Manufacturing factory and material distribution system
By designing a material distribution system with multi-layer production units and exclusive distribution lines in an aviation manufacturing factory, the problems of high costs, large land occupation and low automation in the existing technology are solved, and automated material distribution is realized, reducing the occupation of manufacturing factories. and cost, and reduce the impact on the factory environment.
Patent Information
- Application Number
- CN202411681043.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-01-03
AI Technical Summary
The material distribution system of existing aviation manufacturing plants has problems such as high cost, large area, low degree of automation, affecting personnel safety, high requirements for the factory environment, and secondary manual handling of materials.
A material distribution system of multi-layer production units was designed, and materials were distributed through the exclusive distribution line between the workshop and the central warehouse through the AGV trolley, and materials were distributed between the multi-layer production units through the CTU trolley in the workshop, using The terminal and tail warehouse elevators and the shuttle station carry out material transportation and storage, reducing manual operation and logistics barriers.
It realizes automated material distribution between various workshops and production units, reduces the land occupation and cost of manufacturing plants, improves the degree of automation, reduces the impact on the factory environment, and reduces the secondary manual handling of materials.
Smart Images

Figure CN119240262A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of aviation manufacturing, in particular to a manufacturing plant and a material distribution system for aviation manufacturing. Background Art
[0002] Existing aviation manufacturing plants often use ultra-long-distance belt conveyors, roller conveyors, pallet forklifts, single AGVs and other equipment to distribute materials and store and cache materials.
[0003] The use of ultra-long-distance belt conveyors and roller conveyors to distribute materials and store and cache materials has the problems of high cost, large floor space, and occupation and blockage of logistics and personnel operation channels.
[0004] Pallet forklifts deliver material storage and cache materials, but they have problems such as low automation, large area occupied by the forklift's movement range, impact on personnel safety, and high requirements on the factory environment.
[0005] A single AGV distributes materials and stores and caches materials, which results in the problem of secondary manual handling of materials and is not suitable for large-scale material distribution needs. Summary of the invention
[0006] The present invention proposes a manufacturing plant and material distribution system for aviation manufacturing to solve the technical problems of existing aviation manufacturing plants, such as high cost, large floor space, occupation and blockage of logistics and personnel operation channels, low degree of automation, large floor space occupied by forklifts, impact on personnel safety, high requirements on factory environment, and secondary manual handling of materials.
[0007] One aspect of the present invention is to provide a manufacturing plant for aviation manufacturing, the manufacturing plant comprising a plurality of workshops constructed, and at least one central warehouse;
[0008] A first distribution route is set between each of the workshops and the central warehouse, and between multiple workshops;
[0009] The first distribution route is used for the AVG vehicle to move back and forth between each of the workshops and the central warehouse, and between multiple workshops along the first distribution route;
[0010] Each of the workshops includes multiple layers of production units, and each of the workshops is provided with an end warehouse elevator and a tail warehouse elevator connected to the multiple layers of production units;
[0011] Outside each of the workshops, the first-layer production unit is provided with an end warehouse docking station and a tail warehouse docking station; the end warehouse docking station is connected to the end warehouse elevator, and the tail warehouse docking station is connected to the tail warehouse elevator;
[0012] Inside each of the workshops, each production unit on each floor is provided with an end warehouse docking platform and a tail warehouse docking platform; the end warehouse docking platform is connected to the end warehouse elevator, and the tail warehouse docking platform is connected to the tail warehouse elevator;
[0013] Inside each of the workshops, each production unit is provided with an end warehouse, a tail warehouse, a line side warehouse, and a plurality of production lines;
[0014] A second distribution route is arranged between the end warehouse docking station, the end warehouse, the lineside warehouse, the plurality of production lines, the tail warehouse, and the tail warehouse docking station;
[0015] The second distribution route is used for the CTU trolley to move back and forth between the end warehouse docking station, the end warehouse, the line side warehouse, multiple production lines, the tail warehouse, and the tail warehouse docking station along the second distribution route.
