Construction method of complex-section super-thick concrete bridge tower reinforcing steel bar component

By splitting the steel bar parts into modules and assembling them with bent stirrups and main bars, combining spreaders and binding platforms, the problems of inconvenience and low efficiency in the construction of steel bar parts of super-thick concrete bridge towers in complex sections are solved, and the problem of inconvenience and low efficiency in the construction of steel bar parts of super-thick concrete bridge towers is realized. Efficient and accurate construction process.

CN119061792APending Publication Date: 2024-12-03CCCC SECOND HARBOR ENGINEERING CO LTD +1

Patent Information

Application Number
CN202411092451.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the prior art, the construction of steel bar parts of complex sections of ultra-thick concrete bridge towers has problems such as inconvenient assembly of steel bar parts, low construction efficiency and inability to effectively adjust the shape of the parts, resulting in difficult to control the construction accuracy and high cost.

Method used

By splitting the steel bar parts into steel bar body modules and steel bar cages according to the area, and using bent stirrups and main bars for production, combined with the design of the spreader and the binding platform, the precise assembly and adjustment of the steel bar parts can be achieved to ensure construction efficiency and Accuracy.

Benefits of technology

It improves construction efficiency, reduces aerial work time, reduces safety risks, and through precise modular design and spreader support, efficient assembly and precise adjustment of complex-shaped steel bar parts can be achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061792A_ABST
    Figure CN119061792A_ABST
Patent Text Reader

Abstract

The invention provides a construction method for a reinforcing steel bar component of a complex-section ultra-thick concrete bridge tower. The construction method comprises the following steps that S1, the reinforcing steel bar component is split into reinforcing steel bar body modules, reinforcing steel bar cages and corresponding drag hook ribs; s2, decomposing the reinforcing steel bar body module into a plurality of reinforcing steel bar sheet bodies; s3, manufacturing of a steel bar sheet body is completed through the drag hook bars, the bent stirrups and the main bars; s4, the reinforcing steel bar sheet bodies form reinforcing steel bar body modules through binding drag hook ribs; s5, the reinforcement cage is unfolded and decomposed into reinforcement meshes; s6, manufacturing of the reinforcing mesh is completed through the main reinforcements and the arc stirrups; s7, the manufactured reinforcing mesh is put into a bending device to be bent for multiple times, and then a reinforcement cage is formed; s8, loading and transporting the processed reinforcement body module and the reinforcement cage to a construction site; s9, the fixed jig frame and the sliding jig frame are installed on site; and S10, the reinforcement body module and the reinforcement cage are assembled and formed. The construction efficiency of the steel bar component is greatly improved, construction safety and stability are guaranteed, and good economic benefits are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a construction method for a complex-section ultra-thick concrete bridge tower steel bar component. Background Art

[0002] With the development of bridge engineering, the number of long-span cable-stayed bridges and suspension bridges exceeding one kilometer is increasing. As one of the main load-bearing components of cable-type bridges, bridge towers are mostly made of reinforced concrete structures. The most common method for the steel bar construction of concrete bridge towers is to first process the unit components in the steel bar factory, then transport them to the site, and manually tie them in situ. Manual on-site tying construction has problems such as small and asymmetrical construction space, inconvenient operation, high labor intensity, low construction efficiency, and difficult to control construction accuracy.

[0003] The complex section ultra-thick concrete bridge tower steel bar component structure has the characteristics of ultra-thick section, variable section, multiple edges and arc-shaped outer edge. At present, there is also a construction method for the construction of concrete bridge tower steel bars by prefabricating multiple steel meshes and then assembling them into components. The prefabrication of pieces reduces the manpower demand and shortens the construction period. However, due to the large flexibility of the steel mesh, in order to prevent it from deforming too much, it is necessary to control its deformation by setting multiple lifting points. At the same time, the connection between the steel meshes will produce a large number of joints, the construction efficiency is low, and the cost of steel bar construction will be increased. It is not suitable for the construction of steel bar components with ultra-thick section arc-shaped outer edges. Chinese patent document CN 115448139 A records a flexible hoist and hoisting method for hoisting steel bar components, but this method cannot be adjusted well according to the shape of the component, and there are defects in its use, which needs to be improved. Summary of the invention

