Liftable support for building engineering construction

By integrating vertical tracks, roller mechanisms, dust removal mechanisms and automatic power connection systems in the lifting brackets for construction projects, the problems of dust pollution and power supply difficulties are solved, and efficient filtration and collection of dust are achieved to ensure the cleanliness of the construction environment. and transportation stability.

CN119059394AInactive Publication Date: 2024-12-03张少阳
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411125474.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing construction project construction lifting brackets are difficult to effectively prevent dust pollution when loading sand, gravel and cement, and the dust removal device is difficult to supply power, affecting the construction environment.

Method used

A liftable bracket including vertical tracks, roller mechanisms, dust removal mechanisms and automatic power connection systems is designed to filter and collect dust through exhaust fans, threaded partitions and cleaning mechanisms to ensure that the bracket does not generate during loading. Pollution and convenient power supply through automatic power connection system.

Benefits of technology

It effectively prevents the diffusion of dust during loading, improves dust collection efficiency, ensures cleanliness of the construction environment, and is stable in a strong wind environment, simplifying the unloading process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119059394A_ABST
    Figure CN119059394A_ABST
Patent Text Reader

Abstract

The invention discloses a liftable support for building engineering construction, and relates to the technical field of building construction.The liftable support comprises a liftable support body and a vertical track for limiting the lifting track of the liftable support body, and a supporting mechanism for supporting the bottom of the liftable support body is arranged at the bottom of the vertical track; a roller mechanism used in cooperation with the vertical rail is arranged on the outer side wall of the lifting support, and the roller mechanism drives a cleaning mechanism in the lifting support to conduct cleaning work through a belt transmission structure. Through the arrangement of the dust removal mechanism and the cleaning mechanism, the purpose of cleaning and collecting dust is achieved, through the arrangement of the vertical rail and the roller mechanism, the liftable support is stably lifted upwards, the situation that a large amount of dust drifts in the air in the transportation process is avoided, and through the arrangement of the supporting mechanism, the dust removal efficiency is improved. And when the liftable support is located at the bottommost part, power can be supplied to the dust removal mechanism, and the power utilization safety and the power supply convenience of the dust removal mechanism are guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, in particular to a hoistable support for building engineering construction. Background Art

[0002] Construction engineering is the process of people building building products according to design blueprints, using construction materials and mechanical equipment. In the process of construction engineering, in order to facilitate operations and save construction time, materials such as sand, gravel, and cement need to be lifted to a high place.

[0003] Disclosed in the Chinese invention patent application disclosure CN112479091B is a lifting bracket for construction engineering. Although it can reduce air pollution caused by mud and sand during transportation, it is very difficult to power the mobile device when using a dust suction device to avoid dust pollution. Moreover, when loading sand, gravel, cement and other materials into the bracket, they need to be loaded from the top opening. The upper part of the bracket is open, and the material has a height difference when it falls. When it falls, a lot of dust will be stirred up. This is when the pollution is most serious and dust removal is more needed. Summary of the invention

[0004] 1. Technical issues to be resolved In view of the shortcomings of the prior art, the present invention provides a lifting bracket for construction engineering, which has the advantages of being able to prevent dust from overflowing from the inside when sand, gravel, cement and other materials are loaded into the bracket and being able to automatically clean the filter device to improve the dust collection efficiency, thereby solving the problems raised in the background technology.

[0005] (II) Technical solution In order to achieve the above-mentioned purpose of preventing dust from overflowing from the inside when loading sand, gravel, cement and other materials into the bracket and automatically cleaning the filter device to improve the dust collection efficiency, the present invention provides the following technical solutions: a liftable bracket for construction engineering, comprising a liftable bracket and a vertical track for limiting the lifting trajectory of the liftable bracket, the two sides of the liftable bracket are connected to the hoist at the top of the vertical track through a lifting cable, and the side of the vertical track is reinforced and connected to the side wall of the building floor of the building through a reinforcement beam, the bottom of the vertical track is provided with a support mechanism for supporting the bottom of the liftable bracket, the outer side wall of the liftable bracket is provided with a roller mechanism used in conjunction with the vertical track, the roller mechanism drives the cleaning mechanism inside the lift bracket to perform cleaning work through a belt transmission structure, and the side wall of the lift bracket is provided with a dust removal mechanism; The outermost layer of the lifting bracket is set as a rectangular lifting box, wherein the installation ring protruding outward in the dust removal mechanism is close to the outer wall of the lifting box, an exhaust fan is installed inside the installation ring, and a filter plate for processing dust in the air is set at one end of the installation ring embedded in the inner wall of the lifting box, and a collection box for collecting dust filtered out by the filter plate is set at the bottom of the side wall of the lifting box; A dust suction window is arranged near the inner wall of the lifting box, the interior of the dust suction window is connected to the rotating cylinder through a cross-shaped bearing frame, the outside of the rotating cylinder is provided with threaded partitions which are spaced apart from each other to form a threaded channel, the circumference of the threaded partitions is connected to each other through a hollow ring, the hollows on the hollow ring are communicated with the threaded channels between the threaded partitions, and a rotating brush for cleaning the filter plate is arranged on the side of the hollow ring close to the filter plate, the length of the rotating brush is equal to the radius of the hollow ring and is larger than the radius of the filter plate.

