Dome assembling jig frame scattered dismantling construction method
By dividing the dome assembly tire frame into multiple demolition parts and dismantling them with traction devices, the lifting collision and high-altitude operation risks of steel structure buildings in confined spaces are solved, and an efficient and safe demolition process is achieved.
Patent Information
- Application Number
- CN202411227034.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2024-11-29
AI Technical Summary
When protecting the steel structure buildings with large spans in confined spaces, the existing technology has the problems of high lifting collision risks, high artificial altitude operations risks, and low demolition efficiency, especially for large-span networks of geometric linear structures There is a lack of effective research on rack removal.
The dome assembly tire frame is used to disassemble the construction method. By dividing the tire frame into multiple removal parts, temporary lifting lugs and traction devices are set, and the traction device is used to make the string beam, lower triangle and central inner cylinder in a plumb state, and gradually dismantle it to reduce the High-altitude operation and collision risks to improve demolition efficiency.
It effectively reduces the risk of dome lifting collision, reduces the risk of high-altitude operations, improves construction efficiency, and ensures the stability and protection of finished products of steel structure buildings.
Smart Images

Figure CN119041740A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of steel structure engineering construction, and in particular to a construction method for dismantling a dome assembly frame in pieces. Background Art
[0002] Nuclear power is one of the most environmentally friendly clean energy sources in my country. In order to achieve higher safety and better seal and shield radioactive materials, the Hualong One Nuclear Power Plant adopts a single-stack layout and double-layer containment design. As a mass-produced nuclear power plant in my country, the Hualong One Nuclear Power Plant innovatively uses an assembly frame in the construction process of its containment steel dome, which indirectly provides force support for the dome assembly and raises the dome assembly quality to a qualitative stage.
[0003] In order to control the safety risks and quality of the dome during the hoisting of the steel dome of the containment, and to avoid the dome assembly frame inside the dome from causing collision damage to the dome during hoisting, which would affect the quality of the dome installation, the assembly frame is dismantled inside the dome. How to protectively dismantle the dome frame in the confined space inside the dome is a research direction in the field of steel structure frame dismantling.
[0004] At present, there is no targeted research plan for the protective dismantling of the steel structure frame in the confined space inside the dome. The research on the dismantling of other similar large-span grids mainly has the following problems:
[0005] 1. Most of the lifting and dismantling operations are carried out with automobile cranes, and manual high-altitude operations are used to achieve the results of dismantling and transportation. This requires a large area for the entire operation, and the operating distance between the pole head and the lifting point is insufficient, which cannot meet the requirements of protective dismantling in confined spaces, and increases the risk of personnel working at high altitudes;
[0006] 2. Large-span grids are all geometrically linear structures. Therefore, the geometric center must be considered during the hoisting and dismantling construction to ensure the overall stability of a single or multiple hoists. If the center of gravity of the dismantling unit is not planned reasonably, there will be a risk of instability. However, there is no relevant research on how to avoid the instability of large-span grids with geometrically linear structures during protective dismantling construction;
[0007] 3. There is little research on dismantling steel structures with large spans in confined spaces while ensuring that the outer steel structures do not collide, and there are limited construction cases for reference. Summary of the invention
[0008] The present invention aims to solve the deficiencies in the prior art and to provide a construction method for the scattered dismantling of a dome assembly frame, which is used to fill the technical gap of dismantling a steel structure building with a large span in a confined space, that is, to protectively dismantle its steel structure frame in the confined space inside the dome; thereby achieving the purpose of reducing the risk of collision during dome hoisting, reducing high-altitude operations, and increasing work efficiency.
[0009] The present invention is achieved through the following technical solutions:
[0010] A construction method for dismantling a dome assembly frame in pieces, comprising the following steps:
[0011] S1: Divide the entire tire frame into multiple dismantling parts;
[0012] S2: dividing the dismantling process according to the dismantling part in S1; the dismantling process includes first dismantling the operating platform on the dome frame, and then dismantling the frame body, and the steps of dismantling the frame body include: first dismantling the middle string beam, and then dismantling the lower triangles and the center inner tube at both ends;
[0013] S3: Positioning and laying out the lines, setting temporary lifting lugs on the dome;
[0014] S4: According to the adjusted demolition parts and processes, carry out the scattered demolition of the dome assembly frame;
[0015] When the beam string, the lower triangle and the central inner tube are removed respectively, the following steps are included:
[0016] Install a traction device on the ground, and install a sling group on the temporary lifting lug, wherein the traction device is used to pass the steel wire rope through the sling group and connect it with the corresponding end of the string beam, the lower triangle or the center inner tube;
[0017] Then, the traction device pulls the corresponding string beam, lower triangle or central inner cylinder through the wire rope and makes it in a plumb state with the lower end suspended in the air;
[0018] A temporary scaffold is set up under the corresponding beam string, lower triangle or central inner tube, so that the lower end of the corresponding beam string, lower triangle or central inner tube is placed on the temporary scaffold, and then the beam string, lower triangle or central inner tube is dismantled piecemeal;
[0019] During piecemeal dismantling, the beam string and the central inner tube are dismantled piecemeal from bottom to top.