[0016] In a preferred embodiment, when the AVG vehicle moves back and forth between each of the workshops and the central warehouse, and between a plurality of the workshops along the first distribution route;
[0017] The AVG trolley docks with the end warehouse docking station or the tail warehouse docking station to deliver materials between each workshop and the central warehouse, and between multiple workshops.
[0018] In a preferred embodiment, when the CTU trolley moves back and forth between the end warehouse docking station, the end warehouse, the line side warehouse, the plurality of production lines, the tail warehouse, and the tail warehouse docking station along the second distribution route;
[0019] The CTU cart is connected to the end warehouse docking station, the end warehouse, the line side warehouse, multiple production lines, the tail warehouse, and the tail warehouse docking station, and delivers materials between the end warehouse docking station, the end warehouse, the line side warehouse, multiple production lines, the tail warehouse, and the tail warehouse docking station.
[0020] In a preferred embodiment, the end warehouse docking station adopts a double-layer double-row roller docking station to connect with the end warehouse hoist; the end warehouse docking station includes: an upper conveying roller group of the end warehouse and a lower conveying roller group of the end warehouse;
[0021] The upper conveying roller group of the end warehouse includes a first upper conveying roller and a second upper conveying roller; the lower conveying roller group of the end warehouse includes a first lower conveying roller and a second lower conveying roller;
[0022] The AVG trolley is a double-layer double-row roller-type AGV trolley, including an upper roller group and a lower roller group;
[0023] The upper roller set includes a first upper roller and a second upper roller; the lower roller set includes a first lower roller and a second lower roller;
[0024] When the AVG trolley docks with the end warehouse docking station, the first upper roller is aligned with the first upper conveying roller, the second upper roller is aligned with the second upper conveying roller, the first lower roller is aligned with the first lower conveying roller, and the second lower roller is aligned with the second lower conveying roller.
[0025] In a preferred embodiment, an end warehouse conveying box is arranged in the end warehouse hoist, and the end warehouse conveying box moves back and forth in the vertical direction in the end warehouse hoist, and is used to convey the materials of the end warehouse docking station to the end warehouse docking station of each production unit layer;
[0026] Wherein, a first conveying roller and a second conveying roller are arranged in the end warehouse conveying box;
[0027] When the end warehouse conveying box moves in the vertical direction in the end warehouse hoist to the end warehouse docking station, the first conveying roller is aligned with the first upper conveying roller and the second upper conveying roller of the end warehouse upper conveying roller group, and the second conveying roller is aligned with the first lower conveying roller and the second lower conveying roller of the end warehouse lower conveying roller group, and the end warehouse conveying box receives the materials conveyed by the end warehouse docking station;
[0028] When the end warehouse conveying box moves in the vertical direction in the end warehouse elevator to the end warehouse docking platform of each layer of production units, the end warehouse docking platform receives the materials conveyed by the first conveying roller and the second conveying roller.
[0029] In a preferred embodiment, the tail warehouse docking station adopts a double-layer double-row roller docking station to connect with the tail warehouse elevator; the tail warehouse docking station includes: an upper conveying roller group of the tail warehouse and a lower conveying roller group of the tail warehouse;
[0030] The upper conveying roller group of the tail warehouse includes a third upper conveying roller and a fourth upper conveying roller; the lower conveying roller group of the tail warehouse includes a third lower conveying roller and a fourth lower conveying roller;
[0031] The AVG trolley is a double-layer double-row roller-type AGV trolley, including an upper roller group and a lower roller group;
[0032] The upper roller set includes a first upper roller and a second upper roller; the lower roller set includes a first lower roller and a second lower roller;
[0033] When the AVG trolley docks with the tail warehouse docking station, the first upper roller is aligned with the third upper conveying roller, the second upper roller is aligned with the fourth upper conveying roller, the first lower roller is aligned with the third lower conveying roller, and the second lower roller is aligned with the fourth lower conveying roller.
