 , ..., S j ] storage location, establish all the equipment in the computer room [S 1 , S 2 , ..., S j ] device model [SM 1 , S.M. 2 , ..., SM j ].

[0007] In one embodiment of the present invention, the operation simulation unit includes: an execution data determination module, which determines an execution plan for executing the operation instruction A according to the operation instruction A, and searches for each execution device corresponding to the execution plan [S m , S m+1 , ..., S n-1 , S n ] and each execution device [S m , S m+1 , ..., S n-1 , S n ]The execution status of the work to be executed [W m , W m+1 , ..., W n-1 , W n ]; and an execution simulation module, the execution simulation module executes the simulation module according to the execution device [S m , S m+1 , ..., S n-1 , S n ] and each execution device [S m , S m+1 , ..., S n-1 , S n ]The execution status of the work to be executed [W m , W m+1 , ..., W n-1 , W n ], find the corresponding execution device model [SM m , S.M. m+1 , ..., SM n-1 , S.M. n ] and by executing the device model [SM m , S.M. m+1 , ..., SM n-1 , S.M. n ]Simulate each execution device[S m , S m+1 , ..., S n-1 , S n]'s execution work status [W m , W m+1 , ..., W n-1 , W n ].

[0008] In one embodiment of the present invention, the operation analysis unit includes: an initial state determination module, the initial state determination module for each device [S 1 , S 2 , ..., S j ]In each period [t 1 , t 2 , ..., t k ] received historical operation instruction A k The heat generation and air conditioning cooling data are processed to obtain the S j The final initial state heat Q last ; Instruction execution calculation module, the instruction execution calculation module is based on the execution device corresponding to the execution operation instruction A [S m , S m+1 , ..., S n-1 , S n ], it is determined that each execution device [S m , S m+1 , ..., S n-1 , S n ] The corresponding cumulative heat per unit time And determine the remaining devices [S 1 , S 2 , ..., S m-1 ] and [S n+1 , S n+2 ,...,S j ] The corresponding cumulative heat per unit time and a judgment and analysis module, which judges each device [S 1 , S 2 , ..., S j ] Whether the respective state heat threshold Q is reached before the operation instruction A is executed jmax If it is not reached, the control inputs the operation instruction A and predicts the state heat threshold Q after the input operation instruction A jmax Reaching the status heat threshold Q ymax Corresponding device S y and the corresponding preset time t max .

[0009] In one embodiment of the present invention, the initial state determination module includes: a heat accumulation module, the heat accumulation module calculates the heat accumulation of each device S j Self-generated heat and accept heat QSR Accumulate and get S for each device j Initial cumulative heat Refrigeration capacity determination module, the refrigeration capacity determination module determines each equipment S j The position coordinates (x j ,y j , z j ), the simulation is based on the wind model [Win 1 ,Win 2 , ..., Win i The average cooling rate per unit time According to the duration ∑t k , and the total cooling amount is And the initial state heat statistics module, the initial state heat statistics module is based on the initial cumulative heat Q CS and total cooling Calculate each device S j Final initial state heat

[0010] In one embodiment of the present invention, the heat accumulation module includes: a self-heat measurement module, which obtains all devices [S 1 , S 2 , ..., S j ] device model [SM 1 , S.M. 2 , ..., SM j ]The initial working state before obtaining the operation instruction A [OW 1 , OW 2 , ..., OW j ], based on each device S j Initial working state OW j The corresponding time periods [t 1 , t 2 , ..., t k ] corresponding sub-working state [ZOW 1 ,ZOW 2 , ..., ZOW k ], determine the sub-state workload corresponding to the unit time [GF 1 ,GF 2 , ..., GF k ], and according to the sub-state workload per unit time [GF 1 ,GF 2 , ..., GF k ] corresponds to the self-heating factor [δ 1 ,δ 2 , ..., δ k], and further calculate each device S j Initial working state OW j Self-generated heat and a heat transfer measurement module, the heat transfer measurement module according to each device S j Its neighboring device S a The horizontal distance between a and height difference h a , according to the heat transfer rate per unit length in the horizontal direction α l , heat transfer rate per unit length along the height direction α h and each adjacent device S a Self-generated heat Calculate each device S j The amount of heat received in, is the self-conduction heat rate per unit length in the horizontal direction, α win is the wind heat transfer rate per unit length in the horizontal direction, For device S j The heat transfer rate above, For device S j Heat transfer rate below.

