Drainage anti-blocking method for hydrogen-based shaft furnace gas separator

By using a dispersant dosing device and a high-pressure direct cold water valve set in the hydrogen-based vertical furnace gas separator, combined with an automatic control system, the problem of sewage blockage is solved, ensuring the stable production of the vertical furnace and the automatic operation of the equipment.

CN119082391AActive Publication Date: 2024-12-06BAOSTEEL ZHANJIANG IRON & STEEL CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411194384.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-06
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

In the hydrogen-based vertical furnace gas process, the top gas entrains a large amount of dust, causing sewage to deposit at the bottom of the process gas separator, causing blockage of the drainage system and affecting the stable production of the vertical furnace.

Method used

A dispersant dosing device and a high-pressure direct cooling valve set are configured to optimize liquid level adjustment through an automatic control system to reduce scale and sludge settlement in the tower and pipelines, and ensure smooth drainage of the separator.

Benefits of technology

Effectively prevent solid particles from sedimentation and condensation, reduce drainage system blockage, extend equipment maintenance cycle, and realize the automation, cleaning, efficient and stable production of hydrogen-based vertical furnaces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119082391A_ABST
    Figure CN119082391A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of hydrogen-based shaft furnace gas-liquid separation, and discloses a hydrogen-based shaft furnace gas separator drainage anti-blocking method which specifically comprises the following steps: S1, a direct cooling water valve group is mounted at the upper part of a process gas quenching pore plate, and high-pressure direct cooling water is jetted into gas flow through a hole in an inner pipe so as to cool gas; a dosing device is arranged on a direct cooling water supply main pipe, a dispersing agent solution with a certain proportion is injected according to the use amount of direct cooling water, sedimentation and condensation of solid particles in a direct cooling water system in a process gas loop are prevented, a pipeline is protected from being corroded by incrustation, and blockage of a separator drainage system is reduced; according to the method, the drain valve group of the process gas separator is matched with a corresponding automatic control program, smooth drainage of the separator is automatically achieved through parameter optimization, manpower can be liberated from the tense hydrogen-based shaft furnace smelting process, meanwhile, the stability of shaft furnace smelting can be enhanced, and automation of hydrogen-based shaft furnace smelting is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of hydrogen-based vertical furnace gas-liquid separation, and more specifically discloses a method for preventing drainage and blocking of a hydrogen-based vertical furnace gas separator. Background Art

[0002] In the hydrogen-based vertical furnace gas process, high-temperature and high-pressure reducing gas is introduced into the vertical furnace gas chamber in the middle of the vertical furnace. The reducing gas reacts with the oxidized pellets in the vertical furnace, and the gas discharged from the top of the vertical furnace is called top gas. The top gas leaving the vertical furnace enters the top gas heat exchanger to recover heat. The gas leaving the top gas heat exchanger is called process gas, which enters the process gas quenching orifice plate for water spray washing, and then enters the process gas venturi for acceleration. The acceleration will fully dissolve the solid particles entrained in the gas in the small water droplets in the gas.

[0003] The accelerated process gas enters the process gas separator to separate the liquid and dust entrained in the gas. At the bottom of the separator, the dust particles remain suspended in water; clean hot water is added to the conical part of the container to ensure that the solids do not settle on the container wall.

[0004] In the existing vertical furnace production process, the top gas carries a lot of dust. After being washed by direct cooling water jets and accelerated separation, solid particles are entrained in the liquid flow. The sewage is collected in the cone section of the process gas separator and discharged back to the direct cooling water pool through the bottom drainage valve group for recycling. Due to the large dust content in the sewage, sludge is easy to settle and accumulate at the bottom of the separator, blocking pipes and valves, which is not conducive to the smooth operation of the drainage system and even causes the vertical furnace to shut down. Summary of the invention

[0005] The present invention provides a method for preventing drainage and blocking of a hydrogen-based vertical furnace gas separator, which can solve the problems raised in the above-mentioned background technology.

