Online cleaning system and method for steam turbine

Through the online cleaning system, superheated steam and water spray cooling technology are utilized, combined with the design of bypass pipes and shower conduits, the shutdown and high cost problems of traditional cleaning methods are solved, and the efficient cleaning and stable operation of the turbine is achieved.

CN119062414APending Publication Date: 2024-12-03ETUOKE BANNER JIANYUAN COAL CHEM TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411228746.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Traditional steam turbine cleaning methods require shutdown, high labor intensity and high economic losses, making it difficult to achieve efficient online cleaning.

Method used

A steam turbine online cleaning system was designed to provide superheated steam using the main steam pipeline, reduce the steam temperature through the water spray cooling device, improve the solubility of scale accumulation, and adjust the steam input and pressure through the bypass pipeline and the shower conduit to achieve rapid , accurately clean, and set up insulation buckets to reduce heat loss.

Benefits of technology

It realizes efficient online cleaning of the turbine, improves cleaning efficiency and operating stability, avoids frequent disassembly and assembly, reduces production costs, and has better cleaning effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062414A_ABST
    Figure CN119062414A_ABST
Patent Text Reader

Abstract

The invention provides a steam turbine online cleaning system and method.The system comprises a main steam pipeline, a steam turbine, a condenser and a water spraying cooling device, a first isolation valve and a second isolation valve are sequentially arranged on the main steam pipeline in the steam flowing direction, and the first isolation valve is provided with a first bypass pipeline in parallel; the first bypass pipeline is provided with a first bypass valve, the second isolation valve is connected with a second bypass pipeline in parallel, and the second bypass pipeline is provided with a second bypass valve. The main steam pipeline is further provided with a first warm pipe emptying valve and a second warm pipe emptying valve. A heat preservation dismantling section is arranged on the portion, between the second isolating valve and the second warm pipe emptying valve, of the main steam pipeline, a water spraying opening of the water spraying cooling device is located over the heat preservation dismantling section, and a pipe wall remote transmission temperature measuring point and a main pipeline pressure sensor are arranged at the position behind the heat preservation dismantling section. The method comprises the steps of steam isolation of a steam turbine, steam pipe heating and online cleaning. Efficient online cleaning of the steam turbine is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of steam turbines, and in particular to an online cleaning system and method for a steam turbine. Background Art

[0002] A steam turbine, also known as a steam turbine engine, is a rotary steam power device. High-temperature and high-pressure steam passes through a fixed nozzle and becomes an accelerated airflow, which is then sprayed onto the blades, causing the rotor with blade rows to rotate and perform work externally. Steam turbines are the main equipment in modern thermal power plants and are also used in the metallurgical industry, chemical industry, and ship power plants. An air separation steam turbine is a device that can separate gases. Its working principle is based on the difference in molecular size and boiling point of gases. It converts air into high-temperature and high-pressure gas by heating and compressing it, and separates it into different gases using a series of filters, membranes, and adsorbents to purify or produce oxygen, nitrogen, argon, and other gases.

[0003] After superheated steam with various impurities enters the turbine, due to the decrease in pressure and temperature, the solubility of the impurity salt in the steam decreases as the pressure decreases, and it precipitates in the solid state and deposits in the steam flow part of the turbine to form scaling, which is generally called turbine salt accumulation.

[0004] If the scale inside the turbine is not cleaned in time, the steam flow area and steam intake will be reduced, which will lead to a decrease in turbine power and efficiency.

[0005] The traditional cleaning method is manual cleaning, which is not only labor-intensive, but also requires the turbine to be shut down and the cylinder to be opened for cleaning. The disassembly and assembly steps are cumbersome and the cleaning time is long, resulting in huge economic losses. Summary of the invention

[0006] The present application provides a steam turbine online cleaning system and method to solve the above-mentioned problems mentioned in the background technology.

[0007] On the one hand, the present application provides a steam turbine online cleaning system, comprising: a main steam pipe, a steam turbine, a condenser and a water spray cooling device.

[0008] The outlet end of the main steam pipeline is connected to the steam inlet of the steam turbine, and the exhaust port of the steam turbine is connected to the steam inlet of the condenser.

[0009] A first isolating valve and a second isolating valve are sequentially arranged on the main steam pipeline near the steam inlet end along the steam flow direction; a first bypass pipeline is arranged in parallel with the first isolating valve, and a first bypass valve is arranged on the first bypass pipeline; a second bypass pipeline is arranged in parallel with the second isolating valve, and a second bypass valve is arranged on the second bypass pipeline.

[0010] A first heating pipe vent valve is arranged on the main steam pipeline in front of the first isolation valve, and a second heating pipe vent valve is arranged on the main steam pipeline between the second isolation valve and the steam turbine.

[0011] An insulation removal section is arranged on the main steam pipeline between the second isolation valve and the second heating pipe vent valve. The water spray outlet of the water spray cooling device is located directly above the insulation removal section. A pipe wall remote temperature measuring point and a main pipeline pressure sensor are arranged on the main steam pipeline at a position after the insulation removal section.

[0012] Optionally, multiple shower pipes are also provided on the main steam pipeline, including: an isolation valve intermediate shower pipe located between the first isolation valve and the second isolation valve, a first shower valve is provided on the isolation valve intermediate shower pipe, an isolation valve rear shower pipe is provided between the second isolation valve and the insulation removal section, a second shower valve is provided on the isolation valve rear shower pipe, a third shower pipe is provided between the pipe wall remote temperature measuring point and the steam turbine, and a third shower valve is provided on the third shower pipe.

[0013] Optionally, the length of the insulation removal section is 15-20m.

[0014] Optionally, the cleaning system also includes a water circulation device, which includes a spray water collecting tank, a condensed water collecting tank, a water treatment device and a circulating water pump. The spray water collecting tank is located below the insulation removal section, the inlet of the condensed water collecting tank is connected to the outlet of the condenser, the water outlets of the spray water collecting tank and the condensed water collecting tank are both connected to the water treatment device, and a circulating water pump is connected between the clean water outlet of the water treatment device and the water inlet of the water spray cooling device.

[0015] Optionally, the water treatment unit includes a filter screen filtration chamber, an activated carbon filtration chamber and a water purification chamber which are connected in sequence.

[0016] The water outlets of the spray water collecting tank and the condensed water collecting tank are both connected to the filter screen filtering chamber, and the outlet of the water purification chamber is connected to the water inlet of the water spray cooling device.

