Efficient cooling tower
The high-efficiency cooling tower addresses excessive water retention by using a multi-layer cylindrical structure and water distributor to form uniform water films, reducing weight and enhancing performance and economic benefits.
Patent Information
- Application Number
- CN202411315326.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-12-03
AI Technical Summary
Traditional cooling towers face significant operating weight issues due to excessive water attachment on the filler and in the drip tray, affecting performance and economic benefits.
A high-efficiency cooling tower design featuring a coaxially arranged multi-layer cylindrical structure with a unique water distributor forming uniform water films on the inner and outer walls of each cylinder, coupled with a water level control system to manage drip tray water levels, reducing water retention and capacity.
The design significantly reduces the operating weight of the cooling tower by 20-25%, improves heat exchange efficiency, and extends equipment life while lowering energy consumption and operational costs.
Smart Images

Figure CN119063507A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of circulating water cooling equipment, and more specifically relates to a high-efficiency cooling tower. Background Art
[0002] Open cooling towers play a vital role in modern industrial and commercial refrigeration systems. Their basic working principle is to use the evaporative cooling effect to reduce the temperature of circulating water, thereby providing cooling support for various mechanical equipment. However, open cooling towers will generate a large operating weight during operation, which poses severe challenges to the installation, maintenance and bearing capacity of the equipment and the building structure.
[0003] The operating weight of the cooling tower includes: the weight of the cooling tower itself, the weight of the fan vibration, the weight of the water attached to the filler, and the weight of the water in the drip tray. The operating weight of the cooling tower is 2.5 to 3 times the weight of the cooling tower itself; the weight of the fan vibration is 4% to 5% of the weight of the cooling tower. Therefore, reducing the weight of the cooling tower body and reducing the weight of the fan vibration are not very meaningful. The direction of technical breakthroughs is concentrated on the weight of the water attached to the cooling tower filler and the weight of the water in the drip tray, but the cost of research and development of cooling tower filler technology is extremely high and difficult.
[0004] Conventional cooling tower fillers usually adopt a honeycomb structure to improve cooling efficiency by increasing the surface area. However, this structure causes a large amount of water to adhere to the filler, increasing the operating weight. Although the traditional filler design improves the cooling efficiency to a certain extent, the problem of large amount of attached water has not been effectively solved, which in turn affects the overall performance and economic benefits of the cooling tower.
[0005] One typical open cooling tower can be found in the patent document with publication number CN111895810A, which discloses a fan-drafted countercurrent open cooling tower, including: a tower body, a plurality of EC fans, a water collector, a water distribution pipe with a water inlet, a plurality of nozzles, a filler structure, a water baffle, an air inlet louver and a water collecting basin with a water outlet; an air permeable channel is arranged in the tower body, and a plurality of EC fans, a water collector, a water distribution pipe, a plurality of nozzles, a filler structure, a water baffle and a water collecting basin are arranged in the air permeable channel from top to bottom in sequence; a plurality of nozzles are connected to the water distribution pipe and are arranged at the bottom thereof; and an air inlet louver window located between the water baffle and the water collecting basin is arranged on the front end face of the tower body. When the cooling tower is in operation, circulating hot water enters the water distribution pipe from the water inlet of the cooling tower, and is evenly sprinkled on the packing structure with packing through the nozzles on the water distribution pipe. Multiple nozzles are connected to the water distribution pipe at equal distances to achieve a uniform spraying effect; after the EC fan is started, air is drawn into the tower, forming a negative pressure area in the tower body, and cold air is sucked into the air permeable channel in the tower body from the air inlet louver. The water flows vertically in the air permeable channel, and the airflow direction and the water flow direction form a heat exchange of nearly 180 degrees in the packing area, that is, the airflow is upward and the water flows downward; the hot water is heat exchanged to become cooling water, which passes through the packing structure and falls onto the water collection basin, and is discharged from the water outlet. The cold air becomes hot air after heat exchange, and is discharged by the EC fan after passing through the water collector. The above cooling tower solution does not consider solving the problem of how to reduce the operating weight of the cooling tower. Summary of the invention
[0006] The present invention aims to solve the problem that a large amount of water is attached to the filler of a traditional cooling tower, which leads to an increase in the operating weight of the cooling tower. The present invention provides a high-efficiency cooling tower, which can effectively reduce the operating weight of the cooling tower and improve its overall performance and economic benefits.