[0006] Preferably, the exhaust fan includes a three-rod frame arranged inside the mounting ring, the three ends of the three-rod frame are mounted on the side walls protruding outward from the mounting ring by bolts, a motor is arranged in the middle position of the three-rod frame, the output shaft of the motor is connected to the fan blades that suck the air inside the lifting box to the outside, and an external protective net is arranged on the side of the three-rod frame close to the fan blades.

[0007] Preferably, the roller mechanism includes a short wheel rod on the bottom side of the lifting box, and a long wheel rod in the middle and top of the side of the lifting box, the end of the short wheel rod is provided with a rolling wheel to press against the outer side of the vertical track, the end of the long wheel rod at the top is provided with a rolling wheel to press against the inner side of the vertical track, and the long wheel rod in the middle is provided with two rolling wheels to press against the inner and outer sides of the vertical track respectively.

[0008] Preferably, the rolling wheel located on the middle long wheel rod coaxially drives the driving pulley in the cleaning mechanism to rotate, the driving pulley drives the driven pulley on the outer wall of the lifting box to rotate through the driving belt, the driven pulley drives the driving bevel gear to rotate through the rotating shaft, the driving bevel gear is externally meshed with the driven bevel gears that are perpendicular to each other, a reciprocating screw whose end is connected to the inner wall of the lifting box through a bearing is provided at the axis center of the driven bevel gear, the middle part of the reciprocating screw is threadedly connected with a cleaning frame, which drives the cleaning frame to reciprocate above the collecting box, and a cleaning brush for cleaning the internal space of the side wall of the lifting box is provided on the side of the cleaning frame.

[0009] Preferably, the support mechanism includes a square support base directly connected to the bottom of the vertical track, and four arrayed support columns are arranged in the middle of the top of the support base. The top of the support column supports the bottom of the lifting box through a disc-shaped protective pad, and two sets of automatic power connection systems are arranged between the support mechanism and the lifting box.

[0010] Preferably, the automatic power connection system includes insulating columns arranged at the left and right corners of the front side of the support base, the outside of the insulating column is sleeved with an insulating sleeve that slides up and down on the outside of the insulating column, the inner top wall of the insulating sleeve is elastically connected to the top of the insulating column through a lifting spring, a vertically upward conductive column is arranged in the middle of the top of the insulating column, and the top wall of the insulating sleeve is provided with a circular hole to facilitate the exposure of the end of the conductive column.

[0011] Preferably, a conductive cavity for inserting a conductive column is provided at the bottom of the lifting box, and the interior of the conductive cavity is movably connected to two clamping rods which are close to each other under the action of the torsion spring through a torsion spring shaft, and a conductive block which is conductive to the conductive column is provided on the bottom side of the clamping rod, and the two groups of conductive blocks of the automatic power connection system are connected to the positive and negative poles of the dust removal mechanism for power supply.

[0012] Preferably, the top front side of the lifting box is movably connected to a loading door via a hinge, and a door opening handle is provided on the side of the loading door. The top of the lifting box is located near the hinge, and the switch rod is inserted downward into the conductive cavity. The upper halves of the two clamping rods are set to a bent state separated from each other, and the bottom of the switch rod is fixedly connected to two shifting forks that downwardly separate the clamping rods from each other, and the top of the shifting fork is connected to the inner top wall of the conductive cavity through a pull-up spring.

[0013] Preferably, a unloading door is provided on one side of the lifting box close to the building floor, the bottom of the unloading door is connected to the side wall opening of the lifting box by a hinge, a transport trolley is provided inside the lifting box, and the inner bottom wall of the lifting box and the inner wall of the unloading door are provided with two wheel track grooves that cooperate with the bottom rollers of the transport trolley.

