Cooling pipeline liquid adding method and water chilling unit

By closing the valve body of the cooling pipeline in the chiller unit and using a vacuum device to remove gas in the pipeline, the gas collection phenomenon during cooling liquid filling is solved, the problems of cavitation and increased power consumption of the water pump are avoided, and more efficient is achieved The coolant is filled and runs stably.

CN119029419APending Publication Date: 2024-11-26GREE ELECTRIC APPLIANCE INC OF ZHUHAI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411167482.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

Existing chillers are prone to gas collection when the coolant is infused, resulting in increased cavitation and power consumption during the pump operation.

Method used

By closing the valve body of the cooling pipeline, a closed space is formed, and the gas in the pipeline is extracted using a vacuum device, and then the coolant is filled through the liquid addition port to ensure that the coolant fully fills the pipeline and avoid residual gas.

Benefits of technology

It effectively avoids the gas collection phenomenon during cooling liquid filling, prevents cavitation during operation of the water pump, and reduces the power consumption of the chiller unit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119029419A_ABST
    Figure CN119029419A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of air conditioners, in particular to a cooling pipeline liquid adding method and a water chilling unit, a cooling pipeline is provided with a liquid adding opening, the cooling pipeline liquid adding method comprises the steps that valve closing is conducted, specifically, a valve body on the cooling pipeline is closed, so that a closed space is formed in the cooling pipeline; vacuumizing: performing vacuumizing operation on the closed space in the cooling pipeline through a vacuumizing device; and liquid injection, wherein cooling liquid is injected into the cooling pipeline from the liquid adding opening. According to the liquid adding method for the cooling pipeline, the gas collection phenomenon in the cooling pipeline during filling of the cooling liquid can be effectively avoided, and then the problem of cavitation during operation of a water pump of a water chilling unit is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of air conditioning, and in particular to a cooling pipeline liquid adding method and a chiller. Background Art

[0002] An energy storage cabinet is a large, movable power storage cabinet that combines multiple power sources for emergency use. It acts like a large power bank. Energy storage cabinets usually use rechargeable batteries as energy storage media, such as lithium-ion batteries. According to real-time energy needs, smart energy storage cabinets can control the battery charging and discharging process to balance energy supply and demand.

[0003] Since the energy storage cabinet contains a large number of battery cells, a large amount of heat will be generated during energy conversion during operation, so the battery cells and other structures need to be cooled. A liquid cooling plate is designed near each battery cell for cooling. Therefore, the battery cells and the liquid cooling plate form a battery pack. The energy storage cabinet is composed of many battery packs, and the chiller is a type of air-conditioning device designed for the energy storage cabinet. The low-temperature coolant generated by the chiller will enter the liquid cooling plate of the battery pack, thereby cooling the battery cells.

[0004] Before the chiller is operated, the cooling pipeline needs to be filled with coolant. The coolant of the chiller is generally a 50% ethylene glycol solution. The common filling method is to pump the coolant into the cooling pipeline through an external water pump. During the coolant pumping process, the exhaust valve above the cooling pipeline is in an open state, and the gas in the pipeline is discharged from the upper exhaust valve under the squeeze of the coolant flowing in from below. When the coolant flows out of the upper exhaust valve, it means that the cooling pipeline is also full of coolant. At this time, the exhaust valve is closed and the coolant filling is completed. This currently commonly used coolant filling method is more convenient, but due to the design of the chiller, the pipeline through which the coolant flows is more complicated, and the pipeline has many bends, especially the spacing of the heat exchanger plates of the plate evaporative heat exchanger is relatively small. There will be gas at the bends of the pipeline and the gap between the heat exchanger plates. Once the pipeline and the heat exchanger plate have gas collection, the flow resistance of the coolant will increase, the impeller of the water pump will be unevenly stressed, and cavitation will easily occur, and the power consumption will be greatly increased. Summary of the invention

[0005] The purpose of the present application is to provide a cooling pipeline filling method and a chiller, which can effectively avoid the gas collection phenomenon in the cooling pipeline when the coolant is poured, thereby avoiding the problem of cavitation when the water pump of the chiller is running.

[0006] In a first aspect, an embodiment of the present application provides a method for adding liquid to a cooling pipeline, wherein the cooling pipeline has a liquid adding port, and the method for adding liquid to the cooling pipeline comprises: closing the valve: closing the valve body on the cooling pipeline to form a closed space inside the cooling pipeline; vacuuming: vacuuming the closed space inside the cooling pipeline through a vacuuming device; and injecting liquid: injecting coolant into the cooling pipeline from the liquid adding port.