[0011] In one embodiment of the present invention, each device S j Initial cumulative heat Each device S j The final initial state heat is calculated as

[0012] In one embodiment of the present invention, the instruction execution calculation module includes: executing the self-generated heat calculation module, executing the self-generated heat calculation module according to the simulation operation instruction A to simulate the operation of each execution device [S m , S m+1 , ..., S n-1 , S n ]'s execution work status [W m , W m+1 , ..., W n-1 , W n ], and obtain the execution state workload per unit time [GF m , G.F. m+1 , ..., GF n-1 , G.F. n ], according to the execution state workload per unit time [GF m , G.F. m+1 , ..., GF n-1 , G.F. n ] corresponds to the self-heating factor [δ m , δm+1 , ..., δ n-1 , δ n ], make sure to get all devices [S 1 , S 2 , ..., S j ], each execution device [S m , S m+1 , ..., S n-1 , S n ] per unit time and executing the heat transfer calculation module, executing the heat transfer calculation module in the adjacent device S of the corresponding execution device a When it is also the execution device that receives the operation instruction A, the execution device [S m , S m+1 , ..., S n-1 , S n The amount of heat received per unit time is Get each execution device [S m , S m+1 , ..., S n-1 , S n ]Cumulative heat per unit time The remaining devices [S 1 , S 2 , ..., S m-1 ] and [S n+1 , S n+2 ,...,S j ], the cumulative heat per unit time is

[0013] In one embodiment of the present invention, the judgment and analysis module includes: a prediction and evaluation module, which assumes that the preset time t max There is a device S y The state heat threshold Q ymax If an alarm occurs, the calculation formula Get the device S that caused the alarm y The position coordinates (x j ,y j , z j ) and predicted alarm time t max .

[0014] The present invention also provides a monitoring method for an Internet of Things computer room, comprising the following steps:

[0015] Establish a computer room model for the computer room, and establish a device model for each device in the computer room;

[0016] Obtain control instructions for each device in the computer room and perform operation simulation on the device model;

[0017] Based on the operation simulation and the cooling environment processing status, it is determined whether the operating load of each device under the current control instruction exceeds the set requirements. If not, the control continues to execute the operation instruction, and predicts the corresponding equipment that meets the load setting requirements after executing the operation instruction. If it exceeds, the control directly issues an early warning to the manual end;

[0018] The control marks and warns the predicted equipment model of the corresponding equipment and regulates the refrigeration environment.

[0019] As described above, a monitoring system and method for an Internet of Things computer room of the present invention has the following beneficial effects: when monitoring a computer room, by modeling and simulating the operation of the computer room, the refrigeration and air outlet equipment, and other equipment in the computer room, the unit time cooling rate of the refrigeration and air outlet equipment in the area where the equipment in each computer room is located can be simulated and determined. And by simulating the operation on the equipment model according to the operation instruction of the computer room, by judging the historical operation simulation environment and the refrigeration environment processing state, whether the operation load of each device can meet the set requirements before the operation instruction is input. In other words, whether the ambient temperature change caused by the operation load reaches the upper limit, if it has reached the upper limit, the manual end is directly notified for processing. If it does not exceed the set requirements, the operation instruction will continue to be input to simulate the operation of the corresponding equipment, so as to determine whether the self-operation heat generation of each device during operation and the heat transfer of other adjacent equipment can meet the normal operation requirements under the current cooling conditions of each point. If not, the time when the unsatisfactory situation finally occurs and the corresponding first unsatisfactory equipment are determined, so as to realize the early control of the equipment in the corresponding area. Through the above-mentioned computer room monitoring and processing, real-time centralized analog monitoring is achieved at all stages of equipment operation in the computer room, and corresponding operating load warnings are carried out to avoid possible high temperature and overload operating environments that are difficult to predict, which may cause damage to computer room equipment or affect the life of computer room equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 Schematic diagram of the monitoring system of the present invention.

[0021] Figure 2 This is an architectural diagram of the computer room modeling unit of the present invention.

[0022] Figure 3 The schematic diagram of the simulation unit for running the present invention.

[0023] Figure 4 The schematic diagram of the operation analysis unit of the present invention is shown in FIG.

[0024] Figure 5Flow chart of the monitoring method of the present invention. DETAILED DESCRIPTION

[0025] See also Figure 1 The present invention provides a monitoring system for an Internet of Things computer room, comprising: a computer room modeling unit, an operation simulation unit, an operation analysis unit and a monitoring and early warning unit. The computer room modeling unit establishes a computer room model for the computer room, and establishes a device model for each device in the computer room. The operation simulation unit obtains the control instructions for each device in the computer room, and performs operation simulation on the device model. The operation analysis unit determines whether the operating load of each device under the current control instruction exceeds the set requirements based on the operation simulation and the refrigeration environment processing status. If not, the control continues to execute the operation instruction, and predicts the corresponding device that meets the load setting requirements after executing the operation instruction. If exceeded, the control directly sends an alarm to the manual end. The monitoring and early warning unit controls the marking and early warning of the predicted device model of the corresponding device, and regulates the refrigeration environment.

