Testing device and testing method for disconnector
Through the combination of intelligent switch control system and pneumatic push rod, the complexity and safety problems of traditional disconnector testing devices are solved, and the fast, safe and low-cost implementation of disconnector ampere-second characteristic testing is achieved.
Patent Information
- Application Number
- CN202411280685.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-12-03
AI Technical Summary
The traditional disconnector silometer characteristic test device has a complex structure and requires repeated wiring, which leads to high manufacturing costs and high labor costs, and there is a risk of electric shock and injury.
A test device including an intelligent switch control system, an intelligent test and control system, a test equipment and a test product installation platform was designed to achieve rapid access and testing of the disconnector through a pneumatic push rod, avoid repeated wiring, and reduce the use of an intelligent control system. galvanic isolation risk.
The rapid completion of the disconnector ampere characteristic test is achieved, reducing labor costs, simplifying the device structure, avoiding the risk of electric shock and blow-up injuries, and reducing manufacturing costs.
Smart Images

Figure CN119064772A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of lightning arresters, and in particular to a testing device and a testing method for a disconnector. Background Art
[0002] A lightning arrester is an electrical device used to protect electrical equipment from high transient overvoltage hazards during lightning strikes, and to limit the follow-on time, and often also the follow-on amplitude. A lightning arrester is sometimes also called an overvoltage protector or overvoltage limiter.
[0003] During the use of lightning arresters, disconnectors are often required. Disconnectors are devices that disconnect the faulty lightning arrester from the system and provide a visible mark to prevent the system from continuing to fail when the arrester fails.
[0004] When the disconnector is activated, it can disconnect the low voltage end of the fault arrester from the ground potential, so that the fault arrester can be removed from the system. The disconnector action has a certain relationship with the magnitude of the power frequency current flowing through the disconnector and the duration of the current, that is, the ampere-second characteristic of the disconnector.
[0005] Testing the ampere-second characteristics of the disconnector is an important test to verify or assess the operating performance of the disconnector. For disconnector manufacturers, regularly sampling a certain number of disconnectors for ampere-second characteristic testing is an important means of controlling the operating performance of the disconnector.
[0006] However, the conventional device for testing the disconnector has a complex structure and needs to be repeatedly connected during the testing process, which makes the manufacturing cost of the device for testing the disconnector high and the testing process requires a lot of manpower cost. Summary of the invention
[0007] In view of this, the present invention provides a test device for a disconnector, which can quickly complete the test of the ampere-second characteristics of the disconnector, avoid repeated wiring of traditional ampere-second characteristics test devices for disconnectors during the test experiment, eliminate the risks of electric shock and explosion when replacing the disconnector, and save a lot of labor costs.
[0008] The present invention also provides a testing method including the testing device of the above-mentioned disconnector.
[0009] A test device for a disconnector, used for testing the disconnector, comprises: an intelligent switch control system, an intelligent test measurement and control system, test equipment and a test product installation platform;
[0010] The test product installation platform comprises:
[0011] An I-shaped test cabinet is formed by a partition whose two ends are respectively connected to two side panels, and two test stations are divided on both sides of the partition;
[0012] A mounting plate and a drainage bar connected in a cross, the drainage bar is fixed to the top of the test cabinet along the partition, the two ends of the drainage bar extend outward through the side panels of the test cabinet, and high-voltage terminals are provided at both ends of the drainage bar for introducing the test voltage provided by the intelligent test measurement and control system;
[0013] The mounting plate extends outwards to the two test stations respectively and is provided with mounting through holes on the plate surface;
[0014] A first fixing plate, a second fixing plate, a push rod and a busbar are arranged in each test station;
[0015] The first fixing plate and the second fixing plate are fixed below the mounting plate from top to bottom;
[0016] One end of the disconnector is fixed to the mounting plate through the mounting through hole, and the other end forms an electrical contact on the first fixing plate through a second wire connected to the grounding terminal on the busbar through a first wire;
[0017] The busbar is arranged at the bottom of the test station, and the two ends of the busbar extend outwardly through the wall of the test cabinet. The two ends of the busbar are provided with grounding terminals for connecting to the grounding switch in the intelligent switch control system;
[0018] The movable end of the push rod passes through the second fixed plate, and an insulating support is installed on the movable end, and the insulating support is connected to the ground terminal through the second wire;
[0019] The intelligent test control system is communicatively connected with the intelligent switch control system, the test equipment, and the test product installation platform, and is used to control the switching of switches in the intelligent switch control system to facilitate the connection or disconnection of the test equipment, provide the required test parameters for the test, and control the up and down movement of the push rod during the test to connect or exit the disconnector to the test, as well as to perform test alarms and record test results.
[0020] Preferably, for each of the test stations, a glass side door opposite to the partition is provided on the test cabinet;
[0021] A metal mesh is arranged on the glass side door.
[0022] Preferably, the test sample installation platform further includes: a transparent cover plate arranged on the top of the test cabinet;
[0023] The transparent cover plate is connected to the side plate, and the side plates are each provided with a smoke exhaust hole, and the two ends of the drainage row extend outwardly through the side plate through the smoke exhaust hole.
[0024] Preferably, the sample installation platform further comprises: a debris collection box arranged at the bottom of the test cabinet.
[0025] Preferably, if the test installation platform includes at least two or more test cabinets;
[0026] The sample installation platform also includes: a first connecting plate and a second connecting plate;
[0027] The drainage bars of adjacent test cabinets are connected via the first connection plate; the bus bars of adjacent test cabinets are connected via the second connection plate.
[0028] Preferably, if the sample installation platform includes at least two test cabinets, the side panels of adjacent test cabinets are insulating panels.
[0029] Preferably, the intelligent switch control system comprises a programmable controller, a switch control device, an opening and closing switch and a grounding switch;
[0030] The opening and closing switch is arranged between the intelligent test measurement and control system and the test equipment;
[0031] The grounding switch is connected to the grounding terminal on the busbar in each test cabinet in the test installation platform;
[0032] The programmable controller is connected to the opening and closing switch and the earthing switch through the switch control device, and when performing the test, it controls the opening and closing switch and the earthing switch to be automatically switched on and off, so that the test equipment provides the test parameters required for the test, and the test cabinet performing the test is connected to the test circuit or disconnected from the test circuit in sequence.