[0007] In one possible implementation, the cooling pipeline liquid adding method also includes a vacuum detection performed after vacuuming; the vacuum detection step includes: detecting whether the vacuum degree inside the cooling pipeline reaches a preset value, and when the vacuum degree inside the cooling pipeline reaches the preset value, performing the liquid injection step.

[0008] In a possible implementation, the step of evacuating includes: connecting a vacuum device to the liquid filling port, and the vacuum device extracts gas from the cooling pipeline through the liquid filling port.

[0009] In one possible implementation, a switch valve is provided at the liquid filling port, and the switch valve controls the opening and closing of the liquid filling port; the cooling pipeline liquid filling method also includes mode switching: the mode switching step includes: closing the switch valve to complete the switching between the vacuuming step and the liquid injection step.

[0010] In a possible implementation, the cooling pipeline has an exhaust valve, and the vacuuming step includes: a vacuuming device is connected to the exhaust valve, and the vacuuming device extracts gas from the cooling pipeline through the exhaust valve.

[0011] In one possible implementation, the cooling pipeline is a circulation pipeline, and the cooling pipeline adding liquid method also includes re-adding liquid after the liquid injection step; the re-adding liquid step includes: controlling the coolant in the cooling pipeline to circulate and continue for a first period of time; controlling the coolant in the cooling pipeline to stand still and continue for a second period of time; detecting whether there is gas in the cooling pipeline, if there is residual gas in the cooling pipeline, performing a local vacuuming step and the above-mentioned liquid injection step, the local vacuuming step includes: the vacuuming device extracts the gas at the exhaust valve through the exhaust valve.

[0012] In a possible implementation, the step of partial vacuuming includes: a vacuuming device extracts part of the coolant in the cooling pipeline through an exhaust valve.

[0013] In a possible implementation, the step of locally vacuuming and the step of injecting liquid include: the step of locally vacuuming and the step of injecting liquid are performed simultaneously.

[0014] In a possible implementation, the step of locally vacuuming and the step of injecting liquid include: the step of locally vacuuming and the step of injecting liquid are performed sequentially.

[0015] In a second aspect, an embodiment of the present application provides a chiller, including a cooling pipeline, and the chiller uses the above-mentioned cooling pipeline liquid adding method to add liquid to the cooling pipeline.

[0016] The embodiments of the present application provide a cooling pipeline filling method and a chiller. The cooling pipeline filling method uses a vacuum pumping device to evacuate the cooling pipeline to form a vacuum inside the cooling pipeline, and then pours coolant into the cooling pipeline through a filling port, so that the coolant can be fully filled in the cooling pipeline, effectively avoiding gas accumulation in the cooling pipeline due to residual gas when pouring coolant, thereby avoiding the problem of cavitation when the water pump of the chiller is running. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In addition, in the drawings, the same parts are marked with the same reference numerals, and the drawings are not drawn according to the actual scale.

[0018] Figure 1 A flowchart of a cooling pipeline liquid adding method provided in an embodiment of the present application is shown;

[0019] Figure 2 A schematic diagram showing the structure of a vacuum pumping device provided in an embodiment of the present application when vacuuming a cooling pipeline;

[0020] Figure 3 A schematic diagram showing the structure of another vacuum pumping device provided in an embodiment of the present application when vacuuming a cooling pipeline;

[0021] Figure 4 A schematic diagram showing the structure of a liquid storage assembly provided in an embodiment of the present application when adding liquid to a cooling pipeline;

[0022] Figure 5 A schematic diagram showing the structure of a battery cell and a liquid cooling plate provided in an embodiment of the present application is shown;

[0023] Figure 6 A schematic diagram showing the structure of a cooling pipeline provided by an embodiment of the present application without a liquid cooling plate is shown;

[0024] Figure 7 A schematic structural diagram of an air cooling box provided in an embodiment of the present application is shown.

[0025] Description of reference numerals:

[0026] 1. Cooling pipeline; 11. Base; 12. Water pump; 13. Heat exchanger; 14. Heater; 15. First liquid outlet pipe; 16. Second liquid outlet pipe; 17. Liquid inlet pipe; 18. Liquid filling port; 19. Switch valve; 110. Exhaust valve; 111. Liquid cooling plate;

[0027] 2. Air cooling box;

[0028] 3. Battery cells;

[0029] 4. Vacuum extraction device;

[0030] 5. Liquid storage component. DETAILED DESCRIPTION

[0031] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0032] The disclosure below provides many different embodiments or examples to realize the different structures of the embodiments of the present application. In order to simplify the disclosure of the embodiments of the present application, the parts and settings of specific examples are described below. Of course, they are only examples, and the purpose is not to limit the embodiments of the present application. In addition, the embodiments of the present application can repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed.

