Mounting system for special-shaped curtain wall of multi-story building

By using a combined installation system of aluminum profiles, glass and other materials in multi-story buildings, combined with BIM modeling and Nurbs curved surface forming technology, the complexity and stability of existing curtain wall installation are solved, and efficient and stable curtain wall structure installation is achieved. .

CN119083629AActive Publication Date: 2024-12-06ZHEJIANG HONGKUN CONSTR GRP CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202410873755.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-02
Publication Date
2024-12-06
Estimated Expiration
2044-07-02

AI Technical Summary

Technical Problem

The existing multi-layer curtain wall building structure has a wide range of materials, cumbersome installation, large construction volume, and poor stability and aesthetics after installation.

Method used

A multi-story building special-shaped curtain wall installation system consisting of aluminum profiles, glass, steel, composite aluminum plates, sealants, fasteners, stainless steel components, glue, fireproof rock wool and thermal insulation rock wool. Through BIM modeling and Nurbs curved surface molding, The ground is spliced ​​with keel, bottom plate and upper cover, and positioning instruments are used to ensure accurate corner position and improve installation efficiency and stability.

Benefits of technology

It realizes more efficient curtain wall installation, improves the stability and mechanical properties of the structure, while ensuring the accuracy and economical installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083629A_ABST
    Figure CN119083629A_ABST
Patent Text Reader

Abstract

The invention relates to the field of curtain walls, and discloses a multi-story building special-shaped curtain wall installation system which comprises an aluminum profile unit, a glass unit, a composite aluminum plate unit, a sealing unit, a steel unit, a fastener stainless steel component unit, a glue unit, a fireproof unit, a heat preservation unit and a hardware unit. According to the curtain wall installation system, installation of a multi-layer curtain wall structure is facilitated, and meanwhile higher stability and excellent mechanical performance are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of curtain walls, in particular to an installation system for special-shaped curtain walls of multi-story buildings. Background Art

[0002] Curtain wall refers to the building's external protective structure or decorative structure that has a supporting structural system that can have a certain displacement ability relative to the main structure and does not share the effects on the main structure. The wall has two types of single-layer and double-layer glass. It is a beautiful and novel method of building wall decoration. When constructing high-rise building glass curtain walls, it is usually necessary to hoist the steel used to build the keel to the floor slab of the high-rise building. After that, the staff will set up the keel according to the design drawings, and then fix the glass curtain wall on the keel frame to complete it.

[0003] The existing multi-story curtain wall building structure has a variety of constituent materials, cumbersome installation, large construction workload, and the stability and aesthetics of the curtain wall structure after installation are not satisfactory. Therefore, the present invention proposes a multi-story building special-shaped curtain wall installation system. Summary of the invention

[0004] The object of the present invention is to provide a multi-story building special-shaped curtain wall installation system to solve the problems raised in the above background technology.

[0005] To achieve the above object, the present invention provides the following technical solution: a multi-story building special-shaped curtain wall installation system, the system comprising the following parts:

[0006] Aluminum profile unit, the aluminum profile unit adopts 6063-T5 or 6063-T6 profile; the aluminum profile unit includes an upper cover and a bottom plate;

[0007] Glass unit, wherein the glass unit is made of ultra-white tempered insulating glass;

[0008] A steel unit, wherein the steel material used in the steel unit is Q235B, and the steel unit comprises a keel;

[0009] A composite aluminum plate unit, the composite aluminum plate unit is composed of a 4.0 mm thick composite aluminum plate material; the composite aluminum plate unit includes a support, the support is used to receive and fix the keel;

[0010] A sealing unit, wherein the sealing unit is composed of a sealing strip extruded from an EPDM material and is used to seal the outer edge of the glass unit;

[0011] A fastener stainless steel component unit, wherein the fastener stainless steel component unit is made of A2-70 austenitic non-magnetic stainless steel, and the fastener stainless steel component unit includes a pressing plate, and the pressing plate is used to fix the glass unit;

[0012] A glue unit, wherein the glue unit is a combination of a silicone structural sealant and a silicone weather-resistant sealant, and is used to seal the gap between the upper cover and the bottom plate after they are closed;

[0013] Fireproof unit and thermal insulation unit, both of which are made of fireproof rock wool and are used to fill the gap between steel and aluminum profiles;

[0014] The specific construction method of the curtain wall is as follows:

[0015] The first step is to use Nurbs surface forming based on BIM modeling, and use the surface presented by degree, control points and nodes to form the overall curtain wall surface, which is divided into different units according to the design requirements of the drawings, and the glass units, aluminum profile units and keels of corresponding specifications are customized;

[0016] The second step is to extract X, Y, and Z coordinate data from the model at the corners of the glass units for on-site positioning. During construction, positioning instruments are used to check the corners to ensure that they are accurate. Supports are installed at the corners.

