Ecological management method and system for small watershed river channel

By dividing the river channels into different types of sections and adopting adaptive bank protection projects, the problems of weak flood discharge capacity and deterioration of water quality in small rivers are solved, and efficient ecological governance and environmental protection are achieved.

CN119090367AInactive Publication Date: 2024-12-06惠州市水土保持监督监测站 +1

Patent Information

Application Number
CN202410985852.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Due to the complex terrain and diverse hydrological conditions in the small river basin, the silt changes at the bottom of the river, resulting in weak flood discharge capacity. The construction of existing reinforced concrete shore protection is difficult and destroys biodiversity, affects water quality, and leads to poor management results.

Method used

According to the current status of the river and surrounding information, it is divided into conventional protection, ecological governance and ecological transformation of river sections, and an ecological governance model is generated. Through simulated construction and evaluation adjustment plans, gabion shore protection, siltation and dredging, and vegetation planting are used to divide the measures. Section governance.

Benefits of technology

Adaptive bank protection projects for different river channels have been achieved, avoiding defects of reinforced concrete, improving flood discharge capacity and water quality purification effect, protecting the ecological environment, and achieving the best management effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119090367A_ABST
    Figure CN119090367A_ABST
Patent Text Reader

Abstract

The invention discloses an ecological management method and system for a small-watershed river channel. The method comprises the following steps: dividing a target small-watershed river channel into a plurality of regulation river reaches; simulating and generating an ecological management model of the target small watershed based on the preset improvement scheme corresponding to each improvement river reach; adjusting model parameters of the ecological management model to generate a target ecological management model of the target small watershed river channel; evaluating the target ecological management model by using a preset small watershed ecological evaluation model; and if the small watershed ecological assessment result accords with an expected result, comprehensive treatment construction is performed on each treatment reach of the target small watershed river channel based on the target ecological treatment model. Segmented construction treatment of a target small watershed river channel is achieved, different bank protection projects can be adopted for different river channels, and the defect that only a reinforced concrete bank protection is adopted as a bank protection project is overcome; meanwhile, through scheme adjustment and simulation evaluation, it is guaranteed that corresponding construction schemes are matched with all river channels, measures are adjusted according to local conditions, and the optimal treatment effect is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of ecological management technology, and in particular to a method and system for ecological management of a small watershed river. Background Art

[0002] Small watersheds usually refer to relatively independent and closed natural catchment areas with a catchment area of ​​less than 50 km2, bounded by the watershed and the downstream river outlet section below the second and third-level tributaries. They have complex topography, diverse hydrological conditions, rich soil types, and fragile ecological environment. Among them, for river areas with undulating longitudinal slopes, the riverbed scouring and silting changes greatly and the siltation is serious, which affects the discharge of floods during the flood season and seriously weakens the flood discharge capacity of the river.

[0003] At present, the ecological management of small watersheds relies on river bank protection projects, which mainly use reinforced concrete as construction materials to increase the slope and stability of the river. However, reinforced concrete bank protection has the defects of difficult construction and poor aesthetics. At the same time, reinforced concrete materials will affect the normal growth of plants and destroy biodiversity. Over time, it will lead to water quality deterioration, which will lead to poor river management results. Summary of the invention

[0004] The present application provides a method and system for ecological management of small watershed rivers to solve the above-mentioned technical problems.

[0005] In order to solve the above technical problems, in the first aspect, the present application provides a method for ecological management of a small watershed river, comprising: According to the current information of the target small watershed river and the surrounding information, the target small watershed river is divided into a plurality of regulated river sections, wherein the regulated river sections include conventional protection river sections, ecological management river sections and ecological transformation river sections; Based on the preset regulation plans corresponding to the respective regulated river sections, an ecological regulation model of the target small watershed is simulated and generated; In response to the user's adjustment operation, the model parameters of the ecological governance model are adjusted until the user confirms that the adjustment is completed, and a target ecological governance model of the target small watershed river is generated; Using a preset small watershed ecological assessment model, the target ecological governance model is assessed to obtain a small watershed ecological assessment result; If the small watershed ecological assessment results of the target ecological management model are in line with the expected results, comprehensive management construction will be carried out on each improvement section of the target small watershed river based on the target ecological management model.