[0034] In a preferred embodiment, a tail warehouse conveying box is arranged in the tail warehouse elevator, and the tail warehouse conveying box moves back and forth in the vertical direction in the tail warehouse elevator, and is used to convey the materials of the tail warehouse docking platform of each layer of production unit to the tail warehouse docking station;
[0035] Wherein, a third conveying roller and a fourth conveying roller are arranged in the tail warehouse conveying box;
[0036] When the tail warehouse conveying box moves vertically in the tail warehouse elevator to the tail warehouse docking platform of each production unit, the third conveying roller and the fourth conveying roller receive the material conveyed by the tail warehouse docking platform;
[0037] When the tail warehouse conveying box moves in the vertical direction in the tail warehouse elevator to the tail warehouse docking station, the third upper conveying roller and the fourth upper conveying roller of the tail warehouse upper conveying roller group are aligned with the third conveying roller, and the third lower conveying roller and the fourth lower conveying roller of the tail warehouse lower conveying roller group are aligned with the fourth conveying roller, and the tail warehouse docking station receives the material conveyed by the tail warehouse conveying box.
[0038] In a preferred embodiment, the end warehouse docking platform adopts a double-layer double-row roller docking platform, a single-layer double-row roller docking platform or a single-layer single-row roller docking platform.
[0039] In a preferred embodiment, the tail warehouse docking platform adopts a double-layer double-row roller docking platform, a single-layer double-row roller docking platform or a single-layer single-row roller docking platform.
[0040] Another aspect of the present invention is to provide a material distribution system for an aviation manufacturing plant, the material distribution system comprising:
[0041] MES system is used to manage the production tasks of each workshop, generate production plans, and send them to MOM / WMS system;
[0042] The MOM / WMS system is used to receive the production plan issued by the MES system, generate material scheduling tasks according to the production plan, and issue them to the RCS system;
[0043] The RCS system is used to receive the material scheduling tasks issued by the MOM / WMS system, generate AGV scheduling instructions and CTU scheduling instructions, and send the AGV scheduling instructions to the AGV trolley and send the CTU scheduling instructions to the CTU trolley;
[0044] The AGV trolley is used to receive the AGV dispatching instruction, and according to the AGV dispatching instruction, move back and forth along the first distribution route between the end warehouse docking station or tail warehouse docking station of each workshop and the central warehouse, and between the end warehouse docking stations or tail warehouse docking stations between multiple workshops to distribute materials;
[0045] The CTU trolley is used to receive the CTU dispatching instruction and move back and forth between the end warehouse docking station, the end warehouse, the line side warehouse, multiple production lines, the tail warehouse, and the tail warehouse docking station along the second distribution route according to the CTU dispatching instruction to distribute materials;
[0046] The ICMS system is used to monitor the end warehouse docking station, the tail warehouse docking station, the end warehouse elevator, the tail warehouse elevator, the end warehouse docking platform and the tail warehouse docking platform in real time, generate monitoring data, and feed the monitoring data back to the MOM / WMS system and the RCS system in real time;
[0047] The MOM / WMS system adjusts the material scheduling tasks according to the monitoring data fed back by the ICMS system;
[0048] The RCS system adjusts the AGV scheduling instructions and the CTU scheduling instructions according to the monitoring data fed back by the ICMS system.
[0049] Compared with the prior art, the present invention has the following beneficial effects:
[0050] The present invention proposes a manufacturing plant and material distribution system for aviation manufacturing, in which multiple workshops of the manufacturing plant adopt multi-layer production units, materials are transported between the multi-layer production units through end warehouse elevators and tail warehouse elevators, materials are distributed between the workshop and the central warehouse and between multiple workshops through AGV carts, and materials are distributed to each production unit on each floor inside the workshop through CTU carts. Automatic material distribution can be achieved in each workshop, each production unit, and each production line to meet the needs of large-scale material distribution, so that the manufacturing plant occupies a small area, has a high degree of automation, has low requirements on the factory environment, and has low cost.