[0033] For ease of description, spatial relative terms may be used herein to describe the relative positional relationship or movement of one element or feature relative to another element or feature as shown in the figure, such as "inside", "outside", "inner side", "outer side", "below", "below", "above", "above", "front", "back", etc. Such spatial relative terms are intended to include different orientations of the device in use or operation in addition to the orientation depicted in the figure. For example, if the device in the figure undergoes a position flip or a posture change or a motion state change, then these directional indications also change accordingly, for example: an element described as "below other elements or features" or "below other elements or features" will subsequently be oriented as "above other elements or features" or "above other elements or features". Therefore, the example term "below..." may include both upper and lower orientations. The device may be otherwise oriented (rotated 90 degrees or in other directions) and the spatial relative descriptors used herein are interpreted accordingly.

[0034] In order to solve the problems in the prior art, the present application provides a cooling pipeline filling method and a chiller, which can effectively avoid the gas accumulation phenomenon in the cooling pipeline when the coolant is poured, thereby avoiding the problem of cavitation when the water pump of the chiller is running.

[0035] Figure 1 A flow chart of a method for adding liquid to a cooling pipeline 1 provided in an embodiment of the present application is shown.

[0036] like Figure 1 As shown, an embodiment of the present application provides a method for adding liquid to a cooling pipeline 1, wherein the cooling pipeline 1 has a liquid adding port 18, and the method for adding liquid to the cooling pipeline 1 includes:

[0037] Step S1, closing the valve: closing the valve body on the cooling pipeline 1, so that a closed space is formed inside the cooling pipeline 1;

[0038] Step S2, vacuuming: vacuuming the enclosed space inside the cooling pipeline 1 by using the vacuuming device 4;

[0039] Step S3 , liquid injection: injecting coolant into the cooling pipeline 1 from the liquid injection port 18 .

[0040] In the embodiment of the present application, the cooling pipeline 1 is evacuated by the vacuum pump 4 so that an absolute vacuum is formed inside the cooling pipeline 1, and then coolant is poured into the cooling pipeline 1 through the liquid filling port 18 so that the coolant can be fully filled in the cooling pipeline 1, thereby effectively avoiding gas accumulation in the cooling pipeline 1 due to residual gas during the pouring of coolant, thereby avoiding the problem of cavitation during the operation of the water pump 12 of the chiller.

[0041] In the related art, the energy storage cabinet uses a rechargeable battery as the energy storage medium. The battery cells 3 of the energy storage cabinet are cooled by a chiller. The chiller includes a cooling pipeline 1. The cooling pipeline 1 is provided with a liquid cooling plate 111 at the battery cell. The coolant flows through the liquid cooling plate 111 to take away the heat at the battery cell 3, thereby cooling the battery cell 3. The commonly used method of adding liquid to the cooling pipeline 1 is to pump the coolant into the cooling pipeline 1 through an external water pump 12. During the process of pumping the coolant, the exhaust valve 110 above the cooling pipeline 1 is in an open state. The gas in the pipeline is discharged from the upper exhaust valve 110 under the pressure of the coolant flowing in from below. When the coolant flows out of the upper exhaust valve 110, it means that the cooling pipeline 1 is also full of coolant. At this time, the exhaust valve 110 is closed and the coolant filling is completed. This currently commonly used method of coolant filling is relatively convenient, but due to the design of the chiller, the direction of the pipeline through which the coolant flows is relatively complex, and the pipeline has many bends, especially the spacing between the heat exchange plates of the plate evaporative heat exchanger 13 is relatively small, and there will be gas at the bends of the pipeline and the gaps between the heat exchange plates. In addition, the coolant is generally selected as a 50% ethylene glycol solution, which has a certain viscosity, and it is also easy to cause residual gas in the cooling pipeline 1 during filling due to the inadequate flow of the coolant. Once the pipeline and the heat exchange plate have gas collection, the flow resistance of the coolant will increase, the impeller of the water pump 12 will be unevenly stressed, and cavitation will easily occur, and the power consumption will be greatly increased.

[0042] In the present application, the valve body on the cooling pipeline 1 is closed, and a closed space is formed inside the cooling pipeline 1. The cooling pipeline 1 is then evacuated by the vacuum pump 4 to make the inside of the cooling pipeline 1 an absolute vacuum. Then, coolant is poured into the cooling pipeline 1 through the liquid filling port 18. The coolant will fill each gap in the cooling pipeline 1, thereby ensuring the effect of coolant pouring. There will be no residual gas in the cooling pipeline 1, and there will be no gas accumulation in the cooling pipeline 1. The impeller of the water pump 12 is evenly stressed, thereby avoiding cavitation.