[0014] Preferably, the top wall of the opening on one side of the unloading door of the lifting box is provided with an ejection hole opening downward, the inner top wall of the ejection hole is used to eject the door bolt with a wedge-shaped end downward by an ejection spring, and the side of the unloading door is provided with a latch groove for inserting the door bolt, and the internal movable clamp of the latch groove is provided with an ejection piece for ejecting the door bolt upward, and the end of the ejection piece away from the door bolt is inserted into the door opening hole provided on the unloading door.

[0015] Three beneficial effects Compared with the prior art, the present invention provides a hoistable support for construction engineering, which has the following beneficial effects: 1. The lifting bracket for construction engineering can be provided with a dust removal mechanism. In the process of loading sand, gravel and cement into the lifting box, the fan blades can be driven by the power of the motor to extract the air inside the lifting box to the outside, so that the dust that is about to diffuse upward from the inside of the lifting box enters the dust removal mechanism together with the air, and the air entering the dust removal mechanism is processed by the filter plate. After the dust is blocked on the filter plate, the dust caused by loading sand, gravel and cement into the lifting box is prevented from floating in the air to cause pollution, and dust pollution to the working environment of the construction workers is prevented, and the environment near the construction is protected at the same time.

[0016] 2. The lifting bracket for construction engineering can perform preliminary screening of the dust entering the dust removal mechanism through the setting of the threaded partitions, and form a spiral channel between the threaded partitions by utilizing the shape of the threaded partitions. When the air enters the spiral channel, the airflow will rotate and drive the heavier dust to do centrifugal motion, thereby throwing the large mass of dust out of the hollow ring and falling into the collection box. At the same time, while the airflow rotates, the reaction force will be used to make the threaded partitions rotate in the opposite direction, and the surface of the filter plate is cleaned by a rotating brush to ensure the filtering capacity of the filter plate.

[0017] 3. The lifting bracket for construction engineering can achieve the purpose of cleaning and collecting dust through the setting of the cleaning mechanism. The movement of the roller mechanism on the vertical track during the lifting process of the lifting bracket is utilized to make a rolling wheel in the roller mechanism output power to the cleaning mechanism, thereby driving the reciprocating screw to rotate through the transmission of the pulley and the gear. At the same time, the characteristics of the reciprocating screw itself are utilized to make the cleaning frame reciprocate on the reciprocating screw to clean the dust adhering to the side wall space of the lifting box above the collection box, thereby avoiding excessive dust in the space where the filter plate is located, and ensuring the filtering performance of the filter plate.

[0018] 4. The lifting bracket for construction engineering can achieve the purpose of stably lifting the lifting bracket upward by setting the vertical track and the roller mechanism. By using the reinforcing beam to reinforce the vertical track and each building floor, the stability of the vertical track can be effectively guaranteed, so that the roller mechanism can be used to limit the stable up and down movement of the lifting box on the vertical track, and the shaking of the lifting bracket due to the influence of wind speed can be prevented, which will cause the internal sand and cement to vibrate and leak. Even in a strong wind environment, it can avoid the situation where a large amount of dust is scattered in the air during transportation, and can effectively prevent the impact on the environment during the construction process.

[0019] 5. The lifting bracket for construction engineering can support the lifting bracket when it is at the bottom and supply power to the dust removal mechanism through the setting of the supporting mechanism. When the lifting box falls, the insulating sleeve is located at the uppermost end under the action of the lifting spring to protect the conductive column. After the bottom of the lifting box is pressed on the insulating sleeve, the conductive column can be inserted into the lifting box. When the loading door is opened by the construction workers, the switch rod is pulled upward by the spring and popped out. At the same time, the clamping rods are close to each other under the action of the torsion spring, so that the conductive block is connected with the conductive column, thereby ensuring the safety of electricity use and the convenience of power supply to the dust removal mechanism.

[0020] 6. The lifting bracket for construction engineering can conveniently pull out the transport trolley through the setting of the unloading door and the wheel track groove. The unloading door can be conveniently opened by pushing the ejection piece upward so that the ejection piece can push the door bolt out of the latch groove. After the unloading door is placed on the building floor, the transport trolley can be pulled out along the wheel track groove, which greatly improves the convenience of unloading sand, gravel and cement. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural diagram of the reference document CN112479091B; Figure 2 It is a schematic diagram of the left-side stereoscopic structure of the present invention in a closed state; Figure 3 This is a left-side stereoscopic structural schematic diagram of the present invention in an opened state; Figure 4 A schematic diagram of the interior rear view of the lifting box of the present invention; Figure 5 A schematic diagram of the three-dimensional structure of the dust removal mechanism of the present invention; Figure 6 For the present invention Figure 5 Schematic diagram of the structure at A in the middle; Figure 7 A schematic diagram of the three-dimensional structure of the hollow ring and the rotating brush of the present invention; Figure 8 It is a schematic cross-sectional structure diagram of the dust removal mechanism of the present invention at the side wall of the lifting box; Fig. 9 For the present invention Figure 8 A schematic diagram of the partially enlarged structure; Fig.10 It is a schematic diagram of the three-dimensional structure of the present invention when viewed from the left side; Fig.11 It is a schematic diagram of the three-dimensional structure of the present invention viewed from the left side; Fig.12 This is a schematic diagram of the cross-sectional structure of the unloading door locking device of the present invention; Fig.13 It is a left-side cross-sectional structural schematic diagram of the automatic power connection system of the present invention.

