Cast-in-place pile foundation module capable of preventing seawater erosion and construction method thereof
By setting up a water-filled bag between the external casing and the internal casing in the cast pile foundation, a water barrier is formed, and the seawater erosion caused by the single structure of the traditional steel casing is solved, and the strength and durability of the pile foundation are improved. And reduce environmental pollution and maintenance costs.
Patent Information
- Application Number
- CN202411418215.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-11
- Publication Date
- 2024-11-29
AI Technical Summary
Traditional permanent steel casings are single structure during construction in offshore projects and are susceptible to seawater erosion, resulting in reduced pile foundation strength and increased maintenance costs, while also causing pollution to the marine environment.
Use water filling bags to set up water filling bags between the external casing and the internal casing to form a water barrier to prevent seawater erosion. By filling the water capsules before the concrete is initially settling, ensure that the pile foundation is not affected by seawater during the infusion process, and After the concrete is completely solidified, remove the water bladder to reduce costs and environmental hazards.
Effectively prevent seawater erosion, improve the strength and durability of pile foundations, reduce maintenance costs, and reduce pollution to the marine environment. Protect concrete through multi-layer water barriers to ensure the integrity and stability of pile foundations.
Smart Images

Figure CN119041402A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of marine engineering, and in particular to a cast-in-place pile foundation module for preventing seawater erosion and a construction method thereof. Background Art
[0002] In offshore engineering construction, cast-in-place pile foundation is a common and widely used foundation form. Cast-in-place pile foundation can provide strong bearing capacity and stability, and is suitable for various complex marine environments. However, in the actual construction process, the corrosion of seawater to pile foundation materials is very serious, especially in the concrete pouring and initial setting stage, the erosion of seawater will significantly affect the strength and durability of the pile foundation. This corrosion will not only cause early damage to the pile foundation structure, but also greatly increase the subsequent maintenance and repair costs. The currently commonly used cast-in-place pile construction method usually adopts permanent steel casing construction. The permanent steel casing plays a supporting and protective role during the construction process. By driving it into the seabed and fixing it, it can effectively resist the erosion of seawater and silt. During the concrete pouring process, the steel casing serves as a supporting structure for pouring to ensure that the concrete can be poured and formed smoothly. After pouring, the permanent steel casing will remain on site and participate in the force of the pile foundation structure in the later stage to provide additional support and protection. However, the permanent steel casing construction method has some obvious disadvantages. First of all, the cost of permanent steel casing is high, and its manufacturing, transportation and installation require a lot of capital investment. Secondly, the steel casing has a single structure and poor water-proof effect during the pouring of the pile foundation. In addition, the steel casing is prone to rust and corrosion when exposed to the seawater environment for a long time, which not only reduces its own strength and function, but also pollutes the surrounding marine environment. The corrosion products of the steel casing will be released into the seawater, which will have a negative impact on the marine ecosystem. Summary of the invention
[0003] The purpose of the present invention is to overcome the problem that during offshore pile foundation construction, the traditional steel casing has a single structure and poor structural stability during construction, which makes it easy for seawater to erode the pile foundation under construction. A cast-in-place pile foundation module and a construction method thereof are provided to prevent seawater erosion.
[0004] In a first aspect, the present invention provides a cast-in-place pile foundation module for preventing seawater erosion, the module comprising an outer casing, an inner casing being sleeved inside the outer casing, a casting part being inside the barrel of the inner casing, a gap being provided between the inner casing and the outer casing, a water-filled bag being provided in the gap, the water-filled bag being able to fill the gap after being filled with water, and the outer casing and the inner casing being higher than the sea level.
[0005] The present invention is a cast-in-place pile foundation module for preventing seawater erosion. The module forms a casting part for making a pile foundation through an internal casing, and an external casing is arranged outside the internal casing, and a gap is left between the external casing and the internal casing, and a water-filled water bag that can be injected with water is arranged in the gap. The water-filled water bag can fill the entire gap after water injection, so that in the process of making the pile foundation of the module, the external casing, the water-filled water bag and the internal casing can form a water barrier, further preventing the seawater from corroding the concrete during the pile foundation making process. Compared with the traditional permanent steel casing, the present invention can cut off the contact between the concrete pile foundation and the seawater through the external casing, the water-filled water bag and the internal casing before the concrete pile is formed, and through the multi-layer water barrier, it is ensured that the internal pile foundation will not be affected by the seawater during the casting.