[0007] In order to solve the above technical problems, the present invention adopts the following technical scheme: a high-efficiency cooling tower, comprising an outer shell and a drip tray arranged at the bottom of the inner cavity of the outer shell, a heat exchanger is installed in the inner cavity of the outer shell through a bracket, the heat exchanger is arranged above the drip tray, a water distributor is installed in the inner cavity of the outer shell above the drip tray, the water inlet end of the water distributor is connected to the circulating water inlet pipe, the bottom of the drip tray is connected to the circulating water outlet pipe, a fan is installed on the top of the outer shell, and an air inlet is arranged on the side wall of the outer shell in the interval area between the drip tray and the heat exchanger. The fan can make the air flow pass through the air inlet and the heat exchanger in sequence, and finally be discharged from the air outlet on the top of the outer shell. The heat exchanger comprises a plurality of coaxially arranged cylinders, the axes of the cylinders are arranged vertically, a water distributor is arranged corresponding to the top of each cylinder, and the top of each water distributor is connected to the circulating water inlet pipe through one or more water inlet branches. A circular water inlet pipe, each water distributor comprises a first side wall and a second side wall which are arranged opposite to each other, the first side wall is located in the outer area of the cylinder corresponding thereto, and the second side wall is located in the inner area of the cylinder corresponding thereto, the cross sections of the first side wall and the second side wall are both circular structures which are concentric with the cylinder, the first side wall and the second side wall both comprise a first vertical section, an inclined section and a second vertical section from top to bottom, the radial spacing between the first side wall and the second side wall is in a decreasing trend, the upper end side wall of the cylinder is centrally arranged in the interval space between the first side wall and the second side wall, a first water film channel is formed between the second vertical section of the first side wall and the outer wall of the cylinder, and a second water film channel is formed between the second vertical section of the second side wall and the inner wall of the cylinder, and each water distributor can form a water film on both the inner and outer walls of the cylinder corresponding thereto.
[0008] A further preferred solution is that the upper end position of the second vertical section of the first side wall and the upper end position of the second vertical section of the second side wall are both lower than the upper end surface position of the cylinder.
[0009] A further preferred scheme is that a plurality of first gaskets arranged at intervals in the circumferential direction are fixedly provided between the second vertical section of the first side wall and the outer side wall of the cylinder, and both side surfaces of the first gasket are in corresponding contact with the second vertical section of the first side wall and the outer side wall of the cylinder respectively; a plurality of second gaskets arranged at intervals in the circumferential direction are fixedly provided between the second vertical section of the second side wall and the inner side wall of the cylinder, and both side surfaces of the second gasket are in corresponding contact with the second vertical section of the second side wall and the inner side wall of the cylinder respectively.
[0010] A further preferred solution is that the first gasket is fixedly arranged on the first side wall by bolts, and the second gasket is fixedly arranged on the second side wall by bolts.
[0011] A further preferred solution is that the circulating water inlet pipe is equipped with a pressure pump and a pressure gauge.
[0012] A further preferred scheme is, comprising a control system, the drip tray is connected to a pumping system for pumping water out of the drip tray and a water replenishing system for replenishing water into the drip tray, the water replenishing system has a first electric opening and closing mechanism, the pumping system has a second electric opening and closing mechanism, the drip tray is installed with a first water level switch and a second water level switch for sensing the water level inside the drip tray, the installation position of the first water level switch is higher than the installation position of the second water level switch, the first electric opening and closing mechanism, the second electric opening and closing mechanism, the first water level switch and the second water level switch are all electrically connected to the control system, before the cooling tower is operated, the water level in the drip tray is at a high water level corresponding to the first water level switch through the linkage control of the first water level switch and the first electric opening and closing mechanism, and after the cooling tower operates normally, the water level in the drip tray is at a low water level corresponding to the second water level switch through the linkage control of the second water level switch and the second electric opening and closing mechanism.
