Material storage and transfer platform and method for safety construction of hub intercommunication extra-large bridge

By designing a material storage and transfer platform for super bridge construction, and using hydraulic telescopic rods and motor-driven rotors, safe clamping and efficient transmission of materials are achieved, and the material falloff and transportation of traditional equipment during super bridge construction is solved. The problem of low efficiency improves safety and efficiency.

CN119218649AActive Publication Date: 2024-12-31CHINA MCC17 GRP CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411241655.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2024-12-31
Estimated Expiration
2044-09-05

AI Technical Summary

Technical Problem

During the construction of the super bridge, traditional equipment is likely to cause material to fall off when transporting materials, causing safety hazards, and low transportation efficiency, large space, and requires multiple equipment to operate simultaneously.

Method used

A material storage and transfer platform for safe construction of the hub interchange bridge including base, position assembly, fixture assembly and transmission assembly is designed. The material safety clamping is realized through hydraulic telescopic rods, motor-driven rotors and sliding groove structures. Holding and flexible position adjustment, combining conveyor belt and toggle lever to achieve efficient material transmission.

Benefits of technology

It improves the safety of equipment and material transfer efficiency, reduces material transportation costs, avoids the danger of material falling off to personnel and equipment, and simplifies the material transfer process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119218649A_ABST
    Figure CN119218649A_ABST
Patent Text Reader

Abstract

The material storage and transfer platform comprises a base, a position assembly, a clamp assembly and a transmission assembly, supporting legs are fixedly installed at the four corners of the base, the position assembly is installed on one side of the base, a sliding groove is formed in the position assembly, and the clamp assembly is slidably installed on the position assembly; the transmission assembly is arranged below the clamp assembly and installed on the other side of the base. The flexible and safe clamp assembly is adopted to prevent materials from falling to workers or equipment below when the materials fall off, the safety and reliability of the equipment are greatly improved, the mode that the conveying assembly and the clamp assembly are combined is adopted, the material transfer process is reduced, the material use efficiency and the material transfer efficiency are improved, and the production cost is reduced. And the material transportation and construction cost is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bridge construction, and in particular to a material storage and transfer platform and method for safe construction of a hub interchange super-large bridge. Background Art

[0002] Bridge construction is vital to the development of my country's infrastructure. At present, the main construction directions of bridge construction are straits, bays, large rivers, large, medium and small overpasses, and highways between cities. Bridges are key nodes and hub projects for the interconnection of transportation facilities, and are an important guarantee for the development of the national economy and the safety of social life. The construction of super-large bridges is an important part of bridge construction.

[0003] At present, the construction of super-large bridges in my country is based on BIM-digital twin technology. BIM-digital twin technology is an important technology for building construction and bridge construction. The best role of BIM is to observe the building model in layers. One layer may have a structural framework. Digital twins provide three main functions: modeling, simulation and management. BIM-digital twin technology intelligent software is a key technology to support the entire building life cycle.

[0004] At present, my country's super-large bridge construction technology is relatively mature, and during the construction process, the safety requirements for construction equipment are gradually increasing. When traditional super-large bridge construction equipment is transporting materials, due to reasons on the surface of the materials or the equipment itself, materials may fall off the equipment and fall, causing great danger and damage to ground workers and equipment. In addition, when traditional construction equipment is used for material transfer and material use, multiple devices need to be used to perform a series of operations at the same time to complete material transportation. This mode of transportation not only occupies a large space, but is also inefficient. Therefore, the following solutions are proposed to address the above problems. Summary of the invention

[0005] The object of the present invention is to provide a material storage and transfer platform for safe construction of a hub interchange super-large bridge, so as to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a material storage and transfer platform for safe construction of a hub interchange super-large bridge, comprising a base, characterized in that it also includes a positioning component, a clamping component, and a transmission component. Four legs are fixedly connected under the base, on which a positioning component is rotatably installed. The positioning component is used to adjust the position of the clamping component. A clamping component is installed on the positioning component, and the clamping component can slide on the positioning component to adjust the position. A transmission component is arranged under the clamping component, and the transmission component is installed on the base for transmitting materials to the bottom of the clamping component.