[0043] Specifically, when pouring the coolant, the height of the liquid storage tank must be a certain height (higher than the cooling pipe 1) so that the coolant in the liquid storage tank can be poured into the cooling pipe 1 under the action of the pressure difference, and the coolant in the cooling pipe 1 will not flow back into the liquid storage tank.

[0044] In some embodiments, the cooling line 1 liquid adding method further comprises the following steps after vacuuming:

[0045] Step S4, vacuum detection: detect whether the vacuum degree inside the cooling pipeline 1 reaches a preset value. When the vacuum degree inside the cooling pipeline 1 reaches the preset value, perform the liquid injection step.

[0046] In the present application, after completing the vacuum pumping step, the vacuum degree in the cooling pipeline 1 is detected. When the vacuum degree in the cooling pipeline 1 reaches a preset value, the subsequent liquid injection step is performed to further ensure that the coolant can be fully filled in the cooling pipeline 1, avoiding the situation where gas remains in the gap of the cooling pipeline 1 or due to the coolant's own viscosity, thereby ensuring that the chiller will not experience gas accumulation during subsequent operation, thereby reducing the power consumption of the chiller water pump 12.

[0047] Specifically, the vacuum detection may use a vacuum sensor to detect the air pressure inside the cooling pipeline 1 , so as to determine whether the vacuum degree inside the cooling pipeline 1 meets the standard.

[0048] In some embodiments, the step of evacuating comprises:

[0049] Step S21 , connecting the vacuum pumping device 4 to the liquid filling port 18 , and the vacuum pumping device 4 extracts the gas in the cooling pipeline 1 through the liquid filling port 18 .

[0050] Specifically, the cooling circuit 1 includes a unit part and a liquid cooling plate 111 part. The coolant is transported to the liquid cooling plate 111 part after cooling in the unit part, and returns to the unit part after cooling the battery cell 3, and then cools down. This cycle is repeated to achieve continuous cooling of the battery cell 3.

[0051] In the present application, by connecting the vacuum device 4 to the liquid filling port 18, the existing structure of the cooling pipeline 1 can be directly utilized, and there is no need to open a special vacuum hole in the cooling pipeline 1 to connect the vacuum device 4. In specific operation, the vacuum device 4 is connected to the liquid filling port 18, and the vacuum device 4 vacuumizes the cooling pipeline 1 through the liquid filling port 18. When a vacuum is formed inside the cooling pipeline 1, the liquid filling port 18 is then connected to the liquid storage component 5, so that the coolant in the liquid storage component 5 is poured into the cooling pipeline 1, completing the pouring of the coolant.

[0052] Furthermore, a switch valve 19 is provided at the liquid adding port 18, and the switch valve 19 controls the opening and closing of the liquid adding port 18; the method for adding liquid to the cooling pipeline 1 also includes:

[0053] Step S5, mode switching: close the switch valve 19 to complete the switching between the vacuuming step and the liquid injection step.

[0054] In the present application, since both the vacuuming step and the liquid injection step are completed through the liquid filling port 18, by setting a switch valve 19 at the liquid filling port 18, when it is necessary to switch between the vacuuming step and the liquid injection step, the switch valve 19 can be closed first to ensure that the switching between the vacuuming step and the liquid injection step can be completed smoothly.

[0055] In some embodiments, the cooling line 1 has an exhaust valve 110, and the step of evacuating comprises:

[0056] Step S22 , the vacuum pumping device 4 is connected to the exhaust valve 110 , and the vacuum pumping device 4 extracts the gas in the cooling pipeline 1 through the exhaust valve 110 .

[0057] Specifically, during daily use of the water-cooled unit, if there is a small amount of air entering from a micro-leakage point or a small amount of gas is released from the added coolant after circulating for a long time, the gas can be discharged through the exhaust valve 110 .

[0058] In the present application, the vacuum device 4 can be connected to the exhaust valve 110, and the existing structure of the cooling pipeline 1 can be utilized, without opening a special vacuum hole in the cooling pipeline 1 to connect the vacuum device 4. In specific operation, after the vacuum device 4 is connected to the exhaust valve 110, the inside of the cooling pipeline 1 is vacuumed by the vacuum device 4. When an absolute vacuum is formed inside the cooling pipeline 1, the exhaust valve 110 is closed, and then the cooling liquid is poured into the cooling pipeline 1 through the liquid filling port 18. After the pouring of the coolant is completed, the vacuum device 4 is disassembled and the exhaust valve 110 is opened.

