Engineering logistics simulation method based on LED tunnel lamp flexible production line

The engineering logistics simulation method optimizes LED tunnel light production lines by constructing and evaluating models to enhance efficiency and quality, addressing inefficiencies in traditional methods.

CN119087925APending Publication Date: 2024-12-06GUANGXI TEACHERS EDUCATION UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411068366.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-06
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

Traditional production methods for LED tunnel lights lack scientific planning and design, leading to inefficiencies such as poor logistics, loose process connections, idle equipment, and excessive loads, making it difficult to predict and optimize production line performance accurately.

Method used

An engineering logistics simulation method for LED tunnel lights that constructs workstation and sub-production line models, performs simulation, evaluates, and optimizes the production line model to improve efficiency and quality.

Benefits of technology

Enhances production efficiency and product quality by identifying bottlenecks, optimizing workstation processes, and reducing costs through simulation and optimization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119087925A_ABST
    Figure CN119087925A_ABST
Patent Text Reader

Abstract

The invention discloses an engineering logistics simulation method based on an LED tunnel lamp flexible production line. The method comprises the following steps: obtaining a product technology and a production flow of the LED tunnel lamp production line; constructing a station production model based on the product process and the production flow; building a sub-production line model based on the station production model; performing workshop layout and logistics layout of a station production model and a sub-production line model based on the product process and the production flow to generate a production line simulation model; performing analog simulation of LED tunnel lamp production through the production line simulation model; evaluating the production line simulation model for simulation; when the evaluation result passes, storing the production line simulation model; and when the evaluation result does not pass, optimizing the production line simulation model, and evaluating the optimized production line simulation model. According to the invention, the LED tunnel production line is subjected to simulation layout planning and optimization, the production efficiency of each station is analyzed, and a production line simulation model is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of LED tunnel lamp production, and in particular to an engineering logistics simulation method based on a flexible production line of LED tunnel lamps. Background Art

[0002] With the rapid development of the transportation industry, tunnels are becoming more and more important as transportation infrastructure, and the demand for tunnel lighting is also growing. LED tunnel lights have gradually become the mainstream choice for tunnel lighting due to their significant advantages such as high efficiency and energy saving, long life, and good light color stability. As a key product in the field of lighting, LED tunnel lights have become an important part of the transformation and upgrading of the manufacturing industry through the construction and optimization of their assembly lines. Traditional production methods often rely on experience and trial and error, and lack scientific planning and design. There are many unreasonable aspects in production line layout, equipment configuration, and process flow, which lead to problems such as poor logistics, loose process connection, idle equipment or excessive load in the production process.

[0003] However, due to the lack of advanced simulation systems for the construction and optimization of production lines, it is difficult for enterprises to accurately evaluate and predict the performance and efficiency of production lines before actual production. It is impossible to discover potential bottlenecks and problem points in advance, nor is it possible to explore the optimal production plan through virtual experiments. This makes enterprises have to passively deal with various problems in actual production, constantly adjust and improve, which not only consumes a lot of time and resources, but also seriously affects the productivity of production lines and the stability of product quality. Summary of the invention

[0004] The present invention provides an engineering logistics simulation method based on a flexible production line, which simulates the layout planning and optimization of the LED tunnel production line, analyzes the production efficiency of each workstation, improves the production line simulation model, and improves the production efficiency and product quality of the LED tunnel light production line. The specific technical solution is as follows:

[0005] An engineering logistics simulation method based on a flexible production line of LED tunnel lights includes the following steps:

[0006] Obtain the product technology and production process of LED tunnel light production line;

[0007] Constructing a workstation production model based on the product process and production process; constructing a sub-production line model based on the workstation production model;

[0008] Based on the product process and production process, the workshop layout and logistics layout of the workstation production model and the sub-production line model are performed to generate a production line simulation model;

[0009] Performing simulation of LED tunnel lamp production through the production line simulation model;

[0010] The production line simulation model for simulation is evaluated; when the evaluation result is passed, the production line simulation model is saved; when the evaluation result is not passed, the production line simulation model is optimized, and the optimized production line simulation model is evaluated.

[0011] Preferably, the construction station production model includes building an assembly station, a testing station, a material buffer, a material placement buffer, a tray packaging station, and a three-dimensional warehouse.

[0012] Preferably, constructing a sub-production line model based on the workstation production model includes constructing an assembly sub-production line, a waterproof test sub-production line, an aging test sub-production line, and a packaging sub-production line.

