Marble splicing and paving construction method
By using reinforcement technology of marble glue and carbon fiber composite materials in marble paving, combined with grinding and waterproofing, the gap enlargement and alkali return problems are solved, the aesthetics and impact resistance of marble splicing are improved, and the joints are avoided cracks and aging at the site.
Patent Information
- Application Number
- CN202411458595.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2024-12-03
AI Technical Summary
During the marble laying process, the construction process leads to an increase in gaps, affecting the appearance, and the stone is prone to alkaline reflux problems, resulting in the formation of white spots or yellow spots, and cracks or breaks are prone to splicing.
A marble splicing and laying construction method is adopted, including obtaining two pieces of marble, bonding and fixing with marble glue, and strengthening through seamless splicing cutters and carbon fiber composite materials to ensure gap reduction and connection strength. The surface is polished, waterproof and UV-resistant.
Effectively reduce gaps during marble splicing, enhance overall aesthetics, improve impact resistance, avoid cracks or breakages at joints, and inhibit alkali reflux and aging problems.
Smart Images

Figure CN119062111A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a marble splicing and paving construction method. Background Art
[0002] With the rapid development of my country's economy and society, people have higher and higher requirements for stone materials, especially for some high-end hotels, exhibition halls, clubs, residences and other places. It not only requires a relatively perfect appearance, but also faces elevation requirements. It is not easy to use dry paving construction, and higher requirements are put forward for splicing strength. At the same time, the construction process is demanding, especially at the joints of stones, the width of the splicing gap needs to be minimized. However, in the actual construction process, due to the construction process, when paving marble, it is necessary to beat the marble to be laid, so that the mortar at the bottom emerges and fills the gap between the two marbles, resulting in an increase in the gap between the two marbles, which greatly affects the overall beauty of the marble.
[0003] In addition, since stone paving often requires bonding with cement mortar, the alkaline ions in the paste or mortar can easily seep out, causing the stone to alkali back and form white spots or yellow spots. Summary of the invention
[0004] In view of the shortcomings of the prior art, the present invention proposes a marble splicing and paving construction method, which can improve the impact resistance of the spliced marble in the subsequent construction process, avoid cracks or breaks at the joints, and effectively inhibit the problem of alkali return in the spliced marble in the later stage. It can also reduce the gaps in the marble splicing and enhance the overall aesthetics of the marble splicing.
[0005] In order to realize the above technical solution, the present invention provides a marble splicing and paving construction method, comprising the following steps:
[0006] S1, obtaining a first marble and a second marble;
[0007] S2, using an adhesive to bond and fix the first marble and the second marble, and waiting for the adhesive to solidify to obtain a spliced plate;
[0008] S3. Use seamless splicing cutter head to cut the seams to ensure the bonding surface is flat;
[0009] S4, using an adhesive to bond and fix the first marble and the second marble, and using a carbon fiber composite material to reinforce them, and then standing to wait for the adhesive to solidify to obtain the spliced marble;
[0010] S5. Grind and polish the front of the spliced marble, and perform waterproof and anti-UV treatment on the polished surface.
[0011] Preferably, in step S1, after obtaining the first marble and the second marble, the joint sides of the first marble and the second marble are cut, and the cut edges are polished.
[0012] Preferably, in step S1, when cutting the joint sides of the first marble and the second marble, the cutting angle is 30° to 45°, and the cutting depth is 5 mm to 10 mm.
[0013] Preferably, in step S2, marble glue is used as an adhesive, and the marble glue is applied to the joint side of the first marble and the second marble, and the first marble and the second marble are tightly bonded by the marble glue, and the marble glue protruding from the surface of the bonding part is scraped off with a blade.
[0014] Preferably, in step S2, the first marble and the second marble are bonded and fixed by using marble glue, and the marble glue is left to stand and solidify to obtain the spliced marble, and the curing waiting time of the marble glue is not less than 24 hours.
[0015] Preferably, in step S4, a reinforcement groove is opened on the back of the spliced marble and is located at both the first marble and the second marble, and a connecting piece is bonded and fixed in the reinforcement groove.
[0016] Preferably, in step S4, the connecting piece is made of 304 stainless steel, and the connecting piece is fixed in the reinforcement groove by epoxy adhesive.
[0017] Preferably, in step S4, the specific steps of using carbon fiber composite materials for reinforcement include:
[0018] S41, apply resin to the gap;
[0019] S42, attaching a carbon fiber cloth reinforcement patch on the resin surface;
[0020] S43, completely squeeze out the bubbles on the carbon fiber cloth reinforcement patch along the fiber direction;
[0021] S44. Apply resin on the surface of the carbon fiber cloth reinforcement patch.
[0022] The beneficial effect of the marble splicing and paving construction method provided by the present invention is that the marble splicing and paving construction method is simple to construct, can reduce the gaps during marble splicing, and enhance the overall aesthetics of marble splicing. Through the marble splicing and paving construction method provided by the present invention, after the first marble and the second marble are bonded and fixed, a carbon fiber composite material is used to assist in the splicing and fixing of the first marble and the second marble, which can improve the impact resistance of the spliced marble in the subsequent construction process and avoid cracks or disconnections at the joints. The present invention also performs waterproof and UV-resistant finishing treatment on the surface of the spliced marble after grinding and polishing, which can effectively inhibit the problems of alkali reversion and aging of the spliced marble in the later stage. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a construction flow chart of the present invention.