[0017] The third step is to install the corresponding glass units in the squares formed by the four corner points, and to set an aluminum alloy crossbeam at the junction between the upper and lower glass units. There are several threaded holes on the extension line of the aluminum alloy crossbeam, and several pressure plates are used to fix the pressure plates on the aluminum alloy crossbeam by screws, wherein the pressure plates can act on the upper and lower glass units;

[0018] The fourth step is to complete the splicing of the keel, the base plate and the upper cover on the ground, wherein the keel is fixedly arranged in the upper cover and the base plate, and the gap between the upper cover and the base plate is filled with a glue unit. During the high-altitude construction, the exposed part of the keel is installed on the support.

[0019] Preferably, the aluminum profile surface of the aluminum profile unit is treated with fluorocarbon spraying, and the average spraying thickness is not less than 40 μm, and the minimum local thickness is not less than 35 μm.

[0020] Preferably, the composite aluminum plate of the composite aluminum plate unit is composed of two pieces of 0.5 mm thick 3003 alloy aluminum plates sandwiched by a 3.0 mm thick non-combustible core material.

[0021] Preferably, the fireproof unit is made of two layers of 200mm thickness and density not less than 100kg / m 3 Fireproof rock wool.

[0022] Preferably, the insulation unit adopts a density of not less than 80kg / m 3 Fireproof rock wool is used to fill the thermal insulation and isolation areas.

[0023] Preferably, the system also includes an alloy roof, which is composed of aluminum-magnesium-manganese metal plates, and steel square tubes are used as purlins of the metal roof. The main keel is installed first, and then the roof panel is installed. The panel is made of aluminum-magnesium-manganese metal plates, and is waterproof and soundproofed with the use of noise reduction nets, sound-absorbing glass wool and fat water rolls. The inner lining is 180mm thick thermal insulation rock wool and 80mm thick sound-absorbing glass wool for insulation.

[0024] Preferably, the left and right sides of the glass unit are columns, the columns are made of fluorocarbon sprayed steel, the upper and lower sides of the glass unit are aluminum alloy beams, the columns and the aluminum alloy beams form a load-bearing frame, and then the glass unit is installed on it. The force-bearing mode and structural form are that the load is transmitted from the glass unit to the load-bearing frame.

[0025] Preferably, a support is provided at the corner point where the glass units meet, and a baffle is provided on the support, which divides the support into two equal parts on the left and right. Two transverse first strip grooves are provided on the left and right halves of the support, and the exposed part of the keel is installed at the corresponding position of the support, and a second strip groove facing outward is provided on the keel, and the position of the keel and the support is fixed by passing a bolt through the second strip groove of the keel and then through the first strip groove.

[0026] Preferably, the keel is fixedly mounted on the bottom plate, and then the upper cover is closed and connected, and the gap between the upper cover and the bottom plate is filled with a glue unit.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] 1. The present invention is convenient for installing a multi-layer curtain wall structure by using an aluminum profile unit, a glass unit, a composite aluminum plate unit, a sealing unit, a steel unit, a fastener stainless steel component unit, a glue unit, a fireproof unit and a thermal insulation unit. At the same time, it has higher stability and excellent mechanical properties.

[0029] 2. At the same time, different from the prior art, the splicing of the keel, the base plate and the upper cover is completed on the ground, and then the adaptation installation is carried out on the keel. This method can realize the installation of the curtain wall more efficiently.

[0030] 3. Nurbs surface forming is adopted, and the surface presented by order, control points and nodes is different from Mesh grid forming. The presented model is more accurate and smoother. In the construction process of each part, the benchmark adopted is the BIM model to ensure the reliability, accuracy and economy of each process. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a plane positioning diagram of the curtain wall control line of an embodiment of the present invention;

[0032] Figure 2This is a cross-sectional positioning diagram of the curtain wall control line according to an embodiment of the present invention;

[0033] Figure 3 This is a schematic diagram of the axial positioning of the curtain wall control line according to an embodiment of the present invention;

[0034] Figure 4 This is a diagram showing the arrangement of the curtain wall tube truss rods according to an embodiment of the present invention;

[0035] Figure 5 This is a schematic diagram of the aluminum alloy crossbeam structure of the pressure plate;

[0036] Figure 6 is a schematic diagram of the support structure;

[0037] Figure 7 It is a schematic diagram of the connection structure between the support and the frame in the present invention.

