Transmission shaft hot-dip galvanizing equipment and method thereof

By designing a transmission shaft hot-dip galvanizing equipment that automatically pushes and scrapes zinc slag, the problem of low efficiency and safety hazards of manual scraping of zinc slag during the transmission shaft hot-dip galvanizing process is solved, and automated operation and efficient galvanizing layer are realized Formation.

CN119194325APending Publication Date: 2024-12-27RUGAO JINDING HIGH VOLTAGE ELECTRICAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411607991.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-12
Publication Date
2024-12-27

AI Technical Summary

Technical Problem

During the hot-dip galvanizing process of transmission shaft, the manual scraping of zinc slag is low and has safety risks, which affects the quality of the galvanized layer.

Method used

A transmission shaft hot-dip zinc-dip equipment is designed to automatically push the zinc slag on the surface of the zinc liquid by using the conveying motor and guide structure, and automatically push and scrape the zinc during the process of dipping and zinc extraction through the linkage of the slag-dip and scraping structure. Remove zinc slag and combine it with auxiliary motor to accelerate the cooling of the transmission shaft.

Benefits of technology

The automatic slag push of the transmission shaft during the zinc immersion and zinc extraction process is realized, which improves processing efficiency, reduces manual operation risks, ensures the consistency of the quality of the galvanized layer and accelerates the cooling of the transmission shaft.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119194325A_ABST
    Figure CN119194325A_ABST
Patent Text Reader

Abstract

The invention discloses transmission shaft hot-dip galvanizing equipment and a method thereof. The transmission shaft hot-dip galvanizing equipment comprises a supporting frame; a hot zinc liquid pool is mounted on one side of the supporting frame, a mounting frame is mounted on the supporting frame, and guide rails are mounted on the two sides of the mounting frame; according to the zinc dipping device, during zinc dipping, a transmission shaft can be placed at the position of the fixing clamping plate to be clamped and fixed, then the conveying motor is started to convey the transmission shaft, zinc slag on the surface of zinc liquid in the hot zinc liquid pool can be pushed away through the push plate in the process, and then the transmission shaft descends into the hot zinc liquid pool along the slag pushing path of the push plate; when the transmission shaft is immersed in the zinc liquid, the push plate firstly makes contact with zinc slag on the surface of the zinc liquid to push away the zinc slag formed in the immersion process, then the automatic slag pushing effect can be achieved in the process that the transmission shaft is immersed in the zinc liquid and taken out, the zinc slag is prevented from being attached to the transmission shaft, meanwhile, the step of manual operation is omitted, manpower is saved, and the transmission shaft can be safer during zinc immersion machining; and meanwhile, the zinc immersion processing efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of transmission shaft processing, in particular to a transmission shaft hot-dip galvanizing device and a method thereof. Background Art

[0002] Hot-dip galvanizing of the transmission shaft is to immerse the cleaned transmission shaft into molten zinc liquid through the wetting effect of the plating agent. In this process, the steel reacts with the molten zinc to form an alloyed film, namely the galvanized layer. This galvanized layer can effectively prevent the oxidation reaction caused by the transmission shaft contacting with air, water vapor, etc., thereby achieving a protective effect.

[0003] In the prior art, during the hot-dip galvanizing process, a layer of zinc ash and zinc slag will be formed on the surface of the zinc liquid. In order to prevent the zinc slag from adhering to the drive shaft and affecting the quality of the zinc coating, generally when the drive shaft is immersed in the zinc liquid and taken out of the zinc liquid, the staff is required to use a scraper to push away the zinc slag on the surface of the zinc liquid before taking it out. However, the manual operation efficiency is low, and the staff needs to stand next to the zinc liquid ruler during the operation, which has certain safety hazards. Therefore, a drive shaft hot-dip galvanizing equipment and method are needed to meet people's needs. Summary of the invention

[0004] The object of the present invention is to provide a transmission shaft hot-dip galvanizing device and method thereof to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a kind of hot-dip galvanizing equipment and method for a transmission shaft, comprising a support frame; a hot zinc liquid pool is installed on one side of the support frame, a mounting frame is installed on the support frame, guide rails are installed on both sides of the mounting frame, a plurality of conveying structures are installed on the mounting frame, a mounting plate is installed on the conveying structure, a clamping structure is installed on the mounting plate, four transmission sprockets are rotatably installed on the mounting frame, a driving structure is installed on the four transmission sprockets, a guide frame is installed on the support frame, a guide structure is installed on the guide frame, a push plate is installed on the conveying structure, an L-shaped support plate is installed on the mounting frame, a linkage slag throwing structure is installed on the L-shaped support plate, a reciprocating slide is slidably installed on one side of the push plate, and a slag scraping structure is installed on the reciprocating slide.

[0006] Preferably, the conveying structure includes a U-shaped slide, which is movably mounted on a mounting frame, a connecting seat is installed on one side of the U-shaped slide, a movable sleeve is rotatably mounted on the inner wall of the connecting seat, a lifting rod is slidably mounted on the inner wall of the movable sleeve, and a mounting plate is installed at one end of the lifting rod, and two guide wheels are rotatably mounted on the inner walls of both sides of the U-shaped slide, and the two guide wheels on the same side are respectively in contact with two sides of the same guide rail.

