System for purifying CO through pressure swing adsorption
By optimizing the pipeline layout and valve configuration of the adsorption tower in the pressure-switching adsorption process, using the cooperation of the replacement air and vacuum pump, the CO purity problem caused by the dead space in the adsorption tower is solved, and the extraction and operation of high-purity CO products are achieved.
Patent Information
- Application Number
- CN202411389443.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2024-12-06
AI Technical Summary
In the existing pressure swing adsorption process, the dead space in the adsorption tower causes the purity of CO products to be affected, and complex pre-treatment and post-treatment operations are required.
By setting a replacement air pipe and a replacement air intake pipe on the output and input pipes of the adsorption tower, the replacement air can be discharged or entered through the complete pipe, and the impurity gas is maximized and process control is added at the outlet flange of the adsorption tower. The valve is used to isolate impurity gases and is used in combination with a vacuum pump during the reverse release and vacuum evacuation steps to ensure complete regeneration of the adsorbent.
It significantly improves the purity of CO products, reduces the content of impurity gases, and simplifies process operations, avoiding complex pretreatment and post-treatment steps.
Smart Images

Figure CN119075590A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of CO purification by pressure swing adsorption, and in particular relates to a system for CO purification by pressure swing adsorption. Background Art
[0002] CO is an important basic chemical raw material. It can be extracted from coal, natural gas, petroleum and other resources to produce a CO-rich mixed gas, and then separated and purified. At present, the main processes for separating and purifying CO are: (1) Cryogenic separation process, which uses the boiling point differences of various gas components to separate gas mixtures through low-temperature distillation; however, since water, CO2 and other components in the mixed gas condense into solids at low temperatures and are easy to clog pipelines, a very complex pretreatment system is required. At the same time, the boiling points of nitrogen and CO are almost equal, so it is only suitable for gas sources that do not contain nitrogen in the raw gas. (2) Solution complexation absorption process, which uses a toluene solution of CuCl·AlCl3 to absorb CO, and then heats and desorbs it to obtain CO product gas; however, water, sulfide, ammonia and other components in the raw gas will react with the complexing agent, causing the absorption capacity of the complexing agent to decrease or even fail, requiring complex pretreatment and post-treatment operations. (3) Pressure swing adsorption process, which has good adaptability to raw gas, does not require complex pretreatment, can operate at room temperature, is easy to operate, and has no equipment corrosion and environmental pollution problems. Adsorbents are required in the pressure swing adsorption process. The adsorbent in the adsorption tower has a certain porosity, forming a dead space. Unabsorbed gas exists in the dead space, which seriously affects the purity of the CO product. Summary of the invention
[0003] In view of the above problems, the present invention provides a system for purifying CO by pressure swing adsorption, comprising an adsorption tower, an output pipeline is provided on the top of the adsorption tower, and a control valve is provided on the output pipeline for controlling the gas in the output adsorption tower; the outlet side of the output pipeline is sequentially connected in parallel with a pre-adsorption outlet pipe, a pressure equalizing outlet pipe, a pressure equalizing inlet pipe, an adsorption tail gas outlet pipe and a replacement outlet pipe from the inside to the outside, and the replacement outlet pipe is located at the outermost layer, so that the replacement gas in the adsorption tower can be discharged after passing through the complete output pipeline;
[0004] An input pipe is provided at the bottom of the adsorption tower for inputting gas into the adsorption tower; the air inlet side of the input pipe is sequentially connected in parallel with a raw material air inlet pipe, a pre-adsorption air inlet pipe, a reverse discharge air outlet pipe, a vacuum air outlet pipe and a replacement air inlet pipe from the inside to the outside, and the replacement air inlet pipe is at the outermost layer, so that the replacement gas can pass through the complete input pipe before entering the adsorption tower.
[0005] Optionally, a total air outlet is provided at the top of the adsorption tower, the air inlet end of the output pipe is connected to the total air outlet, and the air outlet side of the output pipe is provided with a first tee, a first air outlet pipe, a second tee, a second air outlet pipe, a third tee, a third air outlet pipe, a fourth tee and a replacement air outlet pipe from the inside to the outside, and the control valve is arranged between the total air outlet and the first tee.
