Logistics park road planning method and equipment
By obtaining the road usage information and vehicle model size of the logistics park, and using preset databases to match road parameters, the problem of unreasonable design and planning of the logistics park in the existing technology is solved, and rapid and reasonable road planning is achieved to ensure vehicle passage and resource utilization is achieved. effect.
Patent Information
- Application Number
- CN202411068654.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-12-06
AI Technical Summary
The existing logistics park design and planning methods cannot meet the actual operational needs of large logistics parks, resulting in unreasonable specific road size data such as entrance and exit width, internal road width and building column grid spacing, which cannot meet the resource utilization of vehicles through and subsequent construction.
By obtaining the planning and use scenario information of the target park, determining the purpose information of each road and the size information of the vehicle model for waiting, using the preset design parameter database to match the road parameter design data set, determining the maximum vehicle model size information and road demand size information, and thus achieving reasonable results road planning.
The road planning of the logistics park is achieved quickly and rationally, ensuring the smooth passage of vehicles, and avoiding waste of resources, and the road size results obtained are more in line with actual operational needs.
Smart Images

Figure CN119089536A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of park road planning, and in particular to a logistics park road planning method and equipment. Background Art
[0002] The design and planning of large-scale logistics parks is an emerging branch of design and planning, and there is no successful experience to learn from. The current common practice is to design large-scale logistics parks based on the experience of existing small and medium-sized logistics parks. Although this practice meets the relevant specifications, it often runs counter to the actual use needs during actual operation. For example, in large-scale logistics parks, the specific road size data such as entrance and exit width, internal road width, and building column grid spacing cannot meet the actual operation requirements. Summary of the invention
[0003] The purpose of this application is to provide a logistics park road planning method and equipment, which can quickly realize reasonable and practical road size planning in the logistics park.
[0004] To achieve the above objectives, this application provides the following solutions:
[0005] In a first aspect, the present application provides a logistics park road planning method, comprising:
[0006] Acquire target park planning and usage scenario information; the target park planning and usage scenario information includes usage information of each road in the target park;
[0007] For each road in the target park, determining corresponding size information of multiple types of vehicles to be used according to the usage information of the road;
[0008] In the preset design parameter database, the size information of each vehicle model to be used is matched to obtain the corresponding road parameter design data set;
[0009] Determine the maximum vehicle size information from the plurality of vehicle size information to be used, and determine the corresponding road size information according to the road parameter design data set corresponding to the maximum vehicle size information;
[0010] The final park planning result is determined based on the road size information corresponding to each road.
[0011] In a second aspect, the present application provides a logistics park road planning method, comprising:
[0012] Acquire target park planning and usage scenario information; the target park planning and usage scenario information includes usage information and planning parameters of each road in the target park;
[0013] For each road in the target park, determining corresponding size information of multiple types of vehicles to be used according to the usage information of the road;
[0014] In the preset design parameter database, the size information of each vehicle model to be used is matched to obtain the corresponding road parameter design data set;
[0015] Determining maximum vehicle size information from the plurality of vehicle size information to be used, and determining corresponding road requirement size information according to a road parameter design data set corresponding to the maximum vehicle size information;
[0016] The final park planning result is determined based on the planning parameters of each road and the corresponding road requirement size information.
[0017] In a third aspect, the present application provides a computer device, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the logistics park road planning method.
[0018] According to the specific embodiments provided by the present application, the present application discloses the following technical effects: The present application provides a logistics park road planning method and equipment, which determines the corresponding size information of multiple models to be used according to the use information of each road in the target park, and then matches the corresponding road parameter design data set from the preset design parameter database, and then performs planning based on this to obtain the final park planning result. A preset design parameter database is set up in the present application, and the required size data can be obtained more quickly by directly matching with the database; in addition, the road use is combined, and the size of the models running on the road is referred to, so that the road size result obtained by the final planning is more in line with reality and more reasonable, which can not only ensure the smooth passage of vehicles, but also avoid the waste of resources in the subsequent construction process to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0020] Figure 1 This is an application environment diagram of a logistics park road planning method in one embodiment of the present application;
[0021] Figure 2 A schematic diagram of a flow chart of a logistics park road planning method provided in one embodiment of the present application;
[0022] Figure 3A schematic diagram of a flow chart of a logistics park road planning method provided in another embodiment of the present application;
[0023] Figure 4 A schematic diagram of the structure of a computer device provided in one embodiment of the present application. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0025] In order to make the purpose, features and advantages of the present application more obvious and easy to understand, the present application is further described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0026] The logistics park road planning method provided in the embodiment of the present application can be applied to Figure 1 In the application environment shown. Among them, the terminal 102 communicates with the server 104 through the network. The data storage system can store the data that the server 104 needs to process and the preset design parameter database. The data storage system can be set up separately, or it can be integrated on the server 104, or it can be placed on the cloud or other servers. The terminal 102 can send the target park planning usage scenario information to the server 104. After the server 104 receives the target park planning usage scenario information, it combines the preset design parameter database to perform corresponding data matching, and then performs data size judgment and corresponding processing to obtain the final park planning result. The server 104 can feedback the final park planning result obtained to the terminal 102. In addition, in some embodiments, the logistics park road planning method can also be implemented by the server 104 or the terminal 102 alone. For example, the terminal 102 can directly perform planning processing on the target park planning usage scenario information, or the server 104 can obtain the target park planning usage scenario information from the data storage system for planning processing.