[0004] The invention provides a construction method for steel bar components of an ultra-thick concrete bridge tower with a complex cross-section, which solves the problems of inconvenient assembly of steel bar components, low construction efficiency, and inability to perform binding operations well.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a construction method for complex section ultra-thick concrete bridge tower steel bar components, comprising the following steps: S1. Process the entire steel bar component according to the design drawings and split it into steel bar body modules, steel bar cages and corresponding hook bars by region; S2, further decomposing each component of the steel bar body module into a plurality of steel bar sheet bodies; S3, completing the production of the steel sheet by bending stirrups and main bars; S4, hoisting the prepared steel bar sheet onto the forming frame, and forming a steel bar body module by tying hook bars; S5, unfolding the steel cage and decomposing it into steel mesh sheets; S6. The steel mesh is made by using main reinforcement and arc stirrups; S7, hoisting the prepared steel mesh to a vertical state, placing it into a bending device and bending it multiple times to form a steel cage; S8. Loading the processed steel bar body modules and steel bar cages onto trucks and transporting them to the construction site; S9, install the fixed tire frame and sliding tire frame on site and debug them; S10, hoisting the steel bar body module and the steel bar cage into the fixed tire frame and the sliding tire frame by means of a hoisting device, and then assembling and forming them.

[0006] In a preferred solution, in S1, the number of the split reinforcement body modules is four, the number of the reinforcement cage is one, and the reinforcement body modules and the reinforcement cage are connected by hook bars.

[0007] In a preferred solution, the step S3 includes: S31. During the processing, the hook bars, bending stirrups and main bars are inspected for quality to ensure that the manufacturing accuracy meets the requirements; S2. Classify, number and stack those that meet the accuracy requirements.

[0008] In a preferred embodiment, the step of S4 includes: S41, grab the hook bars and the bent stirrups with a mechanical arm and place them on a sheet frame, weld them into steel sheet bodies with a welding robot and stack them; S42, hoisting the steel bar sheet to the forming frame and adjusting the position; S43, firstly adjusting the plurality of steel bar sheets to be evenly spaced in the vertical direction by means of a lifting mechanism; S44, then adjusting the postures of the steel bars at different heights in the horizontal direction respectively so that the overall inclination meets the design requirements; S45. After being fixed, the whole is welded to form a steel bar block.

[0009] In the preferred solution, in S43, the structure of the lifting mechanism is: including an upper frame and a chain, and a plurality of hooks are evenly distributed on the chain. As the lifting mechanism is lifted, different steel sheet bodies are mounted on the hooks manually, and the spacing between two adjacent steel sheet bodies is adjusted as needed. When the designed spacing is reached, the steel sheet body is temporarily fixed by adjusting the screw rod; In S45, the upper main reinforcement positioning unit and the lower main reinforcement positioning unit are adjusted to the designed positions respectively, and then the main reinforcement is lifted by the lifting device and inserted into the upper main reinforcement positioning unit and the lower main reinforcement positioning unit in turn and locked, and the shape and accuracy of the reinforcement body module are checked, and welding is carried out after verification and confirmation.

[0010] In a preferred solution, the step of S7 includes: S71, after adjusting the steel mesh to a vertical state, connect the steel mesh to the reaction frame by a hand chain hoist; S72, tensioning the steel mesh from the center to both ends in sequence by using a hand chain hoist, and fixing the steel mesh by moving a limit frame during the tensioning process to avoid excessive bending and ensure the manufacturing accuracy of the steel cage; S73. After the steel mesh is tensioned into place, the two ends of the steel mesh are welded to form a steel cage, and the movable limit frame is retracted to facilitate the lifting of the steel cage.

[0011] In a preferred solution, in S10, the structure of the spreader is: comprising a top annular track arranged at the lower part of the spreader, a moving trolley is arranged on the top annular track, the moving trolley is connected to a lashing platform through a sling, and the lashing platform provides a temporary support foundation for the staff; After adjusting the positions of the fixed cradle and the sliding cradle, the reinforcement body module and the reinforcement cage are temporarily fixed respectively, and the tying platform is driven by the mobile trolley to rotate along the outer side of the reinforcement cage, thereby ensuring that the hook reinforcement is manually tied in the space between the reinforcement body module and the reinforcement cage.