[0017] Optionally, an insulation barrel is provided on the outer peripheral sleeve of the insulation removal section, and a cooling water inlet and a cooling water outlet are respectively provided at both ends of the insulation barrel. A cooling water regulating valve is connected between the cooling water inlet and the outlet of the water spray cooling device, and the cooling water outlet is connected to the inlet of the spray water collection tank.

[0018] Optionally, a heat preservation barrel pressure sensor is provided in the heat preservation barrel, and the heat preservation barrel is also connected to a negative pressure vacuum pump.

[0019] On the other hand, the present application provides a steam turbine online cleaning method, which is applied to the above-mentioned steam turbine online cleaning system, comprising the following steps:

[0020] (1) Steam Isolation of Steam Turbine: Close the first isolation valve, the second isolation valve, the first bypass valve, the second bypass valve, the first warm pipe vent valve and the first drain valve. Open the second warm pipe vent valve and the second drain valve. Allow the steam turbine cylinder to cool naturally to below 80°C. Test the conductivity and silica content of the condensate in the condenser before cleaning.

[0021] (2) Steam heating pipe: adjust the second heating pipe vent valve to 10-90% opening, adjust the second shower valve to 10-90% opening, and adjust the third shower valve to 10-50% opening.

[0022] Then adjust the first bypass valve and the second bypass valve to 10-50% opening, and start heating the main steam pipe. When the pressure value of the main pipe pressure sensor reaches 2.1-2.2MPa and the temperature value of the pipe wall remote temperature measurement point reaches 220-230℃, the heating is completed.

[0023] (3) Online cleaning: Start the steam turbine and control the steam temperature to be overheated by 20-30℃ under the corresponding pressure. At the same time, adjust the speed of the steam turbine periodically and perform online cleaning. Each time the speed of the steam turbine is increased or decreased periodically, one cleaning is achieved. At the same time, the condensate in the condenser is sampled and tested for conductivity and silica content once an hour. The cleaning is completed after 2-3 times.

[0024] Optionally, in the steam pipe heating step, the pressure and temperature regulation method in the main steam pipe includes: when the pressure in the main steam pipe is less than 0.5MPa, the heating rate is 5-10℃ / min. When the temperature in the main steam pipe is greater than or equal to 150℃, the cooling water regulating valve 410 is opened, the pressure is increased at a rate of 0.1-0.3MPa / min, and the heating rate is controlled below 5℃ / min, until the pressure value of the main pipe pressure sensor is 2.1-2.2MPa, and the temperature value of the pipe wall remote temperature measurement point is 220-230℃, the pipe heating is completed.

[0025] Optionally, in the online cleaning step, the periodic speed increase and decrease adjustment process of the steam turbine includes: starting the steam turbine and controlling the turbine speed to 500 rpm. After rotating for 2-5 minutes, the speed is increased to 600 rpm and warmed up for 30-40 minutes. The speed is increased to 1100 rpm and warmed up for 30-40 minutes. Finally, the speed is reduced to 600 rpm, which is a periodic speed increase and decrease of the steam turbine.

[0026] The steam turbine online cleaning system and method provided in the present application realizes efficient online cleaning of the steam turbine and has the following beneficial effects compared with the prior art:

[0027] (1) Superheated steam is provided through the main steam pipeline. The property that scale is soluble in water is utilized. At the same time, the superheated steam is cooled by a water spray cooling device, the temperature of the superheated steam is reduced, and the liquid water in the superheated steam is increased, thereby increasing the solubility of scale, achieving the purpose of rapid descaling, and realizing online cleaning of the steam turbine. A first bypass pipeline is arranged in parallel at both ends of the first isolation valve, and a second bypass pipeline is arranged in parallel at both ends of the second isolation valve. At the same time, the diameters of the first bypass pipeline and the second bypass pipeline are the same and smaller than the diameter of the main steam pipeline. The first bypass valve and the second bypass valve are arranged to adjust the input amount of steam during the cleaning process, which is conducive to the rapid and accurate control of the cleaning system, and improves the convenience of use and operation stability of the cleaning system. At the same time, the setting of the water spray cooling device can also adjust the pressure in the main steam pipeline to achieve a balance between pressure and temperature, and ensure the safe and stable operation of the cleaning system while cleaning the steam turbine. Not only does it not need to open the cover of the steam turbine for cleaning, which improves the cleaning efficiency, but also improves the operation efficiency and stability of the steam turbine.

[0028] (2) By setting up multiple shower pipes on the main steam pipeline, the condensate in the main steam pipeline can be discharged quickly and timely to prevent the accumulation of condensate, which is beneficial to the uniform distribution of temperature and pressure in the main steam pipeline, avoiding the phenomenon of excessive local pressure in the main steam pipeline, and facilitating the efficient and stable operation of the cleaning system.

[0029] (3) By setting up an insulation barrel, when the steam turbine is cleaned, cooling water is introduced through the cooling water inlet to cool the superheated steam and increase the liquid water content, thereby improving the dissolution efficiency of the deposits. The cooling water after heat exchange is then transported to the spray water collection tank through the cooling water outlet. When the steam turbine is not cleaned but is operating normally, the insulation barrel can play a certain role in insulating the insulation removal section and reduce the heat loss of the steam. At the same time, the insulation barrel is connected to a negative pressure vacuum pump. After the steam turbine is cleaned, negative pressure is drawn into the insulation barrel, so that a certain degree of vacuum is formed in the space between the insulation barrel and the insulation removal section, which greatly reduces the air content in the insulation barrel and reduces the heat transfer medium between the main steam pipe and the outside world. When the steam turbine is operating normally, the superheated steam can maintain the temperature when it flows through the insulation removal section, reducing heat loss and thus saving production costs.