[0051] The present invention proposes a manufacturing plant and material distribution system for aviation manufacturing, wherein the AGV cart is equipped with an exclusive first distribution route, and the AVG cart moves back and forth between each workshop and a central warehouse, as well as between multiple workshops, to deliver materials; at each production unit layer in the workshop, the CTU cart is equipped with an exclusive second distribution route, and the CTU cart moves back and forth between the end warehouse docking station, the end warehouse, the line side warehouse, multiple production lines, the tail warehouse, and the tail warehouse docking station along the second distribution route to deliver materials, thereby effectively reducing the occupation and blockage of passages by logistics and personnel operations, reducing the movement range of the AVG cart and the CTU cart, and reducing the impact on personnel safety.
[0052] The present invention proposes a manufacturing plant and material distribution system for aviation manufacturing. Outside each workshop, the first-layer production unit is provided with an end warehouse docking station and a tail warehouse docking station. When the AGV cart moves back and forth between the workshop and the central warehouse and between multiple workshops to distribute materials, the AGV cart distributes the materials to the end warehouse elevator and the tail warehouse elevator by connecting with the end warehouse docking station or the tail warehouse docking station. Inside each workshop, each layer of production unit is provided with an end warehouse docking station and a tail warehouse docking station. When the CTU cart moves back and forth between the end warehouse docking station, the end warehouse, the line-side warehouse, multiple production lines, the tail warehouse and the tail warehouse docking station to distribute materials, the CTU cart receives the materials through the end warehouse docking station and the tail warehouse docking station, and transfers, stores and caches them inside each layer of production units, thereby reducing the secondary manual handling of materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] In order to more clearly illustrate the specific implementation of the present invention or the technical solution in the prior art, the following briefly introduces the drawings required for use in the specific implementation or the prior art description. Obviously, the drawings described below are some implementations of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0054] Figure 1 It is a plan view of a manufacturing plant for aviation manufacturing according to the present invention.
[0055] Figure 2 It is a schematic cross-sectional view of workshop A of the present invention.
[0056] Figure 3 It is a schematic plan view of the first-layer production unit of workshop A of the present invention.
[0057] Figure 4 It is a structural schematic diagram of the end warehouse docking station of the present invention.
[0058] Figure 5 It is a structural schematic diagram of the AGV trolley of the present invention.
[0059] Figure 6 It is a structural schematic diagram of the CTU trolley of the present invention.
[0060] Figure 7 It is a structural schematic diagram of the tail warehouse docking station of the present invention.
[0061] Figure 8 It is a schematic structural diagram of an end docking station / tail docking station in one embodiment of the present invention.
[0062] Fig. 9 It is a structural schematic diagram of an end warehouse docking station / tail docking station in another embodiment of the present invention.
[0063] Fig.10 The present invention is a structural block diagram of a material distribution system for an aviation manufacturing plant. DETAILED DESCRIPTION
[0064] In order to make the above and other features and advantages of the present invention more clear, the present invention is further described below in conjunction with the accompanying drawings. It should be understood that the specific embodiments given herein are for the purpose of explaining to those skilled in the art and are only exemplary and not restrictive.
[0065] Combination Figures 1 to 9 According to an embodiment of the present invention, a manufacturing plant for aviation manufacturing is provided. Figure 1 As shown, a manufacturing plant for aviation manufacturing includes a plurality of workshops 200 and at least one central warehouse 100 .
[0066] By way of example in this embodiment, the plurality of workshops 200 are workshop A, workshop B, workshop C, workshop D, workshop E, workshop F, workshop G, . . . . .
[0067] A first delivery route L1 is set between each workshop 200 and the central warehouse 100, and between multiple workshops 200. The first delivery route L1 is used for the AVG vehicle 300 to move back and forth between each workshop 200 and the central warehouse 100, and between multiple workshops 200 along the first delivery route L1.
[0068] like Figure 2 As shown, according to an embodiment of the present invention, each workshop 200 includes multi-layer production units, and each workshop is provided with an end warehouse elevator 202 and a tail warehouse elevator 209 connecting the multi-layer production units.