[0007] Preferably, the inner wall of the movable sleeve is provided with guide sliding holes, and guide sliding bars are slidably installed in two guide sliding holes, and the two guide sliding bars are installed on the lifting rod.

[0008] Preferably, the clamping structure includes two fixed clamps, both of which are mounted on a mounting plate, and movable clamps are slidably mounted on the inner walls of the two fixed clamps. The two fixed clamps and the two movable clamps are movably mounted on the same transmission shaft, and one end of two adjusting bolts are rotatably mounted on one side of the two movable clamps, and the other ends of the two adjusting bolts are threadedly mounted on the mounting plate.

[0009] Preferably, the driving structure includes four conveying motors, and the four conveying motors are all installed on the bottom side of the mounting frame. The output ends of the four conveying motors pass through the mounting frame and are respectively installed on four transmission sprockets. The four transmission sprockets are equipped with the same transmission chain, and multiple chain racks are movably installed on the transmission chain. The chain racks are installed on the mounting frame, and the U-shaped slide is installed on the transmission chain.

[0010] Preferably, the guide structure includes a guide groove, which is provided on the guide frame, in which a plurality of lifting guide rods are movably installed, a limiting collar is installed at one end of the lifting guide rod, the limiting collar is rotatably sleeved on the lifting rod, a limiting baffle is installed on the lifting guide rod, the limiting baffle is in contact with one side of the guide frame, the limiting ring is rotatably installed on the inner wall of the limiting collar, and the limiting ring is fixedly sleeved on the lifting rod.

[0011] Preferably, the linkage slag rejection structure includes a linkage rack, which is installed on an L-shaped support plate, a linkage gear is rotatably installed on the connecting seat, the linkage gear is meshed with the corresponding linkage rack, and a lifting rod is slidably installed on the linkage gear, a recovery bin is installed on one side of the support frame, a fixed plate is installed on the recovery bin, a plurality of motor frames are installed on the inner wall of the fixed plate, an auxiliary motor is installed on one side of the motor frame, and the output end of the auxiliary motor passes through the motor frame and is installed with fan blades.

[0012] Preferably, an annular groove is provided on the inner wall of the movable sleeve, a limiting ring is rotatably installed in the annular groove, and the limiting ring is installed on the inner wall of the connecting seat.

[0013] Preferably, the scraping structure includes a T-shaped guide bar, which is installed on one side of the push plate, a reciprocating slide bar is slidably installed on the T-shaped guide bar, the push plate is installed on a limiting collar, a plurality of scraping strips are installed on one side of the reciprocating slide bar, the scraping strips are in contact with one side of the push plate, support seats are installed on the limiting collar and the push plate, the same rotating shaft is rotatably installed on the two support seats, bevel gears and swing rods are respectively installed at both ends of the rotating shaft, a conical gear ring is installed on the lifting rod, the conical gear ring is located on the top side of the limiting collar, the conical gear ring is meshed with the bevel gear, a linkage shaft is opened on the reciprocating slide bar, a linkage hole is movably installed in the linkage shaft, and the linkage hole is installed on one side of the swing rod.

[0014] A method for hot-dip galvanizing a transmission shaft, specifically comprising: S1. Adjust the gap between the fixed clamping plate and the movable clamping plate by rotating the corresponding adjusting bolts, and place the transmission shaft between the fixed clamping plate and the movable clamping plate and clamp them.

[0015] S2. Turn on the conveying motor to control the movement of the U-shaped slide and the connecting seat to convey the drive shaft. The drive shaft can move around the mounting frame and the guide rail. When the drive shaft moves to the top of the hot zinc liquid pool, it will be affected by the guide groove and the lifting guide rod and drop into the hot zinc liquid pool. Since the push plate is lower than the drive shaft, the push plate can first push away the zinc slag on the surface of the zinc liquid during the movement and descent process. Then the drive shaft is subsequently dropped and immersed in the zinc liquid in the hot zinc liquid pool to prevent the drive shaft from being attached to the zinc slag when entering the zinc liquid. At this time, close the transmission sprocket and wait for the drive shaft to be zinc dipped.

[0016] S3. After zinc dipping is completed, the transmission sprocket is reopened to transport the transmission shaft. During the process, it will rise again under the influence of the guide groove and the lifting guide rod. During the rising process, the push plate can push away the zinc slag that has re-attached to the surface of the zinc liquid. Then the transmission shaft rises along the path pushed by the push plate to avoid the transmission shaft being stuck with zinc slag during the process of taking it out of the zinc liquid.

[0017] S4. The transmission shaft that has been zinc-dipped will be transported to the top of the recovery bin, and with the movement of the U-shaped slide, the transmission shaft will be lowered into the recovery bin. At the same time, the linkage gear and the linkage rack will be engaged. During the continuous movement, the transmission shaft can rotate in the recovery bin, and the excess zinc liquid on the transmission shaft will be thrown into the recovery bin to prevent too much zinc liquid from adhering to the transmission shaft.

[0018] S5. When the linkage gear rotates, the scraper bar can scrape on one side of the push plate to scrape the zinc slag adhered to the push plate into the recovery bin to avoid affecting the subsequent use of the push plate.

[0019] S6. Turning on the auxiliary motor can make the fan blades rotate and blow air toward the transmission shaft to speed up the cooling of the transmission shaft. Finally, the continuously moving transmission shaft can be lifted and removed from the recovery bin. At this time, the transmission shaft can be removed to complete the zinc dipping operation.