[0059] The above vacuum device 4 is connected to the liquid filling port 18 or the exhaust valve 110, and the existing structure of the cooling pipeline 1 can be utilized without setting a separate vacuum hole. In addition, the water pipes in the loaded battery pack are hidden and the space is narrow, which makes it inconvenient to set a vacuum point. By connecting the vacuum device 4 to the unit part of the cooling pipeline 1, centralized operation is convenient.

[0060] Optionally, a special vacuum hole can be set on the cooling pipeline 1, and a switch valve 19 can be set at the vacuum hole. The vacuum hole is connected to the vacuum device 4. When the cooling pipeline 1 needs to be vacuumed, the switch valve 19 is opened, and then the cooling pipeline 1 is vacuumed by the vacuum device 4. After the vacuuming of the cooling pipeline 1 is completed, the switch valve 19 is closed, and then coolant is poured into the cooling pipeline 1 through the liquid filling port 18.

[0061] In some embodiments, the cooling pipeline 1 is a circulation pipeline, and the method for adding liquid to the cooling pipeline 1 further includes the following steps after the step of injecting liquid:

[0062] Step S6, adding liquid again; the step of adding liquid again includes:

[0063] Step S61, controlling the coolant in the cooling pipeline 1 to circulate and continue for a first time period;

[0064] Step S62, controlling the coolant in the cooling pipeline 1 to stand still for a second time period;

[0065] Step S63, detecting whether there is gas in the cooling pipeline 1, if there is residual gas in the cooling pipeline 1, performing a local vacuuming step and the above-mentioned liquid injection step;

[0066] Step S64 , local vacuuming: the vacuuming device 4 extracts the gas at the exhaust valve 110 through the exhaust valve 110 .

[0067] In the present application, after the initial addition of coolant is completed, it is possible to add coolant again. By turning on the water pump 12 of the chiller, the coolant in the cooling pipeline 1 circulates for the first period of time. If there is still gas in the cooling pipeline 1, the gas flows with the coolant and is concentrated at the exhaust valve 110. The water pump 12 is turned off, and the coolant is shut down to allow the coolant to stand for a second period of time. Whether there is gas in the cooling pipeline 1 is observed at the exhaust valve 110. Specifically, the method for observing whether there is residual gas in the cooling pipeline 1 can be: directly observe whether there is gas at the exhaust valve 110. If there is gas, it proves that there is still gas in the cooling pipeline 1. Then, the subsequent local vacuuming step and the above-mentioned liquid injection step are performed. If there is no gas at the exhaust valve 110, it proves that there is no gas in the cooling pipeline 1. The addition of liquid can be ended. The residual gas in the cooling pipeline 1 can be further removed to avoid gas accumulation in the cooling pipeline 1.

[0068] In some embodiments, the step of locally evacuating the air comprises:

[0069] Step S641 , the vacuum pumping device 4 extracts part of the coolant in the cooling pipeline 1 through the exhaust valve 110 .

[0070] In the present application, when partial vacuuming is performed, by extracting part of the coolant in the cooling pipeline 1 , it is possible to ensure that all the gas at the exhaust valve 110 is exhausted, thereby ensuring that no gas remains in the cooling pipeline 1 .

[0071] Specifically, the vacuum device 4 performs a vacuum operation on the cooling pipeline 1 through the exhaust valve 110, and the gas at the exhaust valve 110 can be extracted, and the liquid filling port 18 simultaneously adds coolant to the cooling pipeline 1. When the vacuum device 4 extracts a small amount of coolant, it proves that the gas at the exhaust valve 110 is completely exhausted, ensuring that there is no gas in the cooling pipeline 1. The above steps are repeated until there is no residual gas at the exhaust valve 110, and the liquid filling is finished.

[0072] Specifically, the water pump 12 runs for 5s to 10s and then shuts down, and waits for 30s to 60s. If there is gas at the exhaust valve 110, the vacuum pumping device 4 performs a vacuum pumping operation for 3s to 10s, and simultaneously opens the liquid filling port 18 for liquid filling.

[0073] In a specific embodiment, the steps of local vacuuming and liquid injection include: the steps of local vacuuming and liquid injection are performed simultaneously.

[0074] In the present application, local vacuuming and liquid injection can be performed simultaneously, that is, the vacuuming device 4 extracts the gas or coolant at the exhaust valve 110 and then adds an equal amount of coolant into the cooling pipeline 1 through the liquid filling port 18, thereby avoiding the entry of gas during the liquid filling process.

[0075] In another embodiment, the step of locally vacuuming and the step of injecting liquid include: the step of locally vacuuming and the step of injecting liquid are performed sequentially.