[0030] (4) This application solves the problem of internal fouling of the steam turbine, does not require frequent disassembly and assembly of the steam turbine, improves the cleaning efficiency of the steam turbine, and improves the operating efficiency and stability of the steam turbine. At the same time, compared with the cleaning method that requires opening the cylinder, the cleaning effect is better and is worthy of promotion in the industry. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0032] Figure 1 A schematic diagram of the structure of a steam turbine online cleaning system provided in one embodiment of the present application;

[0033] Figure 2 A schematic structural diagram of a steam turbine online cleaning system provided by another embodiment of the present application;

[0034] Figure 3 A schematic structural diagram of a steam turbine online cleaning system provided in yet another embodiment of the present application;

[0035] Figure 4 A schematic diagram of the structure of a water circulation device and a heat preservation barrel provided in one embodiment of the present application;

[0036] Description of reference numerals:

[0037] 1: Main steam pipeline, 2: Steam turbine, 3: Condenser, 4: Water spray cooling device, 6: Water treatment device, 7: Circulating water pump, 110: First isolation valve, 120: Second isolation valve, 130: First bypass pipeline, 131: First bypass valve, 140: Second bypass pipeline, 141: Second bypass valve, 150: First heating pipe vent valve, 160: Second heating pipe vent valve, 170: Insulation removal section, 171: Spray water collection tank, 180: Pipe wall remote temperature measurement point, 190: Main Pipeline pressure sensor, 310: condensate collection tank, 410: cooling water regulating valve, 510: isolation valve intermediate shower pipe, 511: first shower valve, 520: isolation valve rear shower pipe, 521: second shower valve, 530: third shower pipe, 531: third shower valve, 610: filter chamber, 620: activated carbon filter chamber, 630: water purification chamber, 710: insulation barrel, 720: water inlet, 730: water outlet, 740: pressure sensor, 750: negative pressure vacuum pump. DETAILED DESCRIPTION

[0038] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application is clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work also fall within the scope of protection of the present application.

[0039] like Figure 1 As shown, on the one hand, the present application provides an online cleaning system for a steam turbine, comprising: a main steam pipe 1, a steam turbine 2, a condenser 3 and a water spray cooling device 4.

[0040] The outlet end of the main steam pipe 1 is connected to the steam inlet of the steam turbine 2 , and the exhaust port of the steam turbine 2 is connected to the steam inlet of the condenser 3 .

[0041] A first isolating valve 110 and a second isolating valve 120 are sequentially arranged on the main steam pipe 1 near the steam inlet end along the steam flow direction. A first bypass pipe 130 is arranged in parallel with the first isolating valve 110, and a first bypass valve 131 is arranged on the first bypass pipe 130. A second bypass pipe 140 is arranged in parallel with the second isolating valve 120, and a second bypass valve 141 is arranged on the second bypass pipe 140.

[0042] A first warm-up pipe vent valve 150 is provided on the main steam pipeline 1 before the first isolation valve 110 , and a second warm-up pipe vent valve 160 is provided on the main steam pipeline 1 between the second isolation valve 120 and the steam turbine 2 .

[0043] An insulation removal section 170 is provided on the main steam pipe 1 between the second isolation valve 120 and the second heating pipe vent valve 160. The water spray outlet of the water spray cooling device 4 is located directly above the insulation removal section 170. A pipe wall remote temperature measurement point 180 and a main pipe pressure sensor 190 are provided on the main steam pipe 1 at a position after the insulation removal section 170.

[0044] Specifically, in this embodiment, an air separation steam turbine is taken as an example to explain the principle of online cleaning of the steam turbine. In this embodiment, the steam turbine 2 is connected to the air compressor and the supercharger through couplings.

[0045] The steam inlet end of the main steam pipe 1 is connected to the steam pipe network to provide superheated steam. When the steam turbine 2 is operating normally, superheated steam is introduced to provide thermal energy to the steam turbine 2, so that the steam turbine 2 converts thermal energy into mechanical energy to perform work, and drives the air compressor and the supercharger to operate, so as to achieve the purpose of separating air and producing gases such as oxygen, nitrogen, and argon. When the steam turbine 2 needs to be cleaned, superheated steam is still provided through the main steam pipe 1, and the property that scale is soluble in water is utilized. At the same time, the superheated steam is cooled by the water spray cooling device 4 to reduce the temperature of the superheated steam and increase the liquid water in the superheated steam, thereby increasing the solubility of the scale, achieving the purpose of rapid descaling and realizing online cleaning of the steam turbine 2. At the same time, the setting of the water spray cooling device 4 can also adjust the pressure in the main steam pipe 1 to achieve a balance between pressure and temperature, so as to achieve the cleaning of the steam turbine 2 while ensuring the safe and stable operation of the cleaning system. After the hot steam is cleaned in the steam turbine 2, it enters the condenser 3 through the exhaust port of the steam turbine 2 for condensation, and condensate is obtained in the condenser 3. The condensate is then transported to a wastewater station for treatment or to a water treatment plant for purification and reuse. This not only eliminates the need to uncover the steam turbine 2 for cleaning, thereby improving cleaning efficiency, but also improves the operating efficiency and stability of the steam turbine 2.

[0046] The first isolation valve 110 and the second isolation valve 120 on the main steam pipeline 1 are used to adjust the flow rate of superheated steam when the steam turbine 2 is operating normally. The amount of superheated steam required when the steam turbine 2 is operating normally is large, and the diameter of the main steam pipeline 1 is large. However, when the steam turbine 2 is cleaned, the amount of superheated steam required is less than that when it is operating normally. Therefore, in order to facilitate accurate and rapid adjustment of the input amount of superheated steam during the cleaning process, a first bypass pipeline 130 is arranged in parallel at both ends of the first isolation valve 110, and a second bypass pipeline 140 is arranged in parallel at both ends of the second isolation valve 120. At the same time, the diameters of the first bypass pipeline 130 and the second bypass pipeline 140 are the same and smaller than the diameter of the main steam pipeline 1. A first bypass valve 131 is arranged on the first bypass pipeline 130, and a second bypass valve 141 is arranged on the second bypass pipeline 140, which are used to adjust the input amount of steam during the cleaning process, which is conducive to rapid and accurate control of the cleaning system and improves the convenience of use and operation stability of the cleaning system.

[0047] Before cleaning the steam turbine, the pipeline needs to be heated so that the main steam pipeline 1, valves, flanges and other components are evenly heated and slowly expanded during the heating process to reach the cleaning working temperature, so as to avoid excessive thermal stress caused by rapid temperature changes. Ensure that there is no additional thermal stress on the pipelines and valves, thereby preventing damage or deformation of components due to excessive stress. When heating the pipes, superheated steam is introduced through the main steam pipeline 1, and the first heating pipe vent valve 150 and the second heating pipe vent valve 160 are opened at the same time. During the heating process, a part of the steam is discharged to release the pressure, so that the superheated steam can circulate quickly in the main steam pipeline 1, thereby improving the heating efficiency, saving time, and thus improving the cleaning efficiency of the steam turbine.