[0020] Compared with the problem that there is no targeted research scheme for the protective dismantling of the steel structure frame in the confined space inside the dome in the prior art, the present invention provides a reasonable, practical, efficient, safe and convenient method for the scattered dismantling of the dome assembly frame of a nuclear power plant, which is used to fill the technical gap of dismantling a steel structure building with a large span in a confined space, that is, the protective dismantling of the steel structure frame in the confined space inside the dome; thereby reducing the collision risk of dome hoisting, reducing high-altitude operations, and increasing work efficiency. In the specific scheme, the following specific operations are included: S1: Divide the entire frame into multiple dismantling parts; S2: Divide the dismantling process according to the dismantling parts in S1; the dismantling process includes first dismantling the operating platform on the dome frame, and then dismantling the frame body, and the steps of dismantling the frame body include: first dismantling the middle string beam, and then dismantling the lower triangle and the central inner cylinder at both ends; S3: Positioning and laying out, and setting temporary lifting ears on the dome; S4: According to the adjusted and divided dismantling parts and processes, the scattered dismantling construction of the dome assembly frame is carried out. In the present invention, the traction device installed on the ground can be a winch, a capstan, etc., and the corresponding beam string, lower triangle or central inner tube is placed in a plumb state with the lower end suspended in the air through the traction of the lower traction device and the upper temporary lifting lug. Then a temporary scaffold is set up below it to temporarily place the lower end of the corresponding beam string, lower triangle or central inner tube. In this way, the beam string, lower triangle and central inner tube can be dismantled piecemeal in the restricted space inside the dome. Since the beam string and the central inner tube have a certain length, they are all dismantled from bottom to top and gradually lowered, thereby reducing manual high-altitude operations, reducing construction risks, improving construction work efficiency, and being beneficial to the protection of the finished product of the dome.
[0021] In order to carry out traction and lifting at respective positions of the lower triangle and the central inner tube, the step S3 further includes the following specific steps:
[0022] Position and lay out the lines on the dome inner wall plate above the lower triangle and the dome inner wall plate above the center inner tube, mark and install the first lifting lug on the dome inner wall plate above the lower triangle, and install the second lifting lug on the dome inner wall plate above the center inner tube.
[0023] In a further solution, the specific steps of dismantling the beam string include:
[0024] S4-1: Install the sling assembly at the first lifting eye above the corresponding dismantled beam string, fix the wire rope at the lower end of the beam string, and connect it to the ground winch through the sling assembly. Then, initially tighten the upper connection point of the beam string, and dismantle the lower connection point of the beam string. By slowly releasing the wire rope, the lower end of the beam string rotates downward around its own upper connection point until it is close to the central inner tube.
[0025] S4-2: Set up a temporary scaffold under the beam string and fix the lower end of the beam string on the temporary scaffold;
[0026] S4-3: After the fixing is completed, the string beam is dismantled piecemeal from bottom to top.
[0027] In order to reduce manual high-altitude work and construction risks, in the step S4-3, when the beam string is dismantled piecemeal from bottom to top, a winch arranged around the central inner tube is used to connect the wire rope, so that the wire rope passes through the sling group installed on the triangle of the ring beam of the central inner tube truss and is connected to the upper end of the beam string;
[0028] Subsequently, the connection between the upper end of the beam string and the upper triangle was removed. During the piecemeal dismantling process, the beam string was gradually lowered by slowly releasing the wire rope.
[0029] In order to improve the stability of the structure during demolition operations, the beam string should be released symmetrically during demolition. After releasing a single beam string, the beam string in the radially symmetrical position should also be released and fixed.
[0030] In a further solution, the specific steps of removing the lower triangle include:
[0031] S4-a: Install a sling set at the first lifting lug above the corresponding lower triangle to be removed, fix the wire rope to the upper end of the lower triangle, and pass it through the sling set to connect it to the winch on the ground, remove the circumferential connecting rods on both sides of the lower triangle, slowly retract the winch to tighten the wire rope, remove the anchor bolts between the lower triangle and the ground or pier, and lift the lower triangle up a certain distance before stopping;
[0032] S4-b: Set up a temporary scaffolding under the lower triangle to support the entire lower triangle; then dismantle the lower triangle piecemeal.