[0006] Further optionally, the inlet of the first tee is connected to the outlet end of the output pipeline, and one outlet of the first tee is connected to the pre-adsorption outlet pipe, on which a programmable valve is provided for controlling the discharge of the pre-adsorption gas; the other outlet of the first tee is connected to the inlet end of the first outlet pipe.
[0007] Further optionally, the inlet of the second tee is connected to the outlet end of the first outlet pipe, and one outlet of the second tee is connected to the pre-equalizing outlet pipe, on which a programmable valve 2 is provided for controlling the discharge of the gas used for pressure equalization in the adsorption tower; the other outlet of the second tee is connected to the inlet end of the second outlet pipe.
[0008] Further optionally, the inlet of the third tee is connected to the outlet end of the second outlet pipe, and one outlet of the third tee is connected to the pre-equalizing air inlet pipe. The equalizing air inlet pipe is provided with a programmable valve three for controlling the input of the equalizing gas into the adsorption tower; the other outlet of the third tee is connected to the inlet end of the third outlet pipe.
[0009] Further optionally, the inlet of the fourth tee is connected to the outlet end of the third outlet pipe, and one outlet of the fourth tee is connected to the adsorption exhaust gas outlet pipe. The adsorption exhaust gas outlet pipe is provided with a programmable valve four for controlling the discharge of the adsorption exhaust gas in the adsorption tower, and the adsorption exhaust gas outlet pipe is connected to the adsorption exhaust gas buffer tank; the other outlet of the fourth tee is connected to the inlet end of the replacement outlet pipe.
[0010] Further optionally, a programmable valve five is provided on the replacement gas outlet pipe for controlling the discharge of the replacement gas in the adsorption tower.
[0011] Optionally, a main air inlet is provided at the bottom of the adsorption tower, the air outlet end of the input pipe is connected to the main air inlet, and the air inlet side of the input pipe is provided with a fifth tee, a first air inlet pipe, a sixth tee, a second air inlet pipe, a seventh tee, a third air inlet pipe, an eighth tee and a replacement air inlet pipe from the inside to the outside.
[0012] Further optionally, one inlet of the fifth tee is connected to the raw material inlet pipe, and the raw material inlet pipe is provided with a programmable valve six for controlling the input of raw material gas into the adsorption tower; the outlet of the fifth tee is connected to the inlet end of the input pipeline, and the other inlet of the fifth tee is connected to the outlet end of the first inlet pipe.
[0013] Further optionally, one inlet of the sixth tee is connected to the pre-adsorption inlet pipe, and the pre-adsorption inlet pipe is provided with a programmable valve seven for controlling the input of the pre-adsorbed process gas into the adsorption tower; the outlet of the sixth tee is connected to the inlet end of the first inlet pipe, and the other inlet of the sixth tee is connected to the outlet end of the second inlet pipe.
[0014] Further optionally, one outlet of the seventh tee is connected to the reverse discharge gas pipe, on which is provided a programmable valve 8 for controlling the reverse discharge gas discharged from the adsorption tower, and the reverse discharge gas pipe is connected to the reverse discharge gas buffer tank; another outlet of the seventh tee is connected to the air inlet end of the second air inlet pipe, and the inlet of the seventh tee is connected to the air outlet end of the third air inlet pipe.
[0015] Further optionally, one outlet of the eighth tee is connected to the vacuum outlet pipe, on which a programmable valve nine is provided, and the vacuum outlet pipe is connected to a vacuum pump for controlling the vacuuming of the adsorption tower; another outlet of the eighth tee is connected to the air inlet end of the third air inlet pipe, and the inlet of the eighth tee is connected to the air outlet end of the replacement air inlet pipe.
[0016] Further optionally, a programmable valve 10 is provided on the replacement air inlet pipe for controlling the input of replacement gas in the adsorption tower, and the air inlet end of the replacement air inlet pipe is connected to the replacement air compressor.