[0007] Preferably, the positioning component includes a rotating wheel and a moving frame. The rotating wheel is rotatably mounted on a base, the rotating wheel is fixedly connected to an output end of a first motor, and the rotating wheel is driven to rotate by the first motor. The first motor is fixedly mounted in the base, and a first hydraulic telescopic rod is fixedly mounted on the rotating wheel. The output end of the first hydraulic telescopic rod is fixedly connected to a middle part of the moving frame. A slide groove is arranged in the moving frame, and a screw rod is rotatably connected in the slide groove. The screw rod is driven by a screw motor, and a ball screw pair on the screw rod is connected to a screw nut, and the screw nut is fixed on a second hydraulic telescopic rod, so that the second hydraulic telescopic rod slides in the slide groove for position adjustment.

[0008] Preferably, the clamp assembly further comprises: a second motor, a worm gear, a locking rod, a fixing hook, a sliding frame, a locking block, a fixing rod, and a lower baffle;

[0009] A second motor is fixedly installed in the inner wall surface of the clamp frame, and an output end of the second motor is fixedly connected to one end of the worm, and the worm is rotatably installed in the clamp frame, and the worm is meshed with the worm wheel, and the worm wheel is arranged above the worm and rotatably installed in the clamp frame, and the worm wheel is fixedly connected to the middle part of the locking rod, one end of the locking rod is fixedly connected to the fixing hook, and the other end is fixedly connected to the lower baffle plate, and the lower baffle plate is arranged below the clamp frame, and the locking block is slidably installed in the sliding frame, and a descending member is installed in the sliding frame, and the descending member drives the locking block to descend and lock the fixing hook, and the sliding frame is fixedly installed in the clamp frame, and a fixing rod is arranged above the worm wheel, and the fixing hook can be hooked on the fixing rod, and the fixing rod is fixedly connected in the clamp frame.

[0010] Preferably, a vertical guide groove is provided on the sliding frame, and ear plates are provided on both sides of the bottom of the locking block, and the ear plates are slidably fitted in the vertical guide groove.

[0011] Preferably, a clamping plate is provided on the locking rod, and a hooking plate is provided on the top of the locking block on one side close to the fixing rod, and the hooking plate is used to press down and limit the clamping plate.

[0012] Preferably, the transmission component includes a groove wheel and a transmission wheel, a conveyor belt is installed on the base, a material bin is provided at one end of the conveyor belt, the material bin is fixedly installed on one side of the base, groove wheels are provided on both sides of the conveyor belt, there are two groove wheels in total, the groove wheels are rotatably installed on the base, four toggle rods are fixedly installed on each groove wheel, the toggle rods toggle the position of the material, the radial grooves on the groove wheels are in contact and connected with the round pins installed non-centrally on the transmission wheel, and each transmission wheel is driven by a third motor, and the third motor is fixedly installed in the base.

[0013] Preferably, a manned cabin is fixedly mounted on one side of the mobile frame.

[0014] A method for using a material storage and transfer platform for safe construction of a hub interchange super-large bridge, the steps are as follows:

[0015] Step 1: Transporting materials

[0016] The third motor rotates the transmission wheel, and the round pin on the transmission wheel contacts and connects with the radial groove of the groove wheel. When the transmission wheel rotates, the round pin gives thrust to the radial groove of the groove wheel, so that the groove wheel rotates, and the toggle rod fixedly connected to the groove wheel rotates at the same time. The toggle rod toggle the material to move on the conveyor belt, and the conveyor belt moves with the movement of the material. The toggle rod toggle the material to the lower end of the clamp assembly, which is convenient for clamping the clamp assembly;