[0076] In the present application, the steps of local vacuuming and liquid injection can also be performed sequentially, that is, the step of local vacuuming is performed first, the gas and a small amount of coolant at the exhaust valve 110 are extracted, the local vacuuming is stopped, and then an equal amount of coolant is injected into the cooling pipeline 1 through the liquid filling port 18.

[0077] The cooling pipeline 1 adding liquid method performs a vacuum operation on the cooling pipeline 1 through a vacuum pumping device 4, so that a vacuum is formed inside the cooling pipeline 1, and then coolant is poured into the cooling pipeline 1 through a liquid filling port 18, so that the coolant can be fully filled in the cooling pipeline 1, and the phenomenon of gas accumulation due to residual gas in the cooling pipeline 1 during the pouring of coolant is effectively avoided, thereby avoiding the problem of cavitation during the operation of the water pump 12 of the chiller.

[0078] An embodiment of the present application provides a chiller, including a cooling pipeline 1, and the chiller uses the above-mentioned cooling pipeline 1 liquid adding method to add liquid to the cooling pipeline 1.

[0079] like Figure 6-7As shown, the chiller in the present application is applied to the energy storage cabinet, the chiller includes an air cooling box 2 and a cooling pipeline 1, the cooling pipeline 1 includes a base 11, a water pump 12, a heat exchanger 13, a heater 14, a first liquid outlet pipe 15, a second liquid outlet pipe 16, a liquid inlet pipe 17, a liquid filling port 18, a switch valve 19, an exhaust valve 110 and a liquid cooling plate 111, the liquid cooling plate 111 and the battery cells 3 of the energy storage cabinet form a battery pack, and the battery cells 3 are cooled by the liquid cooling plate 111. The air-cooled device exchanges heat with the heat exchanger 13. One end of the first liquid outlet pipe 15 is connected to the water pump 12, and the other end is connected to the heat exchanger 13. One end of the second liquid outlet pipe 16 is connected to the heat exchanger 13, and the other end is connected to the liquid cooling plate 111. One end of the liquid inlet pipe 17 is connected to the liquid cooling plate 111, and the other end is connected to the water pump 12. The heater 14 and the exhaust valve 110 are arranged on the first liquid outlet pipe 15. The liquid filling port 18 is arranged on the liquid inlet pipe 17 for filling the cooling liquid into the cooling pipeline 1. The water pump 12 is used to drive the circulation of the coolant in the cooling pipeline 1. The switch valve 19 controls the opening and closing of the liquid filling port 18. When the chiller cools the energy storage cabinet, the water pump 12 drives the coolant to circulate in the cooling pipeline 1. The coolant exchanges heat with the air cooling box 2 at the heat exchanger 13 to achieve cooling, and then is transported to the liquid cooling plate 111 through the second liquid outlet pipe 16. The battery cells 3 of the energy storage cabinet are cooled at the liquid cooling plate 111. The heated coolant returns to the water pump 12 through the liquid inlet pipe 17, and enters the heat exchanger 13 through the first liquid outlet pipe 15 and the second liquid outlet pipe 16 to achieve the circulation of the coolant.

[0080] When adding liquid to the chiller in the present application, the switch valve 19 and the exhaust valve 110 on the cooling pipeline 1 are closed to form a closed space inside the cooling pipeline 1, and then the cooling pipeline 1 is vacuumed by the vacuum pump 4 to form a vacuum inside the cooling pipeline 1, and then the liquid inlet pipe 17 is opened to allow the coolant in the liquid storage component 5 to enter the cooling pipeline 1 through the liquid filling port 18. The coolant can fully fill the gap in the cooling pipeline 1 to avoid the phenomenon of gas accumulation in the cooling pipeline 1 caused by residual gas in the cooling pipeline 1. This ensures that cavitation will not occur during the operation of the chiller, and reduces the power consumption of the water pump 12.

[0081] Figure 2 A schematic diagram showing the structure of a vacuum pumping device provided in an embodiment of the present application when vacuuming a cooling pipeline; Figure 3 A schematic diagram showing the structure of another vacuum pumping device provided in an embodiment of the present application when vacuuming a cooling pipeline; Figure 4 A schematic diagram showing the structure of a liquid storage assembly provided in an embodiment of the present application when adding liquid to a cooling pipeline; Figure 5 A schematic diagram showing the structure of a battery cell and a liquid cooling plate provided in an embodiment of the present application is shown; Figure 6 A schematic diagram showing the structure of a cooling pipeline provided by an embodiment of the present application without a liquid cooling plate is shown; Figure 7 A schematic structural diagram of an air cooling box provided in an embodiment of the present application is shown.