[0033] In a further solution, the specific steps of removing the central inner tube include:
[0034] S4-A: Several winches are evenly distributed on the ground around the central inner tube, and a sling group is installed at the second lifting lug above the central inner tube. The steel wire rope is fixed to the upper end of the central inner tube and connected to several winches on the ground through the sling group. Several winches are synchronously and slowly contracted to tighten the steel wire rope, and the connecting bolts between the bottom of the central inner tube and the pier are removed. Then the central inner tube is lifted up a certain distance and then stopped;
[0035] S4-B: Dismantle the central inner tube section by section from bottom to top on the ground.
[0036] Since the central inner tube is assembled by modules installed by several standard section bolts, in order to improve the dismantling efficiency, when dismantling the central inner tube section by section on the ground, the tie rods between the inner tube columns are first removed, and then the inner tube columns are dismantled section by section.
[0037] In order to reduce the swing during the lifting process and make the lifting process stable, the first lifting lug is set on the inner wall of the dome from the top of the lower triangle vertically upward to the dome positioning point; the second lifting lug is set on the inner wall of the dome from the center inner tube truss ring beam vertically upward to the dome positioning point, and the second lifting lug has at least 4 lifting points evenly distributed in the circumferential direction. The first lifting lug can be set on the dome inner wall plate above each lower triangle in a circle.
[0038] In order to facilitate the installation of temporary lifting ears and the removal of the connecting parts on the respective sides, a high-altitude working platform vehicle is also included, which is introduced by means of the motor vehicle passage of the dome assembly site, and the sling group on the temporary lifting ears is installed by means of the high-altitude working platform vehicle;
[0039] Before dismantling the beam string, the bolt connections of the circumferential connecting rods and supports on both sides of the single beam string need to be loosened initially by using a high-altitude work platform vehicle and a hand chain hoist, but not completely disconnected; then the subsequent scattered dismantling operations are carried out by installing a sling group;
[0040] Before dismantling the lower triangle, the annular rods and tensioning round steel of the lower triangle need to be loosened initially by using a high-altitude work platform vehicle and a hand winch, but not completely disconnected; then the subsequent scattered dismantling operations are carried out by installing a sling group.
[0041] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0042] 1. The invention provides a method for dismantling the dome assembly frame in a scattered manner, which is used to dismantle the frame inside the dome and transport it out of the dome using the personnel passage and motor vehicle passage provided in the dome assembly site, thereby ensuring that the dome will not collide with the frame during hoisting, thereby improving the hoisting quality and installation quality of the dome;
[0043] 2. The present invention provides a method for dismantling the dome assembly frame in a scattered manner. The beam string is released and dismantled symmetrically to ensure the dismantling stability of the entire dome frame. The lifting and dismantling of the lower triangle and the dismantling of the beam string share a set of slings to improve the utilization rate of the slings. The bottom-up dismantling construction method of the central inner tube reduces the number of high-altitude operations. In general, the dome assembly frame is dismantled in a scattered manner, and the high-altitude steel components are hoisted to the ground for dismantling, which reduces the damage rate of component dismantling, is conducive to reuse, has better safety control, and high construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:
[0045] Figure 1 A schematic diagram of the process provided by the present invention;
[0046] Figure 2 A schematic cross-sectional view of a dome assembly frame state provided by the present invention;
[0047] Figure 3 A schematic diagram of the cross-section of the lower end release construction of the beam string provided by the present invention;
[0048] Figure 4 A schematic cross-sectional view of the dismantling construction of the beam string provided by the present invention;
[0049] Figure 5 A schematic diagram of the demolition construction cross section of the lower triangle provided by the present invention;
[0050] Figure 6 A schematic cross-sectional view of the dismantling construction of the central inner tube provided by the present invention;
[0051] Figure 7 A schematic diagram of a dome assembly passage provided by the present invention;
[0052] Figure 8 This is a schematic diagram of the connection of the sling group provided by the present invention.