[0069] like Figure 2 As shown, in this embodiment, workshop A is taken as an example, and workshop A includes a first-layer production unit F1, a second-layer production unit F2, a third-layer production unit F3, ...
[0070] like Figure 2 and Figure 3As shown, according to an embodiment of the present invention, outside each workshop 200, the first-layer production unit F1 is provided with an end warehouse docking station 201 and a tail warehouse docking station 210. The end warehouse docking station 201 is docked with the end warehouse elevator 202, and the tail warehouse docking station 210 is docked with the tail warehouse elevator 209.
[0071] Combination Figure 1 , Figure 2 and Figure 3 When the AVG cart 300 moves back and forth along the first distribution route L1 between each workshop 200 (workshop A, workshop B, workshop C, workshop D, workshop E, workshop F, workshop G, ...) and the central warehouse 100, and between multiple workshops 200 (workshop A, workshop B, workshop C, workshop D, workshop E, workshop F, workshop G, ...), the AVG cart 300 docks with the end warehouse docking station 201 or the tail warehouse docking station 210, and delivers materials between each workshop 200 and the central warehouse 100, and between multiple workshops 200.
[0072] like Figure 2 and Figure 3 As shown, according to an embodiment of the present invention, inside each workshop 200, each layer of production units (first layer production unit F1, second layer production unit F2, third layer production unit F3, ...) is provided with an end warehouse docking platform 203 and a tail warehouse docking platform 208. The end warehouse docking platform 202 is docked with the end warehouse hoist 202, and the tail warehouse docking platform 208 is docked with the tail warehouse hoist 209.
[0073] like Figure 3 As shown, according to an embodiment of the present invention, inside each workshop 200, each layer of production unit (first layer production unit F1, second layer production unit F2, third layer production unit F3, ...) is provided with an end warehouse 204, a tail warehouse 207, a line side warehouse 206, and multiple production lines 205.
[0074] In this embodiment, the plurality of production lines 205 are illustratively production line No. 1, production line No. 2, production line No. 3, ..., production line No. N.
[0075] like Figure 4 As shown, according to an embodiment of the present invention, the end warehouse docking station 201 adopts a double-layer double-row roller docking station to dock with the end warehouse hoist 202. The end warehouse docking station 201 includes: an end warehouse upper conveying roller group and an end warehouse lower conveying roller group.
[0076] The upper conveying roller group of the end storehouse includes a first upper conveying roller 2011 and a second upper conveying roller 2012. The lower conveying roller group of the end storehouse includes a first lower conveying roller 2013 and a second lower conveying roller 2014.
[0077] like Figure 5As shown, the AVG trolley 300 is a double-layer double-row roller-type AGV trolley, including an upper roller group and a lower roller group.
[0078] The upper roller set includes a first upper roller 301 and a second upper roller 302. The lower roller set includes a first lower roller 303 and a second lower roller 304. A material box M is placed on the first upper roller 301, the second upper roller 302, the first lower roller 303 and the second lower roller 304. When the AVG trolley 300 delivers materials, the materials are placed in the material box M.
[0079] When the AVG trolley 300 is docked with the end warehouse docking station 201, the first upper roller 301 is aligned with the first upper conveying roller 2011, the second upper roller 302 is aligned with the second upper conveying roller 2012, the first lower roller 303 is aligned with the first lower conveying roller 2013, and the second lower roller 304 is aligned with the second lower conveying roller 2014. The AVG trolley 300 transports the material box M containing the material to the end warehouse docking station 201.
[0080] In a preferred embodiment, the body of the AVG trolley 300 has a length, width and height less than 1.8*1.5*1 (meter). The body size of the AVG trolley 300 is greatly reduced compared to the range of movement of a forklift.
[0081] The AVG trolley 300 of the present invention adopts a double-layer double-row roller AGV trolley, which can deliver 8 material boxes M with a size of 800*600*250mm or 16 material boxes M with a size of 400*600*250mm at a time.