[0017] The present invention makes improvements on the output pipeline and input pipeline of the adsorption tower, and sets the replacement outlet pipe and the replacement inlet pipe at the outermost sides of the top and bottom of the adsorption tower respectively, so that the air intake of the replacement inlet pipe can pass through the replacement inlet pipe, the third inlet pipe, the second inlet pipe, the first inlet pipe and the input pipeline in sequence, and finally enter the adsorption tower. When the replacement intake passes through the above pipelines, it can also pass through a part of the raw material inlet pipe, the pre-adsorption inlet pipe, the reverse discharge outlet pipe, and the vacuum outlet pipe, so that the replacement gas can enter each pipeline connected to the input pipeline to the maximum extent, and the impurity gas can be expelled to the maximum extent. Similarly, the replacement gas discharged from the adsorption tower can pass through the output pipeline, the first outlet pipe, the second outlet pipe and the third outlet pipe in sequence, and finally be discharged from the replacement outlet pipe. When the replacement outlet gas passes through the above pipelines, it can also pass through a part of the pre-adsorption outlet pipe, the pressure-equalizing outlet pipe, the pressure-equalizing inlet pipe, and the adsorption tail gas outlet pipe, so that the replacement outlet gas can enter each pipeline connected to the output pipeline to the maximum extent, and the impurity gas can be expelled to the maximum extent. As described above, by extending the replacement gas channels at the top and bottom of the adsorption tower, the replacement gas can be used to replace the impurity gases in the upper and lower connecting pipes of the adsorption tower to the maximum extent, thereby improving the purity of the product CO.
[0018] Optionally, the ratio of the length of the pre-adsorption air outlet pipe between the first three-way connection and the program-controlled valve 1 to the length of the pre-adsorption air outlet pipe on the downstream side of the program-controlled valve 1 is 1:(10-20);
[0019] The ratio of the length of the pressure-equalizing air outlet pipe between the second three-way and the second program-controlled valve to the length of the pressure-equalizing air outlet pipe on the downstream side of the second program-controlled valve is 1:(10-20);
[0020] The ratio of the length of the pressure-equalizing air intake pipe between the third three-way and the program-controlled valve three to the length of the pressure-equalizing air intake pipe on the upstream side of the program-controlled valve three is 1:(10-20);
[0021] The ratio of the length of the adsorption exhaust gas outlet pipe between the fourth three-way and the programmable valve four to the length of the adsorption exhaust gas outlet pipe on the downstream side of the programmable valve four is 1:(10-20).
[0022] Optionally, the ratio of the length of the raw material air inlet pipe between the fifth three-way connection and the program-controlled valve six to the length of the raw material air inlet pipe on the upstream side of the program-controlled valve six is 1:(10-20);
[0023] The ratio of the length of the pre-adsorption air intake pipe between the sixth three-way and the program-controlled valve seven to the length of the pre-adsorption air intake pipe on the upstream side of the program-controlled valve seven is 1:(10-20);
[0024] The ratio of the length of the reverse exhaust pipe between the seventh three-way and the program-controlled valve eight to the length of the reverse exhaust pipe on the downstream side of the program-controlled valve eight is 1:(10-20);
[0025] The ratio of the length of the vacuum outlet pipe between the eighth three-way valve and the program-controlled valve nine to the length of the vacuum outlet pipe on the downstream side of the program-controlled valve nine is 1:(10-20).
[0026] The present invention places the above-mentioned program-controlled valves close to their corresponding three-way components, thereby shortening the amount of various process gases upstream or downstream of each program-controlled valve as much as possible and reducing the amount of replacement gas.
[0027] The adsorption tower is a conventional vertical adsorption tower in the art, and the interior of the adsorption tower is filled with conventional fillers for adsorbing CO, such as 5A molecular sieve.
[0028] The method of separating and extracting CO by adsorption tower is:
[0029] (1) Adsorption: The raw gas is fed into the bottom of the adsorption tower through the raw gas inlet pipe. The CO in the raw gas is adsorbed by the adsorbent, and the remaining gas is discharged from the adsorption tail gas outlet pipe connected to the top of the adsorption tower;
[0030] (2) Pressure equalization: After the adsorption tail gas is discharged, the adsorption tower is connected to another auxiliary adsorption tower that has completed regeneration and is in a low-pressure state through a pressure equalization outlet pipe. The pressure of the adsorption tower is reduced, which can discharge the impurity gas in the dead space in the adsorption tower and increase the pressure of the auxiliary adsorption tower to recover mechanical energy;
[0031] (3) Replacement: Part of the product CO is introduced into the adsorption tower through the replacement inlet pipe to further replace the impurity gas in the dead space in the adsorption tower, so that the adsorbent bed space is filled with high concentration of CO;
[0032] (4) Reverse discharge: After the replacement is completed, the reverse discharge valve is opened, and the CO product gas enters the reverse discharge buffer tank in the opposite direction of adsorption. The pressure of the adsorption tower drops to normal pressure after the reverse discharge step;
[0033] (5) Vacuuming: After the inversion is completed, in order to completely regenerate the adsorbent, the adsorption tower is evacuated in the opposite direction of the adsorption direction using a vacuum pump to completely desorb the adsorbed CO.