[0026] In one embodiment of the present invention, the computer room modeling unit can be used to simulate the computer room and various types of equipment in the computer room, such as switches, air conditioners, routers, servers, network cabinets, power supplies, etc., so as to establish a computer room model for the computer room and a device model for various types of equipment in the computer room. The operation simulation is realized by using the equipment in the computer room, and the operation status of each device in the computer room is further accurately monitored. Specifically, the operation simulation unit is used to realize the operation simulation of each device in the computer room. Moreover, the operation simulation is carried out according to the received operation instructions, and each operation instruction may make the equipment involved in the operation different. Therefore, the operation simulation unit will run the corresponding equipment model according to the corresponding operation instruction to perform the operation simulation. During the operation process, the operation analysis unit can realize the operation simulation based on the difference of various parameters of each device, and based on the refrigeration environment processing state brought about by the operation of the refrigeration equipment in the current computer room, such as the air conditioner, the operation load of each device before the operation instruction is executed is judged whether it exceeds the set requirements. Thereby, when the set requirements are exceeded, the corresponding equipment that exceeds the set requirements is directly output, and the manual end alarm is performed. If the set requirements are not exceeded, the corresponding equipment will be predicted by executing the operation and predicting the operating load exceeding the set requirements. After obtaining the corresponding equipment, the equipment model is marked and warned through the monitoring and warning unit, and when the set requirements are about to be exceeded, the cooling environment is regulated by adjusting, for example, air conditioning equipment. Through the above content, real-time simulation monitoring can be achieved at each stage of equipment operation in the computer room, and corresponding operating load warnings can be issued to avoid damage to the equipment in the computer room when unpredictable overload operation occurs.

[0027] like Figure 2 As shown, the computer room modeling unit includes: a construction modeling module, which establishes a room model R based on the size of the computer room and an outlet model based on the outlet position of the refrigeration equipment in the computer room according to the computer room construction [Win 1 ,Win 2 , ..., Win i ]; and the equipment modeling module, the equipment modeling module is based on all the equipment in the computer room [S 1 , S 2 , ..., S j ] storage location, establish all the equipment in the computer room [S 1 , S 2 , ..., S j ] device model [SM 1 , S.M. 2 , ..., SM j ].

[0028] In one embodiment of the present invention, when the computer room modeling unit models the computer room and the equipment in the computer room, a corresponding room model R is established according to the size of the computer room by using the construction modeling module, and a corresponding air outlet model is established for the room model R according to the air outlet position of the refrigeration equipment such as the air conditioner in the computer room. 1 ,Win 2 , ..., Win i ]. Through the device modeling module, various devices in the computer room, such as switches and processors, are simulated to obtain the device model [SM 1 , S.M. 2 , ..., SM j ]. This allows the device model [SM 1 , S.M. 2 , ..., SM j ] The specific layout in the room model R, the air outlet model [Win 1 ,Win 2 , ..., Win i ]In each device model [SM 1 , S.M. 2 , ..., SM j ], so as to accurately calculate the temperature drop per unit time of each equipment model in the room model R [SM 1 , S.M. 2 , ..., SM j ] is the average cooling rate per unit time at its corresponding coordinates.

[0029] like Figure 3As shown, the operation simulation unit includes: an execution data determination module, which determines an execution plan for executing the operation instruction A according to the operation instruction A, and searches for each execution device corresponding to the execution plan [S m , S m+1 , ..., S n-1 , S n ] and each execution device [S m , S m+1 , ..., S n-1 , S n ]The execution status of the work to be executed [W m , W m+1 , ..., W n-1 , W n ]; and an execution simulation module, the execution simulation module executes the simulation module according to the execution device [S m , S m+1 , ..., S n-1 , S n ] and each execution device [S m , S m+1 , ..., S n-1 , S n ]The execution status of the work to be executed [W m , W m+1 , ..., W n-1 , W n ], find the corresponding execution device model [SM m , S.M. m+1 , ..., SM n-1 , S.M. n ] and by executing the device model [SM m , S.M. m+1 , ..., SM n-1 , S.M. n ]Simulate each execution device[S m , S m+1 , ..., S n-1 , S n ]'s execution work status [W m , W m+1 , ..., W n-1 , W n ].

[0030] In one embodiment of the present invention, when the execution data determination module determines the corresponding execution device according to the operation instruction A, the execution scheme corresponding to the execution operation instruction A is obtained by specifying the data determination module according to the operation instruction A, and the execution scheme includes the execution device corresponding to the execution operation instruction A. m , S m+1 , ..., S n-1 , Sn ] and working parameters, and then each execution device [S m , S m+1 , ..., S n-1 , S n ]The corresponding execution work status during execution [W m , W m+1 , ..., W n-1 , W n ]. By executing the simulation module to realize the execution device [S m , S m+1 , ..., S n-1 , S n ] and execution work status [W m , W m+1 , ..., W n-1 , W n ], perform device model [SM m , S.M. m+1 , ..., SM n-1 , S.M. n ] operation simulation, thereby realizing the simulation operation of each execution device and non-execution device in the computer room model according to operation instruction A.