[0020] Compared with the prior art, the present invention has the following beneficial effects: (1) According to the present invention, during zinc dipping, the transmission shaft can be placed on the fixed clamping plate for clamping and fixing, and then the conveying motor is turned on to convey the transmission shaft. During the conveying process, the push plate will first be driven to move and descend into the hot zinc liquid pool under the influence of the lifting guide rod and the guide groove, and the zinc slag on the surface of the zinc liquid in the hot zinc liquid pool will be pushed away. Then, the transmission shaft will descend into the hot zinc liquid pool along the path of the push plate pushing away the zinc slag. After the transmission shaft is immersed in zinc and rises under the action of the lifting guide rod and the guide groove, the push plate will first contact the zinc slag on the surface of the zinc liquid, and push away the zinc slag formed during the immersion process. Then, the effect of automatic slag pushing can be achieved during the process of immersing the transmission shaft in the zinc liquid and taking it out, thereby avoiding the adhesion of zinc slag on the transmission shaft. At the same time, the manual operation steps are omitted, saving manpower, making the zinc dipping process of the transmission shaft safer, and at the same time improving the efficiency of the zinc dipping process.

[0021] (2) The conveying motor can be used to convey the drive shaft to the recovery bin and lower the drive shaft into the recovery bin. At the same time, the linkage rack and the linkage gear will be meshed. At this time, the continuous movement of the U-shaped slide can drive the drive shaft to rotate, so that the excess zinc liquid on the surface of the drive shaft can be shaken off, and the excess or inadequately reacted zinc liquid attached to its surface can be removed, which helps to reduce the thickness difference of the galvanized layer. By turning on the auxiliary motor, the fan blades can rotate and blow air toward the drive shaft, accelerating the cooling speed of the drive shaft. As the drive shaft rotates, the wind can be evenly blown onto the drive shaft.

[0022] (3) When the lifting rod rotates, the scraper bar can move back and forth and scrape off the zinc slag attached to one side of the push plate, so that the zinc slag falls into the recovery bin for recycling and processing, while avoiding affecting the subsequent use of the push plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 A schematic diagram of the three-dimensional structure of a transmission shaft hot-dip galvanizing device and method thereof proposed by the present invention; Figure 2 A schematic side view of a transmission shaft hot-dip galvanizing device and method thereof proposed by the present invention; Figure 3 This is a schematic diagram of the L-shaped support plate structure of a transmission shaft hot-dip galvanizing device and method thereof proposed by the present invention; Figure 4 A schematic diagram of the structure of a conveying motor of a transmission shaft hot-dip galvanizing device and method thereof proposed by the present invention; Figure 5 A schematic diagram of the guide frame structure of a transmission shaft hot-dip galvanizing device and method thereof proposed by the present invention; Figure 6 A schematic diagram of a lifting rod structure of a transmission shaft hot-dip galvanizing device and method thereof proposed by the present invention; Figure 7 A schematic diagram of the cross-sectional structure of a connecting seat of a transmission shaft hot-dip galvanizing device and method thereof proposed by the present invention; Figure 8 A schematic diagram of a movable sleeve structure of a transmission shaft hot-dip galvanizing device and method thereof proposed by the present invention; Fig. 9 This is a schematic cross-sectional structure diagram of a movable sleeve of a transmission shaft hot-dip galvanizing device and method thereof proposed by the present invention; Fig.10 A schematic diagram of a fixed clamping plate structure of a transmission shaft hot-dip galvanizing device and method thereof proposed by the present invention; Fig.11 The present invention provides a schematic diagram of a push plate structure of a transmission shaft hot-dip galvanizing device and method thereof.

[0024] In the figure: 1, support frame; 2, hot zinc liquid pool; 3, mounting frame; 4, guide rail; 41, U-shaped slide seat; 42, connecting seat; 43, movable sleeve; 44, lifting rod; 45, guide wheel; 46, guide slide hole; 47, guide slide; 5, mounting plate; 51, fixed clamping plate; 52, movable clamping plate; 53, transmission shaft; 54, adjusting bolt; 6, transmission sprocket; 61, conveying motor; 62, transmission chain; 63, chain frame; 7, guide frame; 71, guide groove; 72, lifting guide rod; 73, limit collar; 74. Limit baffle; 75. Limit ring; 8. Push plate; 9. L-shaped support plate; 91. Linkage rack; 92. Linkage gear; 93. Recovery bin; 94. Fixed plate; 95. Motor frame; 96. Auxiliary motor; 97. Fan blade; 98. Annular groove; 99. Limit ring; 10. Reciprocating slide; 101. T-shaped guide strip; 102. Scraper strip; 103. Support seat; 104. Rotating shaft; 105. Bevel gear; 106. Bevel gear ring; 107. Swing rod; 108. Linkage shaft; 109. Linkage hole. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] Example 1: Please refer to Figure 1-11The present invention provides a technical solution: a transmission shaft hot dip galvanizing equipment and method, comprising a support frame 1; a hot zinc liquid pool 2 is installed on one side of the support frame 1, a mounting frame 3 is installed on the support frame 1, guide rails 4 are installed on both sides of the mounting frame 3, a plurality of conveying structures are installed on the mounting frame 3, a mounting plate 5 is installed on the conveying structure, a clamping structure is installed on the mounting plate 5, four transmission sprockets 6 are rotatably installed on the mounting frame 3, a driving structure is installed on the four transmission sprockets 6, a guide frame 7 is installed on the support frame 1, a guide structure is installed on the guide frame 7, a push plate 8 is installed on the conveying structure, and an L-shaped support is installed on the mounting frame 3. A linkage slag-sweeping structure is installed on the support plate 9, and a reciprocating slide bar 10 is slidably installed on one side of the push plate 8. A slag-scraping structure is installed on the reciprocating slide bar 10. When in use, the material is first fixed by the clamping structure, and then the conveying structure is controlled to move by the driving structure to convey the material on the clamping structure. The material will drop into the hot zinc liquid pool 2 under the influence of the guide structure, and the zinc liquid in the hot zinc liquid pool 2 can be pushed away during the process. After that, the material that has been dipped in zinc will be affected by the linkage slag-sweeping structure during the continuous conveying process and rotate to throw away the excess zinc liquid. The slag-scraping structure can scrape off the zinc slag attached when pushing the zinc slag.

