Mounting method for side wall of cabin cover of compact wind generating set
By using a combination of adjustment holes, adjustable guide rails and counterweight plates during the lifting of the nacelle cover of the wind turbine, the problem of difficulty in maintaining the level of the nacelle cover is solved, the assembly quality and efficiency are improved, and the safety of the hoisting process is ensured. Sex and accuracy.
Patent Information
- Application Number
- CN202411333490.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-12-03
AI Technical Summary
When hoisting the nacelle cover of a compact wind turbine, the left and right nacelle covers are difficult to maintain level, resulting in the impact of assembly quality and efficiency.
A mounting spreader is adopted, including the main hanging beam, vertical beam and connecting mechanism, which is connected to the suspender through adjustment holes, and the adjustable guide rail and support legs ensure reliable contact between the connecting plate. Long holes are provided for fine-tuning of bolts and through matching The heavy plate adjusts the center of gravity to ensure that the nacelle cover remains stable and safe during the lifting process.
Effectively maintain the horizontal position of the side wall of the nacelle cover, improve assembly quality and efficiency, ensure the safety and accuracy of the lifting process, and is suitable for narrow spaces and different centers of gravity positions.
Smart Images

Figure CN119059407A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of wind turbine generator set installation, and in particular to a method for installing a side wall of a nacelle cover of a compact wind turbine generator set. Background Art
[0002] A wind turbine is a device that converts wind energy into electrical energy. It is mainly composed of a wind rotor, a generator, a tower, a control and safety system, etc. In the process of wind power generation, the wind rotor rotates with the wind, driving the generator to generate electrical energy, which is then connected to the power grid or stored after a series of conversions. Wind turbines are an important representative of modern renewable energy technology and are of great significance in promoting the development of green energy.
[0003] Wind turbines work outdoors all year round under harsh working conditions, so they need regular maintenance. At present, the conventional method of hoisting the nacelle of a wind turbine is to use a sling. When using a sling to hoist the nacelle, the operator must first select the appropriate sling and equipment according to the specifications of the nacelle, then fix the sling on the hoisting point of the nacelle, and plan the hoisting path. During the hoisting process, the operator needs to closely monitor the position and tilt angle of the nacelle to ensure that it remains balanced.
[0004] However, when using conventional slings to hoist the nacelle cover of a compact wind turbine generator set, there is still a problem: it is difficult to keep the left and right nacelles level during the hoisting process. When the nacelle cover is tilted, it will be difficult for the nacelle cover to be accurately positioned, which will seriously restrict the quality and efficiency of the nacelle cover assembly. Summary of the invention
[0005] The embodiment of the present application solves the technical problem in the prior art that the nacelle cover is difficult to keep horizontal during the lifting process by providing a method for installing the side wall of the nacelle cover of a compact wind turbine generator set, thereby improving the quality and efficiency of the nacelle cover assembly.
[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions: a method for installing the side wall of the nacelle cover of a compact wind turbine generator set, adopting an installation hanger, the installation hanger includes a sling and a main suspension beam, and a plurality of adjustment holes are respectively provided above the main suspension beam near its two ends, and the adjustment holes can be connected to the ends of the sling; two vertical beams are fixed below the main suspension beam, and the upper ends of the two vertical beams are respectively located near the two ends of the main suspension beam, and the lower ends of the two vertical beams are respectively installed with connecting mechanisms, and the lower ends of the connecting mechanisms are fixed with connecting plates, and the connecting plates can be fixed to the side wall of the nacelle cover by bolts; And includes the following steps: Step 1: Fix the connecting plate to the side wall of the nacelle cover with bolts; Step 2: Select an adjustment hole and connect it to the end of the sling according to the specific center of gravity position of the side wall of the nacelle cover; Step 3: Use the lifting equipment to connect the lifting straps, start the lifting equipment, and lift the side wall of the nacelle cover; Step 4: When the side wall of the nacelle cover is hoisted to the predetermined position, the operator places it and fixes it with tools.
[0007] Since a plurality of adjustment holes are arranged above the main lifting beam near both ends thereof, before the nacelle cover is hoisted, suitable adjustment holes and slings can be selected for connection according to the specific center of gravity position of the nacelle cover side wall, so that the nacelle cover side wall can be kept level after being hoisted, thereby improving the quality and efficiency of the nacelle cover assembly.