[0082] like Figure 2-7 As shown, an embodiment of the present application provides a cooling pipeline 1 liquid adding device, which is applied to a chiller. The cooling pipeline 1 has a liquid adding port 18 and a valve body. The cooling pipeline 1 liquid adding device includes: a vacuum device 4 and a liquid storage component 5.

[0083] By closing the valve body, a closed space is formed inside the cooling pipeline 1. Specifically, the valve body is a valve body that connects the cooling pipeline 1 with the outside, including a switch valve 19, an exhaust valve 110, and the like.

[0084] The vacuuming device 4 is configured to perform a vacuuming operation on the enclosed space of the cooling pipeline 1 .

[0085] The liquid storage assembly 5 is configured to inject cooling liquid into the vacuumed cooling pipeline 1 through the liquid filling port 18 .

[0086] In the present application, the valve body is closed to form a closed space inside the cooling pipeline 1 in preparation for subsequent vacuuming. The cooling pipeline 1 is evacuated by the vacuuming device 4 so that an absolute vacuum is formed inside the cooling pipeline 1. The liquid storage component 5 is connected to the liquid filling port 18 to fill the vacuumed cooling pipeline 1 with coolant.

[0087] As shown in the figure, in some embodiments, a switch valve 19 is provided at the liquid filling port 18, and the vacuum device 4 is further configured as follows: the vacuum device 4 is connected to the liquid filling port 18, the switch valve 19 is opened, and the vacuum device 4 performs a vacuum operation on the cooling pipeline 1 through the liquid filling port 18.

[0088] In the present application, by setting a switch valve 19 at the liquid adding port 18, the opening and closing of the liquid adding port 18 can be controlled. When the cooling pipeline 1 needs to be vacuumed, the liquid adding port 18 is connected to the vacuuming device 4, and when liquid needs to be added, the liquid adding port 18 is connected to the liquid storage component 5. There is no need to set a special vacuuming hole, and the existing structure of the cooling pipeline 1 can be directly utilized.

[0089] Specifically, because the cooling pipeline 1 is filled with liquid when the chiller is first filled with liquid or after a major maintenance operation, the number of times of filling is very small. By connecting the vacuum device 4 with the liquid filling port 18, the vacuum device 4 can be disassembled after the vacuuming is completed, and the vacuum device 4 will not be used in subsequent normal use. Therefore, the vacuum device 4 is connected to the existing structure in the cooling pipeline 1 to reduce changes to the existing structure of the cooling pipeline 1.

[0090] Optionally, the switch valve 19 can also be configured as a three-way valve, one end of which is connected to the liquid storage component 5 and the other end is connected to the vacuum device 4, so that liquid can be added without disassembly or replacement.

[0091] As shown in the figure, in some embodiments, the cooling pipeline 1 has an exhaust valve 110 , and the vacuum pumping device 4 is further configured as follows: the vacuum pumping device 4 is connected to the exhaust valve 110 , and the vacuum pumping device 4 performs a vacuum operation on the cooling pipeline 1 through the exhaust valve 110 .

[0092] In the present application, during the use of the chiller, a small amount of air entering from a micro-leakage point or a small amount of gas precipitated from the added coolant can be discharged through the exhaust valve 110, thereby avoiding the phenomenon of gas accumulation in the cooling pipeline 1. The vacuum device 4 is directly connected to the exhaust valve 110 to vacuum the interior of the cooling pipeline 1 without changing the existing structure of the cooling pipeline 1. During the specific operation, the vacuum device 4 directly vacuums the cooling pipeline 1 through the exhaust valve 110, then closes the exhaust valve 110, and then injects coolant into the cooling pipeline 1 through the liquid filling port 18. After the injection of the coolant is completed, the vacuum device 4 is disassembled and the exhaust valve 110 is opened.

[0093] In some embodiments, the chiller also includes a water pump 12, which is used to drive the circulation of the coolant in the cooling pipeline 1; the liquid storage component 5 is further configured to: if there is residual gas in the cooling pipeline 1, cooperate with the vacuum device 4 to inject coolant into the cooling pipeline 1 through the liquid filling port 18.

[0094] In the present application, if there is still residual gas in the cooling pipeline 1 after the initial liquid addition, the coolant is injected while the vacuum device 4 vacuums the cooling pipeline 1. The liquid storage component 5 replenishes an equal amount of coolant according to the amount of gas and liquid extracted by the vacuum device 4, thereby ensuring the effect of liquid addition and avoiding residual gas in the cooling pipeline 1.