[0013] Preferably, the product process and production flow are used to carry out the workshop layout of the workstation production model and the sub-production line model, including the following steps:

[0014] Determine the layout type based on the space requirements of the sub-production line model and production line simulation model and the location settings of the inlet and outlet ports;

[0015] Carry out workshop layout for the production line simulation model and each sub-production line model respectively.

[0016] Preferably, the product process and production flow are used to carry out the logistics layout of the workstation production model and the sub-production line model; the steps include:

[0017] Construct AGV transmission module and conveyor belt transmission module;

[0018] Configure an AGV transmission module or a conveyor belt transmission module for the sub-production line model.

[0019] Preferably, the evaluation of the simulated production line simulation model comprises the following steps:

[0020] Obtain the blocking rate and working rate of the workstation production model, and obtain the output of the production line simulation model;

[0021] If there is a blocking rate in a workstation production model, the workstation production model is set as a bottleneck workstation;

[0022] Obtain the time of each process, number of workstations, and production rhythm of the production line simulation model;

[0023] Calculate the production line balance rate for the production line simulation model;

[0024] When the production line balance rate of the production line simulation model reaches 1, the production line simulation model is saved; when the production line simulation model is less than 1, the production line simulation model is optimized.

[0025] Preferably, the optimizing the production line simulation model comprises the following steps:

[0026] Optimize the workstations and processes of the sub-production line model with blocking rate;

[0027] Obtain the time of each process, number of workstations, and production rhythm of the production line simulation model;

[0028] Calculate the production line balance rate for the production line simulation model;

[0029] The production line balance rates obtained before and after optimization are compared; when the optimization is successful, the production line balance rate of the sub-production line model increases and the blocking rate decreases; when the optimization fails, the production line balance rate of the sub-production line model decreases and the blocking rate increases.

[0030] Preferably, the balance rate of the production line is calculated using the following formula:

[0031] P=∑STj / (m×CT)×100%

[0032] Among them, STj is the sum of the time of each process, m is the number of workstations, and CT is the production cycle (bottleneck process time).

[0033] Preferably, the optimization of workstations and processes of the sub-production line model with a blocking rate is performed by increasing the number of workstations of the bottleneck process, shortening the working time of the bottleneck process, or adding a buffer zone.

[0034] An engineering logistics simulation system based on a flexible production line of LED tunnel lights, comprising:

[0035] The first processing unit is used to obtain the product technology and production process of the LED tunnel light production line;

[0036] A second processing unit is used to construct a workstation production model based on the product process and production process; and to construct a sub-production line model based on the workstation production model;

[0037] A third processing unit is used to perform workshop layout and logistics layout of the workstation production model and the sub-production line model based on the product process and production process, and generate a production line simulation model;

[0038] A fourth processing unit, configured to simulate the production of LED tunnel lights through the production line simulation model;

[0039] The fifth processing unit is used to evaluate the production line simulation model for simulation; when the evaluation result is passed, the production line simulation model is saved; when the evaluation result is not passed, the production line simulation model is optimized and the optimized production line simulation model is evaluated.

[0040] A computer-readable storage medium is used to store program codes, and the program codes are used to execute the steps of the engineering logistics simulation method based on the LED tunnel light flexible production line described above.

[0041] Compared with the prior art, the present invention has the following beneficial effects:

[0042] The present invention obtains the product process and production process of the LED tunnel light production line, establishes a production line simulation model through a simulation system, evaluates and optimizes the production line simulation model, performs simulation layout planning and optimization on the LED tunnel production line, analyzes the production efficiency of each workstation, optimizes the existing bottleneck workstations, improves the production line simulation model through reasonable settings, verifies the feasibility and reference of the optimized solution, improves the production efficiency and product quality of the LED tunnel light production line, and achieves cost reduction and efficiency improvement. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.

[0044] Figure 1 The figure is a flow chart of the method of the present invention. DETAILED DESCRIPTION

[0045] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0046] It should be understood that when used in this specification and the appended claims, the terms "include" and "comprises" indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.

[0047] It should also be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.

[0048] It should be further understood that the term "and / or" used in the present description and the appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0049] Example 1

[0050] An engineering logistics simulation method based on a flexible production line of LED tunnel lights includes the following steps:

[0051] Obtain the product technology and production process of LED tunnel light production line;

[0052] Constructing a workstation production model based on the product process and production process; constructing a sub-production line model based on the workstation production model;

[0053] Based on the product process and production process, the workshop layout and logistics layout of the workstation production model and the sub-production line model are performed to generate a production line simulation model;

[0054] Performing simulation of LED tunnel lamp production through the production line simulation model;

[0055] The production line simulation model for simulation is evaluated; when the evaluation result is passed, the production line simulation model is saved; when the evaluation result is not passed, the production line simulation model is optimized, and the optimized production line simulation model is evaluated.