[0006] To solve the above technical problems, according to one aspect of the present invention, more specifically, a method for preventing drainage and blocking of a hydrogen-based vertical furnace gas separator includes configuring a dispersant dosing device, setting a process water valve group, reducing scaling and sludge sedimentation inside the tower and pipeline, configuring an automatic control system for the process water valve group, achieving smooth drainage of the separator through parameter optimization, and maintaining stable production of the hydrogen-based vertical furnace, specifically including the following steps:

[0007] S1. A direct cooling water valve group is installed on the upper part of the process gas quenching orifice plate. High-pressure direct cooling water is sprayed into the gas flow through the holes on the inner tube to cool the gas. A dosing device is installed on the direct cooling water supply main pipe. A certain proportion of dispersant solution is injected according to the direct cooling water usage to prevent the sedimentation and agglomeration of solid particles in the direct cooling water system in the process gas loop, protect the pipeline from scale erosion, and reduce the blockage of the separator drainage system;

[0008] S2. Two flushing water tangential inlets are set in the conical part of the process gas separator. A set of high-pressure direct cooling water valves including a cut-off valve YSV120401 and a flow regulating valve FV120401 are set. The conical part of the process gas separator is continuously flushed by tangentially injecting 10-20m3 / h of direct cooling water to prevent solids and sludge from settling and getting stuck on the bottom cone. The washed process gas and water are discharged from the lower pipe;

[0009] S3. Four interfaces are installed at the bottom of the process gas separator for liquid level transmitters, one for control and three for SIS safety system, namely LT120402 and LIT120401A / B / C. The liquid level of the container is controlled by valve LV120402A / B. There is a stop valve YSV120404 controlled by system interlock upstream. When the liquid level regulating valve LV120402A / B is put into use at the same time, LV120402A is the main valve and LV120402B is the auxiliary valve. The opening is adjusted according to the liquid level. At the same time, the LV120402B auxiliary valve is designed with a timed valve opening control program. The drain valve LV120402B is opened to 100% every T hours. The drainage flow is increased to flush the sludge solids accumulated due to the long-term use of the valve to reduce blockage;

[0010] S4. After entering automatic control, set the process gas separator control liquid level parameter LY120401. According to the actual liquid level LV120401 measured by the liquid level gauge at the bottom of the process gas separator during the vertical furnace smelting process, compare the size of LY120401 and LV120401. The automatic program control instruction directly adjusts the opening of the liquid level regulating valve LV120402A / B to achieve process gas separator liquid level adjustment.

[0011] Furthermore, in step S4, the adjustment principle is: when LV120401 is less than LY120401, the opening of the regulating valve LV120402A / B is reduced to LV120401≈LY120401; when LV120401 is greater than LY120401, the opening of the regulating valve LV120402A / B is increased to LV120401≈LV120401.

[0012] Furthermore, in step S4, the determination principle of LV120401≈LY120401 is:

[0013] Let k = (LY120401-LV120401) / LY120401×100%. If the k value is between -10% and 10%, it is determined that LV120401≈LY120401; when LV120401≈LY120401, the opening of the regulating valve LV120402A / B is kept unchanged.

[0014] Furthermore, in step S4, if the k value is not equal to -10% to 10%, the opening of the liquid level regulating valve LV120402A / B is adjusted, and the valve position △h is adjusted each time. After the adjustment, it is maintained for t time, and then the size relationship between LV120401 and LY120401 is continuously determined until the k value is between -10% and 10%;

[0015] Among them, △h is a parameter related to the valve position of the liquid level control valve LV120402A / B. The system selects that the unit of t is s and the unit of △h is %.

[0016] Furthermore, in step S3, T is optimized and set in the automatic control program according to data related to process direct cooling water, and the unit is h.

[0017] Furthermore, in step S4, Δh=0.1%, t=2S.

[0018] The beneficial effects of the method for preventing drainage and blocking of a hydrogen-based vertical furnace gas separator of the present invention are:

[0019] In the present invention, a set of dosing device is provided to prevent the sedimentation and agglomeration of solid particles, protect the pipeline from being corroded by scale, and reduce the blockage of the separator drainage system.

[0020] In the present invention, a set of direct cooling water flushing valve group and bottom drainage control valve group are provided for the tapered part of the separator to realize continuous flushing of the tapered section of the separator and discharge sludge and sewage from the lower container. The bottom drainage valve group controls the liquid level of the separator and switches regularly to reduce the possibility of blockage due to long-term use and extend the equipment maintenance cycle, thereby ensuring the smooth operation of the separator drainage system and maintaining stable production of the hydrogen-based vertical furnace.

[0021] In the present invention, the process gas separator drainage valve group is equipped with a corresponding automatic control program, which automatically realizes smooth drainage of the separator through parameter optimization, can liberate manpower from the tense hydrogen-based vertical furnace smelting process, and at the same time can enhance the stability of vertical furnace smelting, and realize the automation, cleanliness, efficiency and stability of hydrogen-based vertical furnace smelting. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The present invention is further described in detail below with reference to the accompanying drawings and specific implementation methods.