[0031] like Figure 4 As shown, the operation analysis unit includes: an initial state determination module, the initial state determination module for each device [S 1 , S 2 , ..., S j ]In each period [t 1 , t 2 , ..., t k ] received historical operation instruction A k The heat generation and air conditioning cooling data are processed to obtain the S j The final initial state heat Q last ; Instruction execution calculation module, the instruction execution calculation module is based on the execution device corresponding to the execution operation instruction A [S m , S m+1 , ..., S n-1 , S n ], it is determined that each execution device [S m , S m+1 , ..., S n-1 , S n ] The corresponding cumulative heat per unit time And determine the remaining devices [S 1 , S 2 , ..., S m-1 ] and [S n+1 , Sn+2 ,...,S j ] The corresponding cumulative heat per unit time and a judgment and analysis module, which judges each device [S 1 , S 2 , ..., S j ] Whether the respective state heat threshold Q is reached before the operation instruction A is executed jmax If it is not reached, the control inputs the operation instruction A and predicts the state heat threshold Q after the input operation instruction A jmax Reaching the status heat threshold Q ymax Corresponding device S y and the corresponding preset time t max .

[0032] In one embodiment of the present invention, the operation analysis unit is in the device model [SM m , S.M. m+1 , ..., SM n-1 , S.M. n ]When running the simulation, the operating load will be analyzed. Specifically, the initial state determination module is used to achieve the [S 1 , S 2 , ..., S j ]In each period [t 1 , t 2 , ..., t k ] received historical operation instruction A k The heat generation and air conditioning cooling data are processed to obtain the S j The final initial state heat Q last That is, in each period t k Corresponding historical operation instruction A k May be different, each time period t k The length of time is also different, so it is necessary to 1 , t 2 , ..., t k ] corresponds to each historical operation instruction A k The historical execution equipment heat generation and the corresponding air conditioning cooling data are processed simultaneously to obtain each equipment S j The final initial state heat Q last . The instruction execution calculation module is used to realize the execution device corresponding to the execution operation instruction A [S m , S m+1 , ..., S n-1 , S n ], in each execution device [S m , S m+1 , ..., Sn-1 , S n ]When running, the corresponding accumulated heat per unit time can be determined On all devices [S 1 , S 2 , ..., S j ], including the remaining devices [S 1 , S 2 , ..., S m-1 ] and [S n+1 , S n+2 ,...,S j ], the cumulative heat per unit time is also increasing, and the cumulative heat per unit time can be further determined. The judgment analysis module is used to determine whether there is a device S before executing the operation instruction A. y The initial state heat Q last Reach its corresponding state heat threshold Q jmax If it exists, the control will directly send an alarm to the manual end. If it does not exist, the control will continue to input the operation instruction A and calculate the state heat threshold Q jmax Reaching the status heat threshold Q ymax The corresponding device S y and the corresponding preset time t max .

[0033] Furthermore, the initial state determination module includes: a heat accumulation module, the heat accumulation module calculates the heat of each device S j Self-generated heat and accept heat Q SR Accumulate and get S for each device j Initial cumulative heat Refrigeration capacity determination module, the refrigeration capacity determination module determines each equipment S j The position coordinates (x j ,y j , z j ), the simulation is based on the wind model [Win 1 ,Win 2 , ..., Win i The average cooling rate per unit time According to the duration ∑t k , and the total cooling amount is And the initial state heat statistics module, the initial state heat statistics module is based on the initial cumulative heat Q CS and total cooling Calculate each device S j Final initial state heat

[0034] In one embodiment of the present invention, the initial state determination module determines that each device S j The final initial state heat Q last When the device is running, the heat accumulation module is used to realize the self-generated heat generated by the device itself. Calculate and calculate for each device S j The heat received due to the heat transfer from other nearby equipment Q SR At the same time, when obtaining the self-generated heat and accept heat Q SR Then, add the two together to get S for each device. j The initial cumulative heat Q CS , that is, the formula is Through the cooling capacity determination module to achieve the S j The position coordinates (x j ,y j , z j ), and the average cooling rate per unit time is obtained And the average cooling rate Also affected by the wind model [Win 1 ,Win 2 , ..., Win i ], the cooling degree and other factors. j ,y j , z j ) corresponds to the average cooling rate Then, according to each period [t 1 , t 2 , ..., t k ], and the duration is the time and ∑t k , thus calculating the average cooling rate The total cooling amount Further, the initial state heat statistics module is used to realize the initial cumulative heat Q CS and total cooling Balance the temperature in the room, and get the temperature of each device S j Final initial state heat