[0027] In an exemplary embodiment, Figure 2 As shown, a logistics park road planning method is provided. The method is executed by a computer device, and can be executed by a computer device such as a terminal or a server alone, or by a terminal and a server together. In the embodiment of the present application, the method is applied to Figure 1 The server 104 in the example is used for explanation, and the steps include the following steps 201 to 205.
[0028] Step 201, obtaining the target park planning and usage scenario information; the target park planning and usage scenario information includes the usage information of each road in the target park and the park function of the target park; the park function is logistics transit.
[0029] When the logistics transit park is located in the suburbs, the actual operation scenario of the park may be: large vehicles enter or leave the park from one intersection, and small vehicles enter or leave the park from another intersection; when the logistics transit park is located in the city, the actual operation scenario of the logistics may be: small vehicles enter or leave the park from one intersection, and another type of small vehicle enters or leaves the park from another intersection.
[0030] In actual applications, the target park planning usage scenario information is obtained by the design unit through inquiries and summarization with the park operator.
[0031] Step 202, for each road in the target park, determine the size information of the corresponding multiple types of vehicles to be used according to the purpose information of the road. For example, when the purpose information of the road is the entry of large vehicles, it is necessary to determine the size information of several large vehicles that can enter the park from the road, such as a 17-meter-long large truck and a 22-meter-long large truck. For different logistics parks and different road uses, the types of vehicles allowed to travel are different.
[0032] Step 203, matching the size information of each to-be-used vehicle model in the preset design parameter database to obtain a corresponding road parameter design data set; wherein the road parameter design data set recorded in the preset design parameter database is determined based on the vehicle operation trajectory of the corresponding vehicle model, for example, vehicle N1 enters from entrance A of the park, passes through roads B and C, and arrives at entrance C, and vehicle N2 enters from entrance E of the park, passes through roads C and F, and arrives at entrance G; then, for road B in the park, the relevant parameters of vehicle N1 need to be considered; for road C in the park, the relevant parameters of vehicles N1 and N2 need to be considered; for road F in the park, the relevant parameters of vehicle N2 need to be considered.
[0033] The road parameter design data set includes the park entrance and exit width, the park internal road width, the park internal road angle, the park internal ramp length, the park internal ramp width, the park internal ramp angle, the park building spacing, the park building column grid specifications and the park building column grid spacing. It should be noted that the correspondence between the multiple parameters in the road parameter design data set and the vehicle model size are all calculated in advance, and in this step, they can be directly matched.
[0034] Step 204 , determining the maximum vehicle size information from the plurality of vehicle size information to be used, and determining the corresponding road size information according to the road parameter design data set corresponding to the maximum vehicle size information.
[0035] Generally speaking, the road size information obtained in this step needs to be greater than or equal to the data in the road parameter design data set corresponding to the maximum vehicle size information. The relevant data of the largest vehicle to be run is used as the minimum data for subsequent road construction to ensure the smooth movement of vehicles after the subsequent construction.
[0036] Step 205: Determine the final park planning result according to the road size information corresponding to each road. In actual application, the road size can also be adjusted to a certain extent by relevant technical personnel based on experience.
[0037] In another exemplary embodiment, Figure 3 As shown, a logistics park road planning method is provided. The method is executed by a computer device, and can be executed by a computer device such as a terminal or a server alone, or by a terminal and a server together. In the embodiment of the present application, the method is applied to Figure 1 The server 104 in the example is used for explanation, and the steps include the following steps 301 to 305.
[0038] Step 301, obtain the target park planning and usage scenario information; the target park planning and usage scenario information includes the usage information and planning parameters of each road in the target park. The usage information of the road is consistent with the content recorded in the embodiment shown above, and will not be repeated here. The planning parameters of the road are generally obtained by relevant technical personnel by measuring the parameters of each specific location of the park according to the park planning map.
[0039] Step 302: for each road in the target park, determine the size information of the corresponding multiple types of vehicles to be used according to the usage information of the road.
[0040] Step 303, matching the size information of each vehicle model to be used in the preset design parameter database to obtain a corresponding road parameter design data set; wherein the road parameter design data set recorded in the preset design parameter database is determined based on the vehicle running trajectory of the corresponding vehicle model.
[0041] The road parameter design data set includes the park entrance and exit width, the park internal road width, the park internal road angle, the park internal ramp length, the park internal ramp width, the park internal ramp angle, the park building spacing, the park building column grid specifications and the park building column grid spacing. It should be noted that the correspondence between the multiple parameters in the road parameter design data set and the vehicle model size are all calculated in advance, and in this step, they can be directly matched.
[0042] Step 304 , determining the maximum vehicle size information from the plurality of vehicle size information to be used, and determining the corresponding road requirement size information according to the road parameter design data set corresponding to the maximum vehicle size information.