[0033] Preferably, the test equipment includes a test power supply, a test voltage regulator AT, a test transformer TT, a voltage detection instrument V1 for the voltage regulator, a current suppression adjustable inductor L, a digital oscilloscope AS, a current sensor CT and a voltage divider VT;
[0034] The opening and closing switches include: a first opening and closing switch K1, a second opening and closing switch K2 and a third opening and closing switch K3;
[0035] The test power supply, the test voltage regulator AT and the voltage regulator voltage detection instrument V1 are connected in parallel to one side of the test transformer TT, and the current suppression adjustable inductor L, the voltage divider VT and the test product installation platform are connected to the other side of the test transformer TT;
[0036] One end of the first opening and closing switch K1 is connected to the test power supply, the control end is connected to the switch control device, and the other end is connected to a fixed end of the test voltage regulator AT;
[0037] One end of the second opening and closing switch K2 is connected to the voltage regulating end of the test voltage regulator AT, the other end is connected to one end of the test transformer TT, and the control end is connected to the switch control device;
[0038] One end of the third opening and closing switch K3 is connected to the other end of the test transformer TT, the control end is connected to the switch control device, and the other end is connected to one end of the current suppression adjustable inductor L;
[0039] The other end of the current suppression adjustable inductor L is connected to one end of the voltage regulator voltage monitoring instrument VT, and the voltage regulator voltage monitoring instrument VT is used to monitor the voltage of the test product;
[0040] One end of the current sensor CT is grounded, and the other end is connected to the voltage monitoring instrument VT of the voltage regulator to monitor the current of the test product;
[0041] The input end of the digital oscilloscope AS is respectively connected to the current sensor CT and the voltage monitoring instrument VT of the voltage regulator, and is used to display the test product current and the test product voltage.
[0042] Preferably, the intelligent test measurement and control system includes a test information control unit, a test equipment control unit, a test data processing unit and a test station selection unit;
[0043] The test information control unit is connected to the test equipment control unit, the test data processing unit and the test station selection unit respectively to receive the test product information and preset test parameters of the disconnector;
[0044] The test station selection unit is connected to the test information control unit and the test product installation platform respectively, receives a test station selection signal output by the test information control unit, and selects a test station connected to the test product installation platform based on the test station selection signal;
[0045] The test equipment control unit is respectively connected to the intelligent switch control system, the door interlock, the automatic grounding unit and the test data processing unit for communication. Before the test, it automatically monitors the closed state of the door interlock and the disengaged state of the automatic grounding unit. During and after the test, it sends control instructions to the intelligent switch control system, and the intelligent switch control system controls the switch to be switched on and off as required, and reads the test parameters collected by the test data processing unit during the test.
[0046] The test data processing unit is connected to the test equipment, collects test parameters of the test equipment during the test, compares whether the test parameters are within the allowable error range of the preset test parameters, and adjusts the test equipment based on the comparison result so that the test parameters generated by the test equipment are within the allowable error range of the preset test parameters.
[0047] A method for testing a disconnector, using the above-mentioned testing device for the disconnector, the testing method comprising:
[0048] Use the intelligent test control system to check whether the test product installation platform and the working status of the test equipment are in normal condition;
[0049] When the working status of the test installation platform and the test equipment is normal, the intelligent test measurement and control system is triggered to start the test, and the intelligent switch control system controls the test parameters output by the test equipment according to the preset test station sequence for the disconnector pre-installed on the test station of the test installation platform, so that the test voltage corresponding to each test station is automatically boosted to the preset value;
[0050] When the test voltage corresponding to the first test station where the disconnector is first installed is automatically boosted to a preset value, the intelligent switch control system switches on the first test station;
[0051] The intelligent test measurement and control system collects test parameters in real time; if the collected test parameters are not within the allowable error range of the preset test parameters, the intelligent switch control system controls the switching of the switch connected to the test equipment to increase or decrease the test voltage corresponding to the first test station, so that the test parameters collected in real time by the intelligent test measurement and control system are within the allowable error range of the preset test parameters, until the test of the disconnector is completed, and the data obtained in the test is saved;
[0052] The intelligent switch control system disconnects the first test station, connects to the next second test station where the disconnector is installed, and executes the step of real-time collection of test parameters by the intelligent test measurement and control system until the test of all disconnectors installed at the test stations is completed.
[0053] It can be seen from the above technical scheme that the test device for the disconnector provided by the present invention, compared with the prior art, can avoid the problem of effectively isolating the weak current of the control circuit and the large current of the test circuit flowing through the test product when relying on the traditional solenoid valve to open and close the circuit through the pneumatic push rod setting of the test product installation platform; it can also quickly complete the connection and testing of the disconnector, avoid the repeated wiring of the traditional test disconnector device during the test experiment, eliminate the risk of electric shock and explosion when replacing the disconnector, and save a lot of manpower costs; at the same time, the test device for the disconnector has a simple structure and is easy to manufacture, so that the manufacturing cost of the test device for the disconnector is low.
[0054] The present invention also provides a testing method, which has corresponding beneficial effects due to the use of the above-mentioned testing device for the disconnector. For details, please refer to the above description, which will not be repeated here. BRIEF DESCRIPTION OF THE DRAWINGS
[0055] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0056] Figure 1 A schematic diagram of the connection between various parts of the test device provided in an embodiment of the present invention;
[0057] Figure 2 A schematic diagram of the structure of a test cabinet provided in an embodiment of the present invention;
[0058] Figure 3 A schematic diagram of the structure of the test cabinets provided in the embodiment of the present invention after being connected in series;
[0059] Figure 4 A schematic diagram of the structure of a test cabinet with a hidden transparent cover provided by an embodiment of the present invention;
[0060] Figure 5 A schematic diagram of the structure of the test cabinets provided by the embodiment of the present invention after being connected in series and with the transparent cover hidden;
[0061] Figure 6 A schematic diagram of the coordination between the test equipment provided by the embodiment of the present invention and other parts;
[0062] Figure 7 A schematic diagram of the coordination between the intelligent test control system provided by the embodiment of the present invention and other parts;
[0063] Figure 8 A schematic flow chart of an embodiment of a method for testing a disconnector provided in an embodiment of the present invention;
[0064] Fig. 9 A flowchart of another embodiment of a method for testing a disconnector provided in an embodiment of the present invention.