[0053] Marks and corresponding parts names in the attached drawings:
[0054] 1-dome, 2-center inner tube, 3-string beam, 4-lower triangle, 5-temporary lifting eye, 501-first lifting eye, 502-second lifting eye, 6-winch, 7-wire rope, 8-temporary scaffolding, 9-winch, 10-motor vehicle passage, 11-dome steel lining, 12-first shackle, 13-second shackle, 14-lifting pulley, 15-upper triangle. DETAILED DESCRIPTION
[0055] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0056] Embodiment 1:
[0057] This embodiment 1 provides a method for dismantling a dome assembly frame in a scattered manner, such as Figure 1-Figure 8 As shown, the following steps are included:
[0058] S1: Divide the entire tire frame into multiple dismantling parts;
[0059] S2: dividing the dismantling process according to the dismantling part in S1; the dismantling process includes first dismantling the operating platform on the dome 1 frame, and then dismantling the frame body, and the steps of dismantling the frame body include: first dismantling the middle string beam 3, and then dismantling the lower triangles 4 and the center inner tube 2 at both ends;
[0060] S3: Positioning and laying out, setting temporary lifting lugs 5 on the dome 1;
[0061] S4: According to the adjusted demolition parts and processes, carry out the scattered demolition of the assembly frame of the dome 1;
[0062] When the beam string 3, the lower triangle 4 and the central inner tube 2 are removed respectively, the following steps are included:
[0063] A traction device is installed on the ground, and a sling group is installed on the temporary lifting lug 5, wherein the traction device is used to pass the steel wire rope 7 through the sling group and connect it with the corresponding end of the tension beam 3, the lower triangle 4 or the center inner tube 2;
[0064] Then, the traction device pulls the corresponding string beam 3, lower triangle 4 or central inner tube 2 through the wire rope 7, and makes it in a plumb state with the lower end suspended in the air;
[0065] A temporary scaffold 8 is set up under the corresponding beam string 3, lower triangle 4 or central inner tube 2, so that the lower end of the corresponding beam string 3, lower triangle 4 or central inner tube 2 is placed on the temporary scaffold 8, and then the beam string 3, lower triangle 4 or central inner tube 2 is dismantled piecemeal;
[0066] During piecemeal dismantling, the beam string 3 and the central inner tube 2 are dismantled piecemeal from bottom to top.
[0067] Compared with the problem that there is no targeted research scheme for the protective dismantling of the steel structure frame in the confined space inside the dome in the prior art, the present invention provides a reasonable, practical, efficient, safe and convenient method for the scattered dismantling of the dome assembly frame of a nuclear power plant, which is used to fill the technical gap of dismantling a steel structure building with a large span in a confined space, that is, the protective dismantling of the steel structure frame in the confined space inside the dome 1; thereby reducing the collision risk of dome hoisting, reducing high-altitude operations, and increasing work efficiency. In the specific scheme, the following specific operations are included: S1: dividing the entire frame into multiple dismantling parts; S2: dividing the dismantling process according to the dismantling parts in S1; the dismantling process includes first dismantling the operating platform on the dome frame, and then dismantling the frame body, and the steps of dismantling the frame body include: first dismantling the middle string beam 3, and then dismantling the lower triangle 4 and the central inner tube 2 at both ends; S3: positioning and laying out, and setting temporary lifting ears 5 on the dome 1; S4: according to the adjusted and divided dismantling parts and processes, the scattered dismantling construction of the dome assembly frame is carried out. In the present invention, the traction device installed on the ground can be selected from a winch 6, a capstan 9, etc., and through the traction of the lower traction device and the upper temporary lifting eye 5, the corresponding beam string 3, the lower triangle 4 or the central inner tube 2 is placed in a plumb state, and the lower end is suspended in the air. Then, a temporary scaffold 8 is set up below it to temporarily place the corresponding lower end of the beam string 3, the lower triangle 4 or the central inner tube 2. In this way, the beam string 3, the lower triangle 4 and the central inner tube 2 can be dismantled piecemeal in the confined space inside the dome 1. Since the beam string 3 and the central inner tube 2 have a certain length, they are all dismantled from bottom to top and gradually lowered, thereby reducing manual high-altitude operations, reducing construction risks, improving construction work efficiency, and being beneficial to the protection of the finished product of the dome 1.
[0068] In order to carry out traction and lifting at respective positions of the lower triangle 4 and the central inner tube 2, the step S3 further includes the following specific steps:
[0069] Position and lay out the lines on the inner wall plate of the dome 1 above the lower triangle 4 and the inner wall plate of the dome 1 above the central inner tube 2, mark and install the first lifting lug 501 on the inner wall plate of the dome 1 above the lower triangle 4, and install the second lifting lug 502 on the inner wall plate of the dome 1 above the central inner tube 2.
[0070] In a further solution, the specific steps of dismantling the beam string 3 include:
[0071] S4-1: Install a sling assembly at the first lifting lug 501 above the corresponding dismantled beam string 3, fix the steel wire rope 7 to the lower end of the beam string 3, and connect it to the ground winch 6 through the sling assembly, then initially tighten the upper end connection point of the beam string 3, and dismantle the lower end connection point of the beam string 3, and slowly release the steel wire rope 7 to make the lower end of the beam string 3 rotate downward around its own upper end connection point until it is close to the central inner tube 2;
[0072] S4-2: erecting a temporary scaffold 8 below the beam string 3, and fixing the lower end of the beam string 3 on the temporary scaffold 8;
[0073] S4-3: After the fixing is completed, the beam string 3 is dismantled piecemeal from bottom to top.