[0035] Specifically, the heat accumulation module includes: a self-generated heat measurement module, which obtains all devices [S 1 , S 2 , ..., S j ] device model [SM 1 , S.M. 2 , ..., SMj ]The initial working state before obtaining the operation instruction A [OW 1 , OW 2 , ..., OW j ], based on each device S j Initial working state OW j The corresponding time periods [t 1 , t 2 , ..., t k ] corresponding sub-working state [ZOW 1 ,ZOW 2 , ..., ZOW k ], determine the sub-state workload corresponding to the unit time [GF 1 ,GF 2 , ..., GF k ], and according to the sub-state workload per unit time [GF 1 ,GF 2 , ..., GF k ] corresponds to the self-heating factor [δ 1 ,δ 2 , ..., δ k ], and further calculate each device S j Initial working state OW j Self-generated heat and a heat transfer measurement module, the heat transfer measurement module according to each device S j Its neighboring device S a The horizontal distance between a and height difference h a , according to the heat transfer rate per unit length in the horizontal direction α l , heat transfer rate per unit length along the height direction α h and each adjacent device S a Self-generated heat Calculate each device S j The amount of heat received in, is the self-heat transfer rate per unit length in the horizontal direction, α win is the wind heat transfer rate per unit length in the horizontal direction, For device S j The heat transfer rate above, For device S j Heat transfer rate below.

[0036] In one embodiment of the present invention, the heat accumulation module converts each device S j Self-generated heat and accept heat Q SRWhen performing cumulative calculations, each device S j Self-generated heat and accept heat Q SR Specifically, the self-heating measurement module is used to obtain all devices [S 1 , S 2 , ..., S j ] corresponding device model [SM 1 , S.M. 2 , ..., SM j ]Recorded initial working state [OW 1 , OW 2 , ..., OW j ]. And, according to each device S j Initial working state OW j The corresponding time periods [t 1 , t 2 , ..., t k ] corresponding sub-working state [ZOW 1 ,ZOW 2 , ..., ZOW k ], that is, to form each initial working state OW j All of them are composed of each period [t 1 , t 2 , ..., t k ] corresponding sub-working state [ZOW 1 ,ZOW 2 , ..., ZOW k ] is accumulated. Therefore, it is necessary to calculate the sub-state workload [GF 1 ,GF 2 , ..., GF k ] and the self-heating factor [δ 1 ,δ 2 , ..., δ k ], calculate each device S j Initial working state OW j Self-generated heat It is worth noting that each self-heating factor [δ 1 ,δ 2 , ..., δ k ] corresponds to a sub-state workload GF range value. Through the heat transfer determination module, further measurement of each device S j Nearby device S a Determination of its heat transfer. That is, each device S j Its neighboring device S aThere may be height differences and horizontal distances between them. a and height difference h a When the heat is transmitted, it will correspond to different heat transfer rates, that is, the heat transfer rate per unit length in the horizontal direction α l , heat transfer rate per unit length along the height direction α h Therefore, according to each adjacent device S a Self-generated heat Further calculation is performed to obtain each device S j The amount of heat received in, Among them, α win >0 means the current heat transfer direction is horizontal and the direction is downwind, α win When α is less than 0, it means that the current horizontal heat transfer direction is against the wind, and the specific design can be based on the air outlet speed. Of course, due to the different wind speeds of the wind or against the wind, the α win It can also be in an adjustable state. a >0 indicates device S j Higher than the corresponding adjacent device S a , on the contrary, when h a <0 indicates that the device is S j Lower than the corresponding adjacent device S a .

[0037] More specifically, after determining that each device S j Initial working state OW j Self-generated heat And each device S j The amount of heat received in, After that, we can further get each device S j Initial cumulative heat Each device S j The final initial state heat is calculated as

[0038] Next, the instruction execution calculation module includes: executing the self-generated heat calculation module, executing the self-generated heat calculation module according to the simulation operation instruction A to simulate the operation of each execution device [S m , S m+1 , ..., S n-1 , S n ]'s execution work status [W m , W m+1 , ..., W n-1 , W n ], and obtain the execution state workload per unit time [GF m , G.F. m+1, ..., GF n-1 , G.F. n ], according to the execution state workload per unit time [GF m , G.F. m+1 , ..., GF n-1 , G.F. n ] corresponds to the self-heating factor [δ m , δ m+1 , ..., δ n-1 , δ n ], make sure to get all devices [S 1 , S 2 , ..., S j ], each execution device [S m , S m+1 , …, S n-1 , S n ] per unit time and executing the heat transfer calculation module, executing the heat transfer calculation module in the adjacent device S of the corresponding execution device a When it is also the execution device that receives the operation instruction A, the execution device [S m , S m+1 , …, S n-1 , S n The amount of heat received per unit time is Get each execution device [S m , S m+1 , ..., S n-1 , S n ]Cumulative heat per unit time The remaining devices [S 1 , S 2 , ..., S m-1 ] and [S n+1 , S n+2 ,...,S j ], the cumulative heat per unit time is