[0017] Step 2: Clamp the material

[0018] The piston rod of the second hydraulic telescopic rod extends outward to the two electric clamping blocks to clamp and fix the material. Subsequently, the second motor realizes the rotation function of the worm, and the worm drives the worm wheel to rotate, and the worm wheel drives the locking rod to swing, so that the locking rod rotates through a certain angle, and the fixed hook on the locking rod rotates toward the fixed rod. At this time, the lower baffle plate fixedly connected to the other end of the locking rod rotates in the opposite direction of the fixed hook until the surface of the fixed hook contacts the fixed rod. The lower baffle plate is now located below the clamp frame. The lower baffle plate can prevent the material from falling and hitting the base. The locking block contacts the other side of the fixed rod to complete the locking of the fixed hook. The descending member drives the locking block to move downward along the vertical guide groove until the hook hanging plate is pressed down to limit the card plate;

[0019] Step 3: Transfer

[0020] The first motor provides energy for the rotation of the rotating wheel, driving the rotating wheel to rotate. The rotating angle of the rotating wheel is 270°. The rotation of the rotating wheel drives the first hydraulic telescopic rod to rotate, so that the entire clamp assembly and the clamped material rotate at the same time. The first hydraulic telescopic rod can be vertically telescopic to adjust the height of the material. The installation position of the mobile frame and the first hydraulic telescopic rod is vertically installed. The mobile frame provides a place for the movement of the clamp assembly. The screw motor can be telescopic, and the screw moves in the same direction as the telescopic direction. The screw pulls the second hydraulic telescopic rod to slide in the mobile frame to realize the movement of the clamp assembly on the mobile frame to adjust the horizontal position of the material relative to the target position;

[0021] Step 4: Decentralization

[0022] When the material is adjusted to the upper side of the target position, the downward member drives the locking block to reset vertically, the clamping plate is released from restriction, the second motor drives the worm to rotate in the opposite direction, the worm drives the worm wheel to rotate, the worm wheel drives the locking rod and the lower baffle to reset in the opposite direction to the initial state, the extension length of the first hydraulic telescopic rod and the second hydraulic telescopic rod is adjusted, the material is lowered to the target position, the electric clamping plate is reset, and the material is released;

[0023] Repeat steps 1 to 4 until all materials have been stored and transferred.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] This device adopts flexible and safe clamp components to prevent materials from falling onto workers or equipment below when they fall off, greatly improving the safety and reliability of the equipment. It also adopts a combination of transport components and clamp components to reduce the material transfer process, improve material utilization efficiency and material transfer efficiency, and significantly reduce material transportation and construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a structural schematic diagram of the present invention;

[0027] Figure 2 It is a schematic diagram of the structure of the position component of the present invention;

[0028] Figure 3 It is a schematic diagram of the structure of the fixture frame of the present invention;

[0029] Figure 4 It is a schematic diagram of the structure of the clamp assembly of the present invention;

[0030] Figure 5 It is a schematic diagram of the main structure of the clamp assembly of the present invention;

[0031] Figure 6 It is a schematic diagram of the main structure of the transmission component of the present invention;

[0032] In the figure: 1, base, 2, position component, 201, rotating wheel, 202, first motor, 203, first hydraulic telescopic rod, 204, mobile frame, 205, screw motor, 206, screw, 3, clamp component, 301, second hydraulic telescopic rod, 302, clamp frame, 303, electric clamp block, 304, worm, 305, second motor, 306, worm gear, 307, locking rod, 308, fixed hook, 309, downlink member, 310, sliding frame, 311, locking block, 312, fixed rod, 313, lower baffle, 314, vertical guide groove; 315, hook plate; 316, card plate; 4, transmission component, 401, conveyor belt, 402, material bin, 403, groove wheel, 404, toggle rod, 405, transmission wheel, 406, third motor, 5, outrigger, 6, manned cabin. DETAILED DESCRIPTION

[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] See also Figure 1-6 , the present invention provides a technical solution:

[0035] In order to improve the safety of the device, a material storage and transfer platform for safe construction of a hub interchange super-large bridge is proposed, including a base 1, a position component 2, a fixture component 3, and a transmission component 4. Four legs 5 are fixedly connected under the base 1, on which the position component 2 is rotatably mounted. The position component 2 is used to adjust the position of the fixture component 3. The fixture component 3 is mounted on the position component 2. The fixture component 3 can slide on the position component 2 for position adjustment. The transmission component 4 is arranged under the fixture component 3, and the transmission component 4 is mounted on the base 1 for transmitting materials to the bottom of the fixture component 3. The legs 5 can support the device to be placed on the ground.