[0027] Furthermore, the conveying structure includes a U-shaped slide 41, which is movably installed on the mounting frame 3, a connecting seat 42 is installed on one side of the U-shaped slide 41, a movable sleeve 43 is rotatably installed on the inner wall of the connecting seat 42, a lifting rod 44 is slidably installed on the inner wall of the movable sleeve 43, and the mounting plate 5 is installed at one end of the lifting rod 44. Two guide wheels 45 are rotatably installed on the inner walls of both sides of the U-shaped slide 41, and the two guide wheels 45 located on the same side are respectively in contact with the two sides of the same guide rail 4. The moving U-shaped slide 41 will drive the guide wheels 45 on the inner wall to roll on the corresponding guide rail 4, and the continuously moving U-shaped slide 41 will drive the connecting seat 42 to move, so that the connecting seat 42 drives the mounting plate 5 to move through the lifting rod 44, and then the clamped transmission shaft 53 is conveyed.

[0028] Furthermore, a guide slide hole 46 is opened on the inner wall of the movable sleeve 43, and guide slide bars 47 are slidably installed in the two guide slide holes 46. The two guide slide bars 47 are installed on the lifting rod 44. When the lifting rod 44 descends, it can drive the guide slide bars 47 on both sides to slide in the two guide slide holes 46 on the movable sleeve 43 respectively.

[0029] Furthermore, the clamping structure includes two fixed clamps 51, both of which are mounted on the mounting plate 5, and movable clamps 52 are slidably mounted on the inner walls of the two fixed clamps 51. The same transmission shaft 53 is movably mounted on the two fixed clamps 51 and the two movable clamps 52. One side of the two movable clamps 52 is respectively rotatably mounted with one end of two adjusting bolts 54, and the other ends of the two adjusting bolts 54 are threadedly mounted on the mounting plate 5. Rotating the two adjusting bolts 54 at corresponding positions can enlarge the space on the inner wall of the fixed clamps 51. At this time, the transmission shaft 53 can be placed in the fixed clamps 51 on both sides, and then the adjusting bolts 54 are rotated in the opposite direction to move the movable clamp 52 to reset and clamp the transmission shaft 53.

[0030] Furthermore, the driving structure includes four conveying motors 61, and the four conveying motors 61 are all installed on the bottom side of the mounting frame 3. The output ends of the four conveying motors 61 pass through the mounting frame 3 and are respectively installed on four transmission sprockets 6. The four transmission sprockets 6 are transmission-installed with the same transmission chain 62, and a plurality of chain racks 63 are movably installed on the transmission chain 62. The chain rack 63 is installed on the mounting frame 3, and the U-shaped slide 41 is installed on the transmission chain 62. Opening the conveying motor 61 under the mounting frame 3 can drive the transmission sprocket 6 to rotate, and through the transmission cooperation between the transmission sprocket 6 and the transmission chain 62, the transmission chain 62 can drive the U-shaped slide 41 to move.

[0031] Furthermore, the guide structure includes a guide groove 71, which is provided on the guide frame 7. A plurality of lifting guide rods 72 are movably installed in the guide groove 71. A limiting collar 73 is installed at one end of the lifting guide rod 72. The limiting collar 73 is rotatably sleeved on the lifting rod 44. A limiting baffle 74 is installed on the lifting guide rod 72. The limiting baffle 74 contacts one side of the guide frame 7. A limiting ring 75 is rotatably installed on the inner wall of the limiting collar 73. The limiting ring 75 is fixedly sleeved on the lifting rod 44. During the movement of the lifting rod 44, the lifting guide rod 72 can be driven to move in the guide groove 71 on the guide frame 7 through the limiting collar 73. When the lifting guide rod 72 moves to the top of the hot zinc liquid pool 2, the lifting guide rod 72 will move downward under the guidance of the guide groove 71 during the process, so that the descending lifting guide rod 72 drives the limiting collar 73 to descend.