[0012] In the preferred scheme, during installation, an annular support assembly is installed on the inner side of the top annular track through a lifting rope, the inner diameter of the top annular track is larger than the inner diameter of the annular support assembly, the annular support assembly is installed on the main reinforcement of the steel cage through a sliding clamp assembly, and the lifting of the annular support assembly is completed by lifting the sling and the lifting rope. A telescopic box is slidably provided on the annular support assembly, and the telescopic box is supported at the lower part of the binding platform. The circumferential movement of the binding platform is completed by the cooperation of the annular support assembly and the telescopic box.

[0013] In the preferred solution, the tying platform is driven by a mobile trolley to move around the outside of the steel cage, so that the tying platform slides on the annular support assembly through the telescopic box, and the staff connects the steel body module and the steel cage through the hook bars according to the change in position.

[0014] In the preferred scheme, when the space between the steel body module and the steel cage is large, the telescopic box is extended outward and the deformable plate on the telescopic box is opened, thereby moving the binding platform to the farthest position; when the space between the steel body module and the steel cage is small, the telescopic box is retracted inward and the deformable plate on the telescopic box is closed, thereby moving the binding platform to the nearest position.

[0015] The beneficial effects of the present invention are as follows: all the steel bars on the tower are transferred to the ground factory for production, and are reasonably split, and each unit after the split is accurately produced, which greatly improves the construction efficiency, ensures the quality of steel bar construction, effectively reduces the high-altitude operation time of construction personnel, and reduces the safety risks of bridge tower steel bar construction. After the steel bar body module and the steel bar cage are completed in the factory, they are transported to the construction site. At this time, the installation of the sliding clamp assembly and the annular support assembly is completed by using the lifting rope on the sling. At the same time, a mobile trolley is installed on the top annular track of the sling. The mobile trolley places the binding platform on the upper side of the annular support assembly through the lifting rope, so that under the traction of the mobile trolley, the binding platform is driven to walk along the annular support assembly, so as to move in the space between the steel bar body module and the steel bar cage. In the process of bridge construction, the steel bar body module needs to ensure the inclination requirement, so the space between the steel bar body module and the steel bar cage changes with the change of height, and the telescopic box and the deformable plate can better change the working position of the binding platform according to the needs, meet the needs of use, and ensure simple and efficient operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is an overall top view schematic diagram of the present invention; Figure 2 yes Figure 1 Explosion diagram of Figure 3 yes Figure 2 Schematic diagram of the reinforcement body module; Figure 4 yes Figure 2 Schematic diagram of the steel cage; Figure 5 is a schematic diagram of a steel bar sheet of the present invention; Figure 6 yes Figure 5 Schematic diagram of the production; Figure 7 yes Figure 4 Schematic diagram of the production; Figure 8 yes Figure 3 Transportation diagram of Fig. 9 yes Figure 3 Schematic diagram of the production; Fig.10 yes Figure 6 Production instructions Figure 1 ; Fig.11 yes Figure 6 Production instructions Figure 2 ; Fig.12 This is a schematic diagram of the on-site construction of the present invention. Figure 1 ; Fig.13 This is a schematic diagram of the on-site construction of the present invention. Figure 2 ; Fig.14 This is a schematic diagram of the on-site construction of the present invention. Figure 3 ; Fig.15 yes Figure 1 The overall structure of the production Figure 1 ; Fig.16 yes Fig.15 A top view schematic diagram of Fig.17 yes Fig.15 A front view schematic diagram of Fig.18 yes Fig.15 Schematic diagram of the left side; Fig.19 yes Figure 1 The overall structure of the production Figure 2 ; Fig. 20 yes Fig.19 Explosion diagram of Fig.21 yes Fig. 20 Schematic diagram of the structure of the steel cage installation annular support assembly; Fig. 22 yes Fig.21 Schematic diagram of the explosion structure of the annular support assembly Figure 1 ; Fig.23 yes Fig.21 Schematic diagram of the explosion structure of the annular support assembly Figure 2 ; Fig.24 yes Fig. 22 A schematic diagram of the overall structure of the sliding clamp assembly; Fig.25 yes Fig.24 A top view schematic diagram of Fig.26 yes Fig.24 Schematic diagram of the explosion structure.