[0065] Among them, A is the intelligent switch control system, B is the intelligent test measurement and control system, and C is the test equipment;
[0066] D is the test piece installation platform, 1 is the drainage row, 2 is the glass side door, 3 is the metal mesh, 4 is the transparent cover plate, 5 is the side plate, 6 is the smoke exhaust hole, 7 is the first connecting plate, 8 is the mounting plate, 9 is the disconnector, 10 is the first fixing plate, 11 is the first fixing plate, 12 is the insulating support, 13 is the second conductor, 14 is the push rod, 15 is the second fixing plate, 16 is the bus bar, 17 is the second connecting plate, 18 is the debris collection box, and 19 is the partition. DETAILED DESCRIPTION
[0067] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0068] The embodiment of the present invention provides a test device for a disconnector, which is used to test a disconnector 9. Figure 1-Figure 9 As shown, it includes: intelligent switch control system A, intelligent test measurement and control system B, test equipment C and test product installation platform D;
[0069] like Figure 2 and Figure 4 As shown, the test installation platform D includes:
[0070] The I-shaped test cabinet is formed by a partition 19 connected to two side panels 5 at both ends, and two test stations are divided on both sides of the partition 19;
[0071] The cross-connected mounting plate 8 and the drain bar 1 are fixed to the top of the test cabinet along the partition 19. The two ends of the drain bar 1 extend outward through the side plate 5 of the test cabinet. High-voltage terminals are provided at both ends of the drain bar 1 for introducing the test voltage provided by the intelligent test measurement and control system B.
[0072] The mounting plate 8 extends outwards to the plate surfaces on the two test stations respectively and is provided with mounting through holes;
[0073] A first fixing plate 11, a second fixing plate 15, a push rod 14 and a bus bar 16 are provided in each test station;
[0074] The first fixing plate 11 and the second fixing plate 15 are fixed below the mounting plate 8 from top to bottom;
[0075] One end of the disconnector 9 is fixed to the mounting plate 8 through the mounting through hole, and the other end forms an electrical contact on the first fixing plate 11 through the second wire 13 connected to the ground terminal on the bus 16 via the first wire 10;
[0076] The busbar 16 is arranged at the bottom of the test station, and both ends of the busbar 16 extend outward through the wall of the test cabinet. Both ends of the busbar 16 are provided with grounding terminals for connecting to the grounding switch in the intelligent switch control system A;
[0077] The movable end of the push rod 14 passes through the second fixed plate 15, and an insulating support 12 is installed on the movable end, and the insulating support 12 is connected to the ground terminal through the second wire 13;
[0078] like Figure 1 As shown, the intelligent test control system B is connected to the intelligent switch control system A, the test equipment C, and the test product installation platform D for mutual communication, and is used to control the switch switching in the intelligent switch control system A to facilitate the connection or disconnection of the test equipment C, provide the required test parameters for the test, and control the push rod 14 to move up and down during the test, so that the disconnector 9 is connected to or exits the test, as well as to perform test alarms and record test results.
[0079] In the above technical solution, when it is necessary to test the disconnector 9, the disconnector 9 is first installed on the mounting plate 8 in the corresponding test station, connected to the high-voltage output end of the transformer of the test circuit through the drain bar 1, and conducted to the ground end of the test circuit through the bus 16; when testing the disconnector 9, the push rod 14 is used to drive the second wire 13 at the front end to be in close contact with the low-voltage end of the disconnector 9, so that the low-voltage end of the disconnector 9 is conducted to the ground end of the test circuit, thereby realizing the test of the disconnector 9; in addition, by controlling the push rod 14 in the two test stations, the testing of the two test stations can be completed in sequence.
[0080] It should be noted that if Figure 2 As shown, the push rod 14 can realize the passage and the open circuit under the action of the cylinder. The specific principle is: the test passage is the high-voltage output end of the transformer connected to the test circuit by the drain bar 1, and the voltage is sequentially passed to the mounting plate 8, the disconnector 9, the first end of the first wire 10 (referring to the end connected to the disconnector 9), the second end of the first wire 10 (referring to the end fixed to the first fixing plate 11), the first end of the second wire 13 (referring to the end connected to the push rod 14), the second end of the second wire 13 (referring to the end connected to the bus 16), through the bus 16 and finally to the ground end of the test circuit; on the basis of the above, to realize the test open circuit, that is, only need to control the cylinder to let the push rod 14 slide downward, and then complete the disconnection of the first end of the second wire 13 and the second end of the first wire 10. Among them, in the test passage, it is necessary to control the cylinder to let the push rod 14 slide upward, and then complete the closing of the first end of the second wire 13 and the second end of the first wire 10.
[0081] Compared with the prior art, the present technical solution can avoid the problem of effectively isolating the weak current of the control circuit and the large current of the test circuit flowing through the test product when relying on the traditional solenoid valve to open and close the circuit through the pneumatic push rod setting of the test product installation platform D; it can also quickly complete the connection and test of the disconnector, avoid the repeated wiring of the traditional test disconnector device during the test experiment, and save a lot of manpower costs; at the same time, the test device of the disconnector has a simple structure and is easy to manufacture, so that the manufacturing cost of the test device of the disconnector is low.
[0082] In some embodiments, Figure 4As shown, the first fixing plate 11 is a fixed insulating plate, and both ends are fixed on the opposite side plates 5, and a through hole is provided on the first fixing plate 11, which is connected to the second end of the first wire 10 by a bolt, and the second end of the first wire 10 is fixed between the head of the bolt and the first fixing plate 11, and the screw of the bolt passes through the through hole; in this solution, the screw is used to conduct electricity, and then energizes the first end of the second wire 13 connected to the push rod 14.