[0036] In order to realize the position adjustment function of the fixture assembly 3 of the device, a material storage and transfer platform for safe construction of a hub interchange super-large bridge is proposed, wherein the position assembly 2 includes a rotating wheel 201 and a mobile frame 204, the rotating wheel 201 is rotatably mounted on the base 1, the rotating wheel 201 is fixedly connected to the output end of the first motor 202, and the rotating wheel 201 is driven to rotate by the first motor 202, the first motor 202 is fixedly mounted in the base 1, the first hydraulic telescopic rod 203 is fixedly mounted on the rotating wheel 201, the output end of the first hydraulic telescopic rod 203 is fixedly connected to the middle of the mobile frame 204, a slide groove is arranged in the mobile frame 204, and the second hydraulic telescopic rod 301 is slidably connected in the slide groove, the second hydraulic telescopic rod 301 is fixedly mounted with a screw nut, the screw nut is threadedly mounted on the screw 206, one end of the screw 206 is fixedly connected to the output end of the screw motor 205, and the screw motor 205 is fixed in the mobile frame 204. The manned cabin 6 is fixedly mounted on the mobile frame 204.

[0037] The first motor 202 can provide energy for the rotation of the rotating wheel 201, thereby realizing the rotation of the rotating wheel 201. The rotation angle of the rotating wheel 201 is 270°. The rotation of the rotating wheel 201 drives the first hydraulic telescopic rod 203 fixedly installed thereon to rotate, thereby realizing the rotation of the entire position assembly 2. The first hydraulic telescopic rod 203 can be telescoped, thereby adjusting the height of the device. The installation position of the mobile frame 204 and the first hydraulic telescopic rod 203 is vertically installed. The mobile frame 204 provides a place for the movement of the clamp assembly 3. The screw motor 205 can be telescoped, and the screw rod 206 fixedly connected thereto moves in the same direction as the telescopic direction. The screw rod 206 pulls the second hydraulic telescopic rod 301 fixedly connected thereto to slide in the mobile frame 204, thereby realizing the movement of the clamp assembly 3 on the mobile frame 204. The manned cabin 6 can carry personnel to operate the device.

[0038] In order to realize the clamping of materials of the device, a material storage and transfer platform for safe construction of hub interchange super-large bridge is proposed, wherein: the clamp assembly 3 also includes: a second motor 305, a worm gear 306, a locking rod 307, a fixing hook 308, a sliding frame 310, a locking block 311, a fixing rod 312, and a lower baffle 313;

[0039] A second motor 305 is fixedly installed in the inner wall surface of the clamp frame 302, and the output end of the second motor 305 is fixedly connected to one end of the worm 304. The worm 304 is rotatably installed in the clamp frame 302. The worm 304 is meshed with a worm wheel 306. The worm wheel 306 is arranged above the worm 304 and is rotatably installed in the clamp frame 302. The worm wheel 306 is fixedly connected to the middle part of the locking rod 307. One end of the locking rod 307 is fixedly connected to the fixing hook 308, and the other end is fixedly connected to the lower baffle 313. Next, the lower baffle 313 is arranged below the clamp frame 302, the locking block 311 is slidably installed in the sliding frame 310, and a downward member 309 is installed in the sliding frame 310. The downward member 309 drives the locking block 311 to move downward to lock and fix the fixing hook 308. The sliding frame 310 is fixedly installed in the clamp frame 302, and a fixing rod 312 is arranged above the worm gear 306. The fixing hook 308 can be hooked on the fixing rod 312, and the fixing rod 312 is fixedly connected in the clamp frame 302.