[0034] In the two steps of inversion and vacuuming (producing CO product gas), a program-controlled valve is added to the outlet flange of the adsorption tower. It is closed in these two steps to completely isolate the impurity gas in the outlet pipeline of the adsorption tower, further reducing the impurity content in the product gas. In other steps, it is kept fully open without affecting the normal operation of other steps. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a schematic diagram of the structure of the system for purifying CO by pressure swing adsorption.
[0036] In the accompanying drawings, 1-adsorption tower, 2-output pipeline, 3-control valve, 4-pre-adsorption outlet pipe, 5-equalizing outlet pipe, 6-equalizing inlet pipe, 7-adsorption tail gas outlet pipe, 8-replacement outlet pipe, 9-input pipeline, 10-raw material inlet pipe, 11-pre-adsorption inlet pipe, 12-reverse outlet pipe, 13-vacuum outlet pipe, 14-replacement inlet pipe, 15-first outlet pipe, 16-second outlet pipe, 17-third outlet pipe, 18-first inlet pipe, 19-second inlet pipe, 20-third inlet pipe, 21-programmed valve one. DETAILED DESCRIPTION
[0037] This embodiment provides a system for purifying CO by pressure swing adsorption, such as Figure 1 As shown, it includes an adsorption tower 1, the top of the adsorption tower 1 is provided with an output pipe 2, and the output pipe 2 is provided with a control valve 3 for controlling the gas in the output adsorption tower 1; the outlet side of the output pipe 2 is sequentially connected in parallel with a pre-adsorption outlet pipe 4, a pressure-equalizing outlet pipe 5, a pressure-equalizing inlet pipe 6, an adsorption tail gas outlet pipe 7 and a replacement outlet pipe 8 from the inside to the outside, and the replacement outlet pipe 8 is in the outermost layer, so that the replacement gas in the adsorption tower 1 can pass through the complete output pipe 2 before being discharged;
[0038] An input pipe 9 is provided at the bottom of the adsorption tower 1 for inputting gas into the adsorption tower 1; the air inlet side of the input pipe 9 is sequentially connected in parallel with a raw material air inlet pipe 10, a pre-adsorption air inlet pipe 11, a reverse discharge air outlet pipe 12, a vacuum air outlet pipe 13 and a replacement air inlet pipe 14 from the inside to the outside, and the replacement air inlet pipe 14 is at the outermost layer, so that the replacement gas can pass through the complete input pipe 9 before entering the adsorption tower 1.
[0039] Optionally, a total gas outlet is provided at the top of the adsorption tower 1, the air inlet end of the output pipe 2 is connected to the total gas outlet, and the outlet side of the output pipe 2 is provided with a first tee, a first gas outlet pipe 15, a second tee, a second gas outlet pipe 16, a third tee, a third gas outlet pipe 17, a fourth tee and a replacement gas outlet pipe 8 from the inside to the outside, and the control valve 3 is arranged between the total gas outlet and the first tee.
[0040] Further optionally, the inlet of the first tee is connected to the outlet end of the output pipe 2, and one outlet of the first tee is connected to the pre-adsorption outlet pipe 4, on which a programmable valve 21 is provided for controlling the discharge of the pre-adsorption gas; the other outlet of the first tee is connected to the inlet end of the first outlet pipe 15.
[0041] Further optionally, the inlet of the second tee is connected to the outlet end of the first outlet pipe 15, and one outlet of the second tee is connected to the pre-equalizing outlet pipe 5, on which the programmable valve 2 is provided for controlling the discharge of the gas used for pressure equalization in the adsorption tower 1; the other outlet of the second tee is connected to the inlet end of the second outlet pipe 16.