[0083] In some embodiments, Figure 2 and Figure 4 As shown, the second fixing plate 15 is a fixed insulating plate, and both ends are fixed to the opposite side plates 5, and a through hole is provided on the second fixing plate 15; the push rod 14 is arranged in the through hole and can slide up and down relative to the through hole (such as Figure 1 In this solution, the push rod 14 is used to slide up and down relative to the second fixed plate 15, thereby realizing the test path and the test open circuit.
[0084] Optimize the above technical solutions, such as Figure 2 and Figure 3 As shown, for each test station, a glass side door 2 opposite to the partition 19 is provided on the test cabinet. The setting of the glass side door 2 is convenient for observing the status of the disconnector 9 and replacing the disconnector 9 during the test, and the glass side door 2 is made of high-strength organic glass;
[0085] An aluminum alloy metal mesh 3 is attached to the inner surface of the glass side door 2, which can effectively reduce the impact and damage of debris generated when the sample moves (explodes) on the organic glass plate; as a preference, the outer surface of the metal mesh 3 can be pasted with the sequence number of the disconnector.
[0086] Optimize the above technical solutions, such as Figure 2-Figure 5 As shown, the test sample installation platform D also includes: a transparent cover plate 4 arranged on the top of the test cabinet;
[0087] The transparent cover plate 4 is connected to the side plate 5 , and the side plates 5 are each provided with a smoke exhaust hole 6 , and both ends of the drainage row 1 extend outwardly through the side plates 5 through the smoke exhaust hole 6 .
[0088] In the above technical solution, the transparent cover 4 is provided to facilitate observation of the disconnector status and replacement of the disconnector during the test, and the transparent cover 4 is made of high-strength organic glass; in addition, the smoke exhaust holes 6 are provided on both sides of the top of the test cabinet to prevent debris from flying out and to remove the smoke in the test cabinet in time.
[0089] Optimize the above technical solutions, such as Figure 2 and Figure 3 As shown, the sample installation platform D also includes: a debris collection box 18 arranged at the bottom of the test cabinet.
[0090] In the above technical solution, it should be noted that the debris collection box 18 can be pushed in or pulled out relative to the bottom of the test cabinet. In this way, by setting the debris collection box 1 that can be pushed in or pulled out, it is convenient to collect or clean up the test sample debris after the test.
[0091] In this scheme, if Figure 3 and Figure 5 As shown, if the test installation platform D includes at least two test cabinets;
[0092] The sample installation platform D also includes: a first connecting plate 7 and a second connecting plate 17;
[0093] The drainage bars 1 of adjacent test cabinets are connected via a first connection plate 7 ; the bus bars 16 of adjacent test cabinets are connected via a second connection plate 17 .
[0094] In the above technical solution, multiple test cabinets can be connected together by setting the first connecting plate 7 and the second connecting plate 17; preferably, the first connecting plate 7 is fitted and connected to the end connection of the adjacent drainage bar 1, and the second connecting plate 17 is fitted and connected to the end connection of the adjacent bus bar 16; further, the end of the drainage bar 1 and the first connecting plate 7 are both provided with through holes, and the end of the drainage bar 1 and the first connecting plate 7 are connected by connecting pieces, and the end of the drainage bar 1 and the first connecting plate 7 are passed through in sequence. Similarly, the end of the bus bar 16 and the second connecting plate 17 are also connected in the above manner. Through the above settings, it can be ensured that the test product installation platform D is on the same horizontal plane after the test cabinets are connected in series. You can refer to Figure 3 and Figure 5 .
[0095] In this solution, if the sample installation platform D includes at least two test cabinets, the side panels 5 of adjacent test cabinets are insulating panels.
[0096] In the above technical solution, the sample installation platform D is isolated by the insulating partition 5 to prevent the sample at the test station from damaging the sample at other sample installation stations when the sample is in motion.
[0097] In some embodiments, Figure 3 and Figure 5 As shown, both ends of the drain bus 1 are provided with high-voltage terminals, which are used for introducing the test voltage and connecting the high-voltage end of the test cabinet in series. The corresponding interconnection or disassembly between the test cabinets through the high-voltage access terminals and the grounding terminals can realize the rapid expansion or replacement of the test installation station; it should be noted that both ends of the bus 16 are provided with grounding terminals.
[0098] In some embodiments, the drainage bar 1, the first connecting plate 7, the bus bar 16, and the second connecting plate 17 are made of the same metal material, and the diameter of the through hole on one end of the mounting plate 8 and the disconnector 9 can meet the installation dimensions of various types of disconnectors 9; an insulating support 12 is installed at the top of the push rod 14, which can effectively isolate the potential and prevent the test current from flowing into the cylinder, burning the metal cylinder body or affecting the measurement accuracy of the test current.
[0099] In this technical solution, the intelligent switch control system A includes a programmable controller, a switch control device, a closing and opening switch and a grounding switch;
[0100] The opening and closing switch is set between the intelligent test control system B and the test equipment C. Figure 6 As shown,
[0101] The grounding switch is connected to the grounding terminal on the busbar 16 in each test cabinet in the test installation platform D;
[0102] The programmable controller is connected to the opening and closing switch and the earthing switch through the switch control device, and when performing the test, it controls the opening and closing switch and the earthing switch to be automatically switched, so that the test equipment C provides the test parameters required for the test, and the test cabinet performing the test is connected to the test circuit or disconnected in sequence.
[0103] Optimize the above technical solutions, such as Figure 6 As shown, the test equipment C includes a test power supply, a test voltage regulator AT, a test transformer TT, a voltage detection instrument V1 for the voltage regulator, a current suppression adjustable inductor L, a digital oscilloscope AS, a current sensor CT and a voltage divider VT;
[0104] The opening and closing switches include: a first opening and closing switch K1, a second opening and closing switch K2 and a third opening and closing switch K3;
[0105] It should be noted that the first opening and closing switch K1 of the system power supply and the second opening and closing switch K2 of the test voltage regulator AT both adopt large-capacity AC load switches, which have the ability to pass and disconnect large currents at industrial frequency; the third opening and closing switch K3 of the test transformer adopts a large-capacity vacuum DC load switch, which not only has the ability to pass and disconnect large currents at industrial frequency, but also because the DC switch has a faster response speed than the AC switch, it can meet the operational requirements of quickly switching the test current at high voltage during the test.