[0039] In one embodiment of the present invention, the instruction execution estimation module simulates running each execution device [S m , S m+1 , …, S n-1 , S n ], by executing the self-heating calculation module, the execution equipment [S m , S m+1 , …, S n-1 , S n ]'s execution work status [W m , W m+1, …, W n-1 , W n ] and the corresponding execution state workload per unit time [GF m , G.F. m+1 , …, GF n-1 , G.F. n ]. And according to the workload of each execution state [GF m , G.F. m+1 , ..., GF n-1 , G.F. n ] corresponds to the self-heating factor [δ m , δ m+1 , …, δ n-1 , δ n ], each execution device [S m , S m+1 , …, S n-1 , S n ] per unit time Each self-heating factor [δ m , δ m+1 , …, δ n-1 , δ n ] also corresponds to the range of the workload of the execution state. By executing the heat transfer calculation module, the execution equipment [S m , S m+1 , …, S n-1 , S n ] is used to calculate the accumulated heat per unit time when executing operation instruction A. That is to say, the heat received per unit time is calculated as Then, according to the formula The accumulated heat per unit time can be obtained. For the remaining devices that have not received the operation instruction A [S 1 , S 2 , …, S m-1 ] and [S n+1 , S n+2 ,...,S j ], the cumulative heat per unit time Can be directly converted to Get

[0040] Furthermore, the judgment and analysis module includes: a prediction and evaluation module, which assumes that the preset time t max There is a device S y The state heat threshold Q ymax If an alarm occurs, the calculation formula Get the device S that caused the alarm y The position coordinates (x j ,yj , z j ) and predicted alarm time t max .

[0041] In one embodiment of the present invention, when it is determined that the operation instruction A will have a predicted alarm condition, the formula It can be calculated that when the state heat threshold Q is reached ymax The shortest time required for each device is the longest time t corresponding to the prediction alarm. max . And the corresponding output reaches the longest predicted alarm time t max When the alarm occurs, the corresponding device S is further output. y The position coordinates (x j ,y j , z j ) to notify relevant personnel to adjust the cooling environment, such as adjusting the air outlet direction and cooling temperature of the air-conditioning equipment, so that the equipment S can be turned off before the operation instruction A is executed. y The temperature change caused by the operating load is adjusted to a reasonable range. That is, the monitoring early warning unit can be used to achieve the corresponding equipment S y The equipment model can be marked to realize early warning using the model, and the temperature of the cooling environment and other conditions can be adjusted to keep the load temperature of the corresponding area of ​​the computer room within a reasonable range.

[0042] like Figure 5 As shown, the present invention also provides a monitoring method for an Internet of Things computer room, comprising the following steps:

[0043] Establish a computer room model for the computer room, and establish a device model for each device in the computer room;

[0044] Obtain control instructions for each device in the computer room and perform operation simulation on the device model;

[0045] Based on the operation simulation and the cooling environment processing status, it is determined whether the operating load of each device under the current control instruction exceeds the set requirements. If not, the control continues to execute the operation instruction, and predicts the corresponding equipment that meets the load setting requirements after executing the operation instruction. If it exceeds, the control directly issues an early warning to the manual end;

[0046] The control marks and warns the corresponding equipment predicted, and regulates the refrigeration environment.

[0047] In summary, when the present invention monitors the computer room, by modeling and simulating the operation of the computer room, refrigeration and air outlet equipment, and other equipment in the computer room, it is possible to simulate and determine the cooling rate per unit time of the refrigeration and air outlet equipment in the area where the equipment in each computer room is located. And by simulating the operation on the equipment model according to the operation instructions of the computer room, by judging the historical operation simulation environment and the refrigeration environment processing state, whether the operation load of each device can meet the set requirements before the operation instruction is input. In other words, whether the ambient temperature change caused by the operation load reaches the upper limit, if it has reached the upper limit, the manual end is directly notified for processing. If it does not exceed the set requirements, the operation instruction will continue to be input to simulate the operation of the corresponding equipment, so as to determine whether the self-operation heat generation of each device during operation and the heat transfer of other adjacent equipment can meet the normal operation requirements under the current cooling conditions of each point. If not, the time when the unsatisfactory situation finally occurs and the corresponding first unsatisfactory equipment are determined, so as to realize the early control of the equipment in the corresponding area. Through the above-mentioned computer room monitoring processing, real-time centralized simulation monitoring is realized at each stage of equipment operation in the computer room, and corresponding operation load warning is carried out to avoid the possible high temperature and overload operation environment which is difficult to predict, resulting in damage to the computer room equipment or affecting the life of the computer room equipment. Therefore, the present invention effectively overcomes various shortcomings in the prior art and has high industrial utilization value.