[0022] In the figure: 1. building floor; 2. vertical track; 201. reinforcement beam; 3. roller mechanism; 301. short wheel rod; 302. rolling wheel; 303. long wheel rod; 4. support mechanism; 401. support base; 402. insulating column; 403. insulating sleeve; 404. switch rod; 405. support column; 406. protective pad; 407. torsion spring shaft; 408. conductive block; 409. clamping rod; 410. shift fork; 411. pull-up spring; 412. jacking spring; 413. conductive column; 5. lifting bracket; 501. lifting box; 502. unloading door; 503. loading door; 504. door handle; 505. transport trolley; 506. wheel track groove; 507. door opening hole; 508, ejector plate; 509, latch groove; 510, bolt; 511, ejector spring; 512, ejector hole; 6, dust removal mechanism; 601, mounting ring; 602, three-rod frame; 603, motor; 604, external protection net; 605, dust suction window; 606, bearing frame; 607, threaded partition; 608, collecting box; 609, rotating brush; 610, rotating cylinder; 611, hollow ring; 612, fan blade; 613, filter plate; 7, lifting cable; 8, cleaning mechanism; 801, driving pulley; 802, driving belt; 803, driven pulley; 804, cleaning frame; 805, cleaning brush; 806, reciprocating screw; 807, driving bevel gear; 808, driven bevel gear. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0024] For an embodiment of the present invention, please refer to Figures 3 to 9 , a liftable support for construction engineering, comprising a liftable support 5, a dust removal mechanism 6 is arranged on the side wall of the liftable support 5; the outermost layer of the liftable support 5 is arranged as a lifting box 501 of a rectangular parallelepiped, wherein a mounting ring 601 protruding outward from the dust removal mechanism 6 is arranged near the outer wall of the lifting box 501, an exhaust fan is arranged inside the mounting ring 601, a filter plate 613 for treating dust in the air is arranged at one end of the mounting ring 601 embedded in the inner wall of the lifting box 501, and a collection box 608 for collecting dust filtered out by the filter plate 613 is arranged at the bottom of the side wall of the lifting box 501; A dust collection window 605 is arranged near the inner wall of the lifting box 501, and the interior of the dust collection window 605 is connected to the rotating cylinder 610 through a cross-shaped bearing frame 606. The exterior of the rotating cylinder 610 is provided with threaded partitions 607 which are spaced apart from each other to form a threaded channel. The threaded partitions 607 are connected to each other at their circumferences through hollow rings 611, and the hollows on the hollow rings 611 are communicated with the threaded channels between the threaded partitions 607. A rotating brush 609 for cleaning the filter plate 613 is arranged on the side of the hollow ring 611 close to the filter plate 613, and the length of the rotating brush 609 is equal to the radius of the hollow ring 611 and is greater than the radius of the filter plate 613.

[0025] The exhaust fan includes a three-rod frame 602 arranged inside the mounting ring 601. The three ends of the three-rod frame 602 are installed on the side walls protruding outward from the mounting ring 601 by bolts. A motor 603 is arranged in the middle position of the three-rod frame 602. The output shaft of the motor 603 is connected to the fan blades 612 that suck the air inside the lifting box 501 to the outside. An external protective net 604 is arranged on one side of the three-rod frame 602 close to the fan blades 612.

[0026] Specifically, the dust removal mechanism 6 is powered on, such as Fig. 9 As shown, the fan blades 612 are driven by the motor 603 to rotate and discharge the air to the side where the motor 603 is located, so that the space on the side wall of the lifting box 501 forms a negative pressure, as shown in FIG. Figure 3 As shown, the air inside the lifting box 501 can enter the dust removal mechanism 6 through the dust suction window 605. Since the air will rotate when passing through the spiral space formed between the threaded partitions 607, it can drive the heavier dust to do centrifugal motion, thereby throwing the large mass of dust out of the hollow ring 611 and falling into the collection box 608. At the same time, when the airflow rotates, the reaction force will be used to make the threaded partition 607 rotate in the opposite direction, and the rotating brush 609 is used to clean the surface of the filter plate 613 to ensure the filtering capacity of the filter plate 613. After one treatment, the dust passing through the threaded partition 607 will be blocked by the filter plate 613, thereby collecting the dust floating out of the lifting box 501, effectively preventing the dust from directly spreading upward from the lifting box 501, and avoiding dust pollution to the construction environment.