[0074] In order to reduce manual high-altitude work and construction risks, in the step S4-3, when the beam string 3 is dismantled piecemeal from bottom to top, the winch 9 arranged around the central inner tube 2 is used to connect the wire rope 7, so that the wire rope 7 passes through the sling group installed on the triangle 15 of the truss ring beam of the central inner tube 2, and is connected to the upper end of the beam string 3;
[0075] Then, the connection between the upper end of the beam string 3 and the upper triangle 15 is removed. During the piecemeal dismantling process, the beam string 3 is gradually lowered by slowly releasing the steel wire rope 7 .
[0076] In order to improve the stability of the structure during the dismantling operation, the beam string 3 should be released symmetrically during dismantling. After releasing a single beam string 3, the beam string 3 at the radially symmetrical position thereof should also be released and fixed.
[0077] In a further solution, the specific steps of removing the lower triangle 4 include:
[0078] S4-a: Install a sling group at the first lifting lug 501 above the corresponding lower triangle 4 to be removed, fix the wire rope 7 to the upper end of the lower triangle 4, and pass it through the sling group to connect it to the winch 6 on the ground, remove the circumferential connecting rods on both sides of the lower triangle 4, slowly shrink the winch 6 to tighten the wire rope 7, remove the anchor bolts between the lower triangle 4 and the ground or pier, and lift the lower triangle 4 up a certain distance and then stop;
[0079] S4-b: A temporary scaffold 8 is set up below the lower triangle 4 to support the entire lower triangle 4; then the lower triangle 4 is dismantled piecemeal.
[0080] In a further solution, the specific steps of removing the central inner tube 2 include:
[0081] S4-A: a number of winches 9 are evenly distributed on the ground around the central inner tube 2, and a sling group is installed at the second lifting lug 502 above the central inner tube 2. The steel wire rope 7 is fixed to the upper end of the central inner tube 2 and connected to the winches 9 on the ground through the sling group. The winches 9 are synchronously and slowly contracted to tighten the steel wire rope 7. The connecting bolts between the bottom of the central inner tube 2 and the pier are removed, and then the central inner tube 2 is lifted up a certain distance and then stopped;
[0082] S4-B: Dismantle the central inner tube 2 section by section from bottom to top on the ground.
[0083] Since the central inner tube 2 is a module assembly formed by a number of standard section bolts, in order to improve the dismantling efficiency, when the central inner tube 2 is dismantled section by section on the ground, the tie rods between the inner tube columns are first dismantled, and then the inner tube columns are dismantled section by section.
[0084] In order to reduce the swing during the lifting process and make the lifting process stable, the first lifting lug 501 is set on the inner wall of the dome 1 at a location vertically upward from the top of the lower triangle 4 to the dome 1 positioning point; the second lifting lug 502 is set on the inner wall of the dome 1 at a location vertically upward from the center inner tube 2 truss ring beam to the dome 1 positioning point, and the second lifting lug 502 is evenly distributed at least 4 lifting points in the circumferential direction. Among them, the first lifting lug 501 can be set on the inner wall plate of the dome 1 above each lower triangle 4 in a circle.
[0085] In order to facilitate the installation of the temporary lifting lug 5 and the removal of the connecting pieces on the respective sides, a high-altitude work platform vehicle is also included, which is introduced by utilizing the motor vehicle passage 10 of the dome assembly site, and the sling group on the temporary lifting lug 5 is installed by the high-altitude work platform vehicle;
[0086] Before dismantling the beam string 3, the bolt connections of the annular connecting rods and supports on both sides of the single beam string 3 need to be loosened initially by using a high-altitude work platform vehicle and a hand chain hoist, but not completely disconnected; then the subsequent scattered dismantling operations are carried out by installing a sling group;
[0087] Before dismantling the lower triangle 4, the circumferential rods and tensioning round steel of the lower triangle 4 need to be loosened initially by using a high-altitude work platform vehicle and a hand winch, but not completely disconnected; then the subsequent scattered dismantling operations are carried out by installing a sling group.
[0088] Embodiment 2:
[0089] Based on Example 1, this Example 2 provides a specific implementation method for the scattered dismantling construction of the dome assembly frame in the Hualong One nuclear power plant.