[0023] Figure 1 This is the process flow chart of the process gas separator;

[0024] Figure 2 This is a flow chart of the automatic control method of the process gas separator drain valve group. DETAILED DESCRIPTION

[0025] The present invention will be described in detail below with reference to the accompanying drawings and in combination with embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.

[0026] According to the attached Figure 1-2 , provides a method for preventing drainage and blocking of a hydrogen-based vertical furnace gas separator, including configuring a dispersant dosing device, setting a process water valve group, reducing scaling and sludge sedimentation inside the tower and pipeline, configuring an automatic control system for the process water valve group, achieving smooth drainage of the separator through parameter optimization, and maintaining stable production of the hydrogen-based vertical furnace, characterized in that it specifically includes the following steps:

[0027] S1. A direct cooling water valve group is installed on the upper part of the process gas quenching orifice plate. High-pressure direct cooling water is sprayed into the gas flow through the holes on the inner tube to cool the gas. A dosing device is installed on the direct cooling water supply main pipe. A certain proportion of dispersant solution is injected according to the direct cooling water usage to prevent the sedimentation and agglomeration of solid particles in the direct cooling water system in the process gas loop, protect the pipeline from scale erosion, and reduce the blockage of the separator drainage system;

[0028] S2. Two flushing water tangential inlets are set in the conical part of the process gas separator. A set of high-pressure direct cooling water valves including a cut-off valve YSV120401 and a flow regulating valve FV120401 are set. The conical part of the process gas separator is continuously flushed by tangentially injecting 10-20m3 / h of direct cooling water to prevent solids and sludge from settling and getting stuck on the bottom cone. The washed process gas and water are discharged from the lower pipe;

[0029] S3. Four interfaces are installed at the bottom of the process gas separator for liquid level transmitters, one for control and three for SIS safety system, namely LT120402 and LIT120401A / B / C. The container liquid level is controlled by valve LV120402A / B. There is a stop valve YSV120404 controlled by system interlock upstream. When the liquid level regulating valve LV120402A / B is put into use at the same time, LV120402A is the main valve and LV120402B is the auxiliary valve. The opening is adjusted according to the liquid level. At the same time, LV120402A / B is used as the auxiliary valve. The 2B auxiliary valve is designed with a timed valve opening control program. The drain valve LV120402B is opened to 100% every T hours. The drainage flow is increased to flush the sludge solids accumulated due to long-term use of the valve to reduce blockage. T is optimized and set in the automatic control program according to the data related to the process direct cooling water. The unit is h. The smooth drainage of the separator is automatically achieved through parameter optimization, which can free manpower from the tense hydrogen-based vertical furnace smelting process, and at the same time enhance the stability of the vertical furnace smelting, and realize the automation, cleanliness, efficiency and stability of hydrogen-based vertical furnace smelting.

[0030] S4. After entering the automatic control, set the process gas separator control liquid level parameter LY120401. According to the actual liquid level LV120401 measured by the liquid level gauge at the bottom of the process gas separator during the vertical furnace smelting process, compare the size of LY120401 and LV120401. The automatic program control instruction directly adjusts the opening of the liquid level control valve LV120402A / B to achieve the process gas separator liquid level adjustment. The adjustment principle is: when LV120401 is less than LY120401, reduce the opening of the control valve LV120402A / B to LV120401≈LY120401; when LV120401 is greater than LY120401, increase the opening of the control valve LV120402A / B to LV120401≈LV120401.

[0031] The determination principle of LV120401≈LY120401 is:

[0032] Let k = (LY120401-LV120401) / LY120401×100%. If the k value is between -10% and 10%, it is determined that LV120401≈LY120401. When LV120401≈LY120401, the opening of the regulating valve LV120402A / B is kept unchanged.

[0033] If the k value is not equal to -10% to 10%, adjust the opening of the liquid level control valve LV120402A / B, adjust the valve position △h each time, maintain the time t after adjustment, and then continue to determine the size relationship between LV120401 and LY120401 until the k value is between -10% and 10%;

[0034] Among them, △h is a parameter related to the valve position of the liquid level control valve LV120402A / B. The system selects that the unit of t is s, the unit of △h is %, and △h=0.1%, t=2S.

[0035] The electrical components that appear in this article are all electrical components that exist in reality.