[0095] In some embodiments, the liquid storage assembly 5 includes a liquid storage tank, and the height of the liquid storage tank is higher than the cooling pipeline 1.

[0096] Specifically, the height of the liquid storage tank is higher than the cooling pipeline 1, and the coolant in the liquid storage tank can be automatically added to the cooling pipeline 1 without the coolant in the cooling pipeline 1 flowing back into the liquid storage tank, thereby ensuring the effect of liquid addition.

[0097] It should be understood that the terms used herein are only for the purpose of describing specific example embodiments and are not intended to be limiting. Unless the context clearly indicates otherwise, the singular forms "one", "an" and "" as used herein may also be meant to include plural forms. The terms "include", "comprise", "contain", and "have" are inclusive and therefore specify the presence of stated features, steps, operations, elements and / or parts, but do not exclude the presence or addition of one or more other features, steps, operations, elements, parts, and / or combinations thereof. The method steps, processes, and operations described herein are not interpreted as necessarily requiring them to be performed in the specific order described or illustrated, unless the execution order is clearly indicated. It should also be understood that additional or alternative steps may be used.

[0098] Although the terms first, second, third, etc. can be used in the text to describe multiple elements, components, regions, layers and / or sections, these elements, components, regions, layers and / or sections should not be limited by these terms. These terms can only be used to distinguish an element, component, region, layer or section from another region, layer or section. Unless the context clearly indicates, terms such as "first", "second" and other numerical terms do not imply order or sequence when used in the text. Therefore, the first element, component, region, layer or section discussed below can be referred to as the second element, component, region, layer or section without departing from the teaching of the example embodiments.

[0099] The above is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A cooling pipeline liquid adding method, characterized in that: The cooling pipeline has a liquid filling port, and the cooling pipeline liquid filling method includes: Close valve: Close the valve body on the cooling pipeline to form a closed space inside the cooling pipeline; Vacuuming: The enclosed space inside the cooling pipeline is vacuumed by a vacuuming device; Liquid injection: Pour coolant into the cooling pipeline from the liquid filling port.

2. The cooling pipeline liquid adding method according to claim 1, characterized in that: The cooling pipeline liquid adding method also includes vacuum testing after vacuuming; The vacuum detection step includes: detecting whether the vacuum degree inside the cooling pipeline reaches a preset value, and when the vacuum degree inside the cooling pipeline reaches the preset value, performing the liquid injection step.

3. The cooling pipeline liquid adding method according to claim 1, characterized in that: The vacuuming step comprises: The vacuum pumping device is connected to the liquid filling port, and the vacuum pumping device extracts the gas in the cooling pipeline through the liquid filling port.

4. The cooling pipeline liquid adding method according to claim 3, characterized in that: The liquid adding port is provided with a switch valve, and the switch valve controls the opening and closing of the liquid adding port; the cooling pipeline liquid adding method also includes mode switching: The mode switching step includes: closing the switch valve to complete the switching between the vacuuming step and the liquid injection step.

5. The cooling pipeline liquid adding method according to claim 1, characterized in that: The cooling pipeline has an exhaust valve, and the vacuuming step includes: The vacuum pumping device is connected to the exhaust valve, and the vacuum pumping device extracts the gas in the cooling pipeline through the exhaust valve.

6. The cooling pipeline liquid adding method according to claim 5, characterized in that: The cooling pipeline is a circulation pipeline, and the cooling pipeline liquid adding method further comprises adding liquid again after the liquid injection step; The step of adding liquid again comprises: Controlling the circulation of coolant in the cooling pipeline and maintaining it for a first time period; Controlling the coolant in the cooling pipeline to remain stationary for a second period of time; Detect whether there is gas in the cooling pipeline. If there is residual gas in the cooling pipeline, perform a local vacuuming step and the above-mentioned liquid injection step. The local vacuuming step includes: the vacuuming device extracts the gas at the exhaust valve through the exhaust valve.

7. The cooling pipeline liquid adding method according to claim 6, characterized in that: The local vacuuming step includes: a vacuuming device extracts part of the coolant in the cooling pipeline through an exhaust valve.

8. The cooling pipeline liquid adding method according to claim 6, characterized in that: The steps of locally vacuuming and injecting liquid include: the steps of locally vacuuming and injecting liquid are performed synchronously.

9. The cooling pipeline liquid adding method according to claim 6, characterized in that: The steps of local vacuuming and liquid injection include: the steps of local vacuuming and liquid injection are performed sequentially.

10. A chiller, comprising a cooling pipeline, characterized in that: The chiller uses the cooling pipeline liquid adding method as described in any one of claims 1-9 to add liquid to the cooling pipeline.