Construction method of retaining structure of support pile-basement exterior wall co-structure
By setting up a plain concrete layer and an elastic isolation layer between the pile anchor support system and the basement exterior wall, the soil pressure transmission is optimized, and the soil retaining problem in traditional technology is solved, and the stability and waterproof continuity of the basement exterior wall are achieved. Reduced construction costs and environmental pollution.
Patent Information
- Application Number
- CN202411136689.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-12-06
AI Technical Summary
The traditional pile anchor support system and the soil retaining problems of the basement exterior wall during construction and use have resulted in large thickness, large reinforcement, and high construction organization and quality control requirements, which pose a risk of waterproof failure and environmental pollution.
A retaining structure construction method is adopted for co-structured supporting piles and basement exterior walls. By excavating foundation pits, building pile anchor support system, pouring foundation pit bottom cushion layer and foundation raft slab, combined with the plain concrete layer Pouring and backfill, use finite element analysis to determine whether to set up an elastic isolation layer, optimize soil transmission pressure, and reduce the bending moment and reinforcement requirements of basement exterior walls.
The stability and waterproof continuity of the retaining structure are achieved, construction costs and environmental pollution are reduced, construction efficiency and waterproof quality are improved, and excessive thickness and reinforcement of the basement exterior wall are avoided.
Smart Images

Figure CN119083486A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a construction method for a retaining structure of a supporting pile and a basement outer wall. Background Art
[0002] There are two traditional technical approaches to the soil retaining problem between the pile-anchor support system and the basement outer wall during construction and use: 1. The basement outer wall and the support system are set separately; 2. The underground continuous wall "two walls in one" system. The disadvantages of the traditional technical approach are: (1) There is no relationship between the basement outer wall and the support system. The support system is only used as a temporary soil retaining measure during construction. After the soil is backfilled, the soil retaining effect of the support system is not considered. All soil pressure must be borne independently by the basement outer wall, making the basement outer wall thick and heavily reinforced; (2) "Two walls in one" has high requirements for construction organization and quality control, high requirements for joint anti-seepage performance, and the treatment of abandoned soil and waste mud increases project costs and causes environmental pollution.
[0003] The invention patent with application number CN201510162771.5 discloses a construction method for a permanent support system in which the basement roof and support piles work together. The support piles and the basement outer wall are connected by permanent outriggers, and the temporary support piles are changed into permanent support piles. The outriggers are positioned in the roof plane. The outriggers of the foundation raft are plain concrete supports, and the outriggers of each floor are reinforced concrete supports. The space between the outriggers of each layer is filled with backfill soil. The foundation bottom plate elevation needs to be equipped with outriggers of plain concrete supports. Except for the bottom plate layer, the remaining outriggers are reinforced concrete supports, which require formwork and steel bar binding. The project is large in quantity, the construction period is long, and the construction cost is high. The outriggers are directly connected to the basement, forming a large number of protrusions on the basement outer wall. The waterproofing ends are discontinuous, and weak surfaces are formed at the waterproofing ends, which poses a risk of waterproofing failure. Summary of the invention
[0004] The purpose of the present invention is to provide a method for constructing a retaining structure of supporting piles and basement outer walls, which solves the retaining problem of the pile-anchor supporting system and the basement outer wall during construction and use.