[0027] As an embodiment of the present invention, please refer to Figure 3 , Figure 5 and Figure 6A lifting bracket for construction engineering includes a lifting bracket 5 and a vertical track 2 for limiting the lifting trajectory of the lifting bracket 5. Both sides of the lifting bracket 5 are connected to the hoist at the top of the vertical track 2 through lifting cables 7. The sides of the vertical track 2 are reinforced and connected to the side walls of the building floor 1 of the building through reinforcement beams 201. A supporting mechanism 4 for supporting the bottom of the lifting bracket 5 is arranged at the bottom of the vertical track 2. A roller mechanism 3 used in conjunction with the vertical track 2 is arranged on the outer wall of the lifting bracket 5. The roller mechanism 3 drives a cleaning mechanism 8 inside the lifting bracket 5 to perform cleaning work through a belt transmission structure. A dust removal mechanism 6 is arranged on the side wall of the lifting bracket 5.

[0028] The roller mechanism 3 includes a short wheel rod 301 on the bottom side of the lifting box 501, and a long wheel rod 303 in the middle and top of the side of the lifting box 501. A rolling wheel 302 is set at the end of the short wheel rod 301 to press against the outer side of the vertical track 2, and a rolling wheel 302 is set at the end of the long wheel rod 303 at the top to press against the inner side of the vertical track 2. The middle long wheel rod 303 is provided with two rolling wheels 302 that press against the inner and outer sides of the vertical track 2 respectively.

[0029] The rolling wheel 302 located on the middle long wheel rod 303 coaxially drives the active pulley 801 in the cleaning mechanism 8 to rotate, and the active pulley 801 drives the driven pulley 803 on the outer wall of the lifting box 501 to rotate through the driving belt 802, and the driven pulley 803 drives the active bevel gear 807 to rotate through the rotating shaft. The active bevel gear 807 is externally engaged with the driven bevel gear 808 which is perpendicular to each other. A reciprocating screw 806 whose end is connected to the inner wall of the lifting box 501 through a bearing is set at the axis center of the driven bevel gear 808. The middle part of the reciprocating screw 806 is threadedly connected with a cleaning frame 804, which drives the cleaning frame 804 to reciprocate above the collecting box 608. A cleaning brush 805 for cleaning the internal space of the side wall of the lifting box 501 is set on the side of the cleaning frame 804.

[0030] When in use, the lifting bracket 5 is lifted or lowered by lifting the lifting cable 7 upward or releasing it downward. When lifting or lowering, the rolling wheel 302 on the roller mechanism 3 rolls on the vertical track 2, so that the driving pulley 801 transmits power to the driving belt 802. Figure 6 The active bevel gear 807 is connected through the same rotating shaft, so that the active bevel gear 807 can follow the rotation and drive the driven bevel gear 808. When the driven bevel gear 808 drives the reciprocating screw 806 to rotate, the characteristics of the reciprocating screw 806 are utilized to make the cleaning frame 804 reciprocate on the reciprocating screw 806, so as to clean the dust adhering to the side wall space of the lifting box 501 above the collecting box 608, avoid excessive dust in the space where the filter plate 613 is located, and ensure the filtering performance of the filter plate 613.

[0031] As an embodiment of the present invention, please refer to Fig.10 , Fig.11 and Fig.13 A lifting bracket for construction engineering includes a lifting bracket 5 and a vertical track 2 for limiting the lifting trajectory of the lifting bracket 5. A supporting mechanism 4 for supporting the bottom of the lifting bracket 5 is arranged at the bottom of the vertical track 2. The outermost layer of the lifting bracket 5 is arranged as a rectangular lifting box 501. The side wall of the lifting bracket 5 is provided with a dust removal mechanism 6.

[0032] The supporting mechanism 4 includes a square supporting base 401 directly connected to the bottom of the vertical track 2. Four arrays of supporting columns 405 are arranged in the middle of the top of the supporting base 401. The top of the supporting column 405 supports the bottom of the lifting box 501 through a disc-shaped protective pad 406, and two sets of automatic power connection systems are arranged between the supporting mechanism 4 and the lifting box 501.