[0032] Example 2: Figure 2-9In order to throw off the excess zinc liquid attached to the transmission shaft 53, a linkage slag throwing structure is arranged on the L-shaped support plate 9, and the linkage slag throwing structure includes a linkage rack 91, which is installed on the L-shaped support plate 9, and a linkage gear 92 is rotatably installed on the connecting seat 42, and the linkage gear 92 is meshed with the corresponding linkage rack 91. The lifting rod 44 is slidably installed on the linkage gear 92, and a recovery bin 93 is installed on one side of the support frame 1, and a fixed plate 94 is installed on the recovery bin 93. A plurality of motor frames 95 are installed on the inner wall of the fixed plate 94, and an auxiliary motor 96 is installed on one side of the motor frame 95. The output end of the auxiliary motor 96 passes through the motor frame 95 and is installed with a fan blade 97. The inner wall of the movable sleeve 43 is opened. An annular groove 98 is provided, in which a limiting ring 99 is rotatably installed. The limiting ring 99 is installed on the inner wall of the connecting seat 42. During the continuous movement of the connecting seat 42, the linkage gear 92 is driven to mesh with the linkage rack 91 on the L-shaped support plate 9, and the linkage gear 92 is caused to rotate. The rotating linkage gear 92 can drive the mounting plate 5 to rotate, so that the excess zinc liquid on the transmission shaft 53 can be thrown into the recovery bin 93, and the auxiliary motor 96 can be turned on during the movement of the transmission shaft 53. The output end of the auxiliary motor 96 drives the fan blades 97 to rotate, so that the fan blades 97 blow air toward the transmission shaft 53, and the auxiliary transmission shaft 53 is quickly cooled down. The remaining features are the same as those in Example 1.

[0033] Example 3: Fig.11 In order to scrape off the zinc slag attached to the push plate 8 to avoid affecting its subsequent use, a scraping structure is arranged on the reciprocating slide 10, and the scraping structure includes a T-shaped guide bar 101, the T-shaped guide bar 101 is installed on one side of the push plate 8, the reciprocating slide 10 is slidably installed on the T-shaped guide bar 101, the push plate 8 is installed on the limiting collar 73, and a plurality of scraping strips 102 are installed on one side of the reciprocating slide 10, the scraping strip 102 is in contact with one side of the push plate 8, and the limiting collar 73 and the push plate 8 are both installed with a support seat 103, and the same rotating shaft 104 is rotatably installed on the two support seats 103, and a bevel gear 105 and a swing rod 107 are respectively installed at both ends of the rotating shaft 104, and a bevel gear ring 106 is installed on the lifting rod 44, and the bevel gear ring 106 is positioned at On the top side of the limiting collar 73, the conical gear ring 106 is meshed with the conical gear 105, and a linkage shaft 108 is provided on the reciprocating slide 10, in which a linkage hole 109 is movably installed, and the linkage hole 109 is installed on one side of the swing rod 107. The lifting rod 44 can drive the conical gear ring 106 to rotate during rotation, and the rotating conical gear ring 106 can drive the rotating shaft 104 to rotate by meshing with the conical gear 105, so that the swing rod 107 drives the reciprocating slide 10 to move horizontally back and forth, and the continuously moving reciprocating slide 10 will drive the scraper bar 102 to move back and forth on the surface of the push plate 8, so that the scraper bar 102 can scrape the zinc slag attached to the surface of the push plate 8 into the recovery bin 93 for recovery, and the other features are the same as those in Example 2.

[0034] A method for hot-dip galvanizing a transmission shaft, specifically comprising: S1. Adjust the gap between the fixed clamping plate 51 and the movable clamping plate 52 by rotating the corresponding adjusting bolt 54, and place the transmission shaft 53 between the fixed clamping plate 51 and the movable clamping plate 52 and clamp them.

[0035] S2. Turn on the conveying motor 61 to control the movement of the U-shaped slide 41 and the connecting seat 42 to convey the transmission shaft 53. The transmission shaft 53 can move around the mounting frame 3 and the guide rail 4. When the transmission shaft 53 moves to the top of the hot zinc liquid pool 2, it will be affected by the guide groove 71 and the lifting guide rod 72 and drop into the hot zinc liquid pool 2. Since the push plate 8 is lower than the transmission shaft 53, the push plate 8 can first push away the zinc slag on the surface of the zinc liquid during the movement and descent process. Then the transmission shaft 53 is subsequently dropped and immersed in the zinc liquid in the hot zinc liquid pool 2 to prevent the transmission shaft 53 from being attached to the zinc slag when entering the zinc liquid. At this time, close the transmission sprocket 6 and wait for the zinc immersion of the transmission shaft 53 to be completed.

[0036] S3. After the zinc dipping is completed, the transmission sprocket 6 is reopened to transport the transmission shaft 53. During the process, it will rise again under the influence of the guide groove 71 and the lifting guide rod 72. The push plate 8 can push away the zinc slag re-attached to the surface of the zinc liquid during the rising process. Then the transmission shaft 53 rises along the path pushed by the push plate 8 to prevent the transmission shaft 53 from being stuck with zinc slag during the process of being taken out of the zinc liquid.

[0037] S4. The transmission shaft 53 that has been zinc-dipped will be transported to the top of the recovery bin 93, and with the movement of the U-shaped slide 41, the transmission shaft 53 will be lowered into the recovery bin 93, and at the same time, the linkage gear 92 will be meshed with the linkage rack 91. During the continuous movement, the transmission shaft 53 can be rotated in the recovery bin 93, and the excess zinc liquid on the transmission shaft 53 will be thrown into the recovery bin 93 to prevent too much zinc liquid from adhering to the transmission shaft 53.