[0005] To achieve the above object, the present invention adopts the following technical solutions:
[0006] A method for constructing a retaining structure of supporting piles and basement outer wall, comprising the following steps:
[0007] Step 1: According to the conventional construction method, carry out foundation pit excavation, pile anchor support system construction, foundation pit bottom cushion construction, foundation raft slab and basement exterior wall pouring construction and bottom waterproof membrane construction in sequence;
[0008] Step 2: Backfill the bottom fertilizer tank to the position below the bottom elevation of the basement top plate;
[0009] Step 3: Casting of the first layer of plain concrete: Lay the waterproofing membrane to the position above the top elevation of the first layer of top plate, then backfill the first layer of fertilizer trough to the position below the bottom elevation of the first layer of top plate, determine the thickness and elevation of the first layer of plain concrete, and then cast the first layer of plain concrete corresponding to the first layer of top plate on the backfill soil;
[0010] Step 4: pouring the i-th (i≥2) plain concrete layer: repeat step 3 until the waterproof layer of the basement exterior wall extends to the top of the basement roof and is closed with the waterproof layer of the basement roof, and each plain concrete layer is set one by one with each basement floor slab;
[0011] Step 5: Pouring the top layer of plain concrete: backfill the top fertilizer trough to the position below the top elevation of the basement roof, and reserve the thickness of the plain concrete layer; pour the plain concrete layer corresponding to the basement roof so that its top elevation is the same as the top elevation of the basement roof.
[0012] Preferably, after the i-th plain concrete layer is poured and reaches the design strength, if there are anchor rods within the elevation range of the i+1-th floor, the anchor rods within this elevation range are removed.
[0013] Preferably, the fertilizer trough is backfilled with graded sand and gravel, sandy soil, ash soil or fluidized solidified soil and compacted in layers; when anti-floating requirements are met, weakly permeable materials are used for backfilling.
[0014] Preferably, in step 4, each of the plain concrete layers is arranged in one-to-one correspondence with every other floor slab of the basement.
[0015] Preferably, in the steps 2 to 4, an elastic isolation layer is firstly arranged in the fertilizer trough of each layer close to one side of the outer wall of the basement, and then the fertilizer trough is backfilled.
[0016] Preferably, the elastic isolation layer is a foam polystyrene board or a rubber pad with a thickness of 80 to 150 mm, and the top and bottom elevations of each elastic isolation layer are consistent with the height of the backfill soil of that layer.
[0017] Preferably, whether the elastic isolation layer is provided is determined based on the following:
[0018] S0, establish a finite element analysis model without setting an elastic isolation layer: establish a finite element analysis model including the basement exterior wall, basement floor, backfill soil, plain concrete layer and support piles;
[0019] S1, set material parameters, boundary conditions, load conditions and analysis conditions according to the actual project situation, and carry out finite element analysis;
[0020] S2, extract the settlement difference between the plain concrete layer and the basement outer wall and the bending moment of the basement outer wall, and comprehensively judge whether an elastic isolation layer is needed: if there is a settlement difference between the plain concrete layer and the basement outer wall, or the bending moment of the basement outer wall exceeds the design limit, an elastic isolation layer is set;
[0021] S3, establishing a finite element analysis model with an elastic isolation layer: on the basis of a model without an elastic isolation layer, an elastic isolation layer is additionally established between the backfill soil and the basement outer wall;
[0022] S4, repeat step S1;
[0023] S5, extract the settlement difference between the plain concrete layer and the basement outer wall and the bending moment of the basement outer wall, and comprehensively judge the rationality of the setting parameters of the elastic isolation layer: if there is a settlement difference between the plain concrete layer and the basement outer wall, or the bending moment of the basement outer wall exceeds the design limit, increase the thickness of the elastic isolation layer, or reduce the elastic modulus of the elastic isolation layer;
[0024] S6, extract the axial force of the plain concrete layer, the bending moment and shear force of the basement outer wall and supporting piles to carry out corresponding component design to determine the material, thickness and reinforcement of each part.
[0025] Preferably, in the S0, the side faces of the fill layer, the side faces of the plain concrete layer, the side faces of the basement outer wall and the side faces of the support piles are all modeled in a non-shared node manner, and a friction coefficient is set between the contact surfaces formed by the contact between the above-mentioned two side faces to consider the sliding friction behavior between the contact surfaces of the side faces, and the remaining faces are modeled in a common node manner.