[0056] By obtaining the product technology and production process of the LED tunnel light production line, understanding the layout requirements of the LED tunnel light production line, counting the processing time and related working conditions of the main workstations of each module, setting the processing time sub-production line capacity through production requirements equipment parameters or data statistics of the original equipment.

[0057] Example 2

[0058] This embodiment is different from Embodiment 1 in that the construction station production model includes construction of an assembly station, a test station, a material buffer, a material placement buffer, a tray packaging station, and a three-dimensional warehouse.

[0059] According to the product technology and production process of the LED tunnel light production line, the corresponding workstation production model is constructed to simulate the LED tunnel light production line.

[0060] Example 3

[0061] This embodiment is different from Embodiment 2 in that the sub-production line model constructed based on the workstation production model includes constructing an assembly sub-production line, a waterproof test sub-production line, an aging test sub-production line, and a packaging sub-production line.

[0062] In the production process of LED tunnel light flexible production line, the main part MU of LED tunnel light is assembled in sequence through multiple assembly stations. After passing the test, it enters the waterproof test, aging test, comprehensive test, and finally enters the packaging and storage.

[0063] The process flow of LED tunnel lights is as follows: the tunnel light assembly enters the production line and then assembles the side panels, power supply, bracket, dimming test, waterproof test, aging test, pre-packing test, packaging into boxes, palletizing and packaging into pallets, and storage. The assembly sub-production line performs the processes of assembling side panels, power supply, bracket, dimming test, etc.; the waterproof test sub-production line performs waterproof test; the aging test sub-production line performs aging test; the packaging sub-production line performs the processes of pre-packing test, packaging into boxes, palletizing and packaging into pallets, and storage.

[0064] Example 4

[0065] The difference between this embodiment and the third embodiment is that the product process and the production process are carried out in the workshop layout of the station production model and the sub-production line model, including the following steps:

[0066] Determine the layout type based on the space requirements of the sub-production line model and production line simulation model and the location settings of the inlet and outlet ports;

[0067] Carry out workshop layout for the production line simulation model and each sub-production line model respectively.

[0068] The layout types include a straight layout and a U-shaped layout. The straight layout is an effective way to utilize space. It is planned on a narrow and long working belt and can improve the surface area utilization rate per unit area through a compact layout. The entrance and exit of the production line of the U-shaped layout are located on the same side, which helps to optimize the production process, reduce the movement of materials and workers, and reduce transportation costs and time.

[0069] The production line simulation model adopts a U-shaped layout, the assembly sub-line and the waterproof test sub-line are located on the same side, and the aging test sub-line and the packaging sub-line are located on the same side.

[0070] The assembly sub-production line adopts a straight line layout; the waterproof test sub-production line adopts a straight line layout; the aging test sub-production line adopts a U-shaped layout; and the packaging sub-production line adopts a U-shaped layout.

[0071] Example 5

[0072] The difference between this embodiment and embodiment 4 is that the product process and production process are used to carry out the logistics layout of the station production model and the sub-production line model; the following steps are included:

[0073] Construct AGV transmission module and conveyor belt transmission module;

[0074] Configure an AGV transmission module or a conveyor belt transmission module for the sub-production line model.

[0075] The AGV transmission module uses an AGV trolley to transport materials, and the conveyor belt transmission module uses a conveyor belt to transport materials. The conveyor belt transmission module is used for transportation between the assembly sub-line and the waterproof test sub-line; the AGV transmission module is used for transportation between the waterproof test sub-line and the aging test sub-line, and between the aging test sub-line and the packaging sub-line.

[0076] Example 6

[0077] This embodiment is different from Embodiment 5 in that the evaluation of the production line simulation model for simulation includes the following steps:

[0078] Obtain the blocking rate and working rate of the workstation production model, and obtain the output of the production line simulation model;

[0079] If there is a blocking rate in a workstation production model, the workstation production model is set as a bottleneck workstation;

[0080] Obtain the time of each process, number of workstations, and production rhythm of the production line simulation model;

[0081] Calculate the production line balance rate for the production line simulation model;

[0082] When the production line balance rate of the production line simulation model reaches 1, the production line simulation model is saved; when the production line simulation model is less than 1, the production line simulation model is optimized.