[0006] Preferably, a connecting hole is provided on the side wall of the external casing, a water injection pipe is connected to the connecting hole, and a sealing ring is provided at the connection between the water injection pipe and the connecting hole.
[0007] The sealing ring between the water injection pipe and the connecting hole can ensure that seawater will not penetrate into the gap from the connecting hole, thus effectively playing a role of water isolation.
[0008] Preferably, the water injection pipe is located below the sea level, and one end of the water injection pipe located in the sea water is connected to a stop valve.
[0009] By setting the water injection pipe below the sea level and installing a stop valve on the water injection pipe, it can be ensured that water can be injected into the water-filled water bag, thereby reducing costs and improving mold construction efficiency.
[0010] Preferably, a quick-connect connector is provided at one end of the water injection pipe away from the stop valve, one end of the quick-connect connector is connected to the water injection pipe, and the other end of the quick-connect connector is connected to the water-filled bag.
[0011] Ensure that all the seawater flowing in from the water injection pipe can be injected into the water bag to avoid water in the gap when the pile foundation is not formed.
[0012] Preferably, a water outlet is provided at the top of the water-filled water bag, and a piston is installed at the water outlet.
[0013] By arranging a water outlet and a piston at the top, it is ensured that the mold can be quickly disassembled after the pile foundation is formed.
[0014] In a second aspect, the present invention provides a method for constructing a cast-in-place pile foundation for preventing seawater erosion. The method adopts the above-mentioned cast-in-place pile foundation module for preventing seawater erosion for construction. The specific construction method is as follows:
[0015] S1. Drilling holes on the seabed and installing the external casing;
[0016] S2. After the outer casing is installed, the inner casing is installed;
[0017] S3, after the inner casing is installed, the water-filled bag is arranged in the gap;
[0018] S4, after the water-filled water bag is set, water is poured into the water-filled water bag until the water-filled water bag fills up the entire gap;
[0019] S5, pouring concrete into the pouring part, and pulling out the internal casing before the concrete begins to set;
[0020] S6. After the concrete is completely solidified, pull out the outer casing.
[0021] The present invention is a method for constructing a cast-in-place pile foundation to prevent seawater erosion. A water-filled bag is arranged between an outer casing and an inner casing, and water is injected into the water-filled bag during the construction process to form a water barrier, which effectively isolates seawater from entering the cast-in part, prevents seawater from corroding concrete, and ensures the quality of concrete. Since the water-filled bag has completely filled the gap before the initial setting of the concrete, the inner casing will not cause damage to the concrete structure when it is pulled out, thereby maintaining the integrity and strength of the pile foundation. The outer casing is pulled out after complete solidification, further ensuring the stability and durability of the pile foundation. Since the module is a detachable module, the outer casing, the water-filled bag and the inner casing can be removed after the pile foundation is formed, reducing costs, and also preventing the steel casing from being rusted in seawater for a long time, thereby reducing harm to the natural environment.
[0022] Preferably, in S5, before pouring concrete into the inner casing, construction workers need to first set a steel cage in the inner casing.
[0023] Ensure the stability of subsequent pile foundation forming.
[0024] Preferably, in S5, when the inner casing is pulled out, the water-filled bag serves as a temporary formwork, and the concrete pile foundation that has not yet initially set is supported by the water-filled bag.
[0025] Since the water-filled bag can drain water, it can serve as a temporary template to support the unformed device before the pile foundation is formed, so that the water in the water-filled bag can be directly drained out after the subsequent device is formed, and then it can be disassembled, thereby improving construction efficiency, speeding up construction progress, and allowing the mold to be reused, reducing costs.
[0026] Preferably, in S6, the water-filled bladder needs to be disassembled before the outer casing is pulled out.