[0033] The automatic power connection system includes an insulating column 402 arranged at the left and right corners of the front side of the support base 401, and the outer part of the insulating column 402 is sleeved with an insulating sleeve 403 that slides up and down on the outer part of the insulating column 402. The inner top wall of the insulating sleeve 403 is elastically connected to the top of the insulating column 402 through a lifting spring 412. A vertically upward conductive column 413 is arranged in the middle of the top of the insulating column 402, and a round hole is opened on the top wall of the insulating sleeve 403 to facilitate the exposure of the end of the conductive column 413.

[0034] A conductive cavity for inserting a conductive column 413 is provided at the bottom of the lifting box 501, and the interior of the conductive cavity is movably connected to two clamping rods 409 which are close to each other under the action of the torsion spring through a torsion spring shaft 407. A conductive block 408 which is conductive to the conductive column 413 is provided on the bottom side of the clamping rod 409. The two sets of conductive blocks 408 of the automatic power connection system are connected to the positive and negative poles of the dust removal mechanism 6 for power supply.

[0035] The top front side of the lifting box 501 is movably connected to a loading door 503 through a hinge, and a door opening handle 504 is provided on the side of the loading door 503. The top of the lifting box 501 is located near the hinge and the switch rod 404 is inserted downward into the conductive cavity. The upper halves of the two clamping rods 409 are set to a bent state separated from each other. The bottom of the switch rod 404 is fixedly connected to two shifting forks 410 that downwardly separate the clamping rods 409 from each other, and the top of the shifting fork 410 is connected to the inner top wall of the conductive cavity by a pull-up spring 411.

[0036] When in use, the lifting box 501 can gradually descend as the lifting cable 7 is released. Fig.13 As shown, when the bottom wall of the lifting box 501 contacts the insulating sleeve 403, the lifting spring 412 is compressed by gravity, so that the conductive column 413 can be exposed and inserted into the conductive cavity, as shown in FIG. Fig.10 As shown in FIG. 1 , after the protective pad 406 contacts and supports the lifting box 501, the conductive column 413 is not inserted into the conductive block 408. Since the loading door 503 is not opened when it falls, the two clamping rods 409 are pushed downward by the two shifting forks 410 to separate from each other, so the conductive block 408 and the conductive column 413 are not in contact and energized. Fig.11 In the state shown, after the staff opens the loading door 503 through the door handle 504, the automatic power supply system will appear Fig.13 As shown in the result, the switch rod 404 is pushed upward under the action of the pulling spring 411, and the two clamping rods 409 are close to each other under the elastic force of the torsion spring on the torsion spring shaft 407, so that the two conductive blocks 408 are connected to the same conductive column 413. Since there are two groups of automatic power connection systems, the positive and negative poles of the dust removal mechanism 6 can be connected, and the dust removal mechanism 6 is used for dust removal without manual control of the switch. After the loading door 503 is opened, the dust remaining inside the loading door 503 can be prevented from spreading, and the loading door 503 is in an open state during the entire loading process until the loading door 503 of the lifting box 501 is closed and the dust can no longer spread out, which can effectively prevent the pollution of the environment by dust during construction.

[0037] As an embodiment of the present invention, please refer to Figure 3 , Fig.11 and Fig.12 The invention discloses a lifting bracket for construction engineering, comprising a lifting bracket 5 and a vertical track 2 for limiting the lifting trajectory of the lifting bracket 5. Both sides of the lifting bracket 5 are connected to the hoist at the top of the vertical track 2 through lifting cables 7. The side of the vertical track 2 is reinforced and connected to the side wall of the building floor 1 of the building through a reinforcing beam 201. The outer side wall of the lifting bracket 5 is provided with a roller mechanism 3 used in conjunction with the vertical track 2.

[0038] A discharge door 502 is provided on one side of the lifting box 501 close to the building floor 1, and the bottom of the discharge door 502 is connected to the side wall opening of the lifting box 501 by a hinge. A transport trolley 505 is provided inside the lifting box 501, and the inner bottom wall of the lifting box 501 and the inner wall of the discharge door 502 are provided with two wheel track grooves 506 that cooperate with the bottom rollers of the transport trolley 505.

[0039] A downwardly opening ejection hole 512 is provided on the top wall of the opening on one side of the discharge door 502 of the lifting box 501, and a door bolt 510 with a wedge-shaped end is ejected downwardly by an ejection spring 511 through the inner top wall of the ejection hole 512. A latch groove 509 for inserting the door bolt 510 is provided on the side of the discharge door 502, and an ejection piece 508 for ejecting the door bolt 510 upward is movably connected inside the latch groove 509, and an end of the ejection piece 508 away from the door bolt 510 is inserted into the door opening hole 507 provided on the discharge door 502.