[0083] When the blocking rate of all workstations is reduced to 0%, the balance rate of the production line reaches the theoretical value of 1, and the production capacity of the LED tunnel light production line reaches the theoretical maximum value.

[0084] By analyzing and discussing the bottleneck process and capacity optimization issues of the production line, the impact of the number of bottleneck stations and conveyors on the equipment utilization and blockage rate of each station, as well as how to optimize them, the number of bottleneck stations and conveyors are reasonably optimized based on experimental data to improve production capacity.

[0085] Example 7

[0086] The difference between this embodiment and embodiment 6 is that the optimization of the production line simulation model comprises the following steps:

[0087] Optimize the workstations and processes of the sub-production line model with blocking rate;

[0088] Obtain the time of each process, number of workstations, and production rhythm of the production line simulation model;

[0089] Calculate the production line balance rate for the production line simulation model;

[0090] The production line balance rates obtained before and after optimization are compared; when the optimization is successful, the production line balance rate of the sub-production line model increases and the blocking rate decreases; when the optimization fails, the production line balance rate of the sub-production line model decreases and the blocking rate increases.

[0091] Example 8

[0092] The difference between this embodiment and embodiment 7 is that the balance rate of the production line is calculated using the following formula:

[0093] P=∑STj / (m×CT)×100%

[0094] Among them, STj is the sum of the time of each process, m is the number of workstations, and CT is the production cycle (bottleneck process time).

[0095] The production line balance theory is a strategy for optimizing the production process, which is similar to the barrel theory. In a production line, the maximum production capacity does not depend on the station with the shortest production operation time, but on the station with the longest production operation time, that is, the bottleneck station. These bottleneck stations are like the shortest planks in a barrel. The greater the difference between the station with the shortest production time and the station with the longest production time, the higher the degree of blockage of the production line products and the greater the loss of production capacity.

[0096] Takt Time refers to the maximum time interval required to produce two identical products on a production line, usually represented by the letters CT. The length of the takt time must be longer than the sum of the working hours of all workstations to ensure the smooth operation of the production line.

[0097] Preferably, the optimization of workstations and processes of the sub-production line model with a blocking rate is performed by increasing the number of workstations of the bottleneck process, shortening the working time of the bottleneck process, or adding a buffer zone.

[0098] Example 9

[0099] This embodiment is different from Embodiment 1 in that an engineering logistics simulation system based on a flexible production line of LED tunnel lights comprises:

[0100] The first processing unit is used to obtain the product technology and production process of the LED tunnel light production line;

[0101] A second processing unit is used to construct a workstation production model based on the product process and production process; and to construct a sub-production line model based on the workstation production model;

[0102] A third processing unit is used to perform workshop layout and logistics layout of the workstation production model and the sub-production line model based on the product process and production process, and generate a production line simulation model;

[0103] A fourth processing unit, configured to simulate the production of LED tunnel lights through the production line simulation model;

[0104] The fifth processing unit is used to evaluate the production line simulation model for simulation; when the evaluation result is passed, the production line simulation model is saved; when the evaluation result is not passed, the production line simulation model is optimized and the optimized production line simulation model is evaluated.

[0105] Example 10

[0106] This embodiment is different from Embodiment 1 in that a computer-readable storage medium is provided, wherein the computer-readable storage medium is used to store program codes, and the program codes are used to execute the steps of the above-mentioned engineering logistics simulation method based on the LED tunnel light flexible production line.

[0107] In summary, the present invention obtains the product process and production process of the LED tunnel light production line, establishes a production line simulation model through a simulation system, evaluates and optimizes the production line simulation model, simulates the layout planning and optimizes the LED tunnel production line, analyzes the production efficiency of each workstation, optimizes the existing bottleneck workstations, improves the production line simulation model through reasonable settings, verifies the feasibility and reference of the optimized plan, improves the production efficiency and product quality of the LED tunnel light production line, and achieves cost reduction and efficiency improvement.

[0108] Those of ordinary skill in the art will appreciate that the units of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition of each example has been generally described in terms of function in the above description. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0109] In the embodiments provided by the present invention, it should be understood that the division of units is only a logical function division, and there may be other division methods in actual implementation, for example, multiple units can be combined into one unit, one unit can be split into multiple units, or some features can be ignored, etc.

[0110] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0111] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-0nlyMemory), random access memory (RAM, RandomAccessMemory), mobile hard disk, magnetic disk or optical disk, etc., which can store program code.

[0112] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.