[0038] S5. When the linkage gear 92 rotates, the scraper bar 102 can scrape on one side of the push plate 8 to scrape the zinc slag adhered to the push plate 8 into the recovery bin 93 to avoid affecting the subsequent use of the push plate 8.

[0039] S6. Turning on the auxiliary motor 96 can rotate the fan blades 97 to blow air toward the transmission shaft 53, thereby accelerating the cooling speed of the transmission shaft 53. Finally, the continuously moving transmission shaft 53 can be lifted and removed from the recovery bin 93. At this time, the transmission shaft 53 can be removed to complete the zinc dipping operation.

[0040] The working principle is as follows: by rotating the two adjusting bolts 54 at the corresponding positions, the two adjusting bolts 54 can be moved by cooperating with the threads of the mounting plate 5, so that the rotating and moving adjusting bolts 54 drive the movable clamping plate 52 to slide on the inner wall of the fixed clamping plate 51, so that the space on the inner wall of the fixed clamping plate 51 becomes larger. At this time, the transmission shaft 53 can be placed in the fixed clamping plates 51 on both sides, and then the adjusting bolts 54 are rotated in the opposite direction to move the movable clamping plate 52 to reset. The reset movable clamping plate 52 can clamp the transmission shaft 53 to prevent the transmission shaft 53 from loosening during transportation. Then, the conveying motor 61 under the mounting frame 3 is turned on, and the output end of the conveying motor 61 can drive the transmission sprocket 6 to rotate. Through the transmission cooperation between the transmission sprocket 6 and the transmission chain 62, the transmission chain 6 2 can perform circular motion around the mounting frame 3. During the process, the transmission chain 62 can drive the U-shaped slide 41 to move. The moving U-shaped slide 41 will drive the guide wheel 45 of the inner wall to roll on the corresponding guide rail 4. By arranging the guide wheels 45 on both sides of the guide rail 4, the U-shaped slide 41 can be prevented from falling off the guide rail 4 and the mounting frame 3, and the moving direction of the U-shaped slide 41 can be limited. The continuously moving U-shaped slide 41 will drive the connecting seat 42 to move, so that the connecting seat 42 drives the mounting plate 5 to move through the lifting rod 44, thereby conveying the clamped transmission shaft 53. In the process of the movement of the lifting rod 44, the lifting guide rod 72 can be driven to move in the guide groove 71 on the guide frame 7 through the limiting collar 73. By arranging the limiting baffle 74 and the guide The lifting rod 44 is fitted with the frame 7, which can prevent the limit ring 73 from rotating during the movement of the lifting rod 44. When the lifting guide rod 72 moves to the top of the hot zinc liquid pool 2, the lifting guide rod 72 will move downward under the guidance of the guide groove 71, so that the descending lifting guide rod 72 drives the limit ring 73 to descend, and the limit ring 73 drives the lifting rod 44 to descend by cooperating with the limit ring 75. During the descent of the lifting rod 44, it can drive the guide slides 47 on both sides to slide in the two guide slide holes 46 on the movable sleeve 43 respectively. At the same time, the lifting rod 44 will slide on the inner wall of the linkage gear 92. The continuously descending lifting rod 44 will drive the mounting plate 5 and the clamped transmission shaft 53 to descend, and the limit ring 73 will drive the push plate 8 to descend. Since the push plate 8 is at a lower position than the transmission shaft 53, the push plate 8 will first contact the hot zinc liquid in the hot zinc liquid pool 2 during the descent process, and the push plate 8 can be driven by the cooperation of the U-shaped slide 41 and the lifting guide rod 72 while being lowered into the hot zinc liquid and moving horizontally, so that the zinc slag on the surface of the zinc liquid can be pushed away, and the transmission shaft 53 can be prevented from sticking to the zinc slag when it descends into the zinc liquid. When the transmission shaft 53 is completely immersed in the zinc liquid, the transmission of the transmission shaft 53 can be stopped by turning off the conveying motor 61, so that it is immersed in the zinc liquid. After the zinc immersion operation is completed, the conveying motor 61 is reopened, and at this time, the continuous lifting guide rod 72 will be guided by the guide groove 71 again and rise during the continuous movement, so that the push plate 8 moves horizontally and rises in the zinc liquid.The zinc slag gathered again on the surface of the zinc liquid is pushed away, and then the transmission shaft 53 rises, thereby preventing the transmission shaft 53 from contacting the zinc slag during the process of immersing in the zinc liquid or taking out from the zinc liquid.

[0041] After the transmission shaft 53 is dipped in hot zinc, the movement of the transmission chain 62 can drive it to move to the top of the recovery bin 93, and then under the guidance of the guide groove 71 and the guide frame 7, the transmission shaft 53 is lowered into the recovery bin 93. At the same time, the connecting seat 42 will drive the linkage gear 92 to engage with the linkage rack 91 on the L-shaped support plate 9 during the continuous movement, and the continuous movement of the connecting seat 42 will cause the linkage gear 92 to rotate by engaging with the linkage rack 91. The rotating linkage gear 92 can drive the movable sleeve 43 to rotate, so that the movable sleeve 43 rotates on the limiting ring 99 on the inner wall of the connecting seat 42 through the annular groove 98, thereby preventing the movable sleeve 43 from falling off from the connecting seat 42 during the rotation. The continuously rotating movable sleeve 43 can drive the lifting rod 44 to rotate through the cooperation of the guide sliding hole 46 and the guide sliding strip 47. The rotating lifting rod 44 will drive the limiting ring 75 to rotate on the inner wall of the limiting sleeve 73, so that the limiting sleeve 73 will not interfere with the rotation of the lifting rod 44. The continuously rotating lifting rod 44 can drive the mounting plate 5 to rotate, thereby driving the clamped transmission shaft 53 to rotate, and the excess zinc liquid on the transmission shaft 53 is thrown into the recovery bin 93. In addition, the auxiliary motor 96 can be turned on during the movement of the transmission shaft 53. The output end of the auxiliary motor 96 will drive the fan blades 97 to rotate, so that the fan blades 97 blow air toward the transmission shaft 53, and the auxiliary transmission shaft 53 is quickly cooled down.