[0026] Preferably, in S3, the side surfaces of the elastic isolation layer are modeled in a non-shared node manner with the side surfaces of the fill layer and the side surfaces of the basement outer wall, and a friction coefficient is set between the contact surfaces formed by the contact between the above-mentioned side surfaces, and the top and bottom surfaces of the elastic isolation layer are modeled in a shared node manner with the plain concrete layer.
[0027] In the present invention, the retaining structure is composed of a pile-anchor system, a basement outer wall and a filling layer therebetween. The filling layer is a fill layer and a plain concrete layer. The plain concrete layer is arranged corresponding to the top plate elevation. There is no steel bar connection between the plain concrete layer and the supporting piles and the retaining wall. The waterproofing is completely and continuously laid on the basement outer wall surface. The plain concrete layer only needs to be arranged on the bottom plate of the floor where the lowest anchor rod is located and on the top plate above.
[0028] In order to give full play to the working performance of anchor rods, the anchor rods of conventional pile-anchor systems are set at an upper height. When the anchor rods are removed, the soil pressure outside the pile-anchor system is directly transmitted to the basement top plate closest to it through the plain concrete layer. Therefore, the plain concrete layer can be set only on the bottom plate of the floor where the anchor rods are located and the floors above, and there is no need to set a plain concrete layer on the bottom floor without anchor rods.
[0029] The plain concrete layer corresponding to the basement top slab is mainly under compression, so no reinforcement is required.
[0030] Since the plain concrete layer is surrounded by the lower backfill soil, anchor piles and basement outer walls, there is no need to set up additional formwork, making this technology formwork-free.
[0031] Since the plain concrete layer is only used to transfer horizontal force between the supporting piles and the retaining wall and there is no need to transfer vertical force, there is no need to connect the plain concrete layer and the supporting piles and between the plain concrete layer and the retaining wall. This is conducive to the continuous laying of the external waterproof layer of the retaining wall, facilitates construction and helps to ensure the waterproof quality.
[0032] The width of the soil between the supporting piles and the outer wall of the basement is usually ≤1.2m. The classic Coulomb or Rankine earth pressure theory is based on the assumption that the backfill behind the retaining wall is a semi-infinite body, which is not suitable for the case of finite width backfill. When the supporting piles do not move sideways, the backfill within the finite width will significantly reduce its pressure on the retaining wall due to the soil arching effect.
[0033] After the elastic isolation layer is set, since the elastic modulus of the elastic isolation layer is significantly smaller than that of the plain concrete layer, the earth pressure transmitted from the outer soil to the supporting piles will be mainly transmitted from the plain concrete layer to the outer wall of the basement (and basically not transmitted through the elastic isolation layer). Increasing the pressure between the plain concrete layer and the outer wall of the basement and between the plain concrete layer and the supporting piles can increase the maximum static friction between the plain concrete layer and the outer wall of the basement, and between the plain concrete layer and the supporting piles, avoid the risk of the plain concrete layer sinking, and make the entire fertilizer trough backfill more stable. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 This is a schematic diagram of the structure of step 1 of the present invention;
[0035] Figure 2 This is a schematic diagram of the structure of step 2 and step 3 of the present invention;
[0036] Figure 3 This is a schematic diagram of the construction process of step 4 of the present invention;
[0037] Figure 4 This is a schematic diagram of the structure completed in step five of the present invention;
[0038] Figure 5 Schematic diagram of the analysis process of calculating the thickness of the i-th plain concrete layer of the present invention;
[0039] Figure 6 A schematic diagram of the location of the elastic isolation layer of the present invention;
[0040] Figure 7 It is a schematic diagram for comparing the forces between the present invention and the conventional technology.