[0027] By removing the water-filled water bag before pulling out the outer casing, the water bag can be prevented from being pulled or damaged when the outer casing is pulled out, thereby extending the service life of the water bag, increasing the number of times it is reused, reducing the cost of construction materials, and improving economic benefits.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] 1. The present invention is a cast-in-place pile foundation module for preventing seawater erosion. The module forms a casting part for making pile foundation through an internal casing, and an external casing is arranged outside the internal casing, and a gap is left between the external casing and the internal casing, and a water-filled bag that can be injected with water is arranged in the gap. The water-filled bag can fill the entire gap after water injection, so that in the process of making pile foundation of the module, the external casing, the water-filled bag and the internal casing can form a water barrier, further preventing the erosion of seawater to concrete in the process of pile foundation making. Compared with the traditional permanent steel casing, the present invention can cut off the contact between the concrete pile foundation and the seawater through the external casing, the water-filled bag and the internal casing before the concrete pile is formed, and through the multi-layer water barrier, it is ensured that the internal pile foundation will not be affected by the seawater during the casting.
[0030] 2. The present invention is a method for constructing a cast-in-place pile foundation to prevent seawater erosion. A water-filled bag is arranged between the outer casing and the inner casing, and water is injected into the water-filled bag during the construction process to form a water barrier, which effectively isolates seawater from entering the cast-in part, prevents seawater from corroding the concrete, and ensures the quality of the concrete. Since the water-filled bag has completely filled the gap before the initial setting of the concrete, the inner casing will not cause damage to the concrete structure when it is pulled out, thereby maintaining the integrity and strength of the pile foundation. The outer casing is pulled out after complete solidification, further ensuring the stability and durability of the pile foundation. Since the module is a detachable module, the outer casing, the water-filled bag and the inner casing can be removed after the pile foundation is formed, reducing costs, and also preventing the steel casing from being rusted in seawater for a long time, thereby reducing harm to the natural environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 The present invention provides a construction process for the cast-in-place pile foundation;
[0032] Figure 2 It is a schematic diagram of the structure of the water-filled water bag of the present invention when it is not filled with water;
[0033] Figure 3 This is a schematic diagram of the structure of the water-filled water bag of the present invention after being filled with water;
[0034] Figure 4 It is a schematic diagram of the structure when the inner casing of the present invention is installed with a steel cage;
[0035] Figure 5It is a schematic diagram of the connection between the outer casing and the water-filled water bag of the present invention;
[0036] Figure 6 For the present invention Figure 5 Enlarged view of point A.
[0037] Markings in the figure: 1-external casing; 11-connecting hole; 12-water injection pipe; 2-internal casing; 21-injection part; 22-steel cage; 3-gap part; 4-water-filled water bag; 41-quick plug connector; 42-water outlet; 5-stop valve. DETAILED DESCRIPTION
[0038] The present invention is further described in detail below in conjunction with specific embodiments. However, this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0039] Unless otherwise specified, in the description of the specific embodiments of the present invention, the terms indicating the orientation or position relationship such as "up", "down", "left", "right", "center", "inside", "outside", etc. are all based on the expression of the orientation or position relationship shown in the drawings, or are the orientation or position relationship when the invented product / equipment / device is usually used. These terms of orientation or position relationship are only for the convenience of describing the scheme of the present invention or simplifying the description in the specific embodiments, so as to facilitate the technicians to quickly understand the scheme, and do not indicate or imply that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation on the present invention.
[0040] In addition, if the terms "horizontal", "vertical", "overhanging", "parallel" and the like appear, it does not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or overhanging or parallel, but may be slightly tilted or have deviations. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but may be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in directions such as "horizontal", "vertical", "overhanging", "parallel", etc., and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the scheme of the present invention.
[0041] In addition, the expressions “first”, “second”, “third”, etc., which appear in the terms, are merely used to distinguish the description of the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.
[0042] In addition, in the description of the embodiments of the present invention, "several", "plurality" and "a number" represent at least 2. It can be any number such as 2, 3, 4, 5, 6, 7, 8, 9, and even more than 9.
[0043] In addition, in the description of the technical solution of the present invention, unless otherwise clearly specified / defined / restricted, the terms "set", "install", "connect", "connected", "provided with", "laid", and "arranged" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection, and can be welding, riveting, bolting, threading, and other commonly used connection means in the field. This connection can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or an indirect connection through an intermediate medium, and it can be the internal connection of two elements.