[0106] The test power supply, test voltage regulator AT and voltage regulator voltage detection instrument V1 are connected in parallel to one side of the test transformer TT, and the current suppression adjustable inductor L, voltage divider VT and test product installation platform D are connected to the other side of the test transformer TT;
[0107] One end of the first opening and closing switch K1 is connected to the test power supply, the control end is connected to the switch control device, and the other end is connected to a fixed end of the test voltage regulator AT;
[0108] One end of the second opening and closing switch K2 is connected to the voltage regulating end of the test voltage regulator AT, the other end is connected to one end of the test transformer TT, and the control end is connected to the switch control device;
[0109] One end of the third opening and closing switch K3 is connected to the other end of the test transformer TT, the control end is connected to the switch control device, and the other end is connected to one end of the current suppression adjustable inductor L;
[0110] The other end of the current suppression adjustable inductor L is connected to one end of the voltage regulator voltage monitoring instrument VT, and the voltage regulator voltage monitoring instrument VT is used to monitor the voltage of the test product;
[0111] One end of the current sensor CT is grounded, and the other end is connected to the voltage monitoring instrument VT of the voltage regulator to monitor the current of the test product;
[0112] The input end of the digital oscilloscope AS is connected to the current sensor CT and the voltage monitoring instrument VT of the voltage regulator respectively, so as to display the test product current and the test product voltage.
[0113] like Figure 6 As shown, the grounding switches GW1~GWn are grounding switches on each test station on the test installation platform D. The grounding switches GW1~GWn on each test station on the test installation platform D can be understood as follows: the grounding switches GW1~GWn are push rods 14, and the sliding of the push rods 14 is used to close or disconnect the grounding switches. The sliding of the push rods 14 is pneumatic, which can effectively avoid the problem of effective isolation between the weak current of the control circuit and the large current of the test circuit flowing through the test product when the traditional solenoid valve is used for opening and closing the circuit; and minimize the impact of accidental side flash of the station components on the measurement circuit and the low-voltage control circuit.
[0114] It should be noted that Figure 6 The figure also shows disconnectors, specifically T1 to Tn. Each disconnector is installed on a test station. When any disconnector needs to be tested, the corresponding grounding switch can be controlled to close. For example, the grounding switch GW1 is connected to the first test station. When the grounding switch GW1 is closed, the disconnector T1 in the first test station is connected to the test circuit.
[0115] In this technical solution, if Figure 7 As shown, the intelligent test control system B includes a test information control unit, a test equipment control unit, a test data processing unit and a test station selection unit;
[0116] The test information control unit is connected to the test equipment control unit, the test data processing unit and the test station selection unit respectively, and receives the test product information and preset test parameters of the disconnector 9;
[0117] The test station selection unit is connected to the test information control unit and the test product installation platform D respectively, receives the test station selection signal output by the test information control unit, and selects the test station connected to the test product installation platform D based on the test station selection signal;
[0118] The test equipment control unit is respectively connected to the intelligent switch control system A, the door interlock, the automatic grounding unit and the test data processing unit for communication. Before the test, it automatically monitors the closed state of the door interlock and the disengaged state of the automatic grounding unit. During and after the test, it sends control instructions to the intelligent switch control system A, which controls the switch to be switched on and off as required, and reads the test parameters collected by the test data processing unit during the test.
[0119] It should be noted that it can be understood in this way that before the test, the door interlock closing state is automatically detected, and an alarm prompts if it is not closed; the automatic grounding disengagement state is automatically detected, and an alarm prompts if it is not disengaged. During the test, the test power supply, voltage regulator, and grounding switch on the test station are controlled to automatically close in sequence according to the test process; the output voltage of the voltage regulator set by the test information control unit is automatically read, and the voltage regulator is automatically increased or decreased; after the voltage regulator is boosted to the point, before the third opening and closing switch K3 of the test transformer is closed, the oscilloscope communication connection status is automatically detected, and an alarm prompts if the connection is abnormal; after detecting that the oscilloscope communication connection is normal, it is started to enter the trigger waiting mode. After the test, the test power supply, voltage regulator, and grounding switch on the test station are controlled to automatically open in sequence according to the test process;
[0120] The test data processing unit is connected to the test equipment C, collects the test parameters of the test equipment C during the test, and compares whether the test parameters are within the allowable error range of the preset test parameters, and adjusts the test equipment C based on the comparison result so that the test parameters generated by the test equipment C are within the allowable error range of the preset test parameters.
[0121] It should also be noted that it can be understood that the test data processing unit is responsible for collecting the test current and test voltage signals, automatically comparing them with the preset value of the test current, and automatically and quickly adjusting the voltage of the voltage regulator when it exceeds the preset tolerance so that the test current parameters meet the preset value requirements; automatically filling in and storing the test data according to the test product number and test current according to the automatically selected record template, and automatically generating a standard test record.
[0122] Based on the test device for a disconnector disclosed in the above embodiment of the present invention, the embodiment of the present invention further discloses a test method for a disconnector specifically applied to the test device, such as Figure 8 As shown, it mainly includes the following steps:
[0123] S100. Use the intelligent test measurement and control system B to check whether the working status of the test product installation platform D and the test equipment C are normal.
[0124] In the process of executing S100, the intelligent test control system B is used to perform real-time detection of the working status of the test installation platform D and the test equipment C before and during the test of the disconnector to ensure that the working status of the test installation platform D and the test equipment C is in a normal state. If it is detected that any of the test installation platform D and the test equipment C is in an abnormal state, an alarm prompt is issued.
[0125] Combination Figure 7 As shown, in one embodiment of the present invention, before performing the disconnector test, the test equipment control unit in the intelligent test measurement and control system B automatically detects whether the door interlock connected thereto is in a closed state, and if not, an alarm is issued; it automatically detects whether the automatic grounding unit connected thereto is in a disengaged state, and if not, an alarm is issued.