[0048] At the same time, the outer surface of the main steam pipe 1 is wrapped with an insulation layer to reduce heat loss during steam transportation. The present application provides an insulation removal section 170 on the main steam pipe 1 between the second isolation valve 120 and the second heating pipe vent valve 160. The water spray outlet of the water spray cooling device 4 is located directly above the insulation removal section 170. During the cleaning process, water is sprayed on the insulation removal section 170 through the water spray cooling device 4 to cool the steam in the main steam pipe 1, adjust the pressure and temperature balance in the main steam pipe 1, and at the same time reduce the temperature of the superheated steam and increase the liquid water in the superheated steam, thereby increasing the solubility of the deposited scale and achieving the purpose of rapid scale removal.

[0049] A pipe wall remote temperature measuring point 180 and a main pipe pressure sensor 190 are provided on the main steam pipe 1 after the insulation removal section 170, for detecting the temperature and pressure of the steam entering the steam turbine 2 in the main steam pipe 1, and adjusting the opening of each valve according to the readings of the pipe wall remote temperature measuring point 180 and the main pipe pressure sensor 190 to ensure the balance of temperature and pressure in the main steam pipe 1 and the stable operation of the cleaning system.

[0050] The present application realizes the online cleaning of the steam turbine through the above scheme, provides superheated steam through the main steam pipeline, utilizes the characteristic that scale is soluble in water, and cools the superheated steam through the water spray cooling device, reduces the temperature of the superheated steam, and increases the liquid water in the superheated steam, thereby increasing the solubility of scale, achieving the purpose of rapid descaling, and realizing the online cleaning of the steam turbine. The first bypass pipeline is arranged in parallel at both ends of the first isolation valve, and the second bypass pipeline is arranged in parallel at both ends of the second isolation valve. At the same time, the diameters of the first bypass pipeline and the second bypass pipeline are the same and smaller than the diameter of the main steam pipeline. The first bypass valve and the second bypass valve are arranged to adjust the input amount of steam during the cleaning process, which is conducive to the rapid and accurate control of the cleaning system, and improves the convenience of use and operation stability of the cleaning system. At the same time, the setting of the water spray cooling device can also adjust the pressure in the main steam pipeline, achieve the balance between pressure and temperature, and ensure the safe and stable operation of the cleaning system while cleaning the steam turbine. Not only does it not need to open the cover of the steam turbine for cleaning, which improves the cleaning efficiency, but also improves the operation efficiency and stability of the steam turbine.

[0051] like Figure 2 As shown, optionally, a plurality of drain pipes are further provided on the main steam pipeline 1, including: an isolation valve intermediate drain pipe 510 located between the first isolation valve 110 and the second isolation valve 120, a first drain valve 511 being provided on the isolation valve intermediate drain pipe 510, an isolation valve rear drain pipe 520 being provided between the second isolation valve 120 and the insulation removal section 170, a second drain valve 521 being provided on the isolation valve rear drain pipe 520, a third drain pipe 530 being provided between the pipe wall remote temperature measuring point 180 and the steam turbine 2, and a third drain valve 531 being provided on the third drain pipe 530.

[0052] Specifically, the shower pipe is provided to discharge the liquid phase water in the main steam pipe 1, to prevent the condensate formed by the condensation of steam in the main steam pipe 1 from accumulating in the pipe, causing water hammer, and further damaging the impeller of the steam turbine 2. Timely drainage can prevent the condensate from entering the steam turbine 2, and protect the normal operation of the steam turbine 2.

[0053] The isolation valve rear drip pipe 520 is located after the connection position between the second bypass pipe 140 and the main steam pipe 1, ensuring the circulation of steam and efficient cooling of steam. The isolation valve intermediate drip pipe 510, the isolation valve rear drip pipe 520 and the third drip pipe 530, by arranging multiple drip pipes on the main steam pipe 1, can promptly and quickly discharge the condensate in the main steam pipe 1, prevent the accumulation of condensate, and facilitate the uniform distribution of temperature and pressure in the main steam pipe 1, avoiding the phenomenon of excessive local pressure in the main steam pipe 1, and facilitating the efficient and stable operation of the cleaning system.

[0054] Furthermore, a plurality of third spray pipes 530 are arranged between the pipe wall remote temperature measurement point 180 and the steam turbine 2, and the distance between each third spray pipe 530 is determined according to the actual working conditions, so as to further realize the timely discharge of the condensate in the main steam pipe 1 and improve the safety of the system operation.

[0055] Optionally, the length of the insulation removal section 170 is 15-20 m.

[0056] Specifically, the outer surface of the main steam pipe 1 is wrapped with an insulation layer to reduce heat loss during steam transportation. In this cleaning system, the temperature of the superheated steam is reduced, the liquid water content in the superheated steam is increased, and thus the solubility of the scale is increased, thereby achieving the purpose of rapid scale removal. Therefore, by setting the insulation removal section 170, the water in the water spray cooling device 4 is used to cool the superheated steam in the main steam pipe 1, the liquid water content in the steam is increased, and the scale removal efficiency is improved.

[0057] If the insulation removal section 170 is too short or too long, it will be difficult to control the cooling of the steam. Controlling the insulation removal section 170 to an appropriate length is beneficial to the control of the system and avoids steam loss and heat waste.

[0058] like Figure 3 As shown, optionally, the cleaning system also includes a water circulation device, which includes a spray water collecting tank 171, a condensate water collecting tank 310, a water treatment device 6 and a circulating water pump 7. The spray water collecting tank 171 is located below the insulation removal section 170, the inlet of the condensate water collecting tank 310 is connected to the outlet of the condenser 3, the water outlets of the spray water collecting tank 171 and the condensate water collecting tank 310 are both connected to the water treatment device 6, and a circulating water pump 7 is connected between the clean water outlet of the water treatment device 6 and the water inlet of the water spray cooling device 4.

[0059] Specifically, the water circulation device is used to recover the water in the water spray cooling device 4 and the spray water obtained after heat exchange with the insulation removal section 170, and the condensed water in the condenser 3 and purify it through the water treatment device 6. The purified water obtained is returned to the water spray cooling device 4 through the circulating water pump 7, thereby improving the reuse rate of water, reducing the load of the factory wastewater station, reducing sewage discharge, avoiding waste of water resources, and saving production costs.

[0060] The water in the water spray cooling device 4 is collected in the spray water collecting tank 171 after heat exchange with the insulation removal section 170. The condensed water in the condenser 3 is collected in the condensed water collecting tank 310 and respectively transported to the water processor 6 for purification. After removing impurities in the water, it is transported to the water spray cooling device 4 for reuse.