[0040] When in use, the fully loaded lifting bracket 5 is lifted by the lifting cable 7. During the lifting process, the roller mechanisms 3 on both sides stably restrict the lifting bracket 5 on the vertical track 2. Since the vertical track 2 is connected to the building floor 1 of each floor through the reinforcement beam 201, the stability of the vertical track 2 can be ensured. Therefore, the lifting bracket 5 will not be shaken by the wind during the lifting process, which can prevent the shaking of the lifting bracket 5 due to the influence of wind speed and the shock leakage of the internal sand, gravel and cement. Even in a strong wind environment, it can avoid the situation where a large amount of dust is scattered in the air during transportation, which can effectively prevent excessive The impact on the environment during the lifting process, after lifting to the designated floor, by pushing the ejection piece 508 upward so that the ejection piece 508 pushes the door bolt 510 out of the latch groove 509, the unloading door 502 can be easily opened, and after the unloading door 502 is placed on the building floor 1, the unloading door 502 is connected with the wheel track groove 506 of the inner bottom wall of the lifting box 501, so that the transport cart 505 filled with sand, gravel and cement inside the lifting box 501 can be pulled out, and after unloading the sand, gravel and cement, the transport cart 505 is pushed into the lifting box 501 again along the wheel track groove 506, so that the required sand, gravel and cement can be easily unloaded from the lifting box 501.

[0041] The above description is only a preferred specific implementation mode of the present invention. Although the embodiments of the present invention have been shown and described, it can be understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention. The scope of the present invention is defined by the attached claims and their equivalents. The protection scope of the present invention is not limited to the above embodiments. Any technician familiar with the technical field, within the technical scope disclosed by the present invention, can make equivalent substitutions or changes according to the technical solution and inventive concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A hoistable support for construction engineering, comprising a hoistable support (5) and a vertical track (2) for limiting the hoisting track of the hoistable support (5), wherein both sides of the hoistable support (5) are connected to a hoist at the top of the vertical track (2) via a hoisting cable (7), and the side of the vertical track (2) is reinforced and connected to the side wall of a building floor (1) of a building via a reinforcement beam (201), characterized in that: A support mechanism (4) is provided at the bottom of the vertical track (2) to support the bottom of the liftable bracket (5); a roller mechanism (3) used in conjunction with the vertical track (2) is provided on the outer wall of the liftable bracket (5); the roller mechanism (3) drives a cleaning mechanism (8) inside the liftable bracket (5) to perform cleaning work through a belt transmission structure; and a dust removal mechanism (6) is provided on the side wall of the liftable bracket (5); The outermost layer of the liftable support (5) is arranged as a rectangular lifting box (501), wherein a mounting ring (601) protruding outward from the dust removal mechanism (6) is arranged near the outer wall of the lifting box (501), an exhaust fan is arranged inside the mounting ring (601), a filter plate (613) for treating dust in the air is arranged at one end of the mounting ring (601) embedded in the inner wall of the lifting box (501), and a collection box (608) for collecting dust filtered out by the filter plate (613) is arranged at the bottom of the side wall of the lifting box (501); A dust collecting window (605) is arranged near the inner wall of the lifting box (501), the interior of the dust collecting window (605) is connected to the rotating cylinder (610) via a cross-shaped bearing frame (606), the exterior of the rotating cylinder (610) is provided with threaded partitions (607) spaced apart from each other to form a threaded channel, the threaded partitions (607) are connected to each other at their circumferences via a hollow ring (611), the hollows on the hollow ring (611) are in communication with the threaded channel between the threaded partitions (607), a rotating brush (609) for cleaning the filter plate (613) is arranged on the side of the hollow ring (611) near the filter plate (613), the length of the rotating brush (609) being equal to the radius of the hollow ring (611) and greater than the radius of the filter plate (613).

2. The hoistable support for construction engineering according to claim 1, characterized in that: The exhaust fan comprises a three-rod frame (602) arranged inside a mounting ring (601), the three ends of the three-rod frame (602) being mounted on the outwardly protruding side wall of the mounting ring (601) by means of bolts, a motor (603) being arranged in the middle of the three-rod frame (602), the output shaft of the motor (603) being connected to a fan blade (612) for sucking the air inside the lifting box (501) outward, and an external protective net (604) being arranged on one side of the three-rod frame (602) close to the fan blade (612).