[0017] In the figure: steel bar module 1; steel bar cage 2; hook bar 3; bending stirrup 4; main bar 5; arc stirrup 6; sheet tire frame 7; steel bar sheet 8; forming tire frame 9; lifting mechanism 10; upper frame 1001; chain 1002; hook 1003; adjusting screw 11; upper main bar positioning unit 12; lower main bar positioning unit 13; steel bar block 14; steel bar mesh 15; bending device 16; hand chain hoist 17; reaction frame 18; mobile limit frame 19; fixed tire frame 20; sliding tire frame 21; sling 22; top circular track 23; mobile trolley 2 4; tying platform 25; lifting rope 26; sliding clamp assembly 27; clamp block 2701; arc groove 2702; arc surface 2703; threaded hole 2704; ball screw 2705; annular support assembly 28; circular ring plate 2801; baffle 2802; notch 2803; lock hole 2804; fitting plate 2805; fixing pin 2806; telescopic box 29; support plate 2901; box sleeve 2902; limit plate 2903; claw 2904; slideway 2905; mounting hole 2906; deformation plate 30; rotating plate 3001; cylindrical rod 3002. DETAILED DESCRIPTION

[0018] like Figure 1-14 A construction method for a complex section ultra-thick concrete bridge tower steel bar component comprises the following steps: S1. Process the entire steel bar component according to the design drawing and split it into a steel bar body module 1, a steel bar cage 2 and corresponding hook bars 3 by region; S2, further decomposing each component of the steel bar body module 1 into a plurality of steel bar sheets 8; S3, completing the production of the steel bar sheet 8 by bending the stirrups 4 and the main bars 5; S4, hoisting the prepared steel bar sheet 8 onto the forming frame 9, and forming the steel bar body module 1 by tying the hook bars 3; S5, unfolding the steel cage 2 and decomposing it into steel mesh sheets 15; S6, completing the production of the steel mesh 15 through the main reinforcement 5 and the arc stirrup 6; S7, hoisting the prepared steel mesh 15 to a vertical state, and placing it through a bending device 16 and bending it multiple times to form a steel cage 2; S8, loading the processed reinforcement body module 1 and reinforcement cage 2 onto a truck and transporting them to the construction site; S9, installing and debugging the fixed tire frame 20 and the sliding tire frame 21 on site; S10, hoisting the reinforcement body module 1 and the reinforcement cage 2 into the fixed tire frame 20 and the sliding tire frame 21 by the hoisting device 22, and then assembling and forming them.

[0019] Limited by the environment of the bridge construction site, a preliminary analysis method is adopted to split the bridge into sections, break and decompose the steel components, and refine each broken part until it reaches the most basic steel form. Complex sections include symmetrical and asymmetrical forms. The four-corner split method is adopted to process each inflection point separately to form a steel body module 1. After prefabrication in the factory, it is transported to the construction site together with the manufactured steel cage 2 and assembled on site. Due to the small overall volume and convenient transportation, the weight of a single steel body module 1 and steel cage 2 is more controllable during hoisting, which is convenient for on-site adjustment, thereby meeting the design inclination and height requirements.

[0020] The fixed tire frame 20 is arranged in the middle, and there are four sliding tire frames 21, which are respectively arranged at the diagonal positions outside the fixed tire frame 20. After the steel bar body module 1 and the steel cage 2 are transported to the construction site, the steel bar body module 1 is first hoisted into the sliding tire frame 21 with comb tooth slots, and measured by total station, three-dimensional laser scanner and other measuring methods to ensure that the steel bar body module 1 is accurately placed on the sliding tire frame 21; then the stirrups between the four steel bar body modules 1 are welded to realize the connection between the outer steel bar body modules 1; then the steel cage 2 is hoisted into the fixed tire frame 20, and the posture of the steel cage 2 is adjusted to ensure that it is accurately placed in the fixed tire frame 20; finally, the hook bars 3 for quality inspection of the steel bar body module 1 and the steel cage 2 are tied to form the required steel bar components; after completing the above steps, the steel bar components are hoisted to the top of the bridge tower for subsequent construction.