[0061] like Figure 4As shown, optionally, the water processor 6 includes a filter chamber 610, an activated carbon filter chamber 620 and a water purification chamber 630 which are connected in sequence.

[0062] The water outlets of the spray water collecting tank 171 and the condensed water collecting tank 310 are both connected to the filter screen filtering chamber 610 , and the outlet of the water purification chamber 630 is connected to the water inlet of the water spray cooling device 4 .

[0063] Specifically, the condensate may contain washed solid scale. The filter chamber 610 first passes the collected spray water and condensate through the filter chamber 610 to remove solid impurities, and then passes them through the activated carbon filter chamber 620 for adsorption filtration to remove fine impurities therein, thereby achieving a further purification effect and avoiding clogging of the pump body or pipeline during recycling.

[0064] like Figure 4 As shown, optionally, an insulation barrel 710 is provided on the outer periphery of the insulation removal section 170, and a cooling water inlet 720 and a cooling water outlet 730 are respectively provided at both ends of the insulation barrel 710. A cooling water regulating valve 410 is connected between the cooling water inlet 720 and the outlet of the water spray cooling device 4, and the cooling water outlet 730 is connected to the inlet of the spray water collection tank 171.

[0065] Specifically, when the heat preservation barrel 710 is used to clean the steam turbine 2, cooling water is introduced through the cooling water inlet 720 to cool the superheated steam to increase the liquid water content and improve the dissolution efficiency of the deposits. The cooling water after heat exchange is transferred to the spray water collection tank 171 through the cooling water outlet 730. When the steam turbine is not cleaned but is operating normally, the heat preservation barrel 710 can play a certain role in heat preservation of the heat preservation removal section 170, reducing the heat loss of the steam.

[0066] Optionally, a heat preservation barrel pressure sensor 740 is provided in the heat preservation barrel 710 , and the heat preservation barrel 710 is also connected to a negative pressure vacuum pump 750 .

[0067] Specifically, after the steam turbine is cleaned, or when it is working normally, the negative pressure vacuum pump 750 is turned on to draw negative pressure from the insulation barrel 710, so that a certain vacuum is formed in the space between the insulation barrel 710 and the insulation removal section 170, which greatly reduces the air content in the insulation barrel 710, reduces the heat transfer medium between the main steam pipe 1 and the outside world, and can maintain the temperature and reduce heat loss when the superheated steam flows through the insulation removal section 170 when the steam turbine 2 is operating normally, thereby saving production costs. The space between the insulation barrel 710 and the insulation removal section 170 maintains a vacuum degree of less than 3kPa, which is specifically determined by the material of the insulation barrel 710 and the insulation removal section 170 under actual working conditions. And compared with the disassembly and assembly of the insulation material of the insulation removal section 170 before and after each cleaning, the setting of the insulation barrel 710, the pressure sensor 740 and the negative pressure vacuum pump 750 is more convenient, further improving the cleaning efficiency of the steam turbine.

[0068] On the other hand, the present application provides a steam turbine online cleaning method, which is applied to the above-mentioned steam turbine online cleaning system, comprising the following steps:

[0069] (1) Steam Isolation of Steam Turbine: Close the first isolation valve, the second isolation valve, the first bypass valve, the second bypass valve, the first warm pipe vent valve and the first drain valve. Open the second warm pipe vent valve and the second drain valve. Allow the steam turbine cylinder to cool naturally to below 80°C. Test the conductivity and silica content of the condensate in the condenser before cleaning.

[0070] (2) Steam heating pipe: adjust the second heating pipe vent valve to 10-90% opening, adjust the second shower valve to 10-90% opening, and adjust the third shower valve to 10-50% opening.

[0071] Then adjust the first bypass valve and the second bypass valve to 10-50% opening, and start heating the main steam pipe. When the pressure value of the main pipe pressure sensor reaches 2.1-2.2MPa and the temperature value of the pipe wall remote temperature measurement point reaches 220-230℃, the heating is completed.

[0072] (3) Online cleaning: Start the steam turbine and control the steam temperature to be overheated by 20-30℃ under the corresponding pressure. At the same time, adjust the speed of the steam turbine periodically and perform online cleaning. Each time the speed of the steam turbine is increased or decreased periodically, one cleaning is achieved. At the same time, the condensate in the condenser is sampled and tested for conductivity and silica content once an hour. The cleaning is completed after 2-3 times.

[0073] Specifically, (1) steam isolation of steam turbine: before cleaning the steam turbine, the running steam turbine 2 is stopped and steam input is stopped. In this embodiment, the steam turbine 2 is used in an air separation unit, so the first isolation valve 110 and the second isolation valve 120 are fully closed, and the couplings between the steam turbine 2 and the air compressor, and between the steam turbine 2 and the supercharger are all disconnected.

[0074] At the same time, the first bypass valve 131, the second bypass valve 141, the first warm pipe vent valve 150 and the first drip valve 511 are fully closed to cut off the steam entering the steam turbine 2, and prepare to cool the steam turbine 2. The second warm pipe vent valve 160 and the second drip valve 521 are fully opened, and the steam remaining in the main steam pipeline 1 is released by the second warm pipe vent valve 160, which is beneficial to the pressure relief of the main steam pipeline 1. At the same time, part of the steam forms liquid water in the main steam pipeline 1 during the cooling process. The second drip valve 521 is opened to discharge the liquid water in the main steam pipeline 1 through the drip pipe 520 after the isolation valve. This process is beneficial to the cooling rate in the main steam pipeline 1, so that the turbine cylinder naturally cools down to below 80°C, and the conductivity and silica content of the condensate in the condenser are tested before cleaning.

[0075] Among them, the turbine's shaft seal steam regulating valve, the front and rear stop valves of the shaft seal steam regulating valve, and the bypass valve of the shaft seal steam regulating valve are closed to prevent steam from entering the turbine 2 due to internal leakage of the valve.

[0076] Before cleaning, the turbine cylinder should be cooled down to avoid the expansion of the cylinder and internal parts of the turbine due to high temperature, which will increase the difficulty of cleaning. By lowering the cylinder temperature, the low solubility of the scale caused by excessive temperature can be avoided, and the safety and effectiveness of the cleaning process can be ensured.