[0013] A further preferred solution is that the pumping system and the water replenishing system share an expansion water tank, the drainage end of the pumping system is connected to the expansion water tank, and the water inlet end of the water replenishing system is connected to the expansion water tank.
[0014] A further preferred solution is that the side wall of the drip tray is connected to an overflow pipe through an overflow port, and the position of the overflow port is higher than the installation position of the first water level switch.
[0015] The design principle of the present invention is:
[0016] 1. In terms of reducing the weight of water attached to the cooling tower filler, the traditional honeycomb structure filler is improved into a coaxially arranged multi-layer cylindrical structure, and a water distributor with a unique structure is used to form a uniform water film on the inner and outer walls of each cylinder. Through this design, water forms a thin film flow on the surface of the cylinder, reducing water retention, thereby significantly reducing the weight of the filler. In addition, the water distributor ensures the uniform distribution of the water film on the surface of the cylinder by evenly distributing the water flow, increasing the contact area between water and air and improving the heat exchange efficiency.
[0017] 2. In terms of reducing the weight of water stored in the drip tray, the water level control structure and the specific operation mode are improved. Before the cooling tower is operated, the water level in the drip tray is at the high water level corresponding to the first water level switch through the linkage control of the first water level switch and the first electric opening and closing mechanism, ensuring that there will be no cavitation problem in the return pipe when the cooling tower is started, and at the same time meeting the normal operation requirements of the cooling water main circulation system; after the cooling tower is operating normally, the water level in the drip tray is at the low water level corresponding to the second water level switch through the linkage control of the second water level switch and the second electric opening and closing mechanism, reducing the water capacity of the drip tray when the cooling tower is operating normally.
[0018] The beneficial effects of the present invention are:
[0019] 1. The falling film evaporation technology is used to optimize the filler structure so that the water forms a uniform film flow on the surface of the cylinder, which can ensure that the water film is neither too thin to break quickly nor too thick to cause excessive water retention, thereby significantly reducing the weight of the filler and ultimately reducing the operating weight of the cooling tower by 20% to 25%.
[0020] 2. By ensuring the uniform distribution of the water film on the surface of the cylinder, the contact area between water and air is increased, the heat exchange efficiency is improved, and the cooling tower can work more efficiently under the same operating conditions.
[0021] 3. By reducing the operating weight of the cooling tower, the load on the building structure is reduced, the operating stability and safety of the equipment are improved, and the service life of the cooling tower is extended. In particular, after the preferred solution of reducing the water capacity of the drip tray is implemented, the operating weight of the cooling tower can be further reduced by 15% to 20%.
[0022] 4. Reducing the operating weight of the cooling tower can reduce energy consumption during equipment operation, reduce the overall operating cost of the cooling tower, and improve economic benefits.
[0023] 5. The present invention can prevent the water volume fluctuation caused by the start and stop of the cooling tower from affecting the cooling water main circulation system while reducing the water capacity of the drip tray. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0026] Figure 2 for Figure 1 AA cross-section diagram.
[0027] Figure 3 for Figure 1 A partial enlarged view of point B.
[0028] Figure 4 It is a schematic diagram of the structure when a single cylinder of the heat exchanger in the present invention cooperates with a water distributor in a top view.
[0029] Figure 5 It is a structural schematic diagram (half-section structure) of a single cylindrical body of the heat exchanger in the present invention when it cooperates with a water distributor in the front view direction.
[0030] Figure 6It is a schematic diagram of the overall structure of another embodiment of the present invention (the specific structures of the water distributor and the heat exchanger are not shown).