[0043] Specifically, according to the scenario of the planned use of the road in the park, the largest vehicle type that can pass through the park at this specific location is obtained, and the road parameter design data set of this vehicle type is used as the demand parameters for this specific location of the park.
[0044] Step 305: Determine the final park planning result based on the planning parameters of each road and the corresponding road requirement size information.
[0045] In an application example, step 305 specifically includes:
[0046] (1) For each road in the target park, determine whether the difference between the planning parameters of the road and the required road size information is a negative value.
[0047] (2) If the difference between the planning parameters of the road and the required road size information is a negative value, the adjusted road size information is determined based on the planning parameters of the road and the required road size information; specifically, when the difference between the planning parameters of the road and the required road size information is a negative value, the planning map of this specific location is modified so that the result of subtracting the required road size information from the planning parameters of the road is not a negative value.
[0048] (3) If the difference between the planning parameters of the road and the required road size information is not a negative value, the planning parameters of the road are used as the adjusted road size information; it should be noted that the required road size information contains multiple required parameters, and it is necessary to ensure that the difference between each parameter in the planning parameters and the corresponding required parameter is not a negative value.
[0049] (4) Determine the final park planning result based on the adjusted size information corresponding to each road.
[0050] This application obtains relevant universal parameters of vehicle traffic design through database matching and other means, and then conducts vehicle traffic design for the park, or conducts traffic design after verifying the rationality of the vehicle traffic design drawing files for the park. It has the advantages of easy use, clear results, practicality and efficiency.
[0051] In an exemplary embodiment, a computer device is provided. The computer device may be a server or a terminal. The internal structure diagram thereof may be as follows: Figure 4As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, the steps of a logistics park road planning method in any of the above embodiments are implemented.
[0052] Those skilled in the art will understand that Figure 4 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components. In an exemplary embodiment, a computer device is provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above-mentioned method embodiments when executing the computer program.
[0053] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.
[0054] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. By way of illustration and not limitation, RAM may be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM).
[0055] The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. The non-relational database may include a distributed database based on blockchain, etc., but is not limited thereto. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but is not limited thereto.
[0056] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0057] This article uses specific examples to illustrate the principles and implementation methods of this application. The description of the above embodiments is only used to help understand the method and core ideas of this application. At the same time, for those skilled in the art, according to the ideas of this application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting this application.
Claims
1. A logistics park road planning method, characterized in that: The logistics park road planning method comprises: Acquire target park planning and usage scenario information; the target park planning and usage scenario information includes usage information of each road in the target park; For each road in the target park, determining corresponding size information of multiple types of vehicles to be used according to the usage information of the road; In the preset design parameter database, the size information of each vehicle model to be used is matched to obtain the corresponding road parameter design data set; Determine the maximum vehicle size information from the plurality of vehicle size information to be used, and determine the corresponding road size information according to the road parameter design data set corresponding to the maximum vehicle size information; The final park planning result is determined based on the road size information corresponding to each road.
2. The logistics park road planning method according to claim 1, characterized in that: The road parameter design data set includes the width of the park entrance and exit, the width of the road inside the park, the curve angle of the road inside the park, the length of the ramp inside the park, the width of the ramp inside the park, the curve angle of the ramp inside the park, the distance between park buildings, the column grid specifications of park buildings and the column grid distance between park buildings.
3. The logistics park road planning method according to claim 1, characterized in that: The target park planning usage scenario information also includes the park function of the target park; the park function is logistics transit.
4. The logistics park road planning method according to claim 1, characterized in that: The road parameter design data set recorded in the preset design parameter database is determined based on the vehicle running trajectory of the corresponding vehicle model.
5. A logistics park road planning method, characterized in that: The logistics park road planning method comprises: Acquire target park planning and usage scenario information; the target park planning and usage scenario information includes usage information and planning parameters of each road in the target park; For each road in the target park, determining corresponding size information of multiple types of vehicles to be used according to the usage information of the road; In the preset design parameter database, the size information of each vehicle model to be used is matched to obtain the corresponding road parameter design data set; Determining maximum vehicle size information from the plurality of vehicle size information to be used, and determining corresponding road requirement size information according to a road parameter design data set corresponding to the maximum vehicle size information; The final park planning result is determined based on the planning parameters of each road and the corresponding road requirement size information.
6. The logistics park road planning method according to claim 5, characterized in that: Based on the planning parameters of each road and the corresponding road size information, the final park planning results are determined, including: For each road in the target park, determining whether a difference between the planning parameters of the road and the required road size information is a negative value; If the difference between the planning parameters of the road and the required road size information is a negative value, determining the adjusted road size information according to the planning parameters of the road and the required road size information; If the difference between the planning parameter of the road and the required road size information is not a negative value, the planning parameter of the road is used as the adjusted road size information; The final park planning result is determined based on the adjusted size information corresponding to each road.
7. The logistics park road planning method according to claim 5, characterized in that: The road parameter design data set recorded in the preset design parameter database is determined based on the vehicle running trajectory of the corresponding vehicle model.
8. A computer device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the logistics park road planning method described in any one of claims 1 to 4.
9. A computer device comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the logistics park road planning method described in any one of claims 5 to 7.