[0126] Combination Figure 7 As shown, in one embodiment of the present invention, during the disconnector test, the test equipment control unit in the intelligent test control system B detects whether the test data processing unit connected thereto communicates normally with the digital oscilloscope in the intelligent device. If not, an alarm is given. If normal, the digital oscilloscope is controlled to start running and enter the waiting trigger mode.
[0127] Specific, combined Figure 6 As shown, during the disconnector test, the voltage regulator in the smart device boosts the voltage to the preset test parameters, and before the third opening and closing switch K3 is closed, the test equipment control unit automatically detects whether the communication connection between the test data processing unit and the digital oscilloscope is normal. If the connection is abnormal, an alarm is given; after detecting in real time that the communication connection of the digital oscilloscope is normal, the digital oscilloscope is controlled to start running and enter the trigger-waiting mode.
[0128] Combination Figure 6 As shown, it should be noted that before the test, the intelligent switch control system A can also automatically control the grounding switches GW1-GWn through the PLC and the switch control cabinet to select or switch the test station. Usually, before the test, the grounding switches GW1-GWn are not grounded.
[0129] S200. When the working status of the test installation platform D and the test equipment C are normal, the intelligent test measurement and control system B is triggered to start the test. The intelligent switch control system A controls the disconnector 9 pre-installed on the test station of the test installation platform D according to the preset test station sequence. The test parameters output by the test equipment C are controlled so that the test voltage corresponding to each test station is automatically boosted to the preset value.
[0130] In the process of executing S200, before the test, it is determined that the working status of the test installation platform D and the test equipment C is normal, and other equipment is also in normal status. The intelligent test measurement and control system B starts the test, and uses the test equipment control unit to send a control instruction to the intelligent switch control system A connected thereto, and controls the switch in the intelligent switch control system A, and the grounding switch on the test station where the disconnector 9 is installed on the test installation platform D to automatically close in sequence according to the preset test program; the test equipment control unit automatically reads the preset test parameters pre-set in the test information control unit, and controls the switch in the intelligent switch control system A to close or open according to the preset test parameters, so that the test parameters output by the test equipment C can ensure that the test voltage corresponding to each test station is automatically boosted to the preset value, that is, to the preset test parameters. Combined with the figure, it should be noted that in the process of controlling the test parameters output by the test equipment C according to the preset test station sequence, so that the test voltage corresponding to each test station is automatically boosted to the preset value, the intelligent switch control system A automatically controls the first opening and closing switch K1 and the second opening and closing switch K2 to switch the system power supply and the test voltage regulator in sequence.
[0131] S300. When the test voltage corresponding to the first test station where the disconnector 9 is first installed is automatically boosted to a preset value, the intelligent switch control system A connects to the first test station.
[0132] During the execution of the above S200, the test parameters output by the test equipment C are controlled according to the preset test station sequence so that the test voltage corresponding to each test station is automatically boosted to the preset value. When the test voltage corresponding to the first test station where the disconnector 9 is first installed is automatically boosted to the preset value, S300 is executed, and the intelligent switch control system A controls the grounding switch connected to the first test station to be grounded, thereby connecting the first test station to the test circuit.
[0133] Combination Figure 6 As shown, the intelligent switch control system A controls the grounding of the grounding switch connected to the first test station through the PLC and the switch control cabinet based on the control instructions sent by the test equipment control unit, so that the first test station is connected to the test circuit.
[0134] S400, the intelligent test measurement and control system B collects the test parameters in real time, and compares whether the sample parameters are within the allowable error range of the preset test parameters; if the test parameters are not within the allowable error range of the preset test parameters, execute S500; if the test parameters are within the allowable error range of the preset test parameters, continue to execute S400; until the test of the disconnector 9 is completed, and the data obtained in the test is saved.
[0135] Optionally, the allowable error range is ±10% of the preset test parameters, or other ranges.
[0136] S500, the intelligent switch control system A controls the switching of the switch connected to the test equipment C, so that the test voltage corresponding to the first test station is stepped up or down, so that the test parameters collected in real time by the intelligent test measurement and control system B are within the allowable error range of the preset test parameters, until the test of the disconnector 9 is completed, and the data obtained in the test is saved.
[0137] In the specific execution of S400 and S500, the intelligent test measurement and control system B collects the test parameters of the test equipment C during the test, compares the test parameters with the preset test parameters, and adjusts the test equipment C based on the comparison results, so that the test parameters generated by the test equipment C are consistent with the preset test parameters. Specifically, if the preset test parameters are exceeded, the intelligent switch control system A controls the switch connected to the test equipment C to increase or decrease the test voltage corresponding to the first test station, so that the test parameters collected in real time by the intelligent test measurement and control system B do not exceed the preset test parameters.
[0138] Combination Figure 6 As shown, the test data processing unit in the intelligent test measurement and control system B collects the test current in the test loop through the current sensor, and obtains the test voltage signal in the test loop indicated by the voltage divider through the digital oscilloscope. The test current is compared with the preset test current. If the currently collected test current is not within the allowable error range of the preset test current, the test equipment control unit sends a step-up or step-down control instruction to the voltage regulator to make the test voltage regulator step up or step down. At the same time, the voltage of the test voltage regulator indicated on the voltage detection instrument V1 of the voltage regulator is collected in real time to ensure that the voltage currently indicated by the test voltage regulator meets the requirements, and at the same time, the test current is within the allowable error range of the preset test current and meets the test requirements.
[0139] It should be noted that when the test voltage regulator is controlled to increase or decrease the voltage, the increase or decrease is determined according to a preset percentage based on the current difference.
[0140] S600, the intelligent switch control system A disconnects the first test station, connects the next second test station where the disconnector 9 is installed, and executes the step of real-time collection of test parameters by the intelligent test measurement and control system B until the test of all disconnectors 9 installed at the test stations is completed.
[0141] It should be noted that after completing the test of the disconnectors 9 on all test stations, the test equipment control unit in the intelligent test measurement and control system sends control instructions to the intelligent switch control system to control the test power supply, voltage regulator, and grounding switch on the test station to automatically open the circuit in sequence according to the test process.
[0142] It should be further explained that, when the disconnector 9 completes the test, that is, after it is actuated, the test circuit is in an open circuit state, and the test current will quickly drop to zero.