Claims

1. An engineering logistics simulation method based on a flexible production line of LED tunnel lights, characterized in that: The following steps are involved: Obtain the product technology and production process of LED tunnel light production line; Constructing a workstation production model based on the product process and production process; constructing a sub-production line model based on the workstation production model; Based on the product process and production process, the workshop layout and logistics layout of the workstation production model and the sub-production line model are performed to generate a production line simulation model; Performing simulation of LED tunnel lamp production through the production line simulation model; The production line simulation model for simulation is evaluated; when the evaluation result is passed, the production line simulation model is saved; when the evaluation result is not passed, the production line simulation model is optimized, and the optimized production line simulation model is evaluated.

2. According to claim 1, a method for simulating engineering logistics based on a flexible production line of LED tunnel lights, characterized in that: The construction station production model includes construction assembly stations, test stations, material buffers, material placement buffers, tray packaging stations, and a three-dimensional warehouse.

3. According to claim 1, the engineering logistics simulation method based on the LED tunnel light flexible production line is characterized in that: The construction of the sub-production line model based on the workstation production model includes constructing an assembly sub-production line, a waterproof test sub-production line, an aging test sub-production line, and a packaging sub-production line.

4. According to claim 1, the engineering logistics simulation method based on the LED tunnel light flexible production line is characterized in that: The product process and production flow are used to carry out the workshop layout of the workstation production model and the sub-production line model, including the following steps: Determine the layout type based on the space requirements of the sub-production line model and production line simulation model and the location settings of the inlet and outlet ports; Carry out workshop layout for the production line simulation model and each sub-production line model respectively.

5. The engineering logistics simulation method based on the LED tunnel light flexible production line according to claim 1 is characterized in that: The product process and production flow are used to carry out the logistics layout of the workstation production model and the sub-production line model; including the following steps: Construct AGV transmission module and conveyor belt transmission module; Configure an AGV transmission module or a conveyor belt transmission module for the sub-production line model.

6. The engineering logistics simulation method based on the LED tunnel light flexible production line according to claim 1 is characterized in that: The evaluation of the production line simulation model for simulation includes the following steps: Obtain the blocking rate and working rate of the workstation production model, and obtain the output of the production line simulation model; If there is a blocking rate in a workstation production model, the workstation production model is set as a bottleneck workstation; Obtain the time of each process, number of workstations, and production rhythm of the production line simulation model; Calculate the production line balance rate for the production line simulation model; When the production line balance rate of the production line simulation model reaches 1, the production line simulation model is saved; when the production line simulation model is less than 1, the production line simulation model is optimized.

7. The engineering logistics simulation method based on the LED tunnel light flexible production line according to claim 1 is characterized in that: The optimization of the production line simulation model comprises the following steps: Optimize the workstations and processes of the sub-production line model with blocking rate; Obtain the time of each process, number of workstations, and production rhythm of the production line simulation model; Calculate the production line balance rate for the production line simulation model; The production line balance rates obtained before and after optimization are compared; when the optimization is successful, the production line balance rate of the sub-production line model increases and the blocking rate decreases; when the optimization fails, the production line balance rate of the sub-production line model decreases and the blocking rate increases.

8. The engineering logistics simulation method based on the LED tunnel light flexible production line according to claim 1 is characterized in that: The balance rate of the production line is calculated using the following formula: Among them, STj is the sum of the time of each process, m is the number of workstations, and CT is the production cycle (bottleneck process time). Preferably, the optimization of workstations and processes of the sub-production line model with a blocking rate is performed by increasing the number of workstations of the bottleneck process, shortening the working time of the bottleneck process, or adding a buffer zone.

9. An engineering logistics simulation system based on LED tunnel light flexible production line, characterized in that: include; The first processing unit is used to obtain the product technology and production process of the LED tunnel light production line; A second processing unit, used for building a workstation production model based on the product process and production process; Construct sub-production line model based on workstation production model; A third processing unit is used to perform workshop layout and logistics layout of the workstation production model and the sub-production line model based on the product process and production process, and generate a production line simulation model; A fourth processing unit, configured to simulate the production of LED tunnel lights through the production line simulation model; The fifth processing unit is used to evaluate the production line simulation model for simulation; when the evaluation result is passed, the production line simulation model is saved; when the evaluation result is not passed, the production line simulation model is optimized and the optimized production line simulation model is evaluated.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium is used to store program codes, and the program codes are used to execute the steps of the engineering logistics simulation method based on the LED tunnel light flexible production line according to any one of claims 1 to 8.