[0041] In the figure: 1. Support piles; 2. Basement exterior wall; 3. Fertilizer trough; 4. Waterproof membrane; 5. Backfill soil; 6. Plain concrete layer; 7. Anchor rods; 8. Elastic isolation layer. DETAILED DESCRIPTION
[0042] The present invention will be further described below in conjunction with the accompanying drawings:
[0043] like Figure 1 to Figure 7 As shown, a method for constructing a retaining structure of supporting piles and basement outer wall comprises the following steps:
[0044] Step 1: According to the conventional construction method, excavation of foundation pit, construction of pile-anchor support system, construction of cushion layer at the bottom of foundation pit, pouring of foundation raft slab and basement exterior wall and construction of bottom waterproof membrane are carried out in sequence; the retaining earth support system adopts pile-anchor system, and the piles adopt bored concrete piles or steel sheet piles. The bottom waterproof membrane is laid to a position slightly higher than the top elevation of the bottom basement top plate.
[0045] Step 2: Backfill the bottom fertilizer trough to a position below the bottom elevation of the basement bottom roof. The fertilizer trough is backfilled with graded sand and gravel, sandy soil, ash soil or fluidized solidified soil and compacted in layers. When anti-floating requirements are met, weakly permeable materials should be used for backfilling to avoid the "water basin effect".
[0046] Step 3: Pour the first layer of plain concrete. Lay the waterproof membrane to a position above the top elevation of the first roof slab. Backfill the first fertilizer trough to a position below the bottom elevation of the first roof slab. Determine the thickness and elevation of the first layer of plain concrete. Pour the first layer of plain concrete corresponding to the first roof slab above the backfill soil.
[0047] The thickness of the plain concrete layer must be checked for strength, deformation, stability, local pressure and crack resistance in accordance with the design requirements of Chapter 6 of "Code for Design of Concrete Structures GB 50010-2010". The lower limit of the thickness of the plain concrete layer is 50mm thicker than the corresponding top plate thickness, and the upper limit is 300mm. The ratio of the thickness of the plain concrete layer to the span is not greater than 5. The local compressive stress of the plain concrete layer is not greater than the compressive strength, and the local tensile force of the plain concrete layer is not greater than the tensile strength of the concrete.
[0048] Step 4: Pour the i-th layer of plain concrete, repeat step 3 until the waterproof layer of the basement exterior wall extends to the top of the basement roof and is closed with the waterproof layer of the basement roof; after pouring the i-th layer of plain concrete, if there are anchor rods within the elevation range of the i+i-th floor, remove the anchor rods within this elevation range. The condition for removing the anchor rods within the elevation range of the i-th floor is that the strength of the i-1-th layer of plain concrete reaches the design strength.
[0049] Step 5: Pour the top layer of plain concrete, backfill the top fertilizer trough to the position below the top elevation of the basement roof, and reserve the thickness of the plain concrete layer; pour the plain concrete layer corresponding to the basement roof so that its top elevation is the same as the top elevation of the basement roof.
[0050] In a preferred embodiment, when the bearing capacity of the supporting piles is relatively strong (according to the design requirements of Chapter 6 of the "Code for Design of Concrete Structures GB50010-2010", strength, deformation, stability, local pressure bearing and crack resistance are verified), it is possible to remove part of the plain concrete layer, and each layer of plain concrete layer is arranged one by one corresponding to every other floor slab of the basement.
[0051] As we all know, the elastic modulus of plain concrete is greater than that of fill. When no elastic isolation layer is set, the plain concrete layer can support the support piles when the soil outside the support piles presses against the support piles, so that relatively more loads are transmitted to the outer wall at the same elevation as the basement floor through the plain concrete layer, and then directly transmit the force to the corresponding basement floors; relatively less loads are transmitted to the outer wall of the basement where the floor is not set through the fill, and then transmitted to the basement floors through the wall. Compared with the traditional solution without plain concrete, the out-of-plane force transmitted to the outer wall of the basement where the floor is not set can be reduced, and the out-of-plane bending moment and reinforcement of the basement retaining wall can be reduced.