[0008] Furthermore, the connecting mechanism includes an adjustable guide rail and a supporting leg. The extension direction of the adjustable guide rail is perpendicular to the extension direction of the main suspension beam and is slidably matched with the lower end of the vertical beam. The supporting leg is fixed to one end of the adjustable guide rail. Since it can be ensured that the connecting plate can reliably contact the side wall of the cabin cover, it can be installed even in a narrow space.
[0009] Furthermore, the connecting plate is provided with an elongated hole which passes through its plate surface, and the length direction of the elongated hole is consistent with the extension direction of the main suspension beam. After the bolt passes through the elongated hole, it can be fixed to the side wall of the cabin cover; therefore, during the lifting process, the operator can adjust the position of the bolt in the elongated hole as needed, thereby fine-tuning the front and rear position of the side wall of the cabin cover to ensure that it is accurately aligned with the installation position.
[0010] Furthermore, the main suspension beam, vertical beam and supporting legs are all square tubes, and the upper end of the vertical beam is welded and fixed to the bottom of the main suspension beam; thereby, the overall lightweight of the device can be achieved.
[0011] Furthermore, reinforcing ribs are welded between the main lifting beam and the vertical beam; thereby improving the overall rigidity and stability of the device, enabling it to withstand greater lifting weights and ensuring the safety of the lifting process.
[0012] Furthermore, a counterweight plate mounting structure is fixed at one end of the main lifting beam; thereby, by adding or reducing the number of counterweight plates, the operator can make fine adjustments according to the center of gravity position of the side wall of the cabin cover to avoid tilting or shaking during the lifting process, thereby ensuring a smooth and safe lifting process.
[0013] Furthermore, both ends of the sling are connected to the adjustment holes above the main suspension beam through shackles.
[0014] The present invention also discloses a method for installing a side wall of a nacelle cover of a compact wind turbine generator set, which uses a mounting hanger for installing a side wall of a nacelle cover of a compact wind turbine generator set as described above, and specifically comprises the following steps: Step 1: Fix the connecting plate to the side wall of the nacelle cover with bolts. Step 2: Select the adjustment hole and connect it to the end of the sling according to the specific center of gravity position of the side wall of the nacelle cover. Step 3: Use the lifting equipment to connect the lifting straps, start the lifting equipment, and lift the side wall of the cabin cover. Step 4: When the side wall of the nacelle cover is hoisted to the predetermined position, the operator places it and fixes it with tools.
[0015] It can be seen from the above technical solutions that the present invention has at least the following technical effects or advantages: 1. Since there are multiple adjustment holes on the top of the main lifting beam near both ends, before the nacelle cover is hoisted, appropriate adjustment holes can be selected and connected with the lifting belt according to the specific center of gravity position of the nacelle cover side wall, so that the nacelle cover side wall can be kept level after being hoisted, thereby improving the quality and efficiency of the nacelle cover assembly; 2. Since the connection mechanism includes an adjustable guide rail, the setting of the adjustable guide rail allows the support leg to move within a certain range, thereby ensuring that the connection plate can reliably contact the side wall of the nacelle cover and can be installed even in a narrow space; 3. Since the connecting plate is provided with a long hole penetrating the plate surface, during the hoisting process, the operator can adjust the position of the bolt in the long hole as needed, thereby fine-tuning the front and rear position of the side wall of the nacelle cover to ensure that it is accurately aligned with the installation position; 4. Since a counterweight plate mounting structure is fixed at one end of the main lifting beam, the operator can make fine adjustments according to the center of gravity position of the side wall of the nacelle cover by adding or reducing the number of counterweight plates to avoid tilting or shaking during the lifting process, ensuring a smooth and safe lifting process. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solution of the present invention, the following briefly introduces the drawings required for the description. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative work: Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 This is an illustration of the use of the present invention. Figure 1 ; Figure 3 This is an illustration of the use of the present invention. Figure 2 .
[0017] Explanation of the reference numerals: 1. sling, 2. main sling beam, 3. adjustment hole, 4. vertical beam, 5. adjustable guide rail, 6. support leg, 7. connecting plate, 8. reinforcing rib plate, 9. counterweight plate mounting structure, 10. shackle. DETAILED DESCRIPTION In order to enable those skilled in the art to better understand the technical solutions in the present invention, the technical solutions in the embodiments of the present invention will be described clearly and completely in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments in this patent, other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this patent.