[0082] like Figure 2 As shown, according to an embodiment of the present invention, an end warehouse conveying box 2021 is arranged in the end warehouse elevator 202, and the end warehouse conveying box 2021 moves back and forth in the vertical direction in the end warehouse elevator 202, and is used to convey the materials of the end warehouse docking station 201 to the end warehouse docking platform 203 of each layer of production units (first layer production unit F1, second layer production unit F2, third layer production unit F3, ...).
[0083] Specifically, a first conveying roller 2022 and a second conveying roller 2023 are provided in the end warehouse conveying box 2021 .
[0084] When the end warehouse conveying box 2021 moves in the vertical direction in the end warehouse elevator 202 to the end warehouse docking station 201, the first conveying roller 2022 is aligned with the first upper conveying roller 2011 and the second upper conveying roller 2012 of the end warehouse upper conveying roller group, and the second conveying roller 2023 is aligned with the first lower conveying roller 2013 and the second lower conveying roller 2014 of the end warehouse lower conveying roller group, and the end warehouse conveying box 2021 receives the material conveyed by the end warehouse docking station 201.
[0085] When the end warehouse conveying box 2021 moves vertically in the end warehouse elevator 202 to the end warehouse docking platform 203 of each layer of production unit (first layer production unit F1, second layer production unit F2, third layer production unit F3, ...), the end warehouse docking platform 203 receives the material conveyed by the first conveying roller 2022 and the second conveying roller 2023.
[0086] In some embodiments, the terminal docking station 203 adopts a double-layer double-row roller docking station. In other embodiments, the terminal docking station 203 adopts a single-layer double-row roller docking station, such as Figure 8 In some other embodiments, the terminal docking station 203 is a single-layer single-row roller docking station, such as Fig. 9 shown.
[0087] like Figure 3 As shown, according to an embodiment of the present invention, a second distribution route L2 is set between each layer of production units (first layer production unit F1, second layer production unit F2, third layer production unit F3, ...) inside each workshop 200, the end warehouse docking station 203, the end warehouse 204, the line side warehouse 206, multiple production lines 205 (production line No. 1, production line No. 2, production line No. 3, ..., production line No. N), the tail warehouse 207, and the tail warehouse docking station 208.
[0088] The second distribution route L2 is used for the CTU cart 400 to move back and forth along the second distribution route L2 between the end warehouse docking platform 203, the end warehouse 204, the line side warehouse 206, multiple production lines 205 (production line 1#, production line 2#, production line 3#,..., production line N#), the tail warehouse 207, and the tail warehouse docking platform 208.
[0089] Combination Figure 2 and Figure 3 When the CTU cart 400 moves back and forth between the end warehouse docking station 203, the end warehouse 204, the line side warehouse 206, multiple production lines 205, the tail warehouse 207, and the tail warehouse docking station 208 along the second distribution route L2, the CTU cart 400 docks with the end warehouse docking station 203, the end warehouse 204, the line side warehouse 206, multiple production lines 205, the tail warehouse 207, and the tail warehouse docking station 207, and distributes materials between the end warehouse docking station 203, the end warehouse 204, the line side warehouse 206, multiple production lines 205, the tail warehouse 207, and the tail warehouse docking station 207.
[0090] like Figure 6 As shown, the CTU trolley 400 of the present invention includes a plurality of forks 401 arranged in a vertical array. Figure 2 , Figure 3 and Figure 6The CTU cart 400 receives the materials transported by the end warehouse docking station 203 through the fork 401, and transfers the materials between the end warehouse 204, the line side warehouse 206, multiple production lines 205, the tail warehouse 207, and the tail warehouse docking station 208.
[0091] In some embodiments, the tail warehouse docking platform 208 adopts a double-layer double-row roller docking platform, a single-layer double-row roller docking platform, or a single-layer single-row roller docking platform.