[0077] (2) Steam heating pipe: adjust the second heating pipe vent valve 160 to 10-90% opening, adjust the second shower valve 521 to 10-90% opening, and adjust the third shower valve 531 to 10-50% opening.

[0078] Then adjust the first bypass valve 131 and the second bypass valve 141 to 10-50% opening, start heating the main steam pipe 1, and end heating when the pressure value of the main pipe pressure sensor reaches 2.1-2.2MPa and the temperature value of the pipe wall remote temperature measurement point reaches 220-230℃. Mainly by adjusting the opening of the first bypass valve 131 and the second bypass valve 141, the amount of steam entering the main steam pipe 1 is controlled, and the main steam pipe 1 is heated, so that the main steam pipe 1, various valves, flanges and other components are evenly heated and expand slowly during the heating process, so as to avoid excessive thermal stress caused by too fast temperature changes.

[0079] (3) Online cleaning: Start the steam turbine, and control the steam temperature in the main steam pipeline 1 to be 20-30°C superheated at the corresponding pressure by adjusting the opening of the first bypass valve 131 and the second bypass valve 141, and the flow of the water spray cooling device 4. At the same time, the steam turbine is periodically increased and decreased to perform online cleaning. Each periodic increase and decrease in speed of the steam turbine is used to achieve one cleaning. At the same time, the condensate in the condenser is sampled and tested for conductivity and silica content during cleaning once an hour. The cleaning is completed after 2-3 cleanings. The silica content can be tested once every 1 hour or 2 hours. Control the steam temperature in the main steam pipeline 1 to be 20-30°C superheated at the corresponding pressure. In order to increase the liquid water in the steam and the solubility of the scale, the steam turbine is periodically increased and decreased. By switching the turbine speed, the contact between the turbine blades and the steam is increased, and the steam flushing of the turbine is accelerated, which accelerates the dissolution and shedding of the scale, thereby improving the cleaning efficiency of the steam turbine 2.

[0080] During online cleaning, when repeated cleaning is required after each periodic speed increase or decrease, the steps (1) of steam turbine steam isolation, steam pipe warming and online cleaning need to be repeated in sequence. After the online cleaning is completely completed, when the temperature of the cylinder casing of steam turbine 2 drops below 100°C, the couplings between the steam turbine and the air compressor, and between the steam turbine 2 and the supercharger are reinstalled.

[0081] Optionally, in the steam pipe heating step, the pressure and temperature regulation method in the main steam pipe 1 includes: when the pressure in the main steam pipe 1 is less than 0.5MPa, the heating rate is 5-10℃ / min. When the temperature in the main steam pipe 1 is greater than or equal to 150℃, the cooling water regulating valve 410 is opened, the pressure is increased at a rate of 0.1-0.3MPa / min, and the heating rate is controlled below 5℃ / min, until the pressure value of the main pipe pressure sensor is 2.1-2.2MPa, and the temperature value of the pipe wall remote temperature measurement point is 220-230℃, the pipe heating is completed.

[0082] Specifically, by heating the pipes, the main steam pipe 1, valves, flanges and other components are evenly heated and expand slowly during the heating process to avoid excessive thermal stress caused by too fast temperature changes. By starting the pipe heating at low pressure and then gradually increasing the pressure, it is possible to ensure that the main steam pipe 1 and valves will not experience additional thermal stress, thereby preventing damage or deformation of components caused by excessive stress.

[0083] Optionally, in the online cleaning step, the periodic speed increase and decrease adjustment process of the steam turbine includes: starting the steam turbine and controlling the turbine speed to 500 rpm. After rotating for 2-5 minutes, the speed is increased to 600 rpm and warmed up for 30-40 minutes. The speed is increased to 1100 rpm and warmed up for 30-40 minutes. Finally, the speed is reduced to 600 rpm, which is a periodic speed increase and decrease of the steam turbine.

[0084] Specifically, first control the turbine speed to 500rpm, and rotate for 2-5min, indicating that the turbine can rotate normally, and then increase the speed to 600rpm to warm up for 30-40min. During the speed of 600rpm, check that the system has no abnormal vibration and no abnormal sound, then close the second warm pipe vent valve 160, the second drain valve 521 and the third drain valve 531 to maintain the stability and balance of pressure and temperature in the main steam pipe 1. Increase the speed to 1100rpm again, check the operation of turbine 2 and main steam pipe 1, and check whether there are any abnormal vibrations and sounds to ensure stable operation of the system. By increasing and decreasing the speed of turbine 2, different impact forces are generated when steam contacts the turbine blade rotor, thereby flushing the scale, improving the dissolution and shedding of the scale, and improving the cleaning efficiency.

[0085] Table 1 Comparison table of steam pressure and saturated steam temperature

[0086] Steam pressure (MPa) Saturated steam temperature (℃) 2.5 224 2.6 226 2.7 228 2.8 230 2.9 232 3.0 234 3.1 236 3.2 237 3.3 239 3.4 241 3.5 243 3.6 244 3.7 246 3.8 247 3.9 249 4.0 250

[0087] The technical solution of the present application is described in detail below with reference to specific embodiments.

[0088] The operation process of the steam turbine online cleaning system and method in this embodiment during specific operation is as follows:

[0089] (1) Steam isolation of steam turbine: Before cleaning the steam turbine, the running steam turbine 2 is stopped and the steam input is stopped. In this embodiment, the steam turbine 2 is used in an air separation unit, so the first isolation valve 110 and the second isolation valve 120 are fully closed, and the couplings between the steam turbine 2 and the air compressor, and between the steam turbine 2 and the supercharger are all disconnected.

[0090] At the same time, the first bypass valve 131, the second bypass valve 141, the first warm pipe vent valve 150 and the first drain valve 511 are fully closed to cut off the steam entering the steam turbine 2 and prepare to cool the steam turbine 2. The second warm pipe vent valve 160 and the second drain valve 521 are fully opened, and the steam remaining in the main steam pipeline 1 is released by the second warm pipe vent valve 160, which is beneficial to the pressure relief of the main steam pipeline 1. At the same time, the second drain valve 521 is opened to discharge the liquid phase water in the main steam pipeline 1 through the drain pipe 520 after the isolation valve. This process is beneficial to the cooling rate in the main steam pipeline 1. At the same time, the turbine's shaft seal steam regulating valve, the front and rear stop valves of the shaft seal steam regulating valve, and the bypass valve of the shaft seal steam regulating valve are closed to prevent steam from entering the steam turbine 2 due to internal leakage of the valve. Confirm that the turning gear is normal, so that the steam turbine rotates slowly and is heated evenly. When the temperature of the turbine casing naturally drops to below 80°C, the conductivity and silica content of the condensate in the condenser 3 are tested before cleaning.