[0031] The parts in the figure are marked as follows: outer shell 1, water distributor 2, first side wall 21, second side wall 22, first gasket 23, second gasket 24, drip tray 3, fan 4, heat exchanger 5, cylinder 51, circulating water inlet pipe 6, water inlet branch pipe 61, circulating water outlet pipe 7, overflow pipe 8, water pump 9, expansion water tank 10, bracket 11, first water level 12, second water level 13. DETAILED DESCRIPTION
[0032] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] See also Figures 1 to 5The present invention comprises a housing 1 and a drip tray 3 arranged at the bottom of the inner cavity of the housing 1. A heat exchanger 5 is installed in the inner cavity of the housing 1 through a bracket 11. The heat exchanger 5 is arranged above the drip tray 3. A water distributor 2 is installed in the inner cavity of the housing 1 above the drip tray 3. The water inlet end of the water distributor 2 is connected to a circulating water inlet pipe 6. The bottom of the drip tray 3 is connected to a circulating water outlet pipe 7. A fan 4 is installed on the top of the housing 1. A side wall of the housing 1 is provided in the interval area between the drip tray 3 and the heat exchanger 5. An air inlet is arranged, and the fan 4 can make the air flow pass through the air inlet and the heat exchanger 5 in sequence, and finally be discharged from the air outlet on the top of the shell 1. The heat exchanger 5 includes a plurality of coaxially arranged cylindrical bodies 51, and the axis of the cylindrical bodies 51 is arranged vertically. A water distributor 2 is respectively arranged at the top of each cylindrical body 51. The top of each water distributor 2 is connected to the circulating water inlet pipe 6 through one or more water inlet branches 61. Each water distributor 2 includes a first side wall 21 and a second side wall which are arranged opposite to each other. 22, the first side wall 21 is located at the outer area of the cylinder 51 corresponding thereto, and the second side wall 22 is located at the inner area of the cylinder 51 corresponding thereto, the cross sections of the first side wall 21 and the second side wall 22 are both circular structures concentric with the cylinder 51, the first side wall 21 and the second side wall 22 both include a first vertical section, an inclined section and a second vertical section from top to bottom, the radial spacing between the first side wall 21 and the second side wall 22 is in a decreasing trend, the upper end side wall of the cylinder 51 is centrally arranged in the interval space between the first side wall 21 and the second side wall 22 (that is, equivalent to the water film thickness formed on both sides of each cylinder 51 being the same), a first water film channel is formed between the second vertical section of the first side wall 21 and the outer wall of the cylinder 51, and a second water film channel is formed between the second vertical section of the second side wall 22 and the inner wall of the cylinder 51, and each water distributor 2 can form a water film on both the inner and outer walls of the corresponding cylinder 51. It is understandable that, since the width of the water film channel gap formed by the water distributor 2 and the cylindrical body 51 determines the thickness of the water film, in specific implementation, it is only necessary for each water distributor 2 to have a suitable water inlet pressure. To facilitate the control of the water inlet pressure, preferably, the circulating water inlet pipe 6 is equipped with a booster pump and a pressure gauge. The pressure gauge design here should be understood in a broad sense, and it can be designed in the circulating water inlet pipe 6, or in each inlet branch pipe 61. In addition, it is understandable that the water pipes involved in the circulating water inlet pipe 6 and the inlet branch pipe 61 should have necessary valves, and the water distributor 2 can be integrated and installed inside the housing 1 through a conventional mounting bracket, and it can be reasonably designed according to the common technical knowledge of those skilled in the art.
[0034] In order to give full play to the diversion effect of the water distributor 2, preferably, the upper end position of the second vertical section of the first side wall 21 and the upper end position of the second vertical section of the second side wall 22 are both lower than the upper end surface position of the cylindrical body 51, that is, it is equivalent to the upper end portion of the cylindrical body 51 extending to the area where the inclined sections of the first side wall 21 and the second side wall 22 are located.
[0035] To further ensure the stability of the gap width of the water film channel, a plurality of first gaskets 23 (preferably evenly spaced) arranged at intervals along the circumferential direction are fixedly provided between the second vertical section of the first side wall 21 and the outer wall of the cylinder 51, and both side surfaces of the first gasket 23 are in corresponding contact with the second vertical section of the first side wall 21 and the outer wall of the cylinder 51 respectively; a plurality of second gaskets 24 (preferably evenly spaced) arranged at intervals along the circumferential direction are fixedly provided between the second vertical section of the second side wall 22 and the inner wall of the cylinder 51, and both side surfaces of the second gasket 24 are in corresponding contact with the second vertical section of the second side wall 22 and the inner wall of the cylinder 51 respectively.
[0036] For easy assembly, the first gasket 23 is preferably fixed on the first side wall 21 by bolts. Similarly, the second gasket 24 is preferably fixed on the second side wall 22 by bolts.