[0040] The sliding frame 310 is provided with a vertical guide groove 314 , and both sides of the bottom of the locking block 311 are provided with ear plates, which are slidably fitted in the vertical guide groove 314 .

[0041] The locking rod 307 is provided with a clamping plate 316 , and a hooking plate 315 is provided on the top of the locking block 311 near the fixing rod 312 , and the hooking plate 315 is used to press down and limit the clamping plate 316 .

[0042] The second motor 305 is the rotation function of the worm 304 to realize the rotation of the worm 304. The worm 304 drives the worm wheel 306 to rotate, and the worm wheel 306 drives the locking rod 307 to swing, so that the locking rod 307 rotates through a certain angle, and the fixed hook 308 on the locking rod 307 rotates toward the fixed rod 312. At this time, the lower baffle plate 313 fixedly connected to the other end of the locking rod 307 rotates in the opposite direction of the fixed hook 308 until the surface of the fixed hook 308 contacts the fixed rod 312. The lower baffle plate 313 is now located below the clamp frame 302. The lower baffle plate 313 can prevent materials from falling and hitting the base 1. The locking block 311 contacts the other side of the fixed rod 312 to complete the locking of the fixed hook 308. The descending member 309 (hydraulic cylinder) drives the locking block 311 to move downward along the vertical guide groove 314 until the hook plate 315 presses down to limit the clamping plate 316.

[0043] In order to improve the material transfer efficiency of the device, a material storage and transfer platform for safe construction of a hub interchange super-large bridge is proposed, wherein the transmission component 4 includes a groove wheel 403 and a transmission wheel 405, a conveyor belt 401 is installed on the base 1, and the conveyor belt 401 is initially in a stationary state. A material bin 402 is provided at one end of the conveyor belt 401, and the material bin 402 is fixedly installed on one side of the base 1. Grooved wheels 403 are arranged on both sides of the conveyor belt 401. There are four groove wheels 403 in total, and the groove wheels 403 are rotatably installed on the base 1. Four toggle rods 404 are fixedly installed on each groove wheel 403, and the toggle rods 404 toggle the position of the material. The radial groove on the groove wheel 403 is in contact with the round pin installed non-centrally on the transmission wheel 405, and the transmission wheel 405 is fixedly connected to the output end of the third motor 406, and the third motor 406 is fixedly installed in the base 1.

[0044] The third motor 406 rotates the transmission wheel 405, and the round pin on the transmission wheel 405 is in contact with the radial groove of the groove wheel 403. When the transmission wheel 405 rotates, the round pin gives thrust to the radial groove of the groove wheel 403, so that the groove wheel 403 rotates, and the toggle rod 404 fixedly connected to the groove wheel 403 rotates at the same time. The toggle rod 404 drives the material to move on the conveyor belt 401, and the conveyor belt 401 moves with the movement of the material. The toggle rod 404 drives the material to the lower end of the clamp assembly 3 to facilitate the clamping of the clamp assembly 3.

[0045] Working principle:

[0046] 9. A method for using the material storage and transfer platform for safe construction of a hub interchange super-large bridge according to claim 8, characterized in that the steps are as follows:

[0047] Step 1: Transporting materials

[0048] The third motor 406 rotates the transmission wheel 405, and the round pin on the transmission wheel 405 contacts and connects with the radial groove of the groove wheel 403. The transmission wheel 405 rotates, and the round pin gives thrust to the radial groove of the groove wheel 403, so that the groove wheel 403 rotates, and the toggle rod 404 fixedly connected to the groove wheel 403 rotates at the same time, and the toggle rod 404 toggle the material to move on the conveyor belt 401. The conveyor belt 401 moves with the movement of the material. The toggle rod 404 toggle the material to the lower end of the clamp assembly 3, which is convenient for clamping the clamp assembly 3;