[0038] In the figure: 2, glass unit; 11, aluminum alloy beam; 12, pressure plate; 13, support; 14, keel; 15, upper cover; 16, bottom plate; 17, first strip groove; 18, second strip groove. DETAILED DESCRIPTION

[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] Example

[0041] See also Figure 1-7 , a multi-story building special-shaped curtain wall installation system is shown in the figure, and the system consists of the following parts: an aluminum profile unit, a glass unit 2, a steel unit, a composite aluminum plate unit, a sealing unit, a fastener stainless steel component unit, a glue unit, a fireproof unit and a thermal insulation unit.

[0042] An aluminum profile unit, wherein the aluminum profile unit adopts 6063-T5 or 6063-T6 profile; the aluminum profile unit includes an upper cover 15 and a bottom plate 16, the mechanical properties of the 6063-T5 profile are as follows: tensile and compressive strength: 90MPa, shear strength: 49.6MPa, and local pressure bearing: 120MPa; the mechanical properties of the 6063-T6 profile are as follows: tensile and compressive strength: 150MPa, shear strength: 81MPa, and local pressure bearing: 161MPa, and the aluminum profile surface of the aluminum profile unit is treated with fluorocarbon spraying, and the average spraying thickness is not less than 40μm, and the minimum local thickness is not less than 35μm.

[0043] Glass unit 2: Glass unit 2 adopts ultra-white tempered insulating glass, glass U value ≦1.7W / (㎡.K), self-shading coefficient 0.50, visible light transmittance 0.62, visible light reflectivity not more than O.16, glass solar heat gain coefficient 0.44.

[0044] Steel unit: The steel material used for the steel unit is Q235B. The steel unit includes a keel 14. The surface of the keel 14 should be sandblasted to remove rust, the surface of the visible part should be shot blasted, the non-visible part should be hot-dip galvanized, and all openings should be welded and closed.

[0045] The composite aluminum plate unit is composed of a 4.0 mm thick composite aluminum plate material. The composite aluminum plate unit includes a support 13, which is used to receive and fix the keel 14. The composite aluminum plate of the composite aluminum plate unit is composed of two pieces of 0.5 mm thick 3003 alloy aluminum plates sandwiched by a 3.0 mm thick non-combustible core material.

[0046] The sealing unit is composed of a sealing strip extruded from EPDM material, and is used to seal the outer edge of the glass unit 2 .

[0047] The fastener stainless steel component unit is made of A2-70 austenitic non-magnetic stainless steel. The fastener stainless steel component unit includes a pressing plate 12 , which is used to fix the glass unit 2 .

[0048] The glue unit is a combination of silicone structural sealant and silicone weather-resistant sealant, and is used to seal the gap between the upper cover 15 and the bottom plate 16 after they are closed.

[0049] Fireproof unit and thermal insulation unit, both of which are made of fireproof rock wool, used to fill the gap between steel and aluminum profiles. The fireproof unit uses two layers of 200mm thickness and a density of not less than 100kg / m 3 The fireproof rock wool of the insulation unit adopts a density of not less than 80kg / m 3 Fireproof rock wool is used to fill the thermal insulation and isolation areas.

[0050] The specific construction methods of the curtain wall are as follows:

[0051] The first step is to use Nurbs surface forming based on BIM modeling, and use the surface presented by degree, control points and nodes to form the overall curtain wall surface, which is divided into different units according to the design requirements of the drawings, and the glass units 2, aluminum profile units and keels 14 of corresponding specifications are customized;

[0052] In the second step, the X, Y, and Z coordinate data of the corner points of the intersections between the glass units 2 are extracted from the model for on-site positioning. During construction, a positioning instrument is used to check the position of the corner points to ensure the accuracy of the position of the corner points. A support 13 is installed at the corner points.