[0090] like Figure 1-Figure 8 As shown, in this embodiment, a high-altitude work platform vehicle is first introduced into the interior of the dome 1, and the middle large-span tension string beam 3 is first dismantled by using the hoist 6 and the winch 9. After the tension string beam 3 is hoisted to the ground, it is dismantled piecemeal in sections, and the radially symmetrical dismantling is adopted. Then, the lower triangle 4 and the central inner tube 2 are dismantled to complete the construction work of the embodiment of the present invention.
[0091] The following specific implementation tasks are included:
[0092] S1. Nuclear power plant dome assembly frame system, which divides the entire frame into multiple dismantling parts;
[0093] S2. Divide the demolition process according to the demolition parts in S1;
[0094] S3, positioning and laying out, setting temporary lifting lugs 5;
[0095] S4. Carry out piecemeal dismantling of the dome assembly frame according to the adjusted dismantling parts and processes.
[0096] In this embodiment, the construction method from bottom to top is adopted for the beam string 3 and the central inner tube 2. The beam string 3 with a larger span is dismantled by using a winch 6 to tension the beam string 3, and hoisting it to the ground platform inside the dome 1 for dismantling. The geometric center of the beam string 3 is divided to complete the gradual dismantling of the large-span beam string 3 monomer inside the dome 1. During the dismantling process of the central inner tube 2, a winch 9 is designed to lift the central inner tube 2 to a certain extent, and the dismantling operation of the central inner tube 2 is carried out from bottom to top, which reduces manual high-altitude operations, reduces construction risks, improves construction work efficiency, and is conducive to the protection of the finished product of the dome 1.
[0097] In this embodiment, the lower triangle 4 is dismantled by using a winch 6 to tension and lift the lower triangle 4 to a certain extent to prevent it from tipping over after the annular rods on both sides and the tensioning round steel are dismantled.
[0098] In some embodiments of the construction method of the present invention, the divided demolition process described in S2 is first platform and then main body, first middle and then two ends. The platform-first-then-main body demolition process is to first demolish the operating platform on the dome tire frame and then demolish the tire frame body; the steps of demolishing the tire frame body include: first middle and then two ends demolition process, that is, preferentially demolish the middle tension beam 3 part and then demolish the lower triangle 4 and the center inner tube 2.
[0099] In some embodiments of the construction method of the present invention, before removing the operating platform on the dome frame, the inner wall plate of the dome 1 above the lower triangle 4 and the inner wall plate of the dome 1 above the central inner tube 2 are positioned and laid out, and temporary lifting lugs 5 are marked and installed;
[0100] In this embodiment, the dismantling sling group of the lower triangle 4 and the dismantling sling group of the beam string 3 are a common group, and the dismantling of the beam string 3 takes precedence over the dismantling of the lower triangle 4 .
[0101] In this embodiment, when dismantling the beam string 3, the following steps are included:
[0102] a. Use the motor vehicle passage 10 of the dome 1 assembly site to introduce a high-altitude work platform vehicle, and use a hand chain hoist to loosen the annular connecting rods and supporting bolts on both sides of the single beam string 3, but do not completely disconnect them;
[0103] b. Use a high-altitude work platform vehicle to install a sling group on the first lifting lug 501 above the corresponding dismantled beam string 3, fix the steel wire rope 7 on the lower end of the beam string 3, pass through the sling group and connect to the winch 6 on the ground, at this time, initially loosen the node connecting the upper end of the beam string 3 with the upper triangle 15 of the central inner tube 2, take out the pin shaft at the lower end of the beam string 3, completely detach and dismantle the annular connecting rods on both sides, slowly release the steel wire rope 7, make the beam string 3 do a circular motion around the upper end connection point, and move and release to the scaffolding near the central inner tube 2;
[0104] c. Set up a scaffolding support under the beam string 3 to support the entire single beam string 3, and fix the beam string 3 on the scaffolding below to prevent shaking;
[0105] d. After being fixed on the scaffold, the beam string 3 is dismantled piecemeal on the platform.
[0106] In this embodiment, when the beam string 3 is dismantled piecemeal on the platform, the winch 9 arranged around the central inner tube 2 is used to connect the steel wire rope 7, and the steel wire rope 7 passes through the sling group installed on the triangle 15 of the truss ring beam of the central inner tube 2 to connect the upper end of the beam string 3. The steel wire rope 7 is slowly released to cooperate with the operator to carry out dismantling on the ground.