[0036] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by ordinary technicians in this technical field within the essential scope of the present invention also fall within the protection scope of the present invention.

Claims

1. A method for preventing drainage and clogging of a hydrogen-based vertical furnace gas separator, comprising configuring a dispersant dosing device, setting a process water valve group, configuring an automatic control system for the process water valve group, and achieving smooth drainage of the separator through parameter optimization, characterized in that: The specific steps include: S1. A direct cooling water valve group is installed on the upper part of the process gas quenching orifice plate. High-pressure direct cooling water is sprayed into the air flow through the holes on the inner tube. A dosing device is installed on the direct cooling water supply main pipe. A certain proportion of dispersant solution is injected according to the direct cooling water usage to prevent the sedimentation and agglomeration of solid particles in the direct cooling water system in the process gas loop. S2. Two flushing water tangential inlets are set in the conical part of the process gas separator. A set of high-pressure direct cooling water valves including a cut-off valve YSV120401 and a flow regulating valve FV120401 are set. The conical part of the process gas separator is continuously flushed by tangentially injecting 10-20m3 / h of direct cooling water to prevent solids and sludge from settling and getting stuck on the bottom cone. The washed process gas and water are discharged from the lower pipe; S3. Four interfaces are installed at the bottom of the process gas separator for liquid level transmitters, one for control and three for SIS safety system, namely LT120402 and LIT120401A / B / C. The liquid level of the container is controlled by valve LV120402A / B. There is a stop valve YSV120404 controlled by system interlock upstream. When the liquid level regulating valve LV120402A / B is put into use at the same time, LV120402A is the main valve and LV120402B is the auxiliary valve. The opening is adjusted according to the liquid level. At the same time, the LV120402B auxiliary valve is designed with a timed valve opening control program. The drain valve LV120402B is opened to 100% every T hours to flush the sludge solids accumulated due to the long-term use of the valve by increasing the drainage flow; S4. After entering automatic control, set the process gas separator control liquid level parameter LY120401. According to the actual liquid level LV120401 measured by the liquid level gauge at the bottom of the process gas separator during the vertical furnace smelting process, compare the size of LY120401 and LV120401. The automatic program control instruction directly adjusts the opening of the liquid level regulating valve LV120402A / B to achieve process gas separator liquid level adjustment.

2. A method for preventing drainage and blocking of a hydrogen-based vertical furnace gas separator according to claim 1, characterized in that: In step S4, the adjustment principle is: when LV120401 is less than LY120401, the opening of the regulating valve LV120402A / B is reduced to LV120401≈LY120401; when LV120401 is greater than LY120401, the opening of the regulating valve LV120402A / B is increased to LV120401≈LV120401.

3. A method for preventing drainage and blocking of a hydrogen-based vertical furnace gas separator according to claim 2, characterized in that: In step S4, the determination principle of LV120401≈LY120401 is: Let k = (LY120401-LV120401) / LY120401×100%. If the k value is between -10% and 10%, it is determined that LV120401≈LY120401; when LV120401≈LY120401, the opening of the regulating valve LV120402A / B is kept unchanged.

4. A method for preventing drainage and blocking of a hydrogen-based vertical furnace gas separator according to claim 3, characterized in that: In step S4, if the k value is not equal to -10% to 10%, the opening of the liquid level regulating valve LV120402A / B is adjusted, and the valve position △h is adjusted each time. After the adjustment, it is maintained for t time, and then the size relationship between LV120401 and LY120401 is continuously determined until the k value is between -10% and 10%; Among them, △h is a parameter related to the valve position of the liquid level control valve LV120402A / B. The system selects that the unit of t is s and the unit of △h is %.

5. The method for preventing drainage and blocking of a hydrogen-based vertical furnace gas separator according to claim 1, characterized in that: In step S3, T is optimized and set in the automatic control program according to data related to process direct cooling water, and the unit is h.

6. A method for preventing drainage and blocking of a hydrogen-based vertical furnace gas separator according to claim 4, characterized in that: In the step S4, Δh=0.1%, t=2S.

Citation Information

Patent Citations

  • Method for removing salt crystallization blockage of natural gas pipeline

    CN114147011A

  • Raw material gas pressurization system and control method thereof

    CN117701311A

  • Unattended gas-gathering station separator sewage discharge system

    CN204312995U

  • Piping washing device

    JP1999182991A

  • Air diffuser and flushing method thereof

    US20030001295A1