[0053] In the third step, the corresponding glass units 2 are installed in the squares formed by the four corner points, and an aluminum alloy crossbeam 11 is arranged at the junction between the upper and lower glass units 2. There are several threaded holes on the extension line of the aluminum alloy crossbeam 11, and several pressing plates 12 are used to fix the pressing plates 12 on the aluminum alloy crossbeam 11 by screws, wherein the pressing plates 12 can act on the upper and lower glass units 2;

[0054] The fourth step is to complete the splicing of the keel 14, the base plate 16 and the upper cover 15 on the ground, wherein the keel 14 is fixedly set in the upper cover 15 and the base plate 16, and the gap between the upper cover 15 and the base plate 16 is filled with glue units. During high-altitude construction, the exposed part of the keel 14 is installed on the support 13.

[0055] The system also includes an alloy roof, which is composed of aluminum-magnesium-manganese metal plates, and steel square tubes are used as purlins of the metal roof. The main keel is installed first, and then the roof panel is installed. The panel is made of aluminum-magnesium-manganese metal plates, and is waterproof and soundproofed with noise reduction nets, sound-absorbing glass wool and fat water membranes. The inner lining is 180mm thick thermal insulation rock wool and 80mm thick sound-absorbing glass wool for insulation.

[0056] The left and right sides of the glass unit 2 are columns, and the columns are made of fluorocarbon sprayed steel. The upper and lower sides of the glass unit 2 are aluminum alloy beams 11. The columns and the aluminum alloy beams form a force-bearing frame, and then the glass unit 2 is installed. The force-bearing mode and structural form are that the load is transmitted from the glass unit 2 to the force-bearing frame. When one of the glass units 2 is damaged, it is only necessary to loosen the pressure plate 12 corresponding to the glass unit 2, and tighten it again after replacement so that the pressure plate 12 presses the glass unit 2 on the force-bearing frame.

[0057] A support 13 is provided at the corner point of the intersection between the glass units 2, and a baffle is provided on the support 13, which divides the support 13 into two equal parts on the left and right. Two horizontal first strip grooves 17 are provided on the left and right halves of the support 13. The exposed part of the keel 14 is installed at the corresponding position of the support 13, and the keel 14 is provided with a second strip groove 18 facing outward. The position of the keel 14 and the support 13 is fixed by passing the bolt through the second strip groove 18 of the keel 14 and then through the first strip groove 17, and the bolt group needs to be equipped with two flat washers, a spring washer and a nut. Due to the existence of the first strip groove 17, the position of the keel 14 can be moved left and right and adjusted. Due to the existence of the second strip groove 18, the position of the keel 14 can be moved inward and outward and adjusted. After the position adjustment is completed, the bolts are fixed, and the keel 14 is fixedly installed on the bottom plate 16. Then the upper cover 15 is closed and connected, and the gap between the upper cover 15 and the bottom plate 16 is filled with a glue unit.

[0058] The curtain wall performance test is as follows:

[0059] 1. Wind pressure resistance: Wind pressure resistance refers to the ability of the building curtain wall to maintain normal performance without any damage under the action of wind pressure perpendicular to it. The standard value of the corner wind load at the building elevation of 36.676m is WK=1.677KN / m, so the wind pressure resistance of the curtain wall of this project is level 2.

[0060] 2. Airtightness: Airtightness refers to the ability of a curtain wall to allow air to pass through its open part when it is closed under wind pressure. Therefore, the wind pressure resistance of the curtain wall in this project is level 3.

[0061] 3. Watertight performance: Watertight performance refers to the ability of the curtain wall to pass rainwater under the simultaneous action of wind and rain. Therefore, the wind pressure resistance performance of the curtain wall of this project is level 3.