3. The hoistable support for construction engineering according to claim 1, characterized in that: The roller mechanism (3) comprises a short wheel rod (301) on the bottom side of the lifting box (501), and a long wheel rod (303) on the middle and top of the side of the lifting box (501); a rolling wheel (302) is arranged at the end of the short wheel rod (301) to press against the outer side of the vertical track (2); a rolling wheel (302) is arranged at the end of the long wheel rod (303) on the top to press against the inner side of the vertical track (2); and two rolling wheels (302) are arranged on the middle long wheel rod (303) to press against the inner side and outer side of the vertical track (2) respectively.

4. The hoistable support for construction engineering according to claim 3, characterized in that: The rolling wheel (302) located on the middle long wheel rod (303) coaxially drives the driving pulley (801) in the cleaning mechanism (8) to rotate. The driving pulley (801) drives the driven pulley (803) on the outer wall of the lifting box (501) to rotate through the driving belt (802). The driven pulley (803) drives the driving bevel gear (807) to rotate through the rotating shaft. The driving bevel gear (807) is externally meshed with mutually perpendicular driven bevel gears (808). A reciprocating screw (806) is arranged at the axis of the driven bevel gear (808), and the end thereof is connected to the inner wall of the lifting box (501) through a bearing. The middle part of the reciprocating screw (806) is threadedly connected to a cleaning frame (804), which drives the cleaning frame (804) to reciprocate above the collecting box (608). A cleaning brush (805) for cleaning the inner space of the side wall of the lifting box (501) is arranged on the side of the cleaning frame (804).

5. The hoistable support for construction engineering according to claim 1, characterized in that: The support mechanism (4) comprises a square support base (401) directly connected to the bottom of the vertical track (2), and four arrays of support columns (405) are arranged in the middle of the top of the support base (401). The tops of the support columns (405) support the bottom of the lift box (501) through disc-shaped protective pads (406), and two sets of automatic power connection systems are arranged between the support mechanism (4) and the lift box (501).

6. The hoistable support for construction engineering according to claim 5, characterized in that: The automatic power connection system comprises insulating columns (402) arranged at the left and right corners of the front side of the support base (401); an insulating sleeve (403) is sleeved on the outside of the insulating column (402) and slides up and down on the outside of the insulating column (402); the inner top wall of the insulating sleeve (403) is elastically connected to the top of the insulating column (402) via a lifting spring (412); a conductive column (413) is arranged vertically upward in the middle of the top of the insulating column (402); and a round hole is opened on the top wall of the insulating sleeve (403) to facilitate the exposure of the end of the conductive column (413).

7. The hoistable support for construction engineering according to claim 6, characterized in that: The bottom of the lifting box (501) is provided with a conductive cavity for inserting a conductive column (413), and the inside of the conductive cavity is movably connected to two clamping rods (409) that approach each other under the action of the torsion spring through a torsion spring shaft (407), and the bottom side of the clamping rod (409) is provided with a conductive block (408) that is conductive to the conductive column (413), and the two sets of conductive blocks (408) of the automatic power connection system are connected to the positive and negative poles of the dust removal mechanism (6) for power supply.

8. The liftable support for construction engineering according to claim 7, characterized in that: The top front side of the lifting box (501) is movably connected to a loading door (503) via a hinge, and a door opening handle (504) is arranged on the side of the loading door (503). The top of the lifting box (501) is located near the hinge and the switch rod (404) is inserted downward into the conductive cavity. The upper halves of the two clamping rods (409) are arranged in a bent state separated from each other. The bottom of the switch rod (404) is fixedly connected to two shifting forks (410) that downwardly separate the clamping rods (409) from each other, and the top of the shifting fork (410) is connected to the inner top wall of the conductive cavity via a pull-up spring (411).

9. The hoistable support for construction engineering according to claim 1, characterized in that: A discharge door (502) is provided on a side of the lifting box (501) close to the building floor (1); the bottom of the discharge door (502) is connected to the side wall opening of the lifting box (501) via a hinge; a transport trolley (505) is provided inside the lifting box (501); and the inner bottom wall of the lifting box (501) and the inner wall of the discharge door (502) are both provided with two wheel track grooves (506) that cooperate with the bottom rollers of the transport trolley (505).

10. A hoistable support for construction engineering according to claim 9, characterized in that: The lifting box (501) is provided with an ejection hole (512) on the top wall of an opening on one side of the discharge door (502), and the inner top wall of the ejection hole (512) ejects a door bolt (510) with a wedge-shaped end downwardly through an ejection spring (511). The discharge door (502) is provided with a latch groove (509) on the side thereof for inserting the door bolt (510). An ejection piece (508) for ejecting the door bolt (510) upwardly is movably engaged inside the latch groove (509), and an end of the ejection piece (508) away from the door bolt (510) is inserted into a door opening hole (507) provided on the discharge door (502).