[0042] Further optionally, the inlet of the third tee is connected to the outlet end of the second outlet pipe 16, and one outlet of the third tee is connected to the pre-equalizing air inlet pipe 6. The equalizing air inlet pipe 6 is provided with a programmable valve three for controlling the input of the equalizing gas into the adsorption tower 1; the other outlet of the third tee is connected to the inlet end of the third outlet pipe 17.
[0043] Further optionally, the inlet of the fourth tee is connected to the outlet end of the third outlet pipe 17, and one outlet of the fourth tee is connected to the adsorption exhaust gas outlet pipe 7. The adsorption exhaust gas outlet pipe 7 is provided with a programmable valve four for controlling the discharge of the adsorption exhaust gas in the adsorption tower 1, and the adsorption exhaust gas outlet pipe 7 is connected to the adsorption exhaust gas buffer tank; the other outlet of the fourth tee is connected to the inlet end of the replacement outlet pipe 8.
[0044] Further optionally, the replacement gas outlet pipe 8 is provided with a programmable valve 5 for controlling the discharge of the replacement gas in the adsorption tower 1 .
[0045] Optionally, a main air inlet is provided at the bottom of the adsorption tower 1, the air outlet end of the input pipe 9 is connected to the main air inlet, and the air inlet side of the input pipe 9 is provided with a fifth tee, a first air inlet pipe 18, a sixth tee, a second air inlet pipe 19, a seventh tee, a third air inlet pipe 20, an eighth tee and a replacement air inlet pipe 14 from the inside to the outside.
[0046] Further optionally, one inlet of the fifth tee is connected to the raw material air inlet pipe 10, and the raw material air inlet pipe 10 is provided with a programmable valve 6 for controlling the input of raw gas into the adsorption tower 1; the outlet of the fifth tee is connected to the air inlet end of the input pipeline 9, and the other inlet of the fifth tee is connected to the air outlet end of the first air inlet pipe 18.
[0047] Further optionally, one inlet of the sixth tee is connected to the pre-adsorption inlet pipe 11, and the pre-adsorption inlet pipe 11 is provided with a programmable valve seven for controlling the input of the pre-adsorbed process gas into the adsorption tower 1; the outlet of the sixth tee is connected to the inlet end of the first inlet pipe 18, and the other inlet of the sixth tee is connected to the outlet end of the second inlet pipe 19.
[0048] Further optionally, one outlet of the seventh tee is connected to the reverse discharge gas pipe 12, and the reverse discharge gas pipe 12 is provided with a programmable valve 8 for controlling the reverse discharge gas discharged from the adsorption tower 1, and the reverse discharge gas pipe 12 is connected to the reverse discharge gas buffer tank; another outlet of the seventh tee is connected to the air inlet end of the second air inlet pipe 19, and the inlet of the seventh tee is connected to the air outlet end of the third air inlet pipe 20.
[0049] Further optionally, one outlet of the eighth tee is connected to the vacuum outlet pipe 13, on which a programmable valve nine is provided, and the vacuum outlet pipe 13 is connected to a vacuum pump for controlling the vacuuming of the adsorption tower 1; another outlet of the eighth tee is connected to the air inlet end of the third air inlet pipe 20, and the inlet of the eighth tee is connected to the air outlet end of the replacement air inlet pipe 14.
[0050] Further optionally, a programmable valve 10 is provided on the replacement air inlet pipe 14 for controlling the input of replacement gas in the adsorption tower 1, and the air inlet end of the replacement air inlet pipe 14 is connected to a replacement air compressor.