[0021] In a preferred solution, in S1, the number of the split reinforcement body modules 1 is four, the number of the reinforcement cage 2 is one, and the reinforcement body module 1 and the reinforcement cage 2 are connected by hook bars 3.

[0022] In a preferred solution, the step S3 includes: S31. During the processing, the lengths of the hook bars 3, the bent stirrups 4 and the main bars 5 are quality inspected to ensure that the manufacturing accuracy meets the requirements; an image recognition system is used for photo analysis to quickly inspect and screen the steel bars.

[0023] S2. Classify, number and stack those that meet the accuracy requirements.

[0024] In a preferred embodiment, the step of S4 includes: S41, grab the hook reinforcement 3 and the bent stirrup 4 with a mechanical arm and place them on the sheet frame 7, weld them into steel sheet 8 by a welding robot and stack them; S42, hoisting the steel bar sheet 8 to the forming frame 9 and adjusting the position; S43, firstly, adjusting the plurality of steel bar sheets 8 to be evenly spaced in the vertical direction by the lifting mechanism 10; S44, then adjusting the postures of the steel bar sheets 8 at different heights in the horizontal direction respectively so that the overall inclination meets the design requirements; S45, after being fixed, the whole is welded to form a steel bar block 14.

[0025] In the preferred solution, in S43, the structure of the lifting mechanism 10 is: including an upper frame 1001 and a chain 1002, and a plurality of hooks 1003 are evenly distributed on the chain 1002. As the lifting mechanism 10 is lifted, different steel sheet bodies 8 are manually mounted on the hooks 1003, and the spacing between two adjacent steel sheet bodies 8 is adjusted as needed. When the designed spacing is reached, the steel sheet body 8 is temporarily fixed by adjusting the screw rod 11; In S45, the upper main reinforcement positioning unit 12 and the lower main reinforcement positioning unit 13 are adjusted to the designed positions respectively, and then the main reinforcement 5 is hoisted by the hoist 22 and inserted into the upper main reinforcement positioning unit 12 and the lower main reinforcement positioning unit 13 in turn and locked, and the shape and accuracy of the reinforcement body module 1 are checked, and welding is performed after verification and confirmation.

[0026] The configuration of the steel bar block 14 is different according to the different cross-sectional shapes. The steel bar block 14 includes symmetrical and asymmetrical structural forms, so that the structure of the steel bar body module 1 can be more conveniently adjusted according to the needs, meeting the needs of construction and ensuring the efficiency of construction.

[0027] In a preferred solution, the step of S7 includes: S71, after adjusting the steel mesh 15 to a vertical state, connect the steel mesh 15 and the reaction frame 18 by means of a hand winch 17; S72, tensioning the steel mesh 15 from the center to both ends in sequence by means of the hand chain hoist 17, and fixing the steel mesh 15 by means of the movable limit frame 19 during the tensioning process to avoid excessive bending and ensure the manufacturing accuracy of the steel cage; S73, after the steel mesh 15 is tensioned in place, the two ends of the steel mesh 15 are welded to form a steel cage 2, and the movable limit frame 19 is retracted to facilitate the lifting of the steel cage 2.

[0028] like Figure 13-26 In the preferred solution, in S10, the structure of the sling 22 is: including a top annular track 23 arranged at the lower part of the sling 22, a moving trolley 24 is arranged on the top annular track 23, and the moving trolley 24 is connected to a lashing platform 25 through a sling rope 26, and the lashing platform 25 provides a temporary support foundation for the staff; After adjusting the positions of the fixed frame 20 and the sliding frame 21, the reinforcement body module 1 and the reinforcement cage 2 are temporarily fixed respectively, and the tying platform 25 is driven by the mobile trolley 24 to rotate along the outer side of the reinforcement cage 2, thereby ensuring that the hook bars 3 are manually tied in the space between the reinforcement body module 1 and the reinforcement cage 2.