[0044] Example 1
[0045] like Figures 2 to 4 As shown, a cast-in-place pile foundation module for preventing seawater erosion, the module comprises an inner casing 2, an outer casing 1 is arranged outside the inner casing 2 (one end of the outer casing 1 and one end of the inner casing 2 are both higher than the sea level to avoid the backflow of seawater), the outer casing 1 and the inner casing 2 are not in contact with each other, and a gap 3 is provided between the outer casing 1 and the inner casing 2, a water-filled water bag 4 is provided in the gap 3, and the water-filled water bag 4 can fill the entire gap 3 by injecting water into the water-filled water bag 4;
[0046] Furthermore, a connecting hole 11 is provided on the side wall of the outer casing 1, and the connecting hole 11 is located below the sea level, and a water injection pipe 12 is connected to the connecting hole 11, one end of the water injection pipe 12 is located in the sea water, and the other end of the water injection pipe 12 is located in the gap 3;
[0047] Furthermore, the water-filled water bag 4 is connected to a water injection pipe 12 , and the water-filled water bag 4 is injected with water through the water injection pipe 12 .
[0048] In one or more embodiments, a sealing ring is provided at the connection between the connection hole 11 and the water injection pipe 12 to ensure that when the connection hole 11 is below sea level, seawater will not flow back into the gap 3 through the connection hole 11, thereby affecting the subsequent formation of the pile foundation.
[0049] In one or more embodiments, a stop valve 5 is provided at one end of the water injection pipe 12 located in the seawater, and a quick connector 41 is provided at one end of the water injection pipe 12 away from the stop valve 5. One end of the quick connector 41 is connected to the water injection pipe 12, and the other end is connected to the water-filled water bag 4. Through the stop valve 5, the water injection pipe 12 and the quick connector 41, the operator can inject water into the water-filled water bag 4, thereby accelerating the construction progress and improving the construction efficiency.
[0050] Furthermore, a water outlet 42 and a piston connected to the water outlet 42 are provided at the top of the water-filled water bag 4, so as to ensure that the water-filled water bag 4 can be drained before being disassembled later. Figures 4 to 6 shown.
[0051] The present invention is a cast-in-place pile foundation module for preventing seawater erosion. The module is formed by an internal casing 2 to form a casting part 21 for making a pile foundation, and an external casing 1 is arranged outside the internal casing 2, and a gap part 3 is left between the external casing 1 and the internal casing 2, and a water-filled water bag 4 that can be injected with water is arranged in the gap part 3. After the water is injected, the water-filled water bag 4 can fill the entire gap part 3, so that in the process of making the pile foundation of the module, the external casing 1, the water-filled water bag 4 and the internal casing 2 can form a water barrier, further preventing the erosion of seawater on concrete during the pile foundation making process. Compared with the traditional permanent steel casing, the present mold can cut off the contact between the concrete pile foundation and the seawater through the external casing 1, the water-filled water bag 4 and the internal casing 2 before the concrete pile is formed, and because the module is a detachable module, the external casing 1, the water-filled water bag 4 and the internal casing 2 can be removed after the pile foundation is formed, which reduces the cost and also reduces the harm to the natural environment.
[0052] Example 2
[0053] like Figure 1 and Figure 4 A method for constructing a cast-in-place pile foundation to prevent seawater erosion is shown, which is implemented by the cast-in-place pile foundation module to prevent seawater erosion in Example 1, and specifically includes the following steps:
[0054] S1: First, a hole is drilled on the seabed, and the outer casing 1 is inserted into the hole for fixing. After the insertion is completed, the water in the outer casing 1 is discharged so that the subsequent structure can be installed;
[0055] S2: installing the inner casing 2 in the outer casing 1, and inserting the inner casing 2 on the seabed for fixing;
[0056] S3: After the inner casing 2 and the outer casing 1 are installed, the water-filled bag 4 is installed in the gap 3, the water-filled bag 4 is connected to the quick-connect connector 41, and the stop valve 5 is opened to inject water into the water-filled bag 4;
[0057] S4, after the water-filled water bag 4 completely fills the gap 3, close the stop valve 5 and start pouring the concrete pile foundation;
[0058] S5. After pouring, before the concrete pile foundation begins to set, the internal casing 2 is disassembled;
[0059] S6. After the internal casing 2 is dismantled, the water-filled bladder 4 and the external casing 1 are gradually removed after the concrete pile foundation is formed.