[0091] (2) Steam heating pipe: adjust the second heating pipe vent valve 160 to 10-90% opening, adjust the second shower valve 521 to 10-90% opening, and adjust the third shower valve 531 to 10-50% opening.

[0092] Then adjust the first bypass valve 131 and the second bypass valve 141 to 10-50% opening, and start heating the main steam pipe 1. The pressure and temperature regulation method in the main steam pipe 1 includes: when the pressure in the main steam pipe 1 is less than 0.5MPa, the amount of steam entering the main steam pipe 1 is controlled mainly by adjusting the opening of the first bypass valve 131 and the second bypass valve 141, and the temperature rise rate is controlled to be 5-10℃ / min. When the temperature in the main steam pipe 1 is greater than or equal to 150℃, the pressure is increased at a rate of 0.1-0.3MPa / min mainly by adjusting the opening of the first bypass valve 131, the second bypass valve 141 and the opening of the cooling water regulating valve 410, and the temperature rise rate is controlled below 5℃ / min. When the pressure value of the main pipe pressure sensor is 2.1-2.2MPa, and the temperature value of the pipe wall remote temperature measurement point is 220-230℃, the heating ends.

[0093] (4) Online cleaning: Start the steam turbine, and control the steam temperature in the main steam pipe 1 to be 20-30°C (as shown in Table 1) at the corresponding pressure by adjusting the opening of the first bypass valve 131 and the second bypass valve 141, and the flow of the water spray cooling device 4. At the same time, the steam turbine is periodically increased or decreased in speed, and the steam turbine is cleaned online. Each periodic increase or decrease in speed of the steam turbine is considered to be one cleaning. At the same time, the condensate in the condenser is sampled and tested for conductivity content during cleaning once an hour, and the silica content is tested every two hours. The cleaning is completed after 2-3 cleanings.

[0094] The periodic speed adjustment process of the steam turbine includes: starting the steam turbine, first controlling the speed of the steam turbine to 500rpm, rotating for 2-5min, indicating that the steam turbine can rotate normally, and then increasing the speed to 600rpm to warm up for 30-40min. During the speed of 600rpm, check that the system has no abnormal vibration and no abnormal sound, then close the second warm-up pipe vent valve 160, the second pilot valve 521 and the third pilot valve 531 to maintain the stability and balance of the pressure and temperature in the main steam pipeline 1. Increase the speed to 1100rpm again, check the operation of the steam turbine 2 and the main steam pipeline 1, and check whether there are any abnormal vibrations and sounds to ensure the stable operation of the system.

[0095] After being cleaned in the steam turbine 2, the hot steam enters the condenser 3 through the exhaust port of the steam turbine 2 for condensation, and condensate is obtained in the condenser 3 and flows to the condensate collection tank 310 for collection. The water in the water spray cooling device 4 is collected in the spray water collection tank 171 after heat exchange with the insulation removal section 170. The spray water and the condensate are both sent to the water processor 6 for purification, firstly pass through the filter filter chamber 610 to remove solid impurities, and then pass through the activated carbon filter chamber 620 for adsorption filtration to obtain purified water, and then pass through the circulating water pump 7 back to the water spray cooling device 4 for recycling.

[0096] During online cleaning, when repeated cleaning is required after each periodic speed increase or decrease, the steps (1) of steam turbine steam isolation, steam pipe heating and online cleaning need to be repeated in sequence.

[0097] (4) After the online cleaning is completed, when the temperature of the cylinder shell of steam turbine 2 drops below 100°C, reinstall the couplings between steam turbine 2 and the air compressor, and between steam turbine 2 and the supercharger. Turn on the negative pressure vacuum pump 750 to draw negative pressure from the insulation barrel 710, so that the vacuum degree in the insulation barrel 710 is maintained at 2 kPa.

[0098] In this embodiment, the steam turbine is cleaned three times, and the cleaning results are shown in Table 2.

[0099] Table 2

[0100]

[0101] Note: The unit of conductivity is us / cm, and the unit of silica is mg / L

[0102] As shown in Table 2, the conductivity and SiO2 content both increase first and then decrease, and the cleaning effect is good with a short time consumption. When the conductivity is ≤20us / cm at the end of the third cleaning, the cleaning is completed. The steam turbine is started and steam is introduced into the turbine for use. During operation, the steam introduced will continue to replace the cleaning liquid in the turbine after the third cleaning, and the conductivity will decrease again. Therefore, when the conductivity is ≤20us / cm at the end of the third cleaning, the cleaning is completed.

[0103] The comparison of turbine operation data before and after cleaning is shown in Table 3.

[0104] Table 3

[0105] Before cleaning After cleaning Turbine speed rpm 5900 5900 Main valve opening % 76.1 55.3 Shaft seal steam valve opening % 80.8 62.2 Wheel chamber pressure MPa 3.1 2.2 Medium extraction steam pressure MPaA 1.285 1.143 Thrust bearing temperature ℃ 80.5 48.5 Axis displacement Amm -0.229 -0.018 Axis displacement Bmm -0.229 -0.029 Air compressor guide vane opening % 48 85 Air compressor load% 81.6 94.3 Main steam pressure MPa 4.01 3.88 Oxygen load% 60 70.4

[0106] It can be seen from Table 3 that before cleaning, due to turbine scaling, the wheel chamber pressure and intermediate extraction pressure of the air separation unit were high. The air separation unit was maintained in operation by reducing the air compressor load as much as possible. Three screw air compressors were required for air replenishment. The air compressor guide vanes were closed to the minimum, the shaft displacement was high, and the turbine thrust bearing temperature rose to 106°C, basically reaching the operating limit.

[0107] After cleaning, the turbine parameters were basically restored to the parameters before scaling, the air compressor could run at full load, the main steam valve opening was only 55%, the shaft displacement was normal, the thrust bearing temperature was normal, and there was basically no need to start the screw compressor to replenish air. After cleaning, the impact of turbine scaling was almost unobservable, and it was estimated that at least 90% of the turbine scaling was removed.