[0029] In the preferred scheme, during installation, an annular support assembly 28 is installed on the inner side of the top annular track 23 through a lifting rope 26. The inner diameter of the top annular track 23 is larger than the inner diameter of the annular support assembly 28. The annular support assembly 28 is installed on the main reinforcement 5 of the steel cage 2 through a sliding clamp assembly 27. The lifting of the annular support assembly 28 is completed by lifting the sling 22 and the lifting rope 26. A telescopic box 29 is slidably provided on the annular support assembly 28. The telescopic box 29 is supported on the lower part of the binding platform 25. The circumferential movement of the binding platform 25 is completed by the cooperation of the annular support assembly 28 and the telescopic box 29.

[0030] The structure of the sliding clamp assembly 27 is as follows: it includes a clamp block 2701, the clamp block 2701 is provided with an arc groove 2702, the arc groove 2702 is sleeved on the side wall of the main reinforcement 5 on the reinforcement cage 2, one side of the arc groove 2702 is provided with an arc surface 2703, the arc surface 2703 is attached to the outer side of the arc stirrup 6 on the reinforcement cage 2, and the clamp block 2701 is provided with at least three threaded holes 2704 along the spiral direction, and a ball screw 2705 is detachably provided in the threaded hole 2704, and the ball screw 2705 is against the side wall of the main reinforcement 5; The structure of the annular support assembly 28 is as follows: it includes a circular plate 2801, a baffle 2802 is arranged on the outer side of the circular plate 2801, a notch 2803 is arranged on the baffle 2802, a locking hole 2804 is arranged on the circular plate 2801 in the notch 2803, a fitting plate 2805 is arranged in the notch 2803, 2805 is connected to the circular plate 2801 through a fixing pin 2806, the fixing pin 2806 is located in the locking hole 2804, and both sides of the fitting plate 2805 abut against the baffle 2802; The structure of the telescopic box 29 is as follows: it includes a support plate 2901, a limit plate 2903 is provided at the end of the support plate 2901, the support plate 2901 is inserted into the box sleeve 2902, a claw 2904 is provided on the inner side of the support plate 2901, a slide 2905 is provided on the claw 2904, and the claw 2904 and the baffle 2802 are slidably connected.

[0031] Since the reinforcement body module 1 has a certain inclination requirement, the space between it and the reinforcement cage 2 is not symmetrical. As the height changes, the space also changes, so the space for personnel operation changes. In addition, the overall height of the reinforcement body module 1 and the reinforcement cage 2 is relatively high, and personnel cannot flexibly operate in the space between the reinforcement body module 1 and the reinforcement cage 2. Due to the lack of force application points, the process of manually tying the hook reinforcement 3 is very complicated and inconvenient, and the construction is restricted.

[0032] There is one fixed tire frame 20 and four sliding tire frames 21. The lifting effect of the sling 22 can ensure that the work can be carried out in the height direction during manual construction. At the same time, the sliding clamp assembly 27 can move up and down along the main reinforcement 5. Multiple sliding clamp assemblies 27 work together and use the steel cage 2 as a support to ensure the convenience of construction. The steel cage 2 is temporarily fixed by the fixed tire frame 20, and has strong rigidity and stable support. The annular support assembly 28 and the top annular track 23 cooperate with each other to ensure that the tying platform 25 can move along the circumference of the steel cage 2 under the drive of the mobile trolley 24, and the overall operation is safe and stable.

[0033] In the preferred solution, the tying platform 25 is driven by the mobile trolley 24 to move around the outside of the steel cage 2, so that the tying platform 25 slides on the annular support assembly 28 through the telescopic box 29, and the staff connects the steel body module 1 and the steel cage 2 through the hook bar 3 according to the change in position.

[0034] In the preferred scheme, when the space between the steel body module 1 and the steel cage 2 is large, the telescopic box 29 is extended outward and the deformable plate 30 on the telescopic box 29 is opened, thereby moving the binding platform 25 to the farthest position; when the space between the steel body module 1 and the steel cage 2 is small, the telescopic box 29 is retracted inward and the deformable plate 30 on the telescopic box 29 is closed, thereby moving the binding platform 25 to the nearest position.