[0052] Since the elastic modulus of the elastic isolation layer is significantly smaller than that of the fill, the soil pressure transmitted from the fill through the elastic isolation layer to the basement outer wall where the floor is not set can be further significantly reduced, thereby further reducing the out-of-plane bending moment and reinforcement of the basement outer wall. Correspondingly, more pressure from the soil outside the support piles is transmitted inward through the plain concrete layer to the basement outer wall with the floor elevation, which can increase the maximum static friction between the plain concrete layer and the basement outer wall, and between the plain concrete layer and the support piles, resist the weight of the current layer and the upper fill borne by each plain concrete layer, avoid the risk of plain concrete layer sinking, and make the entire fertilizer trough backfill more stable.
[0053] like Figure 6 and Figure 7 The typical embodiment shown is a four-story basement with a height of 4m per floor and a soil density of 18kN / m3. Without considering water buoyancy, when the solution of the present invention without setting an elastic isolation layer (thick solid line) is adopted, compared with the traditional solution (thin solid line), the soil pressure and retaining wall bending moment are significantly reduced. When the solution of the present invention with an elastic isolation layer (thin dotted line) is adopted, the soil pressure and retaining wall bending moment are further reduced. The wall thickness and reinforcement can be optimized according to the internal forces obtained by analysis.
[0054] On this basis, whether the elastic isolation layer is provided is determined based on the following:
[0055] S0, establish a finite element analysis model without setting an elastic isolation layer: establish a finite element analysis model including the basement outer wall, basement floor, backfill soil, plain concrete layer, and support piles, wherein the side of the backfill layer, the side of the plain concrete layer, the side of the basement outer wall, and the side of the support pile are all modeled in a non-shared node manner, and a friction coefficient is set between the contact surfaces formed by the above-mentioned two sides in contact, so as to consider the sliding and friction behavior between the contact surfaces of each side, and the remaining surfaces are modeled in a shared node manner;
[0056] S1, set material parameters, boundary conditions, load conditions and analysis conditions according to the actual project situation, and carry out finite element analysis;
[0057] S2, extract the settlement difference between the plain concrete layer and the basement outer wall, and the bending moment of the basement outer wall, and comprehensively judge whether an elastic isolation layer is needed. If there is a settlement difference between the plain concrete layer and the basement outer wall, or the bending moment of the basement outer wall exceeds the design limit, an elastic isolation layer is set. In theory, the ability of the basement outer wall to resist the out-of-plane bending moment can be improved by thickening the basement outer wall, but in special cases, the thickness of the retaining wall is limited (for example, the inner boundary range of the retaining wall is limited by the indoor use function and the use area, and the outer boundary position of the retaining wall is limited by the outdoor red line position and the reserved width of the fertilizer trough to facilitate construction. These two boundaries limit the thickness of the retaining wall). The only way to make the retaining wall of a specific thickness meet the bearing capacity design requirements is to reduce the out-of-plane force. At this time, the only way is to set an isolation layer to guide most of the soil pressure to the floor elevation position, reduce the out-of-plane force of the retaining wall without floor elevation, so as to reduce the thickness requirement and reinforcement requirement of the retaining wall;
[0058] S3, establish a finite element analysis model with an elastic isolation layer: on the basis of the model without an elastic isolation layer, an elastic isolation layer is additionally established between the backfill soil and the basement outer wall. The side surfaces of the elastic isolation layer are modeled with the side surfaces of the backfill layer and the side surfaces of the basement outer wall in a non-shared node manner, and a friction coefficient is set between the contact surfaces formed by the above-mentioned two side surfaces, and the top and bottom surfaces of the elastic isolation layer are modeled with the plain concrete layer in a shared node manner;
[0059] S4, repeat step S1;
[0060] S5, extract the settlement difference between the plain concrete layer and the basement outer wall, the bending moment of the basement outer wall, and comprehensively judge the rationality of the elastic isolation layer setting parameters. If there is a settlement difference between the plain concrete layer and the basement outer wall, or the bending moment of the basement outer wall exceeds the design limit, then increase the thickness of the elastic isolation layer, or reduce the elastic modulus of the elastic isolation layer. Both methods can further reduce the external soil pressure transmitted to the retaining wall at the non-floor elevation through the fertilizer trough fill, thereby further guiding the external soil pressure to be transmitted to the retaining wall at the floor elevation through the plain concrete layer, further increasing the static friction between the plain concrete layer and the supporting piles and retaining wall on both sides, and avoiding the sinking of the plain concrete layer;
[0061] S6, extract the axial force of the plain concrete layer, the bending moment and shear force of the basement outer wall and the supporting piles to carry out the corresponding component design to determine the material, thickness and reinforcement of each part. This part belongs to the conventional design content and will not be repeated here.