[0051] The present invention makes improvements on the output pipe 2 and the input pipe 9 of the adsorption tower 1, and respectively arranges the replacement outlet pipe 8 and the replacement inlet pipe 14 at the outermost sides of the top and the bottom of the adsorption tower 1, so that the intake air of the replacement inlet pipe 14 can pass through the replacement inlet pipe 14, the third inlet pipe 20, the second inlet pipe 19, the first inlet pipe 18 and the input pipe 9 in sequence, and finally enter the adsorption tower 1. When the replacement intake air travels in the above-mentioned pipes, it can also pass into a part of the raw material inlet pipe 10, the pre-adsorption inlet pipe 11, the reverse outlet pipe 12, and the vacuum outlet pipe 13, so that the replacement gas enters each pipe connected to the input pipe 9 to the maximum extent, and the impurity gas is removed to the maximum extent. Similarly, the replacement gas discharged from the adsorption tower 1 can pass through the output pipe 2, the first outlet pipe 15, the second outlet pipe 16 and the third outlet pipe 17 in sequence, and finally be discharged from the replacement outlet pipe 8. When the replacement gas travels in the above-mentioned pipelines, it can also pass into a part of the pre-adsorption outlet pipe 4, the equalizing outlet pipe 5, the equalizing inlet pipe 6, and the adsorption tail gas outlet pipe 7, so that the replacement gas can enter each pipeline connected to the output pipe 2 to the maximum extent, and the impurity gas can be removed to the maximum extent. As mentioned above, the replacement gas channels at the top and bottom of the adsorption tower 1 are both extended, so that the replacement gas can be used to the maximum extent to replace the impurity gas in the upper and lower connected pipelines of the adsorption tower 1, thereby improving the purity of the product CO.
[0052] Optionally, the ratio of the length of the pre-adsorption outlet pipe 4 between the first three-way and the program-controlled valve 21 to the length of the pre-adsorption outlet pipe 4 on the downstream side of the program-controlled valve 21 is 1:(10-20);
[0053] The ratio of the length of the pressure-equalizing air outlet pipe 5 between the second three-way connection and the program-controlled valve 2 to the length of the pressure-equalizing air outlet pipe 5 on the downstream side of the program-controlled valve 2 is 1:(10-20);
[0054] The ratio of the length of the pressure-equalizing air intake pipe 6 between the third three-way and the program-controlled valve 3 to the length of the pressure-equalizing air intake pipe 6 on the upstream side of the program-controlled valve 3 is 1:(10-20);
[0055] The ratio of the length of the adsorption tail gas outlet pipe 7 between the fourth three-way and the program-controlled valve four to the length of the adsorption tail gas outlet pipe 7 on the downstream side of the program-controlled valve four is 1:(10-20).
[0056] Optionally, the ratio of the length of the raw material air inlet pipe 10 between the fifth three-way connection and the program-controlled valve 6 to the length of the raw material air inlet pipe 10 on the upstream side of the program-controlled valve 6 is 1:(10-20);
[0057] The ratio of the length of the pre-adsorption air intake pipe 11 between the sixth three-way and the program-controlled valve 7 to the length of the pre-adsorption air intake pipe 11 on the upstream side of the program-controlled valve 7 is 1:(10-20);
[0058] The ratio of the length of the reverse exhaust pipe 12 between the seventh three-way valve and the program-controlled valve 8 to the length of the reverse exhaust pipe 12 on the downstream side of the program-controlled valve 8 is 1:(10-20);
[0059] The ratio of the length of the vacuum outlet pipe 13 between the eighth three-way and the program-controlled valve nine to the length of the vacuum outlet pipe 13 on the downstream side of the program-controlled valve nine is 1:(10-20).
[0060] The present invention places the above-mentioned program-controlled valves close to their corresponding three-way components, thereby shortening the amount of various process gases upstream or downstream of each program-controlled valve as much as possible and reducing the use of replacement gas.
[0061] The adsorption tower is a conventional vertical adsorption tower in the art, and the interior of the adsorption tower is filled with conventional fillers for adsorbing CO, such as 5A molecular sieve.