[0035] The structure of the deformable plate 30 is as follows: it includes a rotating plate 3001, a cylindrical rod 3002 is provided on the rotating plate 3001, a mounting hole 2906 is provided on the box sleeve 2902 of the telescopic box 29, the cylindrical rod 3002 is located in the mounting hole 2906, the rotating plate 3001 is supported on the bottom of the binding platform 25, the upper side of the rotating plate 3001 is connected to the binding platform 25 by screws, a waist-shaped groove is provided on the binding platform 25, the screws are passed through the waist-shaped groove, the rotating plate 3001 is fixed to the binding platform 25 by screws and nuts, and the movement of the binding platform 25 relative to the box sleeve 2902 is completed through the cooperation of the two rotating plates 3001, thereby facilitating further changing the position of the binding platform 25, and the moving direction of the binding platform 25 is coaxial with the central axis of the box sleeve 2902.

[0036] According to the change of the space size between the reinforcement body module 1 and the reinforcement cage 2, the position and state of the telescopic box 29 and the deformation plate 30 are flexibly adjusted to meet the needs of construction. At the same time, no interference or collision will occur between the reinforcement body module 1 and the reinforcement cage 2. The overall operation is convenient and the construction effect is good.

[0037] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A construction method for complex section ultra-thick concrete bridge tower steel bar components, characterized by: The following steps are involved: S1. Processing the entire steel bar component according to the design drawing and splitting it into a steel bar body module (1), a steel bar cage (2) and corresponding hook bars (3) by region; S2, further decomposing each component of the steel bar body module (1) into a plurality of steel bar sheet bodies (8); S3, completing the production of the steel bar sheet (8) by bending the stirrups (4) and the main bars (5); S4, hoisting the prepared steel bar sheet (8) onto the forming frame (9), and forming a steel bar body module (1) by tying the hook bars (3); S5, unfolding the steel cage (2) and decomposing it into steel mesh sheets (15); S6, completing the production of the steel mesh (15) through the main reinforcement (5) and the arc stirrup (6); S7, hoisting the prepared steel mesh (15) to a vertical state, placing it through a bending device (16) and bending it multiple times to form a steel cage (2); S8, loading the processed reinforcement body module (1) and reinforcement cage (2) onto a truck and transporting them to the construction site; S9, installing and debugging the fixed tire frame (20) and the sliding tire frame (21) on site; S10, hoisting the reinforcement body module (1) and the reinforcement cage (2) into the fixed tire frame (20) and the sliding tire frame (21) by means of a hoist (22) and then assembling them into shape.

2. The method for constructing steel bars of complex section ultra-thick concrete bridge tower according to claim 1 is characterized by: In S1, the number of the steel bar body modules (1) after being split is four, the number of the steel bar cage (2) is one, and the steel bar body module (1) and the steel bar cage (2) are connected via a hook bar (3).

3. The method for constructing steel bar components for complex cross-section ultra-thick concrete bridge towers according to claim 1 is characterized by: The steps of S3 include: S31. During the processing, the lengths of the hook reinforcement (3), the bending stirrup reinforcement (4) and the main reinforcement (5) are quality inspected to ensure that the manufacturing accuracy meets the requirements; S2. Classify, number and stack those that meet the accuracy requirements.

4. The method for constructing steel bar components for complex cross-section ultra-thick concrete bridge towers according to claim 1 is characterized by: The steps of S4 include: S41, using a mechanical arm to grab the hook reinforcement (3) and the bent stirrup (4) and place them on a sheet frame (7), welding them into a steel sheet (8) by a welding robot and stacking them; S42, hoisting the steel bar sheet (8) to the forming frame (9) and adjusting the position; S43, firstly adjusting the plurality of steel bar sheets (8) to be spaced evenly in the vertical direction by means of the lifting mechanism (10); S44, then adjusting the postures of the steel bar sheets (8) at different heights in the horizontal direction respectively so that the overall inclination meets the design requirements; S45, after being fixed, the whole is welded to form a steel bar block (14).