[0062] When no elastic isolation layer is set, the thickness and elevation of the plain concrete layer need to take into account the settlement caused by the self-weight of the backfill soil layers above this layer, the self-weight of the plain concrete layer and the ground load. To ensure that the amplitude of the plain concrete layer after completion is S 砼,i The top elevation after settlement shall not be lower than the top elevation H of the basement top plate of the corresponding floor. 0,i , and the bottom elevation of the plain concrete layer is not higher than the bottom elevation H of the basement top slab of the corresponding floor 0,i -t 0,i , the thickness of the i-th plain concrete layer satisfies:
[0063]
[0064] Among them, t 砼,i is the thickness of the plain concrete layer corresponding to the top plate of the i-th layer, t 0,i is the thickness of the top slab of the i-th basement, H 砼,i H is the top elevation of the plain concrete layer corresponding to the top plate of the i-th layer during construction, 0,i It is the top elevation of the basement ceiling.
[0065] Since the modulus of plain concrete is relatively large, the deformation of each plain concrete layer is ignored, and the settlement S of the i-th plain concrete layer is i The deformation of each layer of backfill soil between the base elevation and the base elevation can be superimposed:
[0066]
[0067] In the formula, s 土,j is the deformation of the jth soil layer, and its expression is:
[0068]
[0069] In the formula, E土 is the compression modulus of backfill soil, t 土,x and t 砼,x are the thickness of the x-th layer of backfill soil and its top plain concrete layer, γ 土 and γ 砼 are the bulk density of backfill soil and plain concrete respectively, n is the total number of floors, and p is the pressure above the basement top slab, which usually includes load types such as the weight of the building surface layer and covering soil above the basement top slab and the live load on the ground.
[0070] The above embodiments are only some illustrations of the concept and implementation of the present invention, and are not intended to limit the same. Under the concept of the present invention, technical solutions that have not been substantially changed are still within the scope of protection.
Claims
1. A method for constructing a retaining structure with supporting piles and basement outer wall, characterized in that: The following steps are involved: Step 1: Carry out foundation pit excavation, pile anchor support system construction, foundation pit bottom cushion construction, foundation raft slab and basement exterior wall pouring construction and bottom waterproof membrane construction in sequence according to conventional construction methods; Step 2: Backfill the bottom fertilizer tank to the position below the bottom elevation of the basement top plate; Step 3: Casting of the first layer of plain concrete: Lay the waterproofing membrane to the position above the top elevation of the first layer of top plate, then backfill the first layer of fertilizer trough to the position below the bottom elevation of the first layer of top plate, determine the thickness and elevation of the first layer of plain concrete, and then cast the first layer of plain concrete corresponding to the first layer of top plate on the backfill soil; Step 4: i layer( i ≥2) Casting of plain concrete layer: Repeat step 3 until the waterproof layer of the basement exterior wall extends to the top of the basement roof and is closed with the waterproof layer of the basement roof. Each plain concrete layer is set one by one with each basement floor slab; Step 5: Pouring the top layer of plain concrete: backfill the top fertilizer trough to the position below the top elevation of the basement roof, and reserve the thickness of the plain concrete layer; pour the plain concrete layer corresponding to the basement roof so that its top elevation is the same as the top elevation of the basement roof.