[0042] During the rotation of the lifting rod 44, the conical gear ring 106 can be driven to rotate. The rotating conical gear ring 106 can drive the rotating shaft 104 to rotate on the two support seats 103 by meshing with the conical gear 105. The continuously rotating rotating shaft 104 can drive the swing rod 107 to rotate, so that the swing rod 107 drives the linkage hole 109 to perform circular motion. The circular motion linkage hole 109 will move in the linkage shaft 108, and drive the reciprocating slide 10 to perform horizontal reciprocating movement through cooperation with the linkage shaft 108. The reciprocating reciprocating slide 10 will slide on the T-shaped guide strip 101, thereby limiting the moving direction of the reciprocating slide 10. The continuously moving reciprocating slide 10 will drive the scraper bar 102 to reciprocate on the surface of the push plate 8, so that the scraper bar 102 can scrape the zinc slag attached to the surface of the push plate 8 into the recovery bin 93 for recovery.

[0043] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A transmission shaft hot-dip galvanizing device, comprising a support frame (1); characterized in that: A hot zinc liquid pool (2) is installed on one side of the support frame (1); a mounting frame (3) is installed on the support frame (1); guide rails (4) are installed on both sides of the mounting frame (3); a plurality of conveying structures are installed on the mounting frame (3); a mounting plate (5) is installed on the conveying structure; a clamping structure is installed on the mounting plate (5); four transmission sprockets (6) are rotatably installed on the mounting frame (3); a driving structure is installed on the four transmission sprockets (6); a guide frame (7) is installed on the support frame (1); a guide structure is installed on the guide frame (7); a push plate (8) is installed on the conveying structure; an L-shaped support plate (9) is installed on the mounting frame (3); a linkage slag-sweeping structure is installed on the L-shaped support plate (9); a reciprocating slide bar (10) is slidably installed on one side of the push plate (8); a slag-scraping structure is installed on the reciprocating slide bar (10).

2. A transmission shaft hot dip galvanizing equipment according to claim 1, characterized in that: The conveying structure comprises a U-shaped slide (41), the U-shaped slide (41) is movably mounted on a mounting frame (3), a connecting seat (42) is mounted on one side of the U-shaped slide (41), a movable sleeve (43) is rotatably mounted on the inner wall of the connecting seat (42), a lifting rod (44) is slidably mounted on the inner wall of the movable sleeve (43), a mounting plate (5) is mounted on one end of the lifting rod (44), and two guide wheels (45) are rotatably mounted on the inner walls of both sides of the U-shaped slide (41), and the two guide wheels (45) located on the same side are respectively in contact with the two sides of the same guide rail (4).

3. A transmission shaft hot dip galvanizing equipment according to claim 2, characterized in that: The inner wall of the movable sleeve (43) is provided with a guide sliding hole (46), and guide sliding bars (47) are slidably installed in the two guide sliding holes (46), and the two guide sliding bars (47) are installed on the lifting rod (44).

4. The transmission shaft hot dip galvanizing equipment according to claim 1, characterized in that: The clamping structure comprises two fixed clamping plates (51), the two fixed clamping plates (51) are both mounted on the mounting plate (5), the inner walls of the two fixed clamping plates (51) are both slidably mounted with movable clamping plates (52), the two fixed clamping plates (51) and the two movable clamping plates (52) are movably mounted with a same transmission shaft (53), one end of two adjusting bolts (54) are rotatably mounted on one side of the two movable clamping plates (52), and the other ends of the two adjusting bolts (54) are both threadedly mounted on the mounting plate (5).

5. The transmission shaft hot dip galvanizing equipment according to claim 1, characterized in that: The driving structure comprises four conveying motors (61), the four conveying motors (61) are all mounted on the bottom side of the mounting frame (3), the output ends of the four conveying motors (61) pass through the mounting frame (3) and are respectively mounted on four transmission sprockets (6), the four transmission sprockets (6) are transmission-mounted with a same transmission chain (62), a plurality of chain racks (63) are movably mounted on the transmission chain (62), the chain racks (63) are mounted on the mounting frame (3), and the U-shaped slide seat (41) is mounted on the transmission chain (62).

6. The transmission shaft hot dip galvanizing equipment according to claim 1, characterized in that: The guide structure comprises a guide groove (71), the guide groove (71) being formed on the guide frame (7), a plurality of lifting guide rods (72) being movably mounted in the guide groove (71), a limiting collar (73) being mounted on one end of the lifting guide rod (72), the limiting collar (73) being rotatably sleeved on the lifting rod (44), a limiting baffle (74) being mounted on the lifting guide rod (72), the limiting baffle (74) being in contact with one side of the guide frame (7), a limiting ring (75) being rotatably mounted on the inner wall of the limiting collar (73), the limiting ring (75) being fixedly sleeved on the lifting rod (44).