[0062] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0063] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A multi-story building special-shaped curtain wall installation system, It is characterized in that The system consists of the following parts: Aluminum profile unit, the aluminum profile unit adopts 6063-T5 or 6063-T6 profile; the aluminum profile unit includes an upper cover and a bottom plate; Glass unit, wherein the glass unit is made of ultra-white tempered insulating glass; A steel unit, wherein the steel material used in the steel unit is Q235B, and the steel unit comprises a keel; A composite aluminum plate unit, the composite aluminum plate unit is composed of a 4.0 mm thick composite aluminum plate material; the composite aluminum plate unit includes a support, the support is used to receive and fix the keel; A sealing unit, wherein the sealing unit is composed of a sealing strip extruded from an EPDM material and is used to seal the outer edge of the glass unit; A fastener stainless steel component unit, wherein the fastener stainless steel component unit is made of A2-70 austenitic non-magnetic stainless steel, and the fastener stainless steel component unit includes a pressing plate, and the pressing plate is used to fix the glass unit; A glue unit, wherein the glue unit is a combination of a silicone structural sealant and a silicone weather-resistant sealant, and is used to seal the gap between the upper cover and the bottom plate after they are closed; Fireproof unit and thermal insulation unit, both of which are made of fireproof rock wool and are used to fill the gap between steel and aluminum profiles; The specific construction method of the curtain wall is as follows: The first step is to use Nurbs surface forming based on BIM modeling, and use the surface presented by degree, control points and nodes to form the overall curtain wall surface, which is divided into different units according to the design requirements of the drawings, and the glass units, aluminum profile units and keels of corresponding specifications are customized; The second step is to extract X, Y, and Z coordinate data from the model at the corners of the glass units for on-site positioning. During construction, positioning instruments are used to check the corners to ensure that they are accurate. Supports are installed at the corners. The third step is to install the corresponding glass units in the squares formed by the four corner points, and to set an aluminum alloy crossbeam at the junction between the upper and lower glass units. There are several threaded holes on the extension line of the aluminum alloy crossbeam, and several pressure plates are used to fix the pressure plates on the aluminum alloy crossbeam by screws, wherein the pressure plates can act on the upper and lower glass units; The fourth step is to complete the splicing of the keel, the base plate and the upper cover on the ground, wherein the keel is fixedly arranged in the upper cover and the base plate, and the gap between the upper cover and the base plate is filled with a glue unit. During the high-altitude construction, the exposed part of the keel is installed on the support.

2. A multi-story building special-shaped curtain wall installation system according to claim 1, Features: The aluminum profile surface of the aluminum profile unit is treated by fluorocarbon spraying, and the average spraying thickness is not less than 40 μm, and the minimum local thickness is not less than 35 μm.

3. A multi-story building special-shaped curtain wall installation system according to claim 1, Features: The composite aluminum plate of the composite aluminum plate unit is composed of two 0.5 mm thick 3003 alloy aluminum plates sandwiched by a 3.0 mm thick non-combustible core material.

4. A multi-story building special-shaped curtain wall installation system according to claim 1, Features: The fireproof unit is made of two layers of 200mm thickness and the density is not less than 100kg / m 3 Fireproof rock wool.

5. A multi-story building special-shaped curtain wall installation system according to claim 1, Features: The heat preservation unit adopts a density of not less than 80kg / m 3 Fireproof rock wool is used to fill the thermal insulation and isolation areas.

6. A multi-story building special-shaped curtain wall installation system according to claim 1, Features: The system also includes an alloy roof, which is composed of aluminum-magnesium-manganese metal plates, and steel square tubes are used as purlins of the metal roof. The main keel is installed first, and then the roof panel is installed. The panel is made of aluminum-magnesium-manganese metal plates, and is waterproof and soundproofed by the use of noise reduction nets, sound-absorbing glass wool and fat water rolls. The inner lining is 180mm thick thermal insulation rock wool and 80mm thick sound-absorbing glass wool for insulation.

7. A multi-story building special-shaped curtain wall installation system according to claim 1, Features: The left and right sides of the glass unit are columns, which are made of fluorocarbon sprayed steel. The upper and lower sides of the glass unit are aluminum alloy beams. The columns and the aluminum alloy beams form a load-bearing frame, and then the glass unit is installed on it. The load-bearing mode and structural form are that the load is transmitted from the glass unit to the load-bearing frame.

8. A multi-story building special-shaped curtain wall installation system according to claim 1, Features: A support is arranged at the corner point where the glass units meet, and a baffle is arranged on the support, which divides the support into two equal parts, left and right. Two horizontal first strip grooves are arranged on the left and right halves of the support, and the exposed part of the keel is installed at the corresponding position of the support, and a second strip groove facing outward is arranged on the keel, and the position of the keel and the support is fixed by passing a bolt through the second strip groove of the keel and then through the first strip groove.

9. A multi-story building special-shaped curtain wall installation system according to claim 1, Features: The keel is fixedly installed on the bottom plate, and then the upper cover is closed and connected, and the gap between the upper cover and the bottom plate is filled with a glue unit.

Citation Information

Patent Citations

  • Hollow glass curtain wall

    CN101215863A

  • Mounting method of multi-layer curtain wall

    CN109386077A

  • Application method of BIM modeling in design and construction of special-shaped curved surface structural body

    CN110826130A

  • Construction method for multi-curved-surface specially-shaped combined curtain wall system

    CN111058560A

  • Connecting device of complex special-shaped curtain wall structure

    CN111910802A