[0048] The above embodiments are merely illustrative of the principles and effects of the present invention, and are not intended to limit the present invention. Anyone familiar with the art may modify or alter the above embodiments without departing from the spirit and scope of the present invention. Therefore, all equivalent modifications or alterations made by a person of ordinary skill in the art without departing from the spirit and technical concept disclosed by the present invention shall still be covered by the claims of the present invention.

Claims

1. Monitoring system for IoT computer room, It is characterized in that include: A computer room modeling unit, wherein the computer room modeling unit establishes a computer room model for the computer room and establishes a device model for each device in the computer room; An operation simulation unit, wherein the operation simulation unit obtains control instructions for each device in the computer room and performs operation simulation on the device model; An operation analysis unit, which determines whether the operation load of each device under the current control instruction exceeds the set requirements based on the operation simulation and the refrigeration environment processing status. If not, the control continues to execute the operation instruction, and predicts the corresponding equipment that meets the load setting requirements after executing the operation instruction. If it exceeds, the control directly sends an alarm to the manual end; as well as A monitoring and early warning unit controls the marking and early warning of the predicted equipment model of the corresponding equipment, and regulates the refrigeration environment.

2. The monitoring system for an Internet of Things computer room according to claim 1, Features: The computer room modeling unit comprises: A construction modeling module is constructed, wherein the construction modeling module establishes a room model R based on the size of the computer room and an air outlet model based on the air outlet position of the refrigeration equipment in the computer room according to the computer room construction. 1 ,Win 2 , ..., Win i ];as well as The equipment modeling module is based on all the equipment in the computer room [S 1 , S 2 , ..., S j ] storage location, establish all the equipment in the computer room [S 1 , S 2 , ..., S j ] device model [SM 1 , S.M. 2 , ..., SM j ].

3. The monitoring system for an Internet of Things computer room according to claim 1, Features: The operation simulation unit comprises: An execution data determination module, wherein the execution data determination module determines an execution scheme for executing the operation instruction A according to the operation instruction A, and searches for each execution device corresponding to the execution scheme [S m , S m+1 , ..., S n-1 , S n ] and each execution device [S m , S m+1 , ..., S n-1 , S n ]The execution status of the work to be executed [W m , W m+1 , ..., W n-1 , W n ];as well as The execution simulation module is configured to execute the simulation according to the execution device [S m , S m+1 , ..., S n-1 , S n ] and each execution device [S m , S m+1 , ..., S n-1 , S n ]The execution status of the work to be executed [W m , W m+1 , ..., W n-1 , W n ], find the corresponding execution device model [SM m , S.M. m+1 , ..., SM n-1 , S.M. n ] and executes the device model [SM m , S.M. m+1 , ..., SM n-1 , S.M. n ]Simulate each execution device[S m , S m+1 , ..., S n-1 , S n ]'s execution work status [W m , W m+1 , ..., W n-1 , W n ].

4. The monitoring system for an Internet of Things computer room according to claim 1, Features: The operation analysis unit comprises: An initial state determination module, wherein the initial state determination module determines for each device [S 1 , S 2 , ..., S j ]In each period [t 1 , t 2 , ..., t k ] received historical operation instruction A k The heat generation and air conditioning cooling data are processed to obtain the S j The final initial state heat Q last ; The instruction execution calculation module is configured to calculate the execution of the instruction according to the execution device [S m , S m+1 , ..., S n-1 , S n ], it is determined that each execution device [S m , S m+1 , ..., S n-1 , S n ] The corresponding cumulative heat per unit time And determine the remaining devices [S 1 , S 2 , ..., S m-1 ] and [S n+1 , S n+2 ,...,S j ] The corresponding cumulative heat per unit time as well as A judgment and analysis module is used to judge each device [S 1 , S 2 , ..., S j ] Whether the respective state heat threshold Q is reached before the operation instruction A is executed jmax If it is not reached, the control inputs the operation instruction A and predicts the state heat threshold Q after the input operation instruction A jmax Reaching the status heat threshold Q ymax Corresponding device S y and the corresponding preset time t max .