[0062] The method of separating and extracting CO by adsorption tower is:
[0063] (1) Adsorption: The raw gas is fed into the bottom of the adsorption tower through the raw gas inlet pipe. The CO in the raw gas is adsorbed by the adsorbent, and the remaining gas is discharged from the adsorption tail gas outlet pipe connected to the top of the adsorption tower;
[0064] (2) Pressure equalization: After the adsorption tail gas is discharged, the adsorption tower is connected to another auxiliary adsorption tower that has completed regeneration and is in a low-pressure state through a pressure equalization outlet pipe. The pressure of the adsorption tower is reduced, which can discharge the impurity gas in the dead space in the adsorption tower and increase the pressure of the auxiliary adsorption tower to recover mechanical energy;
[0065] (3) Replacement: Part of the product CO is introduced into the adsorption tower through the replacement inlet pipe to further replace the impurity gas in the dead space in the adsorption tower, so that the adsorbent bed space is filled with high concentration of CO;
[0066] (4) Reverse discharge: After the replacement is completed, the reverse discharge valve is opened, and the CO product gas enters the reverse discharge buffer tank in the opposite direction of adsorption. The pressure of the adsorption tower drops to normal pressure after the reverse discharge step;
[0067] (5) Vacuuming: After the inversion is completed, in order to completely regenerate the adsorbent, the adsorption tower is evacuated in the opposite direction of the adsorption direction using a vacuum pump to completely desorb the adsorbed CO.
[0068] According to the actual test results of industrial equipment, when the hydrogen content in the raw gas is about 60%, the hydrogen content in the CO product gas of the 5A molecular sieve process is about 20,000 ppm, and the hydrogen content in the CO product gas of the copper-loaded molecular sieve process is about 1,000 ppm or less.
Claims
1. A system for purifying CO by pressure swing adsorption, It is characterized in that It includes an adsorption tower, the top of which is provided with an output pipeline, and the output pipeline is provided with a control valve for controlling the gas in the output adsorption tower; the outlet side of the output pipeline is sequentially connected in parallel with a pre-adsorption outlet pipe, a pressure-equalizing outlet pipe, a pressure-equalizing inlet pipe, an adsorption tail gas outlet pipe and a replacement outlet pipe from the inside to the outside, and the replacement outlet pipe is located at the outermost layer, so that the replacement gas in the adsorption tower can be discharged after passing through the complete output pipeline; An input pipe is provided at the bottom of the adsorption tower for inputting gas into the adsorption tower; the air inlet side of the input pipe is sequentially connected in parallel with a raw material air inlet pipe, a pre-adsorption air inlet pipe, a reverse discharge air outlet pipe, a vacuum air outlet pipe and a replacement air inlet pipe from the inside to the outside, and the replacement air inlet pipe is at the outermost layer, so that the replacement gas can pass through the complete input pipe before entering the adsorption tower.
2. The system for purifying CO by pressure swing adsorption according to claim 1, It is characterized in that A total gas outlet is provided at the top of the adsorption tower, the gas inlet end of the output pipe is connected to the total gas outlet, and the gas outlet side of the output pipe is provided with a first tee, a first gas outlet pipe, a second tee, a second gas outlet pipe, a third tee, a third gas outlet pipe, a fourth tee and a replacement gas outlet pipe from the inside to the outside, and the control valve is arranged between the total gas outlet and the first tee.
3. The system for purifying CO by pressure swing adsorption according to claim 2, It is characterized in that The inlet of the first three-way valve is connected to the gas outlet end of the output pipeline, and one outlet of the first three-way valve is connected to the pre-adsorption gas outlet pipe, on which a program-controlled valve 1 is provided for controlling the discharge of the pre-adsorption gas; the other outlet of the first three-way valve is connected to the gas inlet end of the first gas outlet pipe; The inlet of the second three-way valve is connected to the outlet end of the first outlet pipe, and one outlet of the second three-way valve is connected to the pre-pressure equalization outlet pipe. The pressure equalization outlet pipe is provided with a second program-controlled valve for controlling the discharge of the gas used for pressure equalization in the adsorption tower; the other outlet of the second three-way valve is connected to the inlet end of the second outlet pipe; The inlet of the third three-way valve is connected to the outlet end of the second outlet pipe, and one outlet of the third three-way valve is connected to the pre-equalizing air inlet pipe. The equalizing air inlet pipe is provided with a program-controlled valve three for controlling the input of equalizing air into the adsorption tower; the other outlet of the third three-way valve is connected to the inlet end of the third outlet pipe; The inlet of the fourth tee is connected to the outlet end of the third outlet pipe, and one outlet of the fourth tee is connected to the adsorption exhaust gas outlet pipe. The adsorption exhaust gas outlet pipe is provided with a programmable valve four for controlling the discharge of the adsorption exhaust gas in the adsorption tower, and the adsorption exhaust gas outlet pipe is connected to the adsorption exhaust gas buffer tank; the other outlet of the fourth tee is connected to the inlet end of the replacement outlet pipe.