[0037] See also Figure 6 In another preferred embodiment, the present invention includes a control system (not shown in the figure), the drip tray 3 is connected to a pumping system for pumping water out of the drip tray 3 and a water replenishing system for replenishing water into the drip tray 3, the water replenishing system has a first electric opening and closing mechanism, the pumping system has a second electric opening and closing mechanism, the drip tray 3 is installed with a first water level switch and a second water level switch for sensing the water level inside the drip tray 3, the installation position of the first water level switch is higher than the installation position of the second water level switch, the first electric opening and closing mechanism, the second electric opening and closing mechanism, the first water level switch and the second water level switch are all electrically connected to the control system, and before the cooling tower is operated, the water level in the drip tray 3 is at the high water level corresponding to the first water level switch (i.e. Figure 6 After the cooling tower operates normally, the water level in the drip tray 3 is controlled by the linkage of the second water level switch and the second electric opening and closing mechanism so that the water level in the drip tray 3 is at the low water level corresponding to the second water level switch (i.e. Figure 6 The second water level 13 is shown in FIG.
[0038] It should be noted that the "high water level" and "low water level" described in the present invention are not limitations on specific water level values, but only refer to the two corresponding water levels as references to each other, with one water level being higher than the other. The "high-efficiency cooling tower" described in the present invention is not a limitation on specific efficiency, but only refers to the fact that, relative to conventional cooling towers, under the same cooling tower main structure (the only difference is whether it has the water film generation structure (heat exchanger + water distributor) and drip tray water level control method of the present invention), the present invention can reduce the operating weight of the cooling tower and make the cooling tower more efficient.
[0039] It is understandable that the pumping system and the water replenishment system can be set up independently. The first electric opening and closing mechanism corresponding to the water replenishment system can be an electric valve or a control switch of the water replenishment pump combined with necessary control valves according to the location of the water source; the second electric opening and closing mechanism corresponding to the pumping system is usually a control switch of the pumping pump 9 combined with necessary control valves. In order to simplify the device system and make rational use of water resources, the preferred solution is that the pumping system and the water replenishment system share an expansion water tank 10, the drainage end of the pumping system is connected to the expansion water tank 10, and the water inlet end of the water replenishment system is connected to the expansion water tank 10. The present invention states that "before the cooling tower is operated, the water level in the drip tray 3 is at the high water level corresponding to the first water level switch through the linkage control of the first water level switch and the first electric opening and closing mechanism". Here, "before the cooling tower is operated" can be understood in a broad sense. After the cooling tower is shut down, until the next restart, it can be called "before the cooling tower is operated". Usually, after the cooling tower is shut down, the water in the expansion water tank 10 can be replenished to the high water level corresponding to the first water level 12 to prepare for the next startup operation. After the cooling tower is shut down, the water in the cooling tower packing has been drained, the weight of the cooling tower is reduced, and the total weight of the cooling tower after water replenishment is still lower than the total weight in operation.
[0040] In order to better ensure the safe operation of the cooling tower, the side wall of the drip tray 3 is connected to an overflow pipe 8 through an overflow port, and the position of the overflow port is higher than the installation position of the first water level switch.