[0024] Figure 2 It is a schematic diagram of the first marble and the second marble obtained by the construction method of the present invention after being spliced and paved.
[0025] Figure 3 A side view of the connection structure between the carbon fiber composite material, the connector and the spliced marble.
[0026] Figure 4 Schematic diagram of the connection between marble glue, connectors and spliced marble.
[0027] Figure 5 It is a top view of the connection structure between the carbon fiber composite material and the connecting parts and the spliced marble.
[0028] In the figure: 1. first marble; 2. second marble; 3. marble glue; 4. carbon fiber composite material; 5. connecting part. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary persons in the art without creative work are within the scope of protection of the present invention.
[0030] Embodiment: A marble splicing and paving construction method.
[0031] Reference Figures 1 to 5 As shown, a marble splicing and paving construction method comprises the following steps:
[0032] S1. Obtain the first marble 1 and the second marble 2, cut the splicing side of the first marble 1 and the second marble 2, and grind the cut edges. When cutting the splicing side of the first marble 1 and the second marble 2, the cutting angle is 30° to 45°, and the cutting depth is 5mm to 10mm. When cutting, the cutting angle should not be too large or too small, and the cutting depth should not be too large or too small, otherwise it will affect the infusion of the adhesive and the carbon fiber composite material after the splicing of the first marble 1 and the second marble 2, and eventually lead to insufficient bonding strength between the first marble 1 and the second marble 2. Actual research has found that when the cutting angle is 30° to 45° and the cutting depth is 5mm to 10mm, the first marble 1 and the second marble 2 can have a good notch when splicing, so that the adhesive and the carbon fiber composite material 4 can be well retained in the notch during infusion, and then the first marble 1 and the second marble 2 can have a good bonding strength.
[0033] S2. Use an adhesive to bond the first marble 1 and the second marble 2 together, and wait for the adhesive to solidify to obtain a spliced board. In this embodiment, marble glue 3 is used as an adhesive, and marble glue 3 is applied to the splicing side of the first marble 1 and the second marble 2. The first marble 1 and the second marble 2 are tightly bonded together using the marble glue 3, and the marble glue 3 protruding from the surface of the bonding part is scraped off with a blade. Use the marble glue 3 to bond the first marble 1 and the second marble 2 together, and wait for the marble glue 3 to solidify to obtain a spliced marble. The curing waiting time of the marble glue 3 is not less than 24 hours.
[0034] S3. Use a seamless splicing blade to make cuts to ensure that the bonding surface is flat, so as to facilitate the subsequent use of adhesives and carbon fiber composite materials for reinforcement and bonding.
[0035] S4, using an adhesive to bond and fix the first marble 1 and the second marble 2, and using a carbon fiber composite material 4 to reinforce them, and then standing to wait for the adhesive to solidify to obtain a spliced marble; a reinforcement groove is opened on the back of the spliced marble, which is located at both the first marble 1 and the second marble 2, and a connecting piece 5 is bonded and fixed in the reinforcement groove. The connecting piece 5 is made of 304 stainless steel and is fixed in the reinforcement groove by epoxy adhesive. By providing the connecting piece 5, the original gap between the first marble 1 and the second marble 2 can be always maintained during the curing process of the adhesive, which can not only further enhance the connection strength between the first marble 1 and the second marble 2, but also reduce the gap between the first marble 1 and the second marble 2 during the curing process after splicing, thereby enhancing the overall aesthetics of the marble after splicing.
[0036] In this embodiment, the specific steps of using the carbon fiber composite material 4 for reinforcement are as follows:
[0037] (1) Clean the back of the marble, grind the cracks, fill the concrete cracks with resin, fill the missing corners, and grind the angles into an arc shape;
[0038] (2) Apply resin to the gaps. The resin ratio must be evenly mixed. The resin thickness must be evenly applied without sagging. The curing time of the resin must be controlled.
[0039] (3) Stick the carbon fiber cloth reinforcement patch on the resin surface. Stick it in the design direction and position sequence to make it evenly impregnated.
[0040] (4) Squeeze out the bubbles. Completely squeeze out the bubbles on the carbon fiber cloth reinforcement patch along the fiber direction. The degassing operation must confirm that the carbon fiber cloth reinforcement patch fibers are free of wrinkles and skew;
[0041] (5) Apply resin evenly on the surface of the carbon fiber cloth reinforcement patch.
[0042] (6) Confirm that the carbon fiber cloth reinforcement patch is completely impregnated with resin and there is no wind trapping.
[0043] In this embodiment, the coating resin is an ethylene-vinyl chloride-vinyl ester composition, the viscosity of the resin is 80-120 MPa·s, the solid content is 52%±1%, the pH value is 7-9, and the density is 1.1 g / cm 3 .