7. The transmission shaft hot dip galvanizing equipment according to claim 1, characterized in that: The linkage slag-sweeping structure comprises a linkage rack (91), the linkage rack (91) being mounted on the L-shaped support plate (9), a linkage gear (92) being rotatably mounted on the connecting seat (42), the linkage gear (92) being meshed with the corresponding linkage rack (91), a lifting rod (44) being slidably mounted on the linkage gear (92), a recovery bin (93) being mounted on one side of the support frame (1), a fixing plate (94) being mounted on the recovery bin (93), a plurality of motor frames (95) being mounted on the inner wall of the fixing plate (94), an auxiliary motor (96) being mounted on one side of the motor frame (95), and an output end of the auxiliary motor (96) passing through the motor frame (95) and being mounted with a fan blade (97).

8. The transmission shaft hot dip galvanizing equipment according to claim 2, characterized in that: The inner wall of the movable sleeve (43) is provided with an annular groove (98), a limiting ring (99) is rotatably mounted in the annular groove (98), and the limiting ring (99) is mounted on the inner wall of the connecting seat (42).

9. The transmission shaft hot dip galvanizing equipment according to claim 1, characterized in that: The scraping structure comprises a T-shaped guide bar (101), the T-shaped guide bar (101) is mounted on one side of the push plate (8), a reciprocating slide bar (10) is slidably mounted on the T-shaped guide bar (101), the push plate (8) is mounted on a limiting collar (73), a plurality of scraping bars (102) are mounted on one side of the reciprocating slide bar (10), the scraping bars (102) are in contact with one side of the push plate (8), a support seat (103) is mounted on both the limiting collar (73) and the push plate (8), and the same support seat (103) is rotatably mounted on the two support seats (103). A rotating shaft (104), with a bevel gear (105) and a swing rod (107) respectively mounted on both ends of the rotating shaft (104), a bevel gear ring (106) mounted on the lifting rod (44), the bevel gear ring (106) being located on the top side of the limiting collar (73), the bevel gear ring (106) being meshed with the bevel gear (105), a linkage shaft (108) being provided on the reciprocating slide bar (10), a linkage hole (109) being movably mounted in the linkage shaft (108), and the linkage hole (109) being mounted on one side of the swing rod (107).

10. A method for hot-dip galvanizing a transmission shaft according to claim 1, specifically comprising: S1. The gap between the fixed clamping plate (51) and the movable clamping plate (52) is adjusted by rotating the corresponding adjusting bolt (54), and the transmission shaft (53) is placed between the fixed clamping plate (51) and the movable clamping plate (52) and clamped; S2, start the conveying motor (61) to control the movement of the U-shaped slide (41) and the connecting seat (42), and convey the transmission shaft (53). The transmission shaft (53) can move around the mounting frame (3) and the guide rail (4). When the transmission shaft (53) moves to the top of the hot zinc liquid pool (2), it will be affected by the guide groove (71) and the lifting guide rod (72) and fall into the hot zinc liquid pool (2). Since the push plate (8) is lower than the transmission shaft (53), the push plate (8) can first push away the zinc slag on the surface of the zinc liquid during the movement and descent process, and then the transmission shaft (53) will subsequently fall and be immersed in the zinc liquid in the hot zinc liquid pool (2) to prevent the transmission shaft (53) from being attached to the zinc slag when entering the zinc liquid. At this time, close the transmission sprocket (6) and wait for the transmission shaft (53) to be immersed in zinc; S3. After the zinc dipping is completed, the transmission sprocket (6) is reopened to transport the transmission shaft (53). During the process, the transmission shaft (53) is again affected by the guide groove (71) and the lifting guide rod (72) to rise. During the rising process, the push plate (8) can push away the zinc slag that has reattached to the surface of the zinc liquid. Then, the transmission shaft (53) rises along the path pushed away by the push plate (8), thereby preventing the transmission shaft (53) from being attached to the zinc slag during the process of being taken out of the zinc liquid. S4. The transmission shaft (53) that has been zinc-dipped is transported to the top of the recovery bin (93), and as the U-shaped slide (41) moves, the transmission shaft (53) is lowered into the recovery bin (93), and the linkage gear (92) is meshed with the linkage rack (91). During the continuous movement, the transmission shaft (53) is rotated in the recovery bin (93), and the excess zinc liquid on the transmission shaft (53) is thrown into the recovery bin (93), so as to prevent the excessive zinc liquid from adhering to the transmission shaft (53); S5, the linkage gear (92) rotates while the scraper (102) scrapes on one side of the push plate (8), so as to scrape the zinc slag adhered to the push plate (8) into the recovery bin (93), so as to avoid affecting the subsequent use of the push plate (8); S6, turning on the auxiliary motor (96) can cause the fan blade (97) to rotate, blowing air toward the transmission shaft (53), accelerating the cooling speed of the transmission shaft (53), and finally the continuously moving transmission shaft (53) can be lifted and removed from the recovery bin (93), at which time the transmission shaft (53) can be removed, completing the zinc dipping operation.