[0107] In this embodiment, when the lower triangle 4 is removed, the following steps are included:
[0108] a. Use a high-altitude work platform vehicle and a hand chain hoist to remove the annular rods and tension round steel of the lower triangle 4, which are initially loosened but not completely detached;
[0109] b. Use a high-altitude work platform vehicle to install a sling group on the first lifting lug 501 above the corresponding dismantled beam string 3, fix the wire rope 7 on the lower end of the beam string 3, pass it through the sling group and connect it to the winch 6 on the ground, completely detach the annular connecting rods on both sides of the dismantling, slowly shrink the winch 6 to tighten the wire rope 7, remove the anchor bolts between the lower triangle 4 and the ground or pier, and lift the lower triangle 4 up a certain distance and then stop.
[0110] c. Set up a scaffold support under the lower triangle 4 to support the entire single lower triangle 4 to prevent shaking, and carry out piecemeal dismantling on the ground.
[0111] In this embodiment, when removing the central inner tube 2, the following steps are included:
[0112] a. No less than 4 winches 9 are arranged around the central inner tube 2. A sling group is installed on the second lifting lug 502 above the central inner tube 2 using a high-altitude work platform vehicle. The steel wire rope 7 is fixed to the upper end of the central inner tube 2 and connected to the winch 9 on the ground through the sling group. Several synchronous winches 9 are slowly retracted to tighten the steel wire rope 7. The connecting bolts between the bottom of the central inner tube 2 and the pier are removed. The central inner tube 2 is lifted up a certain distance and then stopped.
[0113] b. On the ground, the central inner tube 2 is dismantled section by section from bottom to top.
[0114] In this embodiment, when the central inner tube 2 is dismantled section by section on the ground, considering that the central inner tube 2 is a module assembled by a number of standard section bolts, the tie rods between the inner tube columns are firstly dismantled, and then the inner tube columns are dismantled section by section.
[0115] In this embodiment, the beam string 3 is dismantled and released symmetrically. After releasing a single beam string 3, the beam string 3 at its radially symmetrical position is also released and fixed. After the beam string 3 is fixed, the steel wire rope 7 is removed for use in the next dismantling process.
[0116] In this embodiment, the sling assembly is composed of a first shackle 12, a second shackle 13, and a lifting tackle 14. Figure 8 shown.
[0117] In this embodiment, the first lifting ear 501 is set on the inner wall of the dome 1 at a location vertically upward from the top of the lower triangle 4 to the positioning point of the dome 1; the second lifting ears 502 are set on the inner wall of the dome 1 at a location vertically upward from the truss ring beam of the central inner tube 2 to the positioning point of the dome 1, and there are no less than 4 lifting points evenly distributed around the circle.
[0118] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for dismantling a dome assembly frame in a scattered manner, characterized in that: The following steps are involved: S1: Divide the entire tire frame into multiple dismantling parts; S2: dividing the dismantling process according to the dismantling part in S1; the dismantling process includes first dismantling the operating platform on the dome (1) frame, and then dismantling the frame body; the steps of dismantling the frame body include: first dismantling the middle string beam (3), and then dismantling the lower triangles (4) and the center inner tube (2) at both ends; S3: Positioning and laying out the lines, and setting temporary lifting lugs (5) on the dome (1); S4: According to the adjusted demolition parts and processes, carry out the scattered demolition of the dome assembly frame; When the beam string (3), the lower triangle (4) and the central inner tube (2) are removed respectively, the following steps are included: A traction device is installed on the ground, and a sling group is installed on the temporary lifting lug (5), wherein the traction device is used to pass the steel wire rope (7) through the sling group and connect it to the corresponding end of the string beam (3), the lower triangle (4) or the central inner tube (2); Then, the traction device pulls the corresponding string beam (3), lower triangle (4) or central inner cylinder (2) through the steel wire rope (7) and makes it in a plumb state with the lower end suspended in the air; A temporary scaffold (8) is set up below the corresponding beam string (3), lower triangle (4) or central inner tube (2), so that the lower end of the corresponding beam string (3), lower triangle (4) or central inner tube (2) is placed on the temporary scaffold (8), and then the beam string (3), lower triangle (4) or central inner tube (2) is dismantled piecemeal; During piecemeal dismantling, the beam string (3) and the central inner tube (2) are dismantled piecemeal from bottom to top.
2. A dome assembly frame dismantling construction method according to claim 1, characterized in that: The step S3 also includes the following specific steps: Positioning and laying out the inner wall plate of the dome (1) above the lower triangle (4) and the inner wall plate of the dome (1) above the central inner tube (2), marking and installing the first lifting lug (501) on the inner wall plate of the dome (1) above the lower triangle (4), and installing the second lifting lug (502) on the inner wall plate of the dome (1) above the central inner tube (2).