[0049] Step 2: Clamp the material

[0050] The piston rod of the second hydraulic telescopic rod 301 extends outward to the two electric clamps 303 to clamp the material. Then, the second motor 305 is the rotation function of the worm 304 to realize the rotation of the worm 304. The worm 304 drives the worm wheel 306 to rotate, and the worm wheel 306 drives the locking rod 307 to swing, so that the locking rod 307 rotates to a certain angle, and the fixing hook 308 on the locking rod 307 rotates toward the fixing rod 312. At this time, it is fixedly connected to the other end of the locking rod 307. The lower baffle plate 313 rotates in the opposite direction to the fixing hook 308 until the surface of the fixing hook 308 contacts the fixing rod 312. The lower baffle plate 313 is now located below the clamp frame 302. The lower baffle plate 313 can prevent the material from falling and hitting the base 1. The locking block 311 contacts the other side of the fixing rod 312 to complete the locking of the fixing hook 308. The descending member 309 drives the locking block 311 to move downward along the vertical guide groove 314 until the hook plate 315 presses down to limit the clamping plate 316.

[0051] Step 3: Transfer

[0052] The first motor 202 provides energy for the rotation of the rotating wheel 201, driving the rotating wheel 201 to rotate. The rotation angle of the rotating wheel 201 is 270°. The rotation of the rotating wheel 201 drives the first hydraulic telescopic rod 203 to rotate, so that the entire clamp assembly 3 and the clamped material rotate at the same time. The first hydraulic telescopic rod 203 can be vertically telescopic to adjust the height of the material. The installation position of the mobile frame 204 and the first hydraulic telescopic rod 203 is vertically installed. The mobile frame 204 provides a place for the movement of the clamp assembly 3. The screw motor 205 can be telescopic, and the screw rod 206 moves in the same direction as the telescopic direction. The screw rod 206 pulls the second hydraulic telescopic rod 301 to slide in the mobile frame 204, so as to realize the movement of the clamp assembly 3 on the mobile frame 204 to adjust the horizontal position of the material relative to the target position;

[0053] Step 4: Decentralization

[0054] When the material is adjusted to the upper side of the target position, the downward member 309 drives the locking block 311 to reset vertically, the clamping plate 316 releases the restriction, the second motor 305 drives the worm 304 to rotate in the opposite direction, the worm 304 drives the worm wheel 306 to rotate, the worm wheel 306 drives the locking rod 307 and the lower baffle 313 to reset in the opposite direction to the initial state, the extension length of the first hydraulic telescopic rod 203 and the second hydraulic telescopic rod 301 is adjusted, the material is lowered to the target position, the electric clamping plate 303 is reset, and the material is released;

[0055] Repeat steps 1 to 4 until all materials have been stored and transferred.

[0056] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A material storage and transfer platform for safe construction of a hub interchange super-large bridge, comprising a base (1), characterized in that: It also includes a position component (2), a clamp component (3), and a transmission component (4); four legs (5) are fixedly connected to the bottom of the base (1), on which the position component (2) is rotatably mounted; the clamp component (3) is mounted on the position component (2); the position component (2) is used to adjust the position of the clamp component (3); the clamp component (3) slides on the position component (2) to adjust the position; a transmission component (4) is arranged under the clamp component (3); the transmission component (4) is mounted on the base (1) and is used to transmit materials to the bottom of the clamp component (3).

2. A material storage and transfer platform for safe construction of a hub interchange super-large bridge according to claim 1, characterized in that: The positioning assembly (2) comprises a rotating wheel (201), a first motor (202), and a moving frame (204); the rotating wheel (201) is rotatably mounted on the base (1); the first motor (202) is fixedly mounted in the base (1); the rotating wheel (201) is fixedly connected to the output end of the first motor (202); the first motor (202) drives the rotating wheel (201) to rotate; a first hydraulic telescopic rod (203) is fixedly mounted on the rotating wheel (201); the output end of the first hydraulic telescopic rod (203) is fixedly connected to the moving frame (204); a slide groove is arranged in the moving frame (204); a screw rod (206) is rotatably connected in the slide groove; the screw rod (206) is driven by a screw motor (205); and a ball screw pair on the screw rod (206) is connected to a screw nut.