[0092] like Figure 7 As shown, according to an embodiment of the present invention, the tail warehouse docking station 210 adopts a double-layer double-row roller docking station to dock with the tail warehouse elevator 209. The tail warehouse docking station 210 includes: an upper conveying roller group of the tail warehouse and a lower conveying roller group of the tail warehouse.
[0093] The upper conveying roller group of the tail warehouse includes a third upper conveying roller 2101 and a fourth upper conveying roller 2102. The lower conveying roller group of the tail warehouse includes a third lower conveying roller 2103 and a fourth lower conveying roller 2104.
[0094] like Figure 5 As shown, the AGV trolley 300 is a double-layer double-row roller type AGV trolley, including an upper roller group and a lower roller group. The upper roller group includes a first upper roller 301 and a second upper roller 302, and the lower roller group includes a first lower roller 303 and a second lower roller 304.
[0095] When the AVG trolley 300 docks with the tail warehouse docking station 210, the first upper roller 301 is aligned with the third upper conveying roller 2101, the second upper roller 302 is aligned with the fourth upper conveying roller 2102, the first lower roller 303 is aligned with the third lower conveying roller 2103, and the second lower roller 304 is aligned with the fourth lower conveying roller 2104.
[0096] like Figure 2 As shown, according to an embodiment of the present invention, a tail warehouse conveying box 2091 is arranged in the tail warehouse elevator 209, and the tail warehouse conveying box 2091 moves back and forth in the vertical direction in the tail warehouse elevator 209, and is used to transport the materials of the tail warehouse docking platform 208 of each layer of production units (first layer production unit F1, second layer production unit F2, third layer production unit F3, ...) to the tail warehouse docking station 210.
[0097] Specifically, a third conveying roller 2092 and a fourth conveying roller 2093 are disposed in the tail warehouse conveying box 2091 .
[0098] When the tail warehouse conveying box 2091 moves vertically in the tail warehouse elevator 209 to the tail warehouse docking platform 208 of each layer of production unit (first layer production unit F1, second layer production unit F2, third layer production unit F3, ...), the third conveying roller 2092 and the fourth conveying roller 2093 receive the material conveyed by the tail warehouse docking platform 208.
[0099] When the tail warehouse conveying box 2091 moves in the vertical direction in the tail warehouse elevator 209 to the tail warehouse docking station 210, the third upper conveying roller 2101 and the fourth upper conveying roller 2102 of the tail warehouse upper conveying roller group are aligned with the third conveying roller 2092, and the third lower conveying roller 2103 and the fourth lower conveying roller 2104 of the tail warehouse lower conveying roller group are aligned with the fourth conveying roller 2093, and the tail warehouse docking station 210 receives the material conveyed by the tail warehouse conveying box 2091.
[0100] When the AVG trolley 300 docks with the tail warehouse docking station 210, the first upper roller 301 is aligned with the third upper conveying roller 2101, the second upper roller 302 is aligned with the fourth upper conveying roller 2102, the first lower roller 303 is aligned with the third lower conveying roller 2103, and the second lower roller 304 is aligned with the fourth lower conveying roller 2104, and the materials transported by the tail warehouse docking station 210 are received. After that, the AVG trolley 300 delivers the materials to other workshops 200 (such as workshop B, etc.) for processing in the next step.
[0101] In the present invention, since the AVG cart 300 is a double-layer double-row roller-type AGV cart, an end warehouse docking station 201 and a tail warehouse docking station 210 are set on the first-layer production unit F1 outside each workshop 200. The AVG cart 300 is directly docked with the end warehouse docking station 201 or the tail warehouse docking station 210. The driving speed of the AVG cart 300 can reach more than 1.2 meters per second, thereby realizing long-distance, fast and automatic material distribution.
[0102] In the present invention, an end warehouse docking station 203 and a tail warehouse docking station 208 are set inside each workshop 200 and each production unit on each floor. The CTU cart 400 receives materials through the end warehouse docking station 203 and the tail warehouse docking station 208, and transfers, stores and caches them inside each production unit on each floor, reducing the secondary manual handling of materials.