5. The monitoring system for an Internet of Things computer room according to claim 4, Features: The initial state determination module comprises: Heat accumulation module, the heat accumulation module is each device S j Self-generated heat and accept heat Q SR Accumulate and get S for each device j Initial cumulative heat The refrigeration capacity determination module determines the refrigeration capacity of each device S j The position coordinates (x j ,y j , z j ), the simulation is based on the wind model [Win 1 ,Win 2 , ..., Win i The average cooling rate per unit time According to the duration ∑t k , and the total cooling amount is as well as The initial state heat statistics module is based on the initial cumulative heat Q CS and total cooling Calculate each device S j Final initial state heat 6. The monitoring system for an Internet of Things computer room according to claim 5, Features: The heat accumulation module comprises: A self-heating measurement module is used to obtain all the equipment [S 1 , S 2 , ..., S j ] device model [SM 1 , S.M. 2 , ..., SM j ]The initial working state before obtaining the operation instruction A [OW 1 , OW 2 , ..., OW j ], based on each device S j Initial working state OW j The corresponding time periods [t 1 , t 2 , ..., t k ] corresponding sub-working state [ZOW 1 ,ZOW 2 , ..., ZOW k ], determine the sub-state workload corresponding to the unit time [GF 1 ,GF 2 , ..., GF k ], and according to the sub-state workload per unit time [GF 1 ,GF 2 , ..., GF k ] corresponds to the self-heating factor [δ 1 ,δ 2 , ..., δ k ], and further calculate each device S j Initial working state OW j Self-generated heat as well as The heat transfer determination module is based on each device S j Its neighboring device S a The horizontal distance between a and height difference h a , according to the heat transfer rate per unit length in the horizontal direction α l , heat transfer rate per unit length along the height direction α h and each adjacent device S a Self-generated heat Calculate each device S j The amount of heat received in, is the self-conduction heat rate per unit length in the horizontal direction, α win is the wind heat transfer rate per unit length in the horizontal direction, For device S j The heat transfer rate above, For device S j Heat transfer rate below.

7. The monitoring system for an Internet of Things computer room according to claim 6, Features: Each device S j Initial cumulative heat Each device S j The final initial state heat is calculated as 8. The monitoring system for an Internet of Things computer room according to claim 6, Features: The instruction execution calculation module includes: Execute the self-generated heat calculation module, the execution self-generated heat calculation module simulates the operation of each execution device according to the simulation operation instruction A [S m , S m+1 , ..., S n-1 , S n ]'s execution work status [W m , W m+1 , ..., W n-1 , W n ], and obtain the execution state workload per unit time [GF m , G.F. m+1 , ..., GF n-1 , G.F. n ], according to the execution state workload per unit time [GF m , G.F. m+1 , ..., GF n-1 , G.F. n ] corresponds to the self-heating factor [δ m , δ m+1 , ..., δ n-1 , δ n ], make sure to get all devices [S 1 , S 2 , ..., S j ], each execution device [S m , S m+1 , ..., S n-1 , S n ] per unit time y∈[m,m+1,...,n-1,n]; and Execute the heat transfer calculation module, the heat transfer calculation module is executed in the adjacent device S of the corresponding execution device a When it is also the execution device that receives the operation instruction A, the execution device [S m , S m+1 , ..., S n-1 , S n The amount of heat received per unit time is Get each execution device [S m , S m+1 , ..., S n-1 , S n ]Cumulative heat per unit time The remaining devices [S 1 , S 2 , ..., S m-1 ] and [S n+1 , S n+2 ,...,S j ], the cumulative heat per unit time is 9. The monitoring system for an Internet of Things computer room according to claim 8, Features: The judgment and analysis module comprises: The prediction and evaluation module assumes that the preset time t max There is a device S y The state heat threshold Q ymax If an alarm occurs, the calculation formula Get the device S that caused the alarm y The position coordinates (x j ,y j , z j ) and predicted alarm time t max .

10. Monitoring methods for IoT computer rooms, It is characterized in that The steps include: Establishing a computer room model for a computer room, and establishing a device model for each device in the computer room; Obtaining control instructions for each device in the computer room and performing operation simulation on the device model; Based on the operation simulation and the refrigeration environment processing status, it is determined whether the operating load of each device under the current control instruction exceeds the set requirements. If not, the control continues to execute the operation instruction, and predicts the corresponding equipment that meets the load setting requirements after executing the operation instruction. If it exceeds, the control directly issues an early warning to the manual end; The control marks and warns the predicted equipment model of the corresponding equipment and regulates the refrigeration environment.

Citation Information

Patent Citations

  • Method and device for optimizing machine room energy consumption efficiency on the basis of artificial intelligence

    CN109890176A

  • High-voltage cable line operation monitoring system

    CN111092492A

  • Control system and method for efficient machine room

    CN115540218A

  • Thermal station regulation and control system and method based on virtual-real fusion

    CN115981463A

  • Intelligent energy-saving system and method for precise air conditioner of data machine room

    CN117135885A