[0108] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, ordinary technicians in the field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

Claims

1. A steam turbine online cleaning system, characterized in that: include: Main steam pipeline (1), steam turbine (2), condenser (3) and water spray cooling device (4); The outlet end of the main steam pipe (1) is in communication with the steam inlet of the steam turbine (2), and the exhaust port of the steam turbine (2) is in communication with the steam inlet of the condenser (3); A first isolation valve (110) and a second isolation valve (120) are sequentially arranged on the main steam pipeline (1) near the steam inlet end along the steam flow direction; a first bypass pipeline (130) is arranged in parallel with the first isolation valve (110); a first bypass valve (131) is arranged on the first bypass pipeline (130); a second bypass pipeline (140) is arranged in parallel with the second isolation valve (120); a second bypass valve (141) is arranged on the second bypass pipeline (140); A first warm-up pipe vent valve (150) is provided on the main steam pipeline (1) before the first isolation valve (110), and a second warm-up pipe vent valve (160) is provided on the main steam pipeline (1) between the second isolation valve (120) and the steam turbine (2); An insulation removal section (170) is provided on the main steam pipeline (1) between the second isolation valve (120) and the second heating pipe vent valve (160); a water spray port of the water spray cooling device (4) is located directly above the insulation removal section (170); and a pipe wall remote temperature measurement point (180) and a main pipeline pressure sensor (190) are provided on the main steam pipeline (1) at a position after the insulation removal section (170).

2. The steam turbine online cleaning system according to claim 1, characterized in that: The main steam pipeline (1) is also provided with a plurality of drip pipes, including: an isolation valve intermediate drip pipe (510) located between the first isolation valve (110) and the second isolation valve (120), a first drip valve (511) being provided on the isolation valve intermediate drip pipe (510), an isolation valve rear drip pipe (520) being provided between the second isolation valve (120) and the insulation removal section (170), a second drip valve (521) being provided on the isolation valve rear drip pipe (520), and a third drip pipe (530) being provided between the pipe wall remote temperature measurement point (180) and the steam turbine (2), a third drip pipe (530) being provided with a third drip valve (531).

3. The steam turbine online cleaning system according to claim 1, characterized in that: The length of the insulation removal section (170) is 15-20m.

4. The steam turbine online cleaning system according to claim 1, characterized in that: The cleaning system further comprises a water circulation device, which comprises a spray water collecting tank (171), a condensed water collecting tank (310), a water treatment device (6) and a circulating water pump (7). The spray water collecting tank (171) is located below the insulation removal section (170). The inlet of the condensed water collecting tank (310) is connected to the outlet of the condenser (3). The water outlets of the spray water collecting tank (171) and the condensed water collecting tank (310) are both connected to the water treatment device (6). The circulating water pump (7) is connected between the clean water outlet of the water treatment device (6) and the water inlet of the water spray cooling device (4).

5. The steam turbine online cleaning system according to claim 4, characterized in that: The water treatment device (6) comprises a filter screen filtration chamber (610), an activated carbon filtration chamber (620) and a water purification chamber (630) which are connected in sequence; The water outlets of the spray water collection tank (171) and the condensed water collection tank (310) are both connected to the filter screen filtration chamber (610), and the outlet of the water purification chamber (630) is connected to the water inlet of the water spray cooling device (4).

6. The steam turbine online cleaning system according to claim 5, characterized in that: The outer periphery of the insulation removal section (170) is provided with an insulation barrel (710), and the two ends of the insulation barrel (710) are respectively provided with a cooling water inlet (720) and a cooling water outlet (730), a cooling water regulating valve (410) is connected between the cooling water inlet (720) and the outlet of the water spray cooling device (4), and the cooling water outlet (730) is connected to the inlet of the spray water collecting tank (171).

7. The steam turbine online cleaning system according to claim 6, characterized in that: The heat-insulating barrel (710) is provided with a heat-insulating barrel pressure sensor (740), and the heat-insulating barrel (710) is also connected to a negative pressure vacuum pump (750).

8. A method for online cleaning of a steam turbine, characterized in that: The steam turbine online cleaning system applied to any one of claims 1 to 7 comprises the following steps: (1) Steam isolation of steam turbine: fully close the first isolation valve 110, the second isolation valve 120, the first bypass valve 131, the second bypass valve 141, the first warm pipe vent valve 150 and the first drain valve 511, fully open the second warm pipe vent valve 160 and the second drain valve 521, allow the steam turbine cylinder to cool naturally to below 80°C, and test the conductivity and silica content of the condensate in the condenser before cleaning; (2) Steam heating pipe: adjust the second heating pipe vent valve 160 to 10-90% opening, adjust the second shower valve 521 to 10-90% opening, and adjust the third shower valve 531 to 10-50% opening; Then adjust the first bypass valve 131 and the second bypass valve 141 to 10-50% opening, start heating the main steam pipe 1, and end heating when the pressure value of the main pipe pressure sensor reaches 2.1-2.2MPa and the temperature value of the pipe wall remote temperature measurement point reaches 220-230℃; (3) Online cleaning: Start the steam turbine and control the steam temperature to be overheated by 20-30℃ under the corresponding pressure. At the same time, adjust the speed of the steam turbine periodically and perform online cleaning. Each time the speed of the steam turbine is increased or decreased periodically, one cleaning is achieved. At the same time, the condensate in the condenser is sampled and tested for conductivity and silica content once an hour. The cleaning is completed after 2-3 times.

9. The steam turbine online cleaning method according to claim 8, characterized in that: In the steam pipe heating step, the pressure and temperature regulation method in the main steam pipe 1 includes: when the pressure in the main steam pipe 1 is less than 0.5MPa, the heating rate is 5-10°C / min; when the temperature in the main steam pipe 1 is greater than or equal to 150°C, the cooling water regulating valve (410) is opened to increase the pressure at a rate of 0.1-0.3MPa / min, and the heating rate is controlled below 5°C / min, until the pressure value of the main pipe pressure sensor is 2.1-2.2MPa, and the temperature value of the pipe wall remote temperature measurement point is 220-230°C, the pipe heating is completed.

10. The steam turbine online cleaning method according to claim 9, characterized in that: In the online cleaning step, the periodic speed increase and decrease adjustment process of the steam turbine includes: starting the steam turbine and controlling the speed of the steam turbine to be 500 rpm. After rotating for 2-5 minutes, the speed is increased to 600 rpm and warmed up for 30-40 minutes. The speed is increased again to 1100 rpm and warmed up for 30-40 minutes. Finally, the speed is reduced to 600 rpm. This is a periodic speed increase and decrease of the steam turbine.