3. A dome assembly frame dismantling construction method according to claim 2, characterized in that: The specific steps of dismantling the beam string (3) include: S4-1: Install a sling assembly at the first lifting lug (501) above the corresponding dismantled beam string (3), fix the steel wire rope (7) to the lower end of the beam string (3), and connect it to the ground winch (6) through the sling assembly, then initially tighten the upper end connection point of the beam string (3), and dismantle the lower end connection point of the beam string (3), and slowly release the steel wire rope (7) to rotate the lower end of the beam string (3) downward around its own upper end connection point until it is close to the central inner tube (2); S4-2: erecting a temporary scaffold (8) below the beam string (3), and fixing the lower end of the beam string (3) on the temporary scaffold (8); S4-3: After the fixing is completed, the beam string (3) is dismantled piecemeal from bottom to top.
4. A dome assembly frame dismantling construction method according to claim 3, characterized in that: In the step S4-3, when the beam string (3) is dismantled piecemeal from bottom to top, a winch (9) arranged around the central inner tube (2) is used to connect the steel wire rope (7), so that the steel wire rope (7) passes through a triangular sling group installed on the truss ring beam of the central inner tube (2) and is connected to the upper end of the beam string (3); Then, the connection between the upper end of the beam string (3) and the upper triangle is removed, and during the process of piecemeal dismantling, the beam string (3) is gradually lowered by slowly releasing the steel wire rope (7).
5. The method for dismantling a dome assembly frame in pieces according to claim 3 is characterized in that: The dismantling of the beam string (3) should be symmetrically released, and after releasing a single beam string (3), the beam string (3) at the radially symmetrical position thereof is also released and fixed.
6. The method for dismantling a dome assembly frame in pieces according to claim 2 is characterized in that: The specific steps of removing the lower triangle (4) include: S4-a: Install a sling assembly at the first lifting lug (501) above the corresponding lower triangle (4) to be removed, fix the steel wire rope (7) to the upper end of the lower triangle (4), and pass it through the sling assembly to connect it to the winch (6) on the ground, remove the circumferential connecting rods on both sides of the lower triangle (4), slowly retract the winch (6) to tighten the steel wire rope (7), remove the anchor bolts between the lower triangle (4) and the ground or the pier, and lift the lower triangle (4) up a certain distance before stopping; S4-b: A temporary scaffold (8) is set up below the lower triangle (4) to support the entire lower triangle (4); and then the lower triangle (4) is dismantled piecemeal.
7. The method for dismantling a dome assembly frame in pieces according to claim 2, characterized in that: The specific steps of removing the central inner tube (2) include: S4-A: a plurality of winches (9) are evenly distributed on the ground around the central inner tube (2), and a sling group is installed at the second lifting lug (502) above the central inner tube (2). The steel wire rope (7) is fixed to the upper end of the central inner tube (2) and connected to the plurality of winches (9) on the ground through the sling group. The plurality of winches (9) are synchronously and slowly contracted to tighten the steel wire rope (7), and the connecting bolts between the bottom of the central inner tube (2) and the pier are removed. Then, the central inner tube (2) is lifted up a certain distance and then stopped. S4-B: On the ground, the central inner tube (2) is dismantled section by section from bottom to top.
8. A dome assembly frame dismantling construction method according to claim 7, characterized in that: When the central inner tube (2) is dismantled section by section on the ground, the tie rods between the inner tube columns are firstly dismantled, and then the inner tube columns are dismantled section by section.
9. The method for dismantling a dome assembly frame in pieces according to claim 2, characterized in that: The first lifting lug (501) is arranged at a location on the inner wall of the dome (1) from the top of the lower triangle (4) vertically upward to the positioning point of the dome (1); the second lifting lug (502) is arranged at a location on the inner wall of the dome (1) from the truss ring beam of the central inner tube (2) vertically upward to the positioning point of the dome (1), and the second lifting lug (502) has at least 4 lifting points evenly distributed in the circumference.
10. A method for dismantling a dome assembly frame in pieces according to any one of claims 1 to 9, characterized in that: It also includes a high-altitude work platform vehicle introduced by utilizing the motor vehicle passage (10) of the dome assembly site, and the sling set on the temporary lifting lug (5) is installed by means of the high-altitude work platform vehicle; Before dismantling the beam string (3), the bolt connections between the annular connecting rods and supports on both sides of the single beam string (3) need to be loosened initially by using a high-altitude work platform vehicle in conjunction with a hand chain hoist, but not completely disconnected; then subsequent scattered dismantling operations are performed by installing a sling assembly; Before dismantling the lower triangle (4), the annular rods and the tensioning round steel of the lower triangle (4) need to be loosened initially by using a high-altitude work platform vehicle in conjunction with a hand winch, but not completely disconnected; then the subsequent scattered dismantling operations are carried out by installing a sling group.