Claims
1. A high-efficiency cooling tower, comprising a shell (1) and a drip tray (3) arranged at the bottom of the inner cavity of the shell (1), a heat exchanger (5) is installed in the inner cavity of the shell (1) through a bracket (11), the heat exchanger (5) is arranged above the drip tray (3), a water distributor (2) is installed in the inner cavity of the shell (1) above the drip tray (3), the water inlet end of the water distributor (2) is connected to a circulating water inlet pipe (6), the bottom of the drip tray (3) is connected to a circulating water outlet pipe (7), a fan (4) is installed at the top of the shell (1), and an air inlet is arranged on the side wall of the shell (1) in the interval area between the drip tray (3) and the heat exchanger (5), the fan (4) can make the air flow pass through the air inlet and the heat exchanger (5) in sequence, and finally be discharged from the air outlet at the top of the shell (1), characterized in that: The heat exchanger (5) comprises a plurality of coaxially arranged cylindrical bodies (51), the axis of the cylindrical bodies (51) being arranged vertically, a water distributor (2) being arranged at the top of each cylindrical body (51), the top of each water distributor (2) being connected to a circulating water inlet pipe (6) via one or more water inlet branch pipes (61), each water distributor (2) comprising a first side wall (21) and a second side wall (22) being arranged opposite to each other, the first side wall (21) being located at an outer region of the cylindrical body (51) corresponding thereto, the second side wall (22) being located at an inner region of the cylindrical body (51) corresponding thereto, and the cross sections of the first side wall (21) and the second side wall (22) are both circles having the same center as the cylindrical body (51). The invention discloses a cylindrical structure, wherein the first side wall (21) and the second side wall (22) both comprise a first vertical section, an inclined section and a second vertical section from top to bottom, the radial spacing between the first side wall (21) and the second side wall (22) is in a decreasing trend, the upper end side wall of the cylindrical body (51) is centrally arranged in the interval space between the first side wall (21) and the second side wall (22), a first water film channel is formed between the second vertical section of the first side wall (21) and the outer side wall of the cylindrical body (51), and a second water film channel is formed between the second vertical section of the second side wall (22) and the inner side wall of the cylindrical body (51), and each water distributor (2) can form a water film on both the inner side wall and the outer side wall of the cylindrical body (51) corresponding thereto.
2. A high efficiency cooling tower as claimed in claim 1, characterized in that: The upper end position of the second vertical section of the first side wall (21) and the upper end position of the second vertical section of the second side wall (22) are both lower than the upper end surface position of the cylindrical body (51).
3. A high efficiency cooling tower as claimed in claim 1, characterized in that: A plurality of first gaskets (23) arranged at intervals in the circumferential direction are fixedly arranged between the second vertical section of the first side wall (21) and the outer side wall of the cylindrical body (51), and the two side surfaces of the first gaskets (23) are in corresponding contact with the second vertical section of the first side wall (21) and the outer side wall of the cylindrical body (51); a plurality of second gaskets (24) arranged at intervals in the circumferential direction are fixedly arranged between the second vertical section of the second side wall (22) and the inner side wall of the cylindrical body (51), and the two side surfaces of the second gaskets (24) are in corresponding contact with the second vertical section of the second side wall (22) and the inner side wall of the cylindrical body (51).
4. A high-efficiency cooling tower as claimed in claim 3, characterized in that: The first gasket (23) is fixed on the first side wall (21) by means of bolts, and the second gasket (24) is fixed on the second side wall (22) by means of bolts.
5. A high-efficiency cooling tower as claimed in claim 1, characterized in that: The circulating water inlet pipe (6) is equipped with a pressure pump and a pressure gauge.
6. A high-efficiency cooling tower according to any one of claims 1 to 5, characterized in that: The invention comprises a control system, wherein the drip tray (3) is connected to a pumping system for pumping water out of the drip tray (3) and a water replenishing system for replenishing water into the drip tray (3), the water replenishing system having a first electric opening and closing mechanism, the pumping system having a second electric opening and closing mechanism, the drip tray (3) being installed with a first water level switch and a second water level switch for sensing the water level inside the drip tray (3), the installation position of the first water level switch being higher than the installation position of the second water level switch, the first electric opening and closing mechanism, the second electric opening and closing mechanism, the first water level switch and the second water level switch being all electrically connected to the control system, before the operation of the cooling tower, the water level in the drip tray (3) is at a high water level corresponding to the first water level switch through the linkage control of the first water level switch and the first electric opening and closing mechanism, and after the normal operation of the cooling tower, the water level in the drip tray (3) is at a low water level corresponding to the second water level switch through the linkage control of the second water level switch and the second electric opening and closing mechanism.
7. A high-efficiency cooling tower as claimed in claim 6, characterized in that: The pumping system and the water replenishing system share an expansion water tank (10); the water discharge end of the pumping system is connected to the expansion water tank (10); and the water inlet end of the water replenishing system is connected to the expansion water tank (10).
8. A high-efficiency cooling tower as claimed in claim 6, characterized in that: The side wall of the drip tray (3) is connected to an overflow pipe (8) via an overflow port, and the position of the overflow port is higher than the installation position of the first water level switch.