4. The system for purifying CO by pressure swing adsorption according to claim 1, It is characterized in that A main air inlet is provided at the bottom of the adsorption tower, and the air outlet end of the input pipe is connected to the main air inlet. The air inlet side of the input pipe is provided with a fifth tee, a first air inlet pipe, a sixth tee, a second air inlet pipe, a seventh tee, a third air inlet pipe, an eighth tee and a replacement air inlet pipe from the inside to the outside.
5. The system for purifying CO by pressure swing adsorption according to claim 4, It is characterized in that One inlet of the fifth three-way connection is connected to the raw material inlet pipe, and the raw material inlet pipe is provided with a programmable valve 6 for controlling the input of raw material gas into the adsorption tower; the outlet of the fifth three-way connection is connected to the inlet end of the input pipeline, and the other inlet of the fifth three-way connection is connected to the outlet end of the first inlet pipe; One inlet of the sixth three-way is connected to the pre-adsorption inlet pipe, and the pre-adsorption inlet pipe is provided with a programmable valve 7 for controlling the input of the pre-adsorbed process gas into the adsorption tower; the outlet of the sixth three-way is connected to the inlet end of the first inlet pipe, and the other inlet of the sixth three-way is connected to the outlet end of the second inlet pipe; One outlet of the seventh three-way connection is connected to the reverse discharge gas outlet pipe, on which a program-controlled valve 8 is provided for controlling the reverse discharge gas discharged from the adsorption tower, and the reverse discharge gas outlet pipe is connected to the reverse discharge gas buffer tank; another outlet of the seventh three-way connection is connected to the gas inlet end of the second gas inlet pipe, and the inlet of the seventh three-way connection is connected to the gas outlet end of the third gas inlet pipe; One outlet of the eighth tee is connected to the vacuum outlet pipe, on which a programmable valve nine is provided. The vacuum outlet pipe is connected to a vacuum pump for controlling the vacuuming of the adsorption tower; another outlet of the eighth tee is connected to the air inlet end of the third air inlet pipe, and the inlet of the eighth tee is connected to the air outlet end of the replacement air inlet pipe.
6. The system for purifying CO by pressure swing adsorption according to claim 3, It is characterized in that The ratio of the length of the pre-adsorption outlet pipe between the first three-way connection and the program-controlled valve 1 to the length of the pre-adsorption outlet pipe on the downstream side of the program-controlled valve 1 is 1:(10-20); The ratio of the length of the pressure-equalizing air outlet pipe between the second three-way and the second program-controlled valve to the length of the pressure-equalizing air outlet pipe on the downstream side of the second program-controlled valve is 1:(10-20); The ratio of the length of the pressure-equalizing air intake pipe between the third three-way and the program-controlled valve three to the length of the pressure-equalizing air intake pipe on the upstream side of the program-controlled valve three is 1:(10-20); The ratio of the length of the adsorption exhaust gas outlet pipe between the fourth three-way and the programmable valve four to the length of the adsorption exhaust gas outlet pipe on the downstream side of the programmable valve four is 1:(10-20).
7. The system for purifying CO by pressure swing adsorption according to claim 5, It is characterized in that The ratio of the length of the raw material air inlet pipe between the fifth three-way connection and the program-controlled valve six to the length of the raw material air inlet pipe on the upstream side of the program-controlled valve six is 1:(10-20); The ratio of the length of the pre-adsorption air intake pipe between the sixth three-way and the program-controlled valve seven to the length of the pre-adsorption air intake pipe on the upstream side of the program-controlled valve seven is 1:(10-20); The ratio of the length of the reverse exhaust pipe between the seventh three-way and the program-controlled valve eight to the length of the reverse exhaust pipe on the downstream side of the program-controlled valve eight is 1:(10-20); The ratio of the length of the vacuum outlet pipe between the eighth three-way valve and the program-controlled valve nine to the length of the vacuum outlet pipe on the downstream side of the program-controlled valve nine is 1:(10-20).