[0103] The multiple workshops 200 of the present invention adopt multi-layer production units, and materials are transported between the multi-layer production units through the end warehouse elevator 202 and the tail warehouse elevator 209. The materials are distributed between the workshop 200 and the central warehouse 100 and between the multiple workshops 200 through the AGV cart. The materials are distributed to each production unit on each layer inside the workshop 200 through the CTU cart. It can realize automatic material distribution for each workshop 200, each production unit (first-layer production unit F1, second-layer production unit F2, third-layer production unit F3, ...), and each production line (1# production line, 2# production line, 3# production line, ..., N# production line), meet the needs of large-scale material distribution, so that the manufacturing plant occupies a small area, has a high degree of automation, has low requirements on the factory environment, and has a low cost.
[0104] like Fig.10 As shown, according to an embodiment of the present invention, a material distribution system for a manufacturing plant for aviation manufacturing is provided, including: an MES system (production management system) 500, a MOM / WMS system (warehouse management system) 600, an RCS system (scheduling management system) 700 and an ICMS system (equipment management system) 800.
[0105] The MES system 500 is used to manage the production tasks of each workshop 200, generate a production plan, and send it to the MOM / WMS system 600.
[0106] The MOM / WMS system 600 is used to receive the production plan sheet issued by the MES system, generate material scheduling tasks according to the production plan sheet, and issue the tasks to the RCS system 700.
[0107] The RCS system 700 is used to receive the material scheduling tasks issued by the MOM / WMS system 600, generate AGV scheduling instructions and CTU scheduling instructions, and send the AGV scheduling instructions to the AGV vehicle 300 and send the CTU scheduling instructions to the CTU vehicle 400.
[0108] The AGV cart 300 is used to receive AGV scheduling instructions, and according to the AGV scheduling instructions, it moves back and forth along the first distribution route L1 between the end warehouse docking station 201 or the tail warehouse docking station 210 of each workshop 200 and the central warehouse, and between the end warehouse docking stations 201 or the tail warehouse docking stations 210 between multiple workshops to distribute materials.
[0109] The CTU cart 400 is used to receive CTU scheduling instructions, and according to the CTU scheduling instructions, it moves back and forth along the second distribution route L2 between the end warehouse docking station 203, the end warehouse 204, the line side warehouse 206, multiple production lines 205, the tail warehouse 207, and the tail warehouse docking station 208 to distribute materials.
[0110] The ICMS system 800 is used to monitor the end warehouse docking station 201, the tail warehouse docking station 210, the end warehouse elevator 202, the tail warehouse elevator 209, the end warehouse docking platform 203 and the tail warehouse docking platform 208 in real time, generate monitoring data, and feed back the monitoring data to the MOM / WMS system 300 and the RCS system 700 in real time.
[0111] In some embodiments, the monitoring data generated by the ICMS system 800 includes but is not limited to equipment status (for example, operation, pause, failure, maintenance, etc.), logistics data (for example, the AGV cart 300 arrives at / leaves the end warehouse docking station 201 / tail warehouse docking station 210, the CTU cart 400 arrives at / leaves the end warehouse docking station 203 / tail warehouse docking station 208, etc.), and process data (for example, equipment operation data monitoring and collection, etc.).
[0112] The MOM / WMS system 600 adjusts the material scheduling tasks according to the monitoring data fed back by the ICMS system 800.
[0113] The RCS system 700 adjusts the AGV scheduling instructions and the CTU scheduling instructions according to the monitoring data fed back by the ICMS system.
[0114] Furthermore, the AGV 300 feeds back status information to the RCS system 700 during the process of delivering materials along the first delivery route L1, and the CTU 400 feeds back status information to the RCS system 700 during the process of delivering materials along the second delivery route L2, for example, path conflict.
[0115] The RCS system 700 adjusts the AGV scheduling instructions and the CTU scheduling instructions according to the status information fed back by the AGV vehicle 300 and / or the CTU vehicle 400.
[0116] The RCS system 700