2. The method for constructing a retaining structure of supporting piles and basement outer wall according to claim 1 is characterized in that: After pouring is completed i After the first layer of plain concrete has reached the design strength, i If there are anchor rods within the +1 floor elevation range, remove the anchor rods within this elevation range.
3. The construction method of the retaining structure of supporting piles and basement outer wall according to claim 1 is characterized by: The fertilizer trough is backfilled with graded sand and gravel, sandy soil, ash soil or fluidized solidified soil for layered compaction; when anti-floating requirements are met, weakly permeable materials are used for backfilling.
4. The method for constructing a retaining structure of supporting piles and basement outer wall according to claim 1 is characterized by: In the step 4, the plain concrete layers are arranged in one-to-one correspondence with every other floor slab of the basement.
5. The method for constructing a retaining structure of supporting piles and basement outer wall according to claim 1 is characterized by: In the steps 2 to 4, an elastic isolation layer is firstly arranged in the fertilizer trough of each layer close to one side of the outer wall of the basement, and then the fertilizer trough is backfilled.
6. The method for constructing a retaining structure of supporting piles and basement outer wall according to claim 5 is characterized by: The elastic isolation layer is a foam polystyrene board or a rubber pad with a thickness of 80-150 mm. The top and bottom elevations of each elastic isolation layer are consistent with the height of the backfill soil of that layer.
7. The method for constructing a retaining structure of supporting piles and basement outer wall according to claim 5 or 6, characterized in that: The basis for determining whether the elastic isolation layer is provided is as follows: S0, establish a finite element analysis model without setting an elastic isolation layer: establish a finite element analysis model including the basement exterior wall, basement floor, backfill soil, plain concrete layer and support piles; S1, set material parameters, boundary conditions, load conditions and analysis conditions according to the actual project situation, and carry out finite element analysis; S2, extract the settlement difference between the plain concrete layer and the basement outer wall and the bending moment of the basement outer wall, and comprehensively judge whether an elastic isolation layer is needed: if there is a settlement difference between the plain concrete layer and the basement outer wall, or the bending moment of the basement outer wall exceeds the design limit, an elastic isolation layer is set; S3, establishing a finite element analysis model with an elastic isolation layer: on the basis of a model without an elastic isolation layer, an elastic isolation layer is additionally established between the backfill soil and the basement outer wall; S4, repeat step S1; S5, extract the settlement difference between the plain concrete layer and the basement outer wall and the bending moment of the basement outer wall, and comprehensively judge the rationality of the setting parameters of the elastic isolation layer: if there is a settlement difference between the plain concrete layer and the basement outer wall, or the bending moment of the basement outer wall exceeds the design limit, increase the thickness of the elastic isolation layer, or reduce the elastic modulus of the elastic isolation layer; S6, extract the axial force of the plain concrete layer, the bending moment and shear force of the basement outer wall and supporting piles to carry out corresponding component design to determine the material, thickness and reinforcement of each part.
8. The method for constructing a retaining structure of supporting piles and basement outer wall according to claim 7 is characterized in that: In the S0, the side of the fill layer, the side of the plain concrete layer, the side of the basement outer wall and the side of the supporting pile are all modeled in a non-shared node manner, and a friction coefficient is set between the contact surfaces formed by the contact between the above two sides to consider the sliding friction behavior between the contact surfaces of each side, and the remaining surfaces are modeled in a common node manner.
9. The method for constructing a retaining structure of supporting piles and basement outer wall according to claim 7 is characterized by: In S3, the side surfaces of the elastic isolation layer are modeled in a non-shared node manner with the side surfaces of the fill layer and the side surfaces of the basement outer wall, and a friction coefficient is set between the contact surfaces formed by the contact between the two side surfaces. The top and bottom surfaces of the elastic isolation layer are modeled in a shared node manner with the plain concrete layer.