[0060] In one or more embodiments, in S5, before pouring concrete into the inner casing 2, the construction personnel need to first install a steel cage 22 in the inner casing 2 to enhance the stability of the pile foundation.
[0061] In one or more embodiments, in S5, when the inner casing 2 is pulled out, the water-filled bag 4 serves as a temporary formwork, and the uninitialized concrete pile foundation is supported by the water-filled bag 4.
[0062] In one or several embodiments, in S6, the water-filled bag 4 needs to be disassembled before the external casing 1 is pulled out. When disassembling the water-filled bag 4, the operator opens the piston, discharges the water in the water-filled bag 4 through the water outlet 42, and then recovers the water-filled bag 4.
[0063] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A cast-in-place pile foundation module for preventing seawater erosion, characterized in that: The module comprises an outer casing (1), wherein an inner casing (2) is sleeved inside the outer casing (1), a filling part (21) is provided inside the barrel of the inner casing (2), a gap part (3) is provided between the inner casing (2) and the outer casing (1), a water-filled water bag (4) is provided in the gap part (3), and the water-filled water bag (4) can fill the gap part (3) after being filled with water, and the outer casing (1) and the inner casing (2) are above sea level.
2. A cast-in-place pile foundation module for preventing seawater erosion according to claim 1, characterized in that: The side wall of the outer casing (1) is provided with a connection hole (11), a water injection pipe (12) is connected to the connection hole (11), and a sealing ring is provided at the connection between the water injection pipe (12) and the connection hole (11).
3. A cast-in-place pile foundation module for preventing seawater erosion according to claim 2, characterized in that: The water injection pipe (12) is located below the sea level, and one end of the water injection pipe (12) located in the sea water is connected to a stop valve (5).
4. The cast-in-place pile foundation module for preventing seawater erosion according to claim 3, characterized in that: A quick-connect connector (41) is provided at one end of the water injection pipe (12) away from the stop valve (5); one end of the quick-connect connector (41) is connected to the water injection pipe (12), and the other end of the quick-connect connector (41) is connected to the water-filled bag (4).
5. The cast-in-place pile foundation module for preventing seawater erosion according to claim 4, characterized in that: The top of the water-filled water bag (4) is provided with a water outlet, and a piston is installed at the water outlet (42).
6. A method for constructing a cast-in-place pile foundation to prevent seawater erosion, characterized in that: The method adopts a cast-in-place pile foundation module for preventing seawater erosion according to any one of claims 1 to 5 for construction, and the specific construction method is as follows: S1, drilling holes on the seabed and installing the outer casing (1); S2, after the outer casing (1) is installed, the inner casing (2) is installed; S3, after the inner casing (2) is installed, the water-filled bag (4) is arranged in the gap (3); S4, after the water-filled water bag (4) is set, water is poured into the water-filled water bag (4) until the water-filled water bag (4) fills the entire gap (3); S5, pouring concrete into the pouring part (21), and pulling out the inner casing (2) before the concrete begins to set; S6. After the concrete is completely solidified, pull out the outer casing (1).
7. A method for constructing a cast-in-place pile foundation to prevent seawater erosion according to claim 6, characterized in that: In S5, before pouring concrete into the inner casing (2), the construction personnel need to first install a steel cage (22) in the inner casing (2).
8. A method for constructing a cast-in-place pile foundation to prevent seawater erosion according to claim 6, characterized in that: In S5, when the inner casing (2) is pulled out, the water-filled bag (4) serves as a temporary formwork, and the uninitialized concrete pile foundation is supported by the water-filled bag (4).
9. A method for constructing a cast-in-place pile foundation to prevent seawater erosion according to claim 6, characterized in that: In S6, the water-filled water bag (4) needs to be disassembled before the outer casing (1) is pulled out.