3. A material storage and transfer platform for safe construction of a hub interchange super-large bridge according to claim 2, characterized in that: The clamp assembly (3) comprises a second hydraulic telescopic rod (301) and a clamp frame (302); the screw nut is fixed on the second hydraulic telescopic rod (301) so that the second hydraulic telescopic rod (301) can slide in a slide groove to adjust its position; the output end of the second hydraulic telescopic rod (301) is fixedly connected to the clamp frame (302); an electric clamp block (303) is installed inside the clamp frame (302); and the second hydraulic telescopic rod (301) is slidably connected to the movable frame (204).

4. A material storage and transfer platform for safe construction of a hub interchange super-large bridge according to claim 3, characterized in that: The clamp assembly (3) further comprises: a second motor (305), a worm gear (306), a locking rod (307), a fixing hook (308), a sliding frame (310), a locking block (311), a fixing rod (312), and a lower baffle (313); A second motor (305) is fixedly installed in the inner wall surface of the clamp frame (302), and an output end of the second motor (305) is fixedly connected to one end of a worm (304). The worm (304) is rotatably installed in the clamp frame (302), and the worm (304) is meshed with a worm wheel (306). The worm wheel (306) is arranged above the worm (304) and is rotatably installed in the clamp frame (302). The worm wheel (306) is fixedly connected to the middle part of a locking rod (307), and one end of the locking rod (307) is fixedly connected to a fixing hook (308), and the other end is fixedly connected to a lower baffle (313). The lower baffle (313) is arranged below the clamp frame (302), the locking block (311) is slidably installed in the sliding frame (310), a descending member (309) is installed in the sliding frame (310), the descending member (309) drives the locking block (311) to move downward to lock and fix the fixing hook (308), the sliding frame (310) is fixedly installed in the clamp frame (302), a fixing rod (312) is arranged above the worm gear (306), the fixing hook (308) can be hooked on the fixing rod (312), and the fixing rod (312) is fixedly connected in the clamp frame (302).

5. A material storage and transfer platform for safe construction of a hub interchange super-large bridge according to claim 4, characterized in that: The sliding frame (310) is provided with a vertical guide groove (314), and both sides of the bottom of the locking block (311) are provided with ear plates, which are slidably fitted in the vertical guide groove (314).

6. A material storage and transfer platform for safe construction of a hub interchange super-large bridge according to claim 5, characterized in that: The locking rod (307) is provided with a clamping plate (316), and a hooking plate (315) is provided on the top of the locking block (311) near the fixing rod (312), and the hooking plate (315) is used to press down and limit the clamping plate (316).

7. A material storage and transfer platform for safe construction of a hub interchange super-large bridge according to claim 6, characterized in that: The transmission assembly (4) comprises a groove wheel (403) and a driving wheel (405). A conveyor belt (401) is installed on the base (1). A material bin (402) is arranged at one end of the conveyor belt (401). The material bin (402) is fixedly installed on one side of the base (1). Grooved wheels (403) are arranged on both sides of the conveyor belt (401). There are two grooved wheels (403) in total. The grooved wheels (403) are rotatably installed on the base (1). Four toggle rods (404) are fixedly installed on each grooved wheel (403). The toggle rods (404) are used to toggle the position of the material. The radial grooves on the grooved wheels (403) are in contact with and connected to the round pins installed non-centrally on the driving wheel (405). Each driving wheel (405) is driven by a third motor (406). The third motor (406) is fixedly installed in the base (1).

8. The material storage and transfer platform for safe construction of a hub interchange super-large bridge according to claim 7 is characterized by: A manned cabin (6) is fixedly mounted on one side of the mobile frame (204).