[0143] In the above technical testing scheme, the disconnector test can be completed quickly in batches as needed; S400 can be used to improve the accuracy of the disconnector test; S500 can be used to store the test data; and S600 can be used to improve the safety of the disconnector test.
[0144] Combined with the above Figures 1 to 9 To illustrate with a specific example, disconnectors 9 are installed on the first to fourth test stations on the test installation platform D, and the grounding switches corresponding to the first to fourth test stations are GW1 to GW4. The specific process of testing the disconnectors 9 installed on the first to fourth test stations is as follows:
[0145] S1. The intelligent test control system inputs the sample information and preset test parameters of the disconnectors 9 installed on the first to fourth test stations, and starts the test after the working status of the test sample installation platform and the test equipment is in normal state.
[0146] When executing S1 , the process of checking the working status of the test product installation platform and the test equipment can be referred to step S100 .
[0147] S2, the intelligent switch control system closes the first opening and closing switch K1 and the second opening and closing switch K2 based on the control instructions of the intelligent test measurement and control system to connect the system power supply and the test voltage regulator.
[0148] S3. The intelligent test measurement and control system reads the output voltage of the test voltage regulator and controls the test voltage regulator to perform step-up and step-down operations.
[0149] S4. The intelligent test control system detects the output voltage and compares whether the output voltage is within the allowable error range of the preset value. If not, the process returns to execute S3. If yes, the process executes S5.
[0150] S5. The intelligent test control system starts the digital oscilloscope and puts it into the trigger-waiting mode.
[0151] S6. The intelligent switch control system controls the grounding switch GW1 to be grounded, and connects the first test station.
[0152] S7. The intelligent switch control system controls the third opening and closing switch K3 to close, so that the test circuit connected to the first test station is energized, and the disconnector 9 on the first test station is started to be tested.
[0153] S8, the intelligent test measurement and control system collects the test parameters in real time and compares whether the test parameters are within the preset test parameter allowable error range. If the test parameters are not within the preset test parameter allowable error range, execute S9; if the test parameters are within the preset test parameter allowable error range, continue to execute S11.
[0154] S9, the intelligent switch control system controls the third opening and closing switch K3 to open, so that the first test station disconnects the test circuit.
[0155] S10, the intelligent test measurement and control system controls the test voltage regulator to perform step-up and step-down operations, and returns to execute S5.
[0156] S11. When the disconnector 9 is actuated, the test is completed, and the intelligent test control system controls the digital oscilloscope to stop data acquisition, and reads and stores the data and waveform in the digital oscilloscope.
[0157] S12, the intelligent switch control system controls the third opening and closing switch K3 to open, so that the cylinder of the first test station retracts, completing the disconnection of the grounding switch GW1.
[0158] It should be noted that only the first test station is connected to the test circuit each time, and the connection is made in sequence.
[0159] S13, confirm whether all disconnectors have completed the disconnection test, if not, return to execute S3. If completed, execute S14.
[0160] S14, the intelligent switch control system controls the second opening and closing switch K2 and the first opening and closing switch K1 to open in sequence, and the test ends.
[0161] In the above scheme, the cooperation of the test piece installation platform and the test equipment can start to complete the test of the disconnector.
[0162] In the above technical solution, through the above process steps, the test of the disconnectors can be completed quickly in batches as needed, and the safety of the test can be guaranteed; step S8 can be used to further improve the accuracy of the test; step S13 can be used to ensure that each disconnector is tested, thereby increasing the test base and avoiding waste of disconnectors; step S11 can be used to collect various test data.
[0163] The technical features mentioned above and the technical features shown separately in the drawings can be combined with each other arbitrarily, as long as the combined technical features are not contradictory. All feasible feature combinations are technical contents clearly recorded in this article. Any of the multiple sub-features contained in the same sentence can be applied independently, and does not have to be applied together with other sub-features.
[0164] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0165] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A test device for a disconnector, used for testing a disconnector (9), It is characterized in that include: Intelligent switch control system (A), intelligent test measurement and control system (B), test equipment (C) and test product installation platform (D); The sample installation platform (D) comprises: An I-shaped test cabinet is formed by a partition (19) whose two ends are respectively connected to two side panels (5), and two test stations are divided on both sides of the partition (19); A mounting plate (8) and a drain bar (1) connected in a cross manner, wherein the drain bar (1) is fixed to the top of the test cabinet along the partition (19), and the two ends of the drain bar (1) extend outwardly through the side plate (5) of the test cabinet, and high-voltage wiring terminals are provided at both ends of the drain bar (1) for introducing the test voltage provided by the intelligent test measurement and control system (B); The mounting plate (8) is provided with mounting through holes on the plate surface extending outwards to the two test stations respectively; A first fixing plate (11), a second fixing plate (15), a push rod (14) and a bus bar (16) are arranged in each test station; The first fixing plate (11) and the second fixing plate (15) are fixed below the mounting plate (8) from top to bottom; One end of the disconnector (9) is fixed to the mounting plate (8) through the mounting through hole, and the other end forms an electrical contact on the first fixing plate (11) through a second wire (13) connected to a grounding terminal on the busbar (16) via a first wire (10); The busbar (16) is arranged at the bottom of the test station, and the two ends of the busbar (16) extend outwardly through the wall of the test cabinet. The two ends of the busbar (16) are provided with grounding terminals for connecting to the grounding switch in the intelligent switch control system (A); The movable end of the push rod (14) passes through the second fixed plate (15), and an insulating support (12) is installed on the movable end, and the insulating support (12) is connected to the ground terminal through the second wire (13); The intelligent test control system (B) is connected to the intelligent switch control system (A), the test equipment (C), and the test product installation platform (D) for controlling the switching of switches in the intelligent switch control system (A) to facilitate the connection or disconnection of the test equipment (C), provide the required test parameters for the test, and control the push rod (14) to move up and down during the test to connect or exit the disconnector (9) to the test, as well as to generate a test alarm and record the test results.
2. The testing device according to claim 1, It is characterized in that For each of the test stations, a glass side door (2) is provided on the test cabinet and is opposite to the partition (19); A metal mesh (3) is arranged on the glass side door (2).