5. The method for constructing steel bar components for complex-section ultra-thick concrete bridge towers according to claim 4 is characterized by: In S43, the structure of the lifting mechanism (10) is as follows: it includes an upper frame (1001) and a chain (1002), and a plurality of hooks (1003) are evenly distributed on the chain (1002). As the lifting mechanism (10) is lifted, different steel bar sheets (8) are manually mounted on the hooks (1003), and the spacing between two adjacent steel bar sheets (8) is adjusted as needed. When the designed spacing is reached, the steel bar sheets (8) are temporarily fixed by adjusting the screw rod (11); In S45, the upper main reinforcement positioning unit (12) and the lower main reinforcement positioning unit (13) are adjusted to the designed positions respectively, and then the main reinforcement (5) is hoisted by the hoist (22) and sequentially inserted into the upper main reinforcement positioning unit (12) and the lower main reinforcement positioning unit (13) and locked, and the shape and accuracy of the reinforcement body module (1) are checked, and welding is performed after verification and confirmation.

6. The method for constructing steel bar components for complex cross-section ultra-thick concrete bridge towers according to claim 1 is characterized by: The steps of S7 include: S71, after adjusting the steel mesh (15) to a vertical state, connecting the steel mesh (15) and the reaction frame (18) by means of a hand chain hoist (17); S72, tensioning the steel mesh (15) from the center to both ends in sequence by means of a hand chain hoist (17), and fixing the steel mesh (15) by means of a movable limit frame (19) during the tensioning process to avoid excessive bending and ensure the manufacturing accuracy of the steel cage; S73. After the steel mesh (15) is tensioned in place, the two ends of the steel mesh (15) are welded to form a steel cage (2), and the movable limit frame (19) is retracted to facilitate the lifting of the steel cage (2).

7. The method for constructing steel bars for complex section ultra-thick concrete bridge towers according to claim 1 is characterized by: In S10, the structure of the sling (22) is as follows: it includes a top annular track (23) arranged at the bottom of the sling (22), a moving trolley (24) is arranged on the top annular track (23), the moving trolley (24) is connected to a lashing platform (25) via a sling rope (26), and the lashing platform (25) provides a temporary support foundation for the staff; After adjusting the positions of the fixed frame (20) and the sliding frame (21), the reinforcement body module (1) and the reinforcement cage (2) are temporarily fixed respectively, and the tying platform (25) is driven by the moving trolley (24) to rotate along the outer side of the reinforcement cage (2), thereby ensuring that the hook reinforcement (3) is manually tied in the space between the reinforcement body module (1) and the reinforcement cage (2).

8. The method for constructing steel bar components for complex-section ultra-thick concrete bridge towers according to claim 7 is characterized by: During installation, an annular support assembly (28) is installed on the inner side of the top annular track (23) via a lifting rope (26); the inner diameter of the top annular track (23) is larger than the inner diameter of the annular support assembly (28); the annular support assembly (28) is installed on the main reinforcement (5) of the reinforcement cage (2) via a sliding clamp assembly (27); the lifting of the annular support assembly (28) is completed by lifting the sling (22) and the lifting rope (26); a telescopic box (29) is slidably provided on the annular support assembly (28); the telescopic box (29) is supported on the lower part of the tying platform (25); and the circumferential movement of the tying platform (25) is completed by the cooperation of the annular support assembly (28) and the telescopic box (29).

9. The method for constructing steel bar components for complex-section ultra-thick concrete bridge towers according to claim 8 is characterized by: The tying platform (25) is driven by the moving trolley (24) to move around the outer side of the steel cage (2), so that the tying platform (25) slides on the annular support assembly (28) through the telescopic box (29), and the staff connects the steel body module (1) and the steel cage (2) through the hook bar (3) according to the change in position.

10. The method for constructing steel bar components for complex-section ultra-thick concrete bridge towers according to claim 9 is characterized by: When the space between the reinforcement body module (1) and the reinforcement cage (2) is large, the telescopic box (29) is extended outwards and the deformable plate (30) on the telescopic box (29) is opened, thereby moving the tying platform (25) to the farthest position; when the space between the reinforcement body module (1) and the reinforcement cage (2) is small, the telescopic box (29) is retracted inwards and the deformable plate (30) on the telescopic box (29) is closed, thereby moving the tying platform (25) to the nearest position.

Citation Information

Patent Citations

  • Flexible lifting appliance for lifting reinforcing steel bar component and lifting method

    CN115448139A

Cited By

  • Steel bar mesh construction method suitable for large-diameter pile foundation

    CN119332674A