[0018] The present invention discloses a compact wind turbine nacelle cover side wall installation hoist, which comprises a sling 1 and a main sling beam 2. The upper two ends of the main sling beam 2 are provided with adjustment holes 3. The lower two ends of the main sling beam 2 are respectively fixed with vertical beams 4, and the lower ends of the vertical beams 4 are installed with connecting mechanisms. In one example, the connecting mechanism is fixed to the side wall of the nacelle cover, and the two ends of the sling 1 are respectively connected to the adjustment holes 3 at the two ends of the main sling beam 2. When the hoisting equipment is connected to the sling 1 and started, the nacelle cover side wall can be hoisted.
[0019] like Figure 1 As shown, in this embodiment, the main suspension beam 2 is a square tube, and a strip plate is welded and fixed on the top of the main suspension beam 2. The strip plate extends in a square shape along the length of the main suspension beam 2. The adjustment hole 3 is set through the strip plate and is located near the two ends of the main suspension beam 2. As shown in the figure, in this embodiment, a plurality of adjustment holes 3 are set on the top of the main suspension beam 2 near its two ends, and the plurality of adjustment holes 3 are arranged in an array along the length direction of the main suspension beam 2. Therefore, before hoisting the nacelle cover, the appropriate adjustment hole 3 can be selected according to the specific center of gravity position of the side wall of the nacelle cover to connect with the sling 1, so that the side wall of the nacelle cover can remain horizontal after being hoisted.
[0020] The vertical beam 4 is a square tube, the upper end of the vertical beam 4 is welded and fixed to the bottom of the main suspension beam 2, and the connecting mechanism is installed at the lower end of the vertical beam 4. The connecting mechanism includes an adjustable guide rail 5 and a support leg 6. Figure 1 As shown, the lower end of the vertical beam 4 has a sleeve, which can be nested in the outside of the adjustable guide rail 5, so that the relative position of the connecting mechanism and the main suspension beam 2 can be adjusted by the cooperation between the adjustable guide rail 5 and the sleeve. Specifically, the extension direction of the adjustable guide rail 5 is perpendicular to the extension direction of the main suspension beam 2. When the bottom of the connecting mechanism is connected to the side wall of the cabin cover, the position of the adjustable guide rail 5 can be adjusted to ensure reliable contact between the connecting mechanism and the side wall of the cabin cover. It should be understood that a fastening bolt can be set at the bottom of the sleeve. When the position of the adjustable guide rail 5 is adjusted to the right position, tightening the fastening bolt can make the connection between the connecting mechanism and the vertical beam 4 more stable.
[0021] like Figure 1 As shown, a connecting plate 7 is fixed to the bottom of the supporting leg 6, and the connecting plate 7 can be fixed to the side wall of the cabin cover by bolts. Specifically, the connecting plate 7 is provided with a long hole penetrating its plate surface, and the length direction of the long hole is consistent with the extension direction of the main suspension beam 2. During the hoisting process, through the long hole, the operator can adjust the front and rear position of the side wall of the cabin cover as needed to ensure that it is accurately aligned with the installation position. Moreover, the long hole also provides the ability to fine-tune the side wall of the cabin cover in the front and rear directions, thereby making the hoisting process more flexible and precise. In addition, a reinforcing rib plate 8 is welded between the main suspension beam 2 and the vertical beam 4, and the reinforcing rib plate 8 can improve the strength of the connection between the main suspension beam 2 and the vertical beam 4.
[0022] In this embodiment, the angle between the support leg 6 and the adjustable guide rail 5 is an obtuse angle. Figure 2 , Figure 3 As shown, in the case where the internal space of a compact wind turbine generator set is relatively narrow, the arrangement of the support legs 6 can ensure that the connecting plate 7 is fixed to the side wall of the nacelle cover.
[0023] In this embodiment, a counterweight plate mounting structure 9 is also fixed to one end of the main lifting beam 2 for mounting a counterweight plate. Since the center of gravity of different nacelle covers may vary, during the hoisting process, when the center of gravity of the side wall of the nacelle cover does not coincide with the center of gravity of the device in the vertical direction, by adding or reducing the number of counterweight plates, the center of gravity of the device can be effectively adjusted to be as close to or coincident with the center of gravity of the side wall of the nacelle cover as possible, thereby ensuring the stability and safety of the hoisting process.
[0024] In this embodiment, both ends of the sling 1 are connected to the adjustment holes 3 of the main beam 2 through shackles 10. The shackles 10 are existing structures, and can be quickly installed and disassembled during the lifting operation. This helps to improve the efficiency of the lifting operation and reduce the difficulty and complexity of manual operation.