[0044] By using the carbon fiber composite material 4 to assist in the splicing and fixing of the first marble 1 and the second marble 2 after the first marble 1 and the second marble 2 are bonded and fixed, the impact resistance of the spliced marble in the subsequent construction process can be improved, and cracks or disconnections at the joints can be avoided.
[0045] S5. Polish the front of the spliced marble, and perform waterproof and UV resistance treatment on the polished surface. You can also apply fire retardant coating on the polished surface as needed. By performing waterproof, UV resistance and fire retardant coating on the surface of the spliced marble after polishing, it can effectively prevent the spliced marble from returning to alkali, aging, water seepage, flammability and other problems in the later stage.
[0046] In order to further illustrate the present invention, the following example is given to illustrate a marble splicing and paving construction method, comprising the following steps:
[0047] (1) The first marble 1 and the second marble 2 are both made of 600 mm × 600 mm snowflake white marble.
[0048] (2) Partially cut the back of the first marble 1 and the second marble 2, with a cutting angle of 30° and a cutting depth of 10 mm along the thickness direction of the first marble 1 or the second marble 2;
[0049] (3) Grinding the cut edges, applying marble glue 3 on the polished edges to bond and fix the first marble 1 and the second marble 2, scraping the overflowed marble glue 3 with a blade, and leaving it to stand for 24 hours to wait for the marble glue 3 to solidify to obtain the spliced marble;
[0050] (4) Apply resin to the gaps. The resin ratio must be evenly mixed. The resin thickness must be evenly applied without sagging. The curing time of the resin must be controlled.
[0051] (5) Stick the carbon fiber cloth reinforcement patch on the resin surface. Stick it in the design direction and position sequence to make it evenly impregnated.
[0052] (6) Squeeze out the bubbles. Completely squeeze out the bubbles on the carbon fiber cloth reinforcement patch along the fiber direction. The degassing operation must confirm that the carbon fiber cloth reinforcement patch fibers are free of wrinkles and skew;
[0053] (7) Apply resin evenly on the surface of the carbon fiber cloth reinforcement patch;
[0054] (8) Confirm that the reinforcing patch is completely impregnated with resin and there is no wind trapping. Repeat the above steps (5)-(7) when multiple layers of reinforcing patches are pasted.
[0055] (9) Grind and polish the front of the spliced marble, and perform waterproof and UV-resistant finishing on the polished surface.
[0056] After testing with a crack observation instrument, the bonding gap of the spliced marble was 0.1mm, and there was no yellowing observed with the naked eye after six months of use.
[0057] The above description is only a preferred embodiment of the present invention, but the present invention should not be limited to the contents disclosed in the embodiment and the drawings, so any equivalent or modification completed without departing from the spirit disclosed in the present invention shall fall within the scope of protection of the present invention.
Claims
1. A marble splicing and paving construction method, Features The steps include: S1, obtaining a first marble and a second marble; S2, using an adhesive to bond and fix the first marble and the second marble, and waiting for the adhesive to solidify to obtain a spliced plate; S3. Use seamless splicing cutter head to cut the seams to ensure the bonding surface is flat; S4, using an adhesive to bond and fix the first marble and the second marble, and using a carbon fiber composite material to reinforce them, and then standing to wait for the adhesive to solidify to obtain a spliced marble; S5. Grind and polish the front of the spliced marble, and perform waterproof and anti-UV treatment on the polished surface.
2. The marble splicing and paving construction method according to claim 1, Features: In the step S1, after obtaining the first marble and the second marble, the joint sides of the first marble and the second marble are cut, and the cut edges are polished.
3. The marble splicing and paving construction method as claimed in claim 2, Features: In the step S1, when cutting the joint side of the first marble and the second marble, the cutting angle is 30° to 45° and the cutting depth is 5 mm to 10 mm.
4. The marble splicing and paving construction method according to claim 1, Features: In step S2, marble glue is used as an adhesive, and the marble glue is applied to the joint side of the first marble and the second marble, and the first marble and the second marble are tightly bonded by the marble glue, and the marble glue protruding from the surface of the bonding part is scraped off with a blade.
5. The marble splicing and paving construction method as claimed in claim 4, Features: In the step S2, the first marble and the second marble are bonded and fixed by using marble glue, and the marble glue is left to stand and solidify to obtain the spliced marble. The curing waiting time of the marble glue is not less than 24 hours.
6. The marble splicing and paving construction method according to claim 1, Features: In the step S4, a reinforcement groove is opened on the back of the spliced marble and is located at both the first marble and the second marble, and a connecting piece is bonded and fixed in the reinforcement groove.
7. The marble splicing and paving construction method according to claim 6, Features: In the step S4, the connecting piece is made of 304 stainless steel and is fixed in the reinforcement groove by epoxy adhesive.
8. The marble splicing and paving construction method according to claim 1, Features: In the step S4, the specific steps of using the carbon fiber composite material for reinforcement include: S41, apply resin to the gap; S42, attaching a carbon fiber cloth reinforcement patch on the resin surface; S43, completely squeeze out the bubbles on the carbon fiber cloth reinforcement patch along the fiber direction; S44. Apply resin on the surface of the carbon fiber cloth reinforcement patch.