3. The testing device according to claim 1, It is characterized in that The sample installation platform (D) further comprises: a transparent cover plate (4) arranged on the top of the test cabinet; The transparent cover plate (4) is connected to the side plate (5), and the side plates (5) are each provided with a smoke exhaust hole (6), and the two ends of the drainage row (1) extend outwardly through the side plates (5) through the smoke exhaust hole (6).
4. The testing device according to claim 1, It is characterized in that The sample installation platform (D) also includes: a debris collection box (18) arranged at the bottom of the test cabinet.
5. The testing device according to any one of claims 1 to 4, It is characterized in that If the sample installation platform (D) includes at least two or more test cabinets; The sample installation platform (D) further comprises: a first connecting plate (7) and a second connecting plate (17); The drainage bars (1) of adjacent test cabinets are connected via the first connection plate (7); and the bus bars (16) of adjacent test cabinets are connected via the second connection plate (17).
6. The testing device according to any one of claims 1 to 4, It is characterized in that If the sample installation platform (D) includes at least two of the test cabinets, the side panels (5) of adjacent test cabinets are insulating panels.
7. The testing device according to claim 1, It is characterized in that The intelligent switch control system (A) comprises a programmable controller, a switch control device, an opening and closing switch and a grounding switch; The opening and closing switch is arranged between the intelligent test measurement and control system (B) and the test equipment (C); The grounding switch is connected to the grounding terminal on the busbar (16) in each test cabinet in the test installation platform (D); The programmable controller is connected to the opening and closing switch and the earthing switch through the switch control device, and when performing the test, it controls the opening and closing switch and the earthing switch to be automatically switched on and off, so that the test equipment (C) provides the test parameters required for the test, and the test cabinet performing the test is connected to the test circuit or disconnected in sequence.
8. The testing device according to claim 7, It is characterized in that The test equipment (C) includes a test power supply, a test voltage regulator AT, a test transformer TT, a voltage regulator voltage detection instrument V1, a current suppression adjustable inductor L, a digital oscilloscope AS, a current sensor CT and a voltage divider VT; The opening and closing switches include: a first opening and closing switch K1, a second opening and closing switch K2 and a third opening and closing switch K3; The test power supply, the test voltage regulator AT and the voltage regulator voltage detection instrument V1 are connected in parallel to one side of the test transformer TT, and the current suppression adjustable inductor L, the voltage divider VT and the test product installation platform (D) are connected to the other side of the test transformer TT; One end of the first opening and closing switch K1 is connected to the test power supply, the control end is connected to the switch control device, and the other end is connected to a fixed end of the test voltage regulator AT; One end of the second opening and closing switch K2 is connected to the voltage regulating end of the test voltage regulator AT, the other end is connected to one end of the test transformer TT, and the control end is connected to the switch control device; One end of the third opening and closing switch K3 is connected to the other end of the test transformer TT, the control end is connected to the switch control device, and the other end is connected to one end of the current suppression adjustable inductor L; The other end of the current suppression adjustable inductor L is connected to one end of the voltage regulator voltage monitoring instrument VT, and the voltage regulator voltage monitoring instrument VT is used to monitor the voltage of the test product; One end of the current sensor CT is grounded, and the other end is connected to the voltage monitoring instrument VT of the voltage regulator to monitor the current of the test product; The input end of the digital oscilloscope AS is respectively connected to the current sensor CT and the voltage monitoring instrument VT of the voltage regulator, and is used to display the test product current and the test product voltage.
9. The testing device according to claim 1, It is characterized in that The intelligent test control system (B) comprises a test information control unit, a test equipment control unit, a test data processing unit and a test station selection unit; The test information control unit is connected to the test equipment control unit, the test data processing unit and the test station selection unit respectively, and receives the test product information and preset test parameters of the disconnector (9); The test station selection unit is connected to the test information control unit and the sample installation platform (D) respectively, receives a test station selection signal output by the test information control unit, and selects a test station connected to the sample installation platform (D) based on the test station selection signal; The test equipment control unit is respectively connected to the intelligent switch control system (A), the door interlock, the automatic grounding unit and the test data processing unit for communication, and before the test, automatically monitors the closed state of the door interlock and the disengaged state of the automatic grounding unit; during and after the test, sends control instructions to the intelligent switch control system (A), and the intelligent switch control system (A) controls the switch to be switched on and off as required, and reads the test parameters collected by the test data processing unit during the test; The test data processing unit is connected to the test equipment (C), collects test parameters of the test equipment (C) during the test, compares whether the test parameters are within the allowable error range of the preset test parameters, and adjusts the test equipment (C) based on the comparison result so that the test parameters generated by the test equipment (C) are within the allowable error range of the preset test parameters.
10. A method for testing a disconnector, It is characterized in that The testing device for the disconnector according to any one of claims 1 to 9, wherein the testing method comprises: Use the intelligent test control system (B) to check whether the working status of the test product installation platform (D) and the test equipment (C) are in normal condition; When the working status of the sample installation platform (D) and the test equipment (C) is normal, the intelligent test measurement and control system (B) is triggered to start the test, and the intelligent switch control system (A) controls the disconnector (9) pre-installed on the test station of the sample installation platform (D) according to the preset test station sequence, and controls the test parameters output by the test equipment (C), so that the test voltage corresponding to each test station is automatically boosted to a preset value; When the test voltage corresponding to the first test station where the first disconnector (9) is installed is automatically increased to a preset value, the intelligent switch control system (A) switches on the first test station; The intelligent test measurement and control system (B) collects test parameters in real time; if the collected test parameters are not within the allowable error range of the preset test parameters, the intelligent switch control system (A) controls the switching of the switch connected to the test equipment (C) to increase or decrease the test voltage corresponding to the first test station, so that the test parameters collected in real time by the intelligent test measurement and control system (B) are within the allowable error range of the preset test parameters, until the test of the disconnector (9) is completed, and the data obtained in the test is saved; The intelligent switch control system (A) disconnects the first test station, connects to the second test station where the disconnector (9) is installed, and executes the step of real-time collection of test parameters by the intelligent test measurement and control system (B) until the test of all disconnectors (9) installed at the test stations is completed.