[0025] The present invention also discloses a method for installing the side wall of the nacelle cover of a compact wind turbine generator set. The method uses a mounting hoist for the side wall of the nacelle cover of a compact wind turbine generator set as described above, and includes the following steps: step 1, fixing the connecting plate 7 to the side wall of the nacelle cover by bolts, step 2, selecting a suitable adjustment hole 3 to connect with the end of the sling 1 according to the specific center of gravity position of the nacelle cover side wall, step 3, connecting the sling 1 with a hoisting device, and starting the hoisting device to hoist the side wall of the nacelle cover, and step 4, when the side wall of the nacelle cover is hoisted to a predetermined position (i.e., the position to be installed), the operator places it and fixes it with tools. Through the method disclosed by the present invention, the installation of the side wall of the nacelle cover of a compact wind turbine is realized, which greatly ensures the safety and reliability of the hoisting operation and improves the production efficiency.
[0026] In the description of the present invention, the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "vertical", "horizontal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the purpose of describing the present invention rather than requiring the present invention to be constructed or operated in a specific position, and therefore should not be construed as limiting the present invention. The terms "connected" and "connected" in the present invention should be understood in a broad sense, for example, it can be a connection or a detachable connection; it can be a direct connection or an indirect connection through an intermediate component. For those of ordinary skill in the art, the specific meanings of the above terms can be understood according to specific circumstances.
[0027] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in their embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novelties disclosed herein.
Claims
1. A method for installing a side wall of a nacelle cover of a compact wind turbine generator set, characterized in that: A mounting sling is used, the mounting sling comprising a sling (1) and a main sling beam (2), a plurality of adjustment holes (3) are respectively provided above the main sling beam (2) near both ends thereof, the adjustment holes (3) being capable of being connected to the ends of the sling (1); Two vertical beams (4) are fixed below the main suspension beam (2), the upper ends of the two vertical beams (4) are respectively located near the two ends of the main suspension beam (2), the lower ends of the two vertical beams (4) are respectively provided with connecting mechanisms, the lower ends of the connecting mechanisms are fixed with connecting plates (7), and the connecting plates (7) can be fixed to the side walls of the nacelle cover by bolts; And includes the following steps: Step 1: Fix the connecting plate (7) to the side wall of the nacelle cover by means of bolts; Step 2: Select an adjustment hole (3) and connect it to the end of the sling (1) according to the specific center of gravity position of the side wall of the nacelle cover; Step 3: Use a lifting device to connect the lifting strap (1), and start the lifting device to lift the side wall of the nacelle cover; Step 4: When the side wall of the nacelle cover is hoisted to the predetermined position, the operator places it and fixes it with tools.
2. A method for installing a side wall of a nacelle cover of a compact wind turbine generator set according to claim 1, characterized in that: The connection mechanism for installing the sling comprises an adjustable guide rail (5) and a support leg (6); the extension direction of the adjustable guide rail (5) is perpendicular to the extension direction of the main suspension beam (2) and is slidably matched with the lower end of the vertical beam (4); and the support leg (6) is fixed to one end of the adjustable guide rail (5).
3. A method for installing a side wall of a nacelle cover of a compact wind turbine generator set according to claim 2, characterized in that: The connecting plate (7) is provided with an elongated hole penetrating the plate surface, and the length direction of the elongated hole is consistent with the extension direction of the main suspension beam (2); the bolt can be fixed to the side wall of the cabin cover after passing through the elongated hole.
4. A method for installing a side wall of a nacelle cover of a compact wind turbine generator set according to claim 2, characterized in that: The main suspension beam (2), the vertical beam (4) and the supporting legs (6) are all square tubes, and the upper end of the vertical beam (4) is welded and fixed to the bottom of the main suspension beam (2).
5. A method for installing a side wall of a nacelle cover of a compact wind turbine generator set according to claim 4, characterized in that: A reinforcing rib plate (8) is welded between the main suspension beam (2) and the vertical beam (4).
6. A method for installing a side wall of a nacelle cover of a compact wind turbine generator set according to any one of claims 1 to 5, characterized in that: A counterweight plate mounting structure (9) is fixed to one end of the main suspension beam (2).
7. A method for installing a side wall of a nacelle cover of a compact wind turbine generator set according to claim 6, characterized in that: Both ends of the sling (1) are connected to the adjustment holes (3) above the main suspension beam (2) via shackles (10) respectively.
Citation Information
Cited By
Automatic hoisting equipment and hoisting method for wind power generation set
CN120004136A