9. A method for using the material storage and transfer platform for safe construction of a hub interchange super-large bridge according to claim 8, characterized in that: Here are the steps: Step 1: Transporting materials The third motor (406) rotates the transmission wheel (405), and the round pin on the transmission wheel (405) contacts and connects with the radial groove of the groove wheel (403). The transmission wheel (405) rotates, and the round pin gives thrust to the radial groove of the groove wheel (403), so that the groove wheel (403) rotates, and the toggle rod (404) fixedly connected to the groove wheel (403) rotates at the same time. The toggle rod (404) toggle the material to move on the conveyor belt (401), and the conveyor belt (401) moves with the movement of the material. The toggle rod (404) toggle the material to the lower end of the clamp assembly (3) to facilitate the clamping of the clamp assembly (3); Step 2: Clamp the material The piston rod of the second hydraulic telescopic rod (301) extends outward to the two electric clamps (303) to clamp and fix the material. Then, the second motor (305) is used to rotate the worm (304), thereby realizing the rotation of the worm (304). The worm (304) drives the worm wheel (306) to rotate, and the worm wheel (306) drives the locking rod (307) to swing, so that the locking rod (307) rotates through a certain angle, and the fixing hook (308) on the locking rod (307) rotates toward the fixing rod (312). At this time, the lower end fixedly connected to the other end of the locking rod (307) The baffle plate (313) rotates in the opposite direction to the fixing hook (308) until the surface of the fixing hook (308) contacts the fixing rod (312). The lower baffle plate (313) is now located below the clamp frame (302). The lower baffle plate (313) can prevent the material from falling and hitting the base (1). The locking block (311) contacts the other side of the fixing rod (312) to complete the locking of the fixing hook (308). The descending member (309) drives the locking block (311) to move downward along the vertical guide groove (314) until the hook plate (315) presses down to limit the clamping plate (316). Step 3: Transfer The first motor (202) provides energy for the rotation of the rotating wheel (201), driving the rotating wheel (201) to rotate. The rotation angle of the rotating wheel (201) is 270 degrees. The rotation of the rotating wheel (201) drives the first hydraulic telescopic rod (203) to rotate, so that the entire clamp assembly (3) and the clamped material rotate at the same time. The first hydraulic telescopic rod (203) can be vertically extended to adjust the height of the material. The installation position of the mobile frame (204) and the first hydraulic telescopic rod (203) is vertically installed. The mobile frame (204) provides a place for the movement of the clamp assembly (3). The screw motor (205) can be extended and retracted. The screw rod (206) moves in the same direction as the extension direction. The screw rod (206) pulls the second hydraulic telescopic rod (301) to slide in the mobile frame (204), so as to realize the movement of the clamp assembly (3) on the mobile frame (204) to adjust the horizontal position of the material relative to the target position. Step 4: Decentralization When the material is adjusted to the position just above the target position, the downward member (309) drives the locking block (311) to reset vertically, the clamping plate (316) releases the restriction, the second motor (305) drives the worm (304) to rotate in the opposite direction, the worm (304) drives the worm wheel (306) to rotate, the worm wheel (306) drives the locking rod (307) and the lower baffle (313) to reset in the opposite direction to the initial state, the extension length of the first hydraulic telescopic rod (203) and the second hydraulic telescopic rod (301) is adjusted, the material is lowered to the target position, the electric clamping plate (303) is reset, and the material is released; Repeat steps 1 to 4 until all materials have been stored and transferred.

Citation Information

Patent Citations

  • Projectile carrying, taking and placing special robot

    CN109775345A

  • Rapid maintenance tool and method for mobile power source of rail large hoisting machinery

    CN117865023A

  • Full-automatic transfer equipment for photovoltaic module production

    CN118545502A

  • Smart card card feed mechanism

    CN205471505U

  • Support for a belt conveyor

    EP0381941A1