[0006] In some of the embodiments, the target small watershed river is divided into a plurality of regulation river sections according to the river status information and surrounding information of the target small watershed river, including: Using on-site survey equipment to collect the current information of the river channel of the target small watershed, and to obtain the surrounding information on both sides of the river channel of the target small watershed, the current information of the river channel includes river flow information, river bottom elevation information, river channel soil information and river channel pollution information, and the surrounding information includes village distribution information, farmland distribution information and factory distribution information; The river sections in the target small watershed where villages, farmlands or silt are distributed are classified as ecological management river sections; The river sections in the target small watershed where factories are distributed or the river sections with pollution levels greater than a preset value are classified as ecologically renovated river sections; Other river sections in the target small watershed that have not been classified as ecological management river sections and ecological transformation river sections shall be classified as conventional protection river sections.

[0007] In some embodiments, the simulation and generation of the ecological management model of the target small watershed river channel based on the preset management schemes corresponding to the respective management river sections includes: For each of the regulated river sections, according to the reasons for the segmentation of the regulated river section, a preset regulation plan corresponding to the regulated river section is matched, and the preset regulation plan includes a bank protection project plan, a dredging project plan, a river dam project plan, a vegetation planting plan and a water purification plan; By using preset simulation construction tools and according to the preset regulation plan, simulated construction is carried out on the target small watershed river channel to generate the ecological management model after the simulated construction of the target small watershed river channel.

[0008] In some embodiments, in response to the user's adjustment operation, the model parameters of the ecological governance model are adjusted until the user confirms that the adjustment is completed, and the target ecological governance model of the target small watershed river is generated, including: In response to a user's scheme replacement operation, scheme deletion operation, scheme addition operation and / or scheme parameter change operation, the regulation scheme corresponding to the regulated river section in the ecological governance model is replaced, deleted, added and / or the parameters are changed; In response to the user's confirmation operation, the adjusted ecological management model is determined as the target ecological management model of the target small watershed river.

[0009] In some embodiments, the use of a preset small watershed ecological assessment model to assess the target ecological governance model to obtain a small watershed ecological assessment result includes: The preset small watershed ecological assessment model is used to simulate the flood conditions, drought conditions and factory sewage conditions in the target small watershed river, and the small watershed ecological assessment results of the target ecological governance model are evaluated. The small watershed ecological assessment results include the flood discharge capacity assessment results under flood conditions, the water storage capacity assessment results under drought conditions and the water purification capacity under factory sewage conditions.

[0010] In some embodiments, if the ecological assessment result of the small watershed of the target ecological management model meets the expected result, comprehensive management construction is carried out on each regulation river section of the target small watershed river based on the target ecological management model, including: If the ecological assessment result of the small watershed of the target ecological governance model meets the expected result, the remediation plan corresponding to the target ecological governance model is sent to the construction unit as the construction plan of the construction unit; Among them, for the ecological management river section with villages and farmlands, gabion footing is used as the bank retaining wall, and the top surface of the gabion footing is paved with C30 concrete pavement and turf slope protection; For river sections with sediment accumulation, the riverbed is dredged and stepped waterfalls and hydrophilic stepping stones are used at the sediment accumulation locations. For ecologically renovated river sections where factories are distributed, gabion retaining walls are used on the river bank, and mortar-laid stone retaining walls are used at preset positions away from the shore. Connecting bridges are set up at the joints of the mortar-laid stone retaining walls and the gabion retaining walls to form purification pools through which river water can flow in and out, and vegetation is planted in the purification pools.

[0011] In some embodiments, after evaluating the target ecological management model using a preset small watershed ecological assessment model and obtaining the small watershed ecological assessment result, the method further includes: If the ecological assessment result of the small watershed of the target ecological governance model does not meet the expected result, then output the ecological governance river section and the reason that does not meet the expected result in the target ecological governance model; Based on the reasons stated above, the plan for the ecological management river sections that do not meet the expected results will be modified; Based on the target ecological management model after the modification of the plan, comprehensive management construction is carried out on each river section of the target small watershed river.

[0012] In the second aspect, the present application also provides a small watershed river ecological management system, including: A segmentation module is used to divide the target small watershed river into multiple regulation river sections according to the river status information and surrounding information of the target small watershed river, and the regulation river sections include conventional protection river sections, ecological governance river sections and ecological transformation river sections; A simulation module, used to simulate and generate an ecological management model of the target small watershed based on the preset management plans corresponding to each of the managed river sections; An adjustment module, for adjusting the model parameters of the ecological governance model in response to the user's adjustment operation, until the user confirms that the adjustment is completed, and generating a target ecological governance model for the target small watershed river; An evaluation module is used to evaluate the target ecological governance model using a preset small watershed ecological evaluation model to obtain a small watershed ecological evaluation result; The governance module is used to carry out comprehensive governance construction on each regulated river section of the target small watershed river based on the target ecological governance model if the small watershed ecological assessment result of the target ecological governance model meets the expected result.

[0013] In a third aspect, the present application also provides a computer device, including a processor and a memory, wherein the memory is used to store a computer program, and when the computer program is executed by the processor, the method for ecological management of a small watershed river as described in the first aspect above is implemented.

[0014] In a fourth aspect, the present application also provides a computer-readable storage medium storing a computer program, which, when executed by a processor, implements the small watershed river ecological management method as described in the first aspect above.

[0015] Compared with the prior art, this application has at least the following beneficial effects: The present application divides the target small watershed river into multiple regulation sections according to the current status information and surrounding information of the target small watershed river, and the regulation sections include conventional protection sections, ecological regulation sections and ecological transformation sections; based on the preset regulation plans corresponding to each of the regulation sections, an ecological regulation model of the target small watershed is simulated and generated; in response to the user's adjustment operation, the model parameters of the ecological regulation model are adjusted until the user confirms that the adjustment is complete, and a target ecological regulation model of the target small watershed river is generated; using a preset small watershed ecological assessment model, the target ecological governance model is evaluated to obtain a small watershed ecological assessment result; if the small watershed ecological assessment result of the target ecological governance model meets the expected result, then based on the target ecological governance model, comprehensive regulation construction is carried out on each regulation section of the target small watershed river. By implementing segmented construction on the target small watershed river channel, different bank protection projects can be adopted for different river channels, avoiding the defects of using only reinforced concrete bank protection as the bank protection project; at the same time, through scheme adjustment and simulation evaluation, it is ensured that the corresponding construction scheme is adapted to each river channel, adapted to local conditions, and achieves the best governance effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1A schematic diagram of a process for ecological management of a small watershed river channel shown in an embodiment of the present application; Figure 2 This is a schematic diagram of the structure of the gabion revetment shown in the embodiment of the present application; Figure 3 A schematic diagram of the structure of a small watershed river ecological management system shown in an embodiment of the present application; Figure 4 A schematic diagram of the structure of a computer device shown in an embodiment of the present application. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0018] Please refer to Figure 1 , Figure 1 A flow chart of a small watershed river ecological management method provided in an embodiment of the present application. The small watershed river ecological management method of the embodiment of the present application can be applied to computer devices, including but not limited to smart phones, laptops, tablet computers, desktop computers, physical servers, cloud servers and other devices. Figure 1 As shown, the small watershed river ecological management method of this embodiment includes steps S101 to S105, which are described in detail as follows: Step S101, dividing the target small watershed river into a plurality of regulation river sections according to the river channel status information and surrounding information of the target small watershed river, wherein the regulation river sections include conventional protection river sections, ecological management river sections and ecological transformation river sections.

[0019] In this step, the target small watershed river is divided into multiple sections for regulation. Targeted regulation can be carried out according to the specific conditions of each section of the river and the characteristics of the surrounding environment, avoiding a one-size-fits-all approach and improving the regulation effect. By comprehensively considering surrounding information, such as land use, water quality, and ecosystem health, limited resources can be maximized, and comprehensive regulation of the river can be achieved to improve regulation efficiency and cost-effectiveness. At the same time, segmented regulation can help establish a long-term management and maintenance mechanism, and the governance results and problems of each river section can be more clearly evaluated and monitored, which is conducive to the long-term improvement and protection of the ecological environment.

[0020] In some embodiments, the step S101 includes: Using on-site survey equipment to collect the current information of the river channel of the target small watershed, and to obtain the surrounding information on both sides of the river channel of the target small watershed, the current information of the river channel includes river flow information, river bottom elevation information, river channel soil information and river channel pollution information, and the surrounding information includes village distribution information, farmland distribution information and factory distribution information; The river sections in the target small watershed where villages, farmlands or silt are distributed are classified as ecological management river sections; The river sections in the target small watershed where factories are distributed or the river sections with pollution levels greater than a preset value are classified as ecologically renovated river sections; Other river sections in the target small watershed that have not been classified as ecological management river sections and ecological transformation river sections shall be classified as conventional protection river sections.

[0021] In this embodiment, a drone carrying a high-resolution camera can be used to perform vertical and oblique photography of the target small watershed, and a three-dimensional image of the river and surrounding areas can be quickly obtained for analyzing river flow information, riverbed elevation information, river soil information, and river pollution information. Satellite remote sensing images can be used to observe changes in the target small watershed more macroscopically, including changes in the distribution of villages, farmland, and factories, as well as natural changes in the river. Ground monitoring stations can be set up on both sides of the river to monitor river water quality, water volume, sediment content, and river pollution information in real time. In this embodiment, the target small watershed river is segmented so that different rivers can be finely managed, avoiding the use of reinforced concrete revetments to prevent secondary damage to the ecology. The present invention is more in line with the ecological characteristics of small watershed rivers and can effectively improve the management effect and resource utilization efficiency.

[0022] Step S102, based on the preset regulation plans corresponding to the respective regulated river sections, an ecological regulation model of the target small watershed is simulated and generated.

[0023] In this step, the ecological governance model is a visualized river model after the simulated construction of the remediation plan. The simulated ecological governance model can be customized according to the specific preset remediation plan for each regulated river section, so as to formulate the most appropriate governance strategy for the characteristics and problems of different river sections to achieve the best ecological restoration effect. The model can comprehensively consider the characteristics of the river itself (such as flow, water quality, sediment content, etc.) and surrounding environmental factors (such as the distribution of villages, farmland, and factories), and can predict the development trend of the river ecosystem under different governance plans, which is helpful to evaluate the long-term effect of the governance plan, so as to provide a scientific basis and foresee possible ecological changes in the future. At the same time, this step can help optimize resource allocation, determine the human, material and financial resources required in the governance process, and improve governance efficiency and cost-effectiveness.

[0024] In some embodiments, the step S102 includes: For each of the regulated river sections, according to the reasons for the segmentation of the regulated river section, a preset regulation plan corresponding to the regulated river section is matched, and the preset regulation plan includes a bank protection project plan, a dredging project plan, a river dam project plan, a vegetation planting plan and a water purification plan; By using preset simulation construction tools and according to the preset regulation plan, simulated construction is carried out on the target small watershed river channel to generate the ecological management model after the simulated construction of the target small watershed river channel.

[0025] In this embodiment, each river section under renovation can match at least one of the bank protection engineering scheme, dredging engineering scheme, river dam engineering scheme, vegetation planting scheme and water purification scheme. For example, a conventionally protected river section can only match one bank protection engineering scheme without matching other schemes; an ecologically renovated river section can match the bank protection engineering scheme, dredging engineering scheme, river dam engineering scheme, vegetation planting scheme and water purification scheme respectively. The preset simulation construction tool can be a tool such as Synchro 4D, Navisworks, Revit, Civil 3D or Tekla Structures. This embodiment can simulate various possible risks and adverse effects through simulation construction tools, thereby helping to avoid potential ecological and environmental risks and ensure the long-term sustainability of ecological governance.

[0026] Step S103, in response to the user's adjustment operation, the model parameters of the ecological management model are adjusted until the user confirms that the adjustment is completed, and a target ecological management model of the target small watershed river is generated.

[0027] In this step, the user adjusts the construction plan according to actual needs to better suit the actual construction conditions of the river.

[0028] In some embodiments, the step S103 includes: In response to a user's scheme replacement operation, scheme deletion operation, scheme addition operation and / or scheme parameter change operation, the regulation scheme corresponding to the regulated river section in the ecological governance model is replaced, deleted, added and / or the parameters are changed; In response to the user's confirmation operation, the adjusted ecological management model is determined as the target ecological management model of the target small watershed river.

[0029] In this embodiment, the data of the current ecological governance model and the new solution requirements input by the user can be automatically matched and replaced, and the impact of the change can be evaluated; the impact of the new or modified solution can also be simulated in real time and integrated into the existing ecological governance model to achieve comprehensive governance coverage and effect evaluation. This embodiment supports users to dynamically adjust and confirm ecological governance solutions according to real-time needs, so as to better achieve the protection and sustainable development of the river ecological environment.

[0030] Step S104, using a preset small watershed ecological assessment model, the target ecological management model is assessed to obtain a small watershed ecological assessment result.

[0031] In this step, the preset small watershed ecological assessment model can be an assessment model in tools such as Synchro 4D, Navisworks, Revit, Civil 3D or Tekla Structures. This embodiment uses the preset small watershed ecological assessment model to assess the target ecological governance model, which can ensure the scientificity and comprehensiveness of the assessment, improve the assessment efficiency and decision-making quality, and promote the sustainable management and protection of the small watershed ecological environment.

[0032] In some embodiments, the step S104 includes: The preset small watershed ecological assessment model is used to simulate the flood conditions, drought conditions and factory sewage conditions in the target small watershed river, and the small watershed ecological assessment results of the target ecological governance model are evaluated. The small watershed ecological assessment results include the flood discharge capacity assessment results under flood conditions, the water storage capacity assessment results under drought conditions and the water purification capacity under factory sewage conditions.

[0033] In this embodiment, for example, for flood conditions, real-time hydrological data monitoring, such as rainfall, river flow, reservoir water level, etc., can be integrated, and a flood evolution model, such as a one-dimensional or two-dimensional fluid dynamics model, can be established to simulate the evolution of floods under different terrain and river conditions, so as to accurately simulate the flood discharge capacity of flood conditions. For example, for sewage discharge, environmental pollution data such as factory emissions, urban sewage and agricultural pollution can be integrated to establish a water quality model, such as a zero-dimensional or one-dimensional water quality model, to simulate the transport and mixing process of pollutants in the river and evaluate the water purification capacity. By simulating floods, droughts and environmental pollution, this embodiment can predict the ecological status of small watershed rivers under special events, so that the target ecological governance model is more in line with the ecological characteristics of small watershed rivers and ensures long-term and stable governance.

[0034] Step S105: If the ecological assessment result of the small watershed of the target ecological management model meets the expected result, comprehensive management construction is carried out on each regulation river section of the target small watershed river based on the target ecological management model.

[0035] In this step, optionally, if the small watershed ecological assessment result of the target ecological governance model meets the expected result, the remediation plan corresponding to the target ecological governance model is sent to the construction unit as the construction plan of the construction unit; For example, for ecological management river sections with villages and farmlands, gabion foot guards are used as revetment retaining walls, and the top surface of the gabion foot guards is paved with C30 concrete pavement and turf slope protection; For river sections with sediment accumulation, the riverbed is dredged and stepped waterfalls and hydrophilic stepping stones are used at the sediment accumulation locations. For ecologically renovated river sections where factories are distributed, gabion retaining walls are used on the river bank, and mortar-laid stone retaining walls are used at preset positions away from the shore. Connecting bridges are set up at the joints of the mortar-laid stone retaining walls and the gabion retaining walls to form purification pools through which river water can flow in and out, and vegetation is planted in the purification pools.

[0036] Among them, gabion foot guards are suitable for drainage ditches that are not restricted by terrain. Figure 2 As shown, the foot guard is divided into two layers, and each layer of gabion cage (galvanized, plastic coated) is 1m high. The gabion foot guard is used, the foot guard is 2.0m high, the designed burial depth is 1.0m, the wall top is 1.0m wide, and a 1.0m wide and 200mm thick C30 concrete pavement (pavement inlaid with river pebbles) is laid on the top of the wall. Before backfilling the earth, a layer of geotextile (300g / m2) should be laid on the backwater side of the wall as a filter layer. The gabion specifications are 2m×0.8m×1m and 2m×1.5m×1m. The top of the wall uses turf slope protection, and the bank slope is appropriately adjusted according to the existing terrain and controlled at about 1:1.5.

[0037] This embodiment can not only effectively solve the ecological and environmental problems of the river, but also improve the riverbank protection capacity and water quality, achieve the coordinated development of ecology and environment, and comply with the basic principles of sustainable governance and the needs of social and economic development.

[0038] In some embodiments, after step S103, the method further includes: If the ecological assessment result of the small watershed of the target ecological governance model does not meet the expected result, then output the ecological governance river section and the reason that does not meet the expected result in the target ecological governance model; Based on the reasons stated above, the plan for the ecological management river sections that do not meet the expected results will be modified; Based on the target ecological management model after the modification of the plan, comprehensive management construction is carried out on each river section of the target small watershed river.

[0039] In this embodiment, the ecological management river section that does not meet the expected results can be modified by user means or by system settings.

[0040] In order to implement the small watershed river ecological management method corresponding to the above method embodiment, to achieve the corresponding functions and technical effects. Figure 3 , Figure 3 The structural block diagram of a small watershed river ecological management system provided in an embodiment of the present application is shown. For the sake of convenience, only the parts related to this embodiment are shown. The small watershed river ecological management system provided in an embodiment of the present application includes: The segmentation module 301 is used to divide the target small watershed river into a plurality of regulation river sections according to the river channel status information and surrounding information of the target small watershed river, wherein the regulation river sections include conventional protection river sections, ecological governance river sections and ecological transformation river sections; A simulation module 302 is used to simulate and generate an ecological management model of the target small watershed based on the preset management plans corresponding to each of the managed river sections; The adjustment module 303 is used to adjust the model parameters of the ecological management model in response to the user's adjustment operation, until the user confirms that the adjustment is completed, and generate the target ecological management model of the target small watershed river; An evaluation module 304 is used to evaluate the target ecological management model using a preset small watershed ecological evaluation model to obtain a small watershed ecological evaluation result; The governance module 305 is used to carry out comprehensive governance construction on each regulated river section of the target small watershed river based on the target ecological governance model if the small watershed ecological assessment result of the target ecological governance model meets the expected result.

[0041] In some embodiments, the segmentation module 301 is specifically used to: Using on-site survey equipment to collect the current information of the river channel of the target small watershed, and to obtain the surrounding information on both sides of the river channel of the target small watershed, the current information of the river channel includes river flow information, river bottom elevation information, river channel soil information and river channel pollution information, and the surrounding information includes village distribution information, farmland distribution information and factory distribution information; The river sections in the target small watershed where villages, farmlands or silt are distributed are classified as ecological management river sections; The river sections in the target small watershed where factories are distributed or the river sections with pollution levels greater than a preset value are classified as ecologically renovated river sections; Other river sections in the target small watershed that have not been classified as ecological management river sections and ecological transformation river sections shall be classified as conventional protection river sections.

[0042] In some embodiments, the simulation module 302 is specifically used to: For each of the regulated river sections, according to the reasons for the segmentation of the regulated river section, a preset regulation plan corresponding to the regulated river section is matched, and the preset regulation plan includes a bank protection project plan, a dredging project plan, a river dam project plan, a vegetation planting plan and a water purification plan; By using preset simulation construction tools and according to the preset regulation plan, simulated construction is carried out on the target small watershed river channel to generate the ecological management model after the simulated construction of the target small watershed river channel.

[0043] In some embodiments, the adjustment module 303 is specifically used to: In response to a user's scheme replacement operation, scheme deletion operation, scheme addition operation and / or scheme parameter change operation, the regulation scheme corresponding to the regulated river section in the ecological governance model is replaced, deleted, added and / or the parameters are changed; In response to the user's confirmation operation, the adjusted ecological management model is determined as the target ecological management model of the target small watershed river.

[0044] In some embodiments, the evaluation module 304 is specifically configured to: The preset small watershed ecological assessment model is used to simulate the flood conditions, drought conditions and factory sewage conditions in the target small watershed river, and the small watershed ecological assessment results of the target ecological governance model are evaluated. The small watershed ecological assessment results include the flood discharge capacity assessment results under flood conditions, the water storage capacity assessment results under drought conditions and the water purification capacity under factory sewage conditions.

[0045] In some embodiments, the governance module 305 is specifically used to: If the ecological assessment result of the small watershed of the target ecological governance model meets the expected result, the remediation plan corresponding to the target ecological governance model is sent to the construction unit as the construction plan of the construction unit; Among them, for the ecological management river section with villages and farmlands, gabion footing is used as the bank retaining wall, and the top surface of the gabion footing is paved with C30 concrete pavement and turf slope protection; For river sections with sediment accumulation, the riverbed is dredged and stepped waterfalls and hydrophilic stepping stones are used at the sediment accumulation locations. For ecologically renovated river sections where factories are distributed, gabion retaining walls are used on the river bank, and mortar-laid stone retaining walls are used at preset positions away from the shore. Connecting bridges are set up at the joints of the mortar-laid stone retaining walls and the gabion retaining walls to form purification pools through which river water can flow in and out, and vegetation is planted in the purification pools.

[0046] In some embodiments, the system further comprises: An output module, for outputting the ecologically managed river sections and reasons that do not meet the expected results in the target ecologically managed model if the ecological assessment results of the small watershed of the target ecologically managed model do not meet the expected results; A modification module is used to modify the plan for the ecological management river section that does not meet the expected results based on the reasons; The governance module 305 is also used to carry out comprehensive governance construction on each regulated river section of the target small watershed river based on the target ecological governance model after the scheme is modified.

[0047] The above-mentioned small watershed river ecological management system can implement the small watershed river ecological management method of the above-mentioned method embodiment. The options in the above-mentioned method embodiment are also applicable to this embodiment and will not be described in detail here. The rest of the contents of the embodiment of this application can refer to the contents of the above-mentioned method embodiment, and will not be repeated in this embodiment.

[0048] Figure 4 This is a schematic diagram of the structure of a computer device provided in one embodiment of the present application. Figure 4 As shown, the computer device 4 of this embodiment includes: at least one processor 40 ( Figure 4 Only one is shown in the figure), a memory 41, and a computer program 42 stored in the memory 41 and executable on the at least one processor 40, wherein the processor 40 implements the steps of any of the above method embodiments when executing the computer program 42.

[0049] The computer device 4 may be a computing device such as a smart phone, a tablet computer, a desktop computer, a cloud server, etc. The computer device may include but is not limited to a processor 40 and a memory 41. Those skilled in the art will appreciate that Figure 4 It is only an example of the computer device 4 and does not constitute a limitation on the computer device 4. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, it may also include input and output devices, network access devices, etc.

[0050] The processor 40 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.

[0051] In some embodiments, the memory 41 may be an internal storage unit of the computer device 4, such as a hard disk or memory of the computer device 4. In other embodiments, the memory 41 may also be an external storage device of the computer device 4, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the computer device 4. Further, the memory 41 may also include both an internal storage unit and an external storage device of the computer device 4. The memory 41 is used to store an operating system, an application program, a boot loader (BootLoader), data, and other programs, such as the program code of the computer program. The memory 41 may also be used to temporarily store data that has been output or is to be output.

[0052] In addition, an embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.

[0053] An embodiment of the present application provides a computer program product. When the computer program product is run on a computer device, the computer device implements the steps in the above-mentioned method embodiments when executing the computer device.

[0054] In several embodiments provided in the present application, it is understood that each box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, a program segment or a part of a code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from that marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved.

[0055] If the functions are implemented in the form of software function modules and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium and includes several instructions for a computer device to execute all or part of the steps of the methods described in the various embodiments of the present application. The aforementioned storage media include: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, and other media that can store program codes.

[0056] The specific embodiments described above further describe the purpose, technical solutions and beneficial effects of the present application in detail. It should be understood that the above description is only a specific embodiment of the present application and is not intended to limit the scope of protection of the present application. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of protection of the present application.

Claims

1. A method for ecological management of a small watershed river, characterized in that: include: According to the current information of the target small watershed river and the surrounding information, the target small watershed river is divided into a plurality of regulated river sections, wherein the regulated river sections include conventional protection river sections, ecological management river sections and ecological transformation river sections; Based on the preset regulation plans corresponding to the respective regulated river sections, an ecological regulation model of the target small watershed is simulated and generated; In response to the user's adjustment operation, the model parameters of the ecological governance model are adjusted until the user confirms that the adjustment is completed, and a target ecological governance model of the target small watershed river is generated; Using a preset small watershed ecological assessment model, the target ecological governance model is assessed to obtain a small watershed ecological assessment result; If the small watershed ecological assessment results of the target ecological management model are in line with the expected results, comprehensive management construction will be carried out on each improvement section of the target small watershed river based on the target ecological management model.

2. The method for ecological management of a small watershed river according to claim 1, characterized in that: According to the current information of the target small watershed river and the surrounding information, the target small watershed river is divided into a plurality of regulation river sections, including: Using on-site survey equipment to collect the current information of the river channel of the target small watershed, and to obtain the surrounding information on both sides of the river channel of the target small watershed, the current information of the river channel includes river flow information, river bottom elevation information, river channel soil information and river channel pollution information, and the surrounding information includes village distribution information, farmland distribution information and factory distribution information; The river sections in the target small watershed where villages, farmlands or silt are distributed are classified as ecological management river sections; The river sections in the target small watershed where factories are distributed or the river sections with pollution levels greater than a preset value are classified as ecologically renovated river sections; Other river sections in the target small watershed that have not been classified as ecological management river sections and ecological transformation river sections shall be classified as conventional protection river sections.

3. The method for ecological management of a small watershed river according to claim 1, characterized in that: The method of simulating and generating an ecological management model of the target small watershed river based on the preset management plans corresponding to each of the managed river sections includes: For each of the regulated river sections, according to the reasons for the segmentation of the regulated river section, a preset regulation plan corresponding to the regulated river section is matched, and the preset regulation plan includes a bank protection project plan, a dredging project plan, a river dam project plan, a vegetation planting plan and a water purification plan; By using preset simulation construction tools and according to the preset regulation plan, simulated construction is carried out on the target small watershed river channel to generate the ecological management model after the simulated construction of the target small watershed river channel.

4. The method for ecological management of a small watershed river according to claim 1, characterized in that: In response to the user's adjustment operation, the model parameters of the ecological governance model are adjusted until the user confirms that the adjustment is completed, and the target ecological governance model of the target small watershed river is generated, including: In response to a user's scheme replacement operation, scheme deletion operation, scheme addition operation and / or scheme parameter change operation, the regulation scheme corresponding to the regulated river section in the ecological governance model is replaced, deleted, added and / or the parameters are changed; In response to the user's confirmation operation, the adjusted ecological management model is determined as the target ecological management model of the target small watershed river.

5. The method for ecological management of a small watershed river according to claim 1, characterized in that: The preset small watershed ecological assessment model is used to assess the target ecological governance model to obtain the small watershed ecological assessment results, including: The preset small watershed ecological assessment model is used to simulate the flood conditions, drought conditions and factory sewage conditions in the target small watershed river, and the small watershed ecological assessment results of the target ecological governance model are evaluated. The small watershed ecological assessment results include the flood discharge capacity assessment results under flood conditions, the water storage capacity assessment results under drought conditions and the water quality purification capacity under factory sewage conditions.

6. The method for ecological management of a small watershed river according to claim 1, characterized in that: If the ecological assessment results of the small watershed of the target ecological governance model meet the expected results, comprehensive governance construction is carried out on each regulated river section of the target small watershed river based on the target ecological governance model, including: If the ecological assessment result of the small watershed of the target ecological governance model meets the expected result, the remediation plan corresponding to the target ecological governance model is sent to the construction unit as the construction plan of the construction unit; Among them, for the ecological management river section with villages and farmlands, gabion footing is used as the bank retaining wall, and the top surface of the gabion footing is paved with C30 concrete pavement and turf slope protection; For river sections with sediment accumulation, the riverbed is dredged and stepped waterfalls and hydrophilic stepping stones are used at the sediment accumulation locations. For ecologically renovated river sections where factories are distributed, gabion retaining walls are used on the river bank, and mortar-laid stone retaining walls are used at preset positions away from the shore. Connecting bridges are set up at the joints of the mortar-laid stone retaining walls and the gabion retaining walls to form purification pools through which river water can flow in and out, and vegetation is planted in the purification pools.

7. The method for ecological management of a small watershed river according to claim 1, characterized in that: After evaluating the target ecological governance model using the preset small watershed ecological assessment model and obtaining the small watershed ecological assessment result, the method further includes: If the ecological assessment result of the small watershed of the target ecological governance model does not meet the expected result, then output the ecological governance river section and the reason that does not meet the expected result in the target ecological governance model; Based on the reasons stated above, the plan for the ecological management river sections that do not meet the expected results will be modified; Based on the target ecological management model after the modification of the plan, comprehensive management construction is carried out on each river section of the target small watershed river.

8. A small watershed river ecological management system, characterized in that: include: A segmentation module is used to divide the target small watershed river into multiple regulation river sections according to the river status information and surrounding information of the target small watershed river, and the regulation river sections include conventional protection river sections, ecological governance river sections and ecological transformation river sections; A simulation module, used to simulate and generate an ecological management model of the target small watershed based on the preset management plans corresponding to each of the managed river sections; An adjustment module, for adjusting the model parameters of the ecological governance model in response to the user's adjustment operation, until the user confirms that the adjustment is completed, and generating a target ecological governance model for the target small watershed river; An evaluation module is used to evaluate the target ecological governance model using a preset small watershed ecological evaluation model to obtain a small watershed ecological evaluation result; The governance module is used to carry out comprehensive governance construction on each regulated river section of the target small watershed river based on the target ecological governance model if the small watershed ecological assessment result of the target ecological governance model meets the expected result.

9. A computer device, characterized in that: It comprises a processor and a memory, wherein the memory is used to store a computer program, and when the computer program is executed by the processor, the small watershed river ecological management method as described in any one of claims 1 to 7 is implemented.

10. A computer-readable storage medium, characterized in that: It stores a computer program, which, when executed by a processor, implements the small watershed river ecological management method as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Riparian zone ecological remediation measure suitability assessment method

    CN107506939A

  • Riverway ecological revetment construction technology

    CN110306491A

  • River regulation scheme simulation and optimization method

    CN111177875A

  • Ecological bank protection system for wandering river regulation, and control method thereof

    CN112945859A

  • Ecological frame bank protection construction method based on BIM

    CN116516897A

Cited By

  • Simulated natural assembly type treatment planning method for river

    CN121052677A

  • River natural-like assembled treatment planning method

    CN121052677B