Mixing-like tower frame type foundation device and preparation method thereof
By adopting a mixed tower-like tower-type foundation device based on the wind farm fan, the performance of beams and tower steel pipes is used to reduce the foundation diameter, the problems of medium and high costs and difficulty in land acquisition are solved, and efficient engineering transformation and Resource utilization.
Patent Information
- Application Number
- CN202411409416.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-12-06
AI Technical Summary
In the existing wind farm fan renovation project, a large amount of original foundation needs to be demolished, resulting in solid waste disposal problems and high project costs. It is difficult to implement the "big instead of small" project in areas restricted by land acquisition.
Using a tower-like base device for mixing towers, the top table, bottom concealed beam and tower steel pipe are installed on the bottom foundation, and the shear performance of the beam and the bending moment reduction function of the tower steel pipe are used to reduce the foundation diameter and reduce concrete. and reduce project costs.
It effectively reduces project costs and construction periods, and realizes the transformation of the original small unit fan into a large unit fan, solves the application problems in areas with restricted land acquisition, and saves about 50% of the concrete usage.
Smart Images

Figure CN119083481A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of wind tower foundations, and in particular to a hybrid tower frame type foundation device and a preparation method thereof. Background Art
[0002] At present, in wind farm wind turbine renovation projects, the basic method for existing wind turbine foundations is to demolish the original foundation and build a new foundation. The existing technology requires the demolition of a large number of original foundations, involving the problem of solid waste disposal of the original foundations; the existing technology demolishes the original foundation and builds a new foundation, and a large number of original foundations, roads and other facilities are abandoned, which is not economical, and the project cost and construction period are unfavorable.
[0003] When using conventional technology to transform a small unit into a large unit wind turbine, the foundation diameter often exceeds the original small unit wind turbine red line range and requires re-expropriation of land. Re-expropriation of land for the original wind farm is generally difficult, especially for the original small unit wind turbines in some scenic areas, where the existing wind turbine unit "replacing small with large" project is difficult to implement. Therefore, it is necessary to design a wind tower foundation that can make full use of the original foundation, so that some wind turbine unit "replacing small with large" projects can be possible instead of impossible. Summary of the invention
[0004] The purpose of the present invention is to provide a quasi-hybrid tower frame type foundation device and a preparation method thereof. The quasi-hybrid tower frame type foundation can fully utilize the shear performance of the beam and the moment reduction function of the tower frame steel pipe, which can greatly reduce the concrete volume of the foundation and effectively reduce the project cost and construction period, and has a greater application effect in areas with restricted land acquisition.
[0005] According to one purpose of the present invention, the present invention provides a hybrid tower frame type foundation device, including a bottom foundation, a top platform, a bottom hidden beam and a tower frame steel pipe, the top platform is cast on the top of the bottom foundation, the bottom hidden beam is arranged circumferentially around the bottom foundation, a tower is fixed on the top of the top platform, and both ends of the tower frame steel pipe are respectively hingedly connected to the tower and the bottom hidden beam.
[0006] Furthermore, there are multiple tower steel pipes, and the multiple tower steel pipes are evenly arranged around the tower.
[0007] Furthermore, a new foundation is provided between the bottom foundation and the bottom hidden beam, and the new foundation is provided around the bottom foundation.
[0008] Furthermore, annular reinforcement and radial reinforcement are arranged on the inner top of the newly-established foundation, and the radial reinforcement is anchored into the inner part of the top platform hidden beam.
[0009] Furthermore, the bottom foundation is a trapezoidal structure, and the bottom of the bottom foundation is connected to the foundation.
[0010] Furthermore, additional reinforcement is provided between the top platform and the bottom foundation, the additional reinforcement is connected to the reinforcement in the bottom foundation, and the top of the additional reinforcement is cast inside the top platform.
[0011] Furthermore, a plurality of top platform hidden beams are arranged in a circular shape around the periphery of the top platform, and steel bars are arranged inside the top platform hidden beams. The steel bars inside the top platform hidden beams are fixedly connected to the anchor cage steel bars inside the bottom foundation.
[0012] Furthermore, a prestressed anchor bolt is provided inside the top platform hidden beam, the bottom of the prestressed anchor bolt is anchored into the bottom foundation, and the tower is fixedly connected to the prestressed anchor bolt.
[0013] Furthermore, a prestressed anchor cable and anchor bolt combination is provided at the bottom of the bottom concealed beam, and the prestressed anchor cable and anchor bolt combination is anchored and connected to the ground.
[0014] Furthermore, the bottom of the bottom hidden beam is provided with an added arm.
[0015] According to another object of the present invention, the present invention provides a method for preparing the above-mentioned mixed tower tower type foundation device, comprising the following steps:
[0016] S1. Roughen the outer surface of the bottom foundation, set additional steel bars on the bottom foundation, and weld the additional steel bars to the steel bars in the bottom foundation;
[0017] S2, pouring the top platform on the top of the bottom foundation;
[0018] S3. Set a bottom hidden beam around the outside of the bottom foundation;
[0019] S4. The tower is fixedly installed on the top platform, the top of the tower steel pipe is hingedly connected to the tower, and the bottom of the tower steel pipe is hingedly connected to the bottom hidden beam.
[0020] Furthermore, a new foundation is arranged on the surface of the bottom foundation, and the new foundation is connected to the bottom foundation and the bottom hidden beam through steel bars.
[0021] The technical solution of the present invention is to arrange a top platform on the bottom foundation, arrange a bottom hidden beam on the outside of the bottom foundation, install the tower on the top platform, connect the tower and the bottom hidden beam through a tower steel pipe, and adopt a quasi-hybrid tower frame foundation. The shear performance of the beam and the moment reduction function of the tower steel pipe can be fully utilized to reduce the foundation diameter, which can greatly reduce the concrete volume of the foundation, and effectively reduce the project cost and construction period, making it possible to transform the original small-unit fan into a large-unit fan in areas with restricted land acquisition. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0023] Figure 1 It is a structural schematic diagram of an embodiment of the present invention;
[0024] Figure 2 A top view of an embodiment of the present invention;
[0025] In the figure: 1. Bottom foundation; 2. Bottom hidden beam; 3. Tower steel pipe; 4. New foundation; 5. Top platform; 6. Top platform hidden beam; 7. Prestressed anchor bolts; 8. Tower tube; 9: Add haunch. DETAILED DESCRIPTION
[0026] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0028] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0029] Example 1
[0030] like Figure 1-Figure 2 As shown,
[0031] A quasi-hybrid tower frame foundation device comprises a bottom foundation 1, a top platform 5, a newly-established foundation 4 and a bottom hidden beam 2. The bottom foundation 1 is a foundation fixed on the ground, the bottom foundation 1 is an original platform-shaped foundation, and the bottom of the bottom foundation 1 is connected to the foundation.
[0032] The top platform 5 is cast on the top of the bottom foundation 1. Before casting the top platform 5, additional steel bars are set in the bottom foundation 1. The additional steel bars are welded and connected to the steel bars in the bottom foundation 1. The additional steel bars are exposed on the upper surface of the bottom foundation 1. When casting the top platform 5, the additional steel bars are cast inside the top platform 5.
[0033] A top platform hidden beam 6 is arranged in a ring around the top platform 5 . The top platform hidden beam 6 is provided with steel bars. The steel bars inside the top platform hidden beam 6 are fixedly connected to the anchor cage steel bars in the bottom foundation 1 .
[0034] A prestressed anchor bolt 7 is arranged inside the top platform hidden beam 6, and the bottom of the prestressed anchor bolt 7 is anchored inside the bottom foundation 1. The height of the top platform hidden beam 6 is determined according to the length of the prestressed anchor bolt 7, and the top platform hidden beam 6 is generally more than 1 meter higher than the outdoor floor. The tower 8 is arranged on the top platform 5 and the tower 8 is fixedly connected to the prestressed anchor bolt 7.
[0035] A bottom concealed beam 2 is circumferentially arranged on the outer side of the bottom foundation 1, and the bottom concealed beam 2 is connected to the bottom foundation 1 through steel bars to ensure overall rigidity; the bottom of the bottom concealed beam 2 is connected to the foundation.
[0036] The bottom of the bottom hidden beam 2 is provided with an added arm 9, the height and inclination angle of the added arm 9 are determined according to calculation, and the height of the added arm 9 is generally between 0mm-1500mm.
[0037] A new foundation 4 is provided between the bottom foundation 1 and the bottom hidden beam 2, and the new foundation 4 is provided around the bottom foundation 1. Circumferential steel bars and radial steel bars are provided on the inner top of the new foundation 4, and the radial steel bars are anchored in the top platform hidden beam 6; the new foundation 4 is not less than 500mm lower than the outdoor floor, so that the surface is covered with green plants after the overall foundation in-situ transformation is completed; the new foundation 4 is connected to the bottom foundation 1 and the bottom hidden beam 2 through steel bars.
[0038] A plurality of tower steel pipes 3 are also provided between the tower 8 and the bottom hidden beam 2, and the plurality of tower steel pipes 3 are evenly arranged along the circumferential direction of the bottom foundation 1. The top of the tower steel pipe 3 is hingedly connected to the tower 8, and the bottom of the tower steel pipe 3 is hingedly connected to the bottom hidden beam 2.
[0039] The present invention is used in a wind turbine reconstruction project in a wind farm, and is used to reconstruct an existing wind turbine foundation and to reuse the existing bottom foundation 1 .
[0040] The preparation method of the above-mentioned mixed tower tower type foundation device comprises the following steps:
[0041] 1. Roughen the outer surface of the existing bottom foundation 1, and set new steel bars on the bottom foundation 1. The new steel bars are welded to the steel bars in the original bottom foundation 1. The new steel bars are used to extend into the new foundation so that the new and old foundations are stressed together to ensure the overall rigidity of the new and old foundations;
[0042] 2. Cast the top platform 5 on the top of the original truncated cone-shaped bottom foundation 1, cast the newly added steel bars inside the top platform 5, set the top platform hidden beam 6 in the circumferential direction around the top platform 5, and the steel bars of the top platform hidden beam 6 are reliably connected with the steel bars of the anchor cage in the bottom foundation 1; set the prestressed anchor bolt 7 of the new unit in the top platform hidden beam 6, and the tower 8 is set on the top platform 5 and the tower 8 is fixedly connected with the prestressed anchor bolt 7; the prestressed anchor bolt 7 is anchored into the original bottom foundation 1; the height of the top platform hidden beam 6 is determined according to the length of the prestressed anchor bolt 7 of the new unit, and the top platform hidden beam 6 is generally more than 1 meter higher than the outdoor floor;
[0043] 3. A bottom hidden beam 2 is arranged in a circumferential direction outside the bottom foundation 1. The bottom hidden beam 2 is connected to the bottom foundation 1 through steel bars to ensure the overall rigidity;
[0044] The bottom hidden beam 2 is lower than the outdoor floor, and the bottom hidden beam 2 is higher than the newly established foundation 4 to prevent the prestressed anchor bolts and anchor cables in the bottom hidden beam 2 from wading; the bottom hidden beam 2 is provided with a prestressed anchor cable and anchor bolt combination, the number and combination of the prestressed anchor cable and anchor bolt combination are determined according to calculation, and a symmetrical arrangement is required; the bottom of the bottom hidden beam 2 is provided with an axil 9, the height and inclination of the axil 9 are determined according to calculation, and the height of the axil 9 is generally between 0mm-1500mm;
[0045] 4. A new foundation 4 is set on the surface of the original truncated cone-shaped bottom foundation 1. The top of the new foundation 4 is provided with circumferential steel bars and radial steel bars for stress, and the radial steel bars are anchored in the top platform hidden beam 6. The new foundation 4 is not less than 500mm lower than the outdoor floor, so that the surface can be covered with green plants after the overall foundation in-situ transformation is completed. The new foundation 4 is connected to the bottom foundation 1 and the bottom hidden beam 2 through steel bars.
[0046] 5. A tower steel pipe 3 is arranged between the top of the bottom hidden beam 2 and the tower 8. The top of the tower steel pipe 3 is hingedly connected to the tower 8, and the bottom of the tower steel pipe 3 is hingedly connected to the bottom hidden beam 2.
[0047] For example, a 1.5MW wind turbine is upgraded to a 6.25MW unit. The original foundation is a 12-meter-diameter truncated cone gravity foundation, rock foundation, and the red line width is 14 meters. The original foundation steel and concrete consumption is about 300m 3 .
[0048] If the traditional technology of dismantling the new reduced or enlarged section is adopted, the wind load bending moment of the 1.5MW unit after upgrading to a 6.25MW unit will be more than three times the original bending moment of 46000kNm, the new foundation diameter will be about 22 meters, and the amount of concrete will be about 800m 3 , and the new foundation exceeds the original foundation red line, conventional technology will not be able to solve the problem of restricted land acquisition.
[0049] By adopting the technical solution of the present invention, the width of the new foundation hidden beam is only 0.8m, the diameter of the new foundation is about 13.6m, and the amount of reinforced concrete used for the new foundation is about 300m 3 , saving 400m3 of reinforced concrete compared with conventional technology 3 , saving about 50% of the engineering workload, with obvious results.
[0050] The present invention takes into account that the wind tower foundation is subjected to the dynamic effect of wind load for a long time, and the foundation is mainly controlled by the bending moment of wind load. The bending moment of the new unit is generally more than twice the bending moment of the original foundation. By adopting the conventional method of expanding the cross-section, the foundation will be larger than the existing foundation. By adopting a quasi-hybrid tower frame foundation, the shear performance of the beam and the bending moment reduction function of the tower frame steel pipe can be fully utilized to reduce the foundation diameter, which can greatly reduce the concrete volume of the foundation, and effectively reduce the project cost and construction period, making it possible to transform the original small unit fan into a large unit fan in areas with restricted land acquisition.
[0051] The present invention aims at the rock foundation conditions, innovates the reinforcement structure form and studies the relevant key nodes and material properties, forming a universal in-situ transformation technology for wind tower foundations, which can extend the life and resource utilization of existing foundations and facilities to the greatest extent, and provide technical guarantee for the acquisition and implementation of future wind power upgrade and transformation projects.
[0052] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A quasi-hybrid tower frame type foundation device, characterized in that: It includes a bottom foundation, a top platform, a bottom hidden beam and a tower steel pipe. The top platform is cast on the top of the bottom foundation, the bottom hidden beam is circumferentially arranged around the bottom foundation, a tower is fixed on the top of the top platform, and both ends of the tower steel pipe are hingedly connected to the tower and the bottom hidden beam respectively.
2. The quasi-hybrid tower frame type foundation device according to claim 1, characterized in that: There are multiple tower steel pipes, and the multiple tower steel pipes are evenly arranged around the tower.
3. The quasi-hybrid tower frame type foundation device according to claim 1, characterized in that: A new foundation is arranged between the bottom foundation and the bottom hidden beam, and the new foundation is arranged around the bottom foundation.
4. The quasi-hybrid tower frame type foundation device according to claim 1, characterized in that: New reinforcement is provided between the top platform and the bottom foundation, the new reinforcement is connected to the reinforcement in the bottom foundation, and the top of the new reinforcement is cast inside the top platform.
5. The quasi-hybrid tower frame type foundation device according to claim 3, characterized in that: A plurality of top platform hidden beams are arranged in a circular shape around the periphery of the top platform, and the top platform hidden beams are more than 1 meter higher than the outdoor floor.
6. The quasi-hybrid tower frame type foundation device according to claim 5 is characterized in that ,,Reinforcements are arranged inside the top platform hidden beam, and the reinforcements inside the top platform hidden beam are fixedly connected to the anchor cage reinforcements inside the bottom foundation.
7. The quasi-hybrid tower frame type foundation device according to claim 6, characterized in that: Circumferential steel bars and radial steel bars are arranged on the inner top of the newly-established foundation, and the radial steel bars are anchored into the inner part of the top platform hidden beam.
8. The quasi-hybrid tower frame type foundation device according to claim 1, characterized in that: The bottom of the bottom hidden beam is provided with an armpit, and the height of the armpit is between 0mm-1500mm.
9. The method for preparing a quasi-hybrid tower frame type foundation device according to claim 1, characterized in that: The steps include: S1. Roughen the outer surface of the bottom foundation, set additional steel bars on the bottom foundation, and weld the additional steel bars to the steel bars in the bottom foundation; S2, pouring the top platform on the top of the bottom foundation; S3. Set a bottom hidden beam around the outside of the bottom foundation; S4. The tower is fixedly installed on the top platform, the top of the tower steel pipe is hingedly connected to the tower, and the bottom of the tower steel pipe is hingedly connected to the bottom hidden beam.
10. The method for preparing a quasi-hybrid tower frame type foundation device according to claim 9, characterized in that: A new foundation is set on the surface of the bottom foundation, and the new foundation is connected to the bottom foundation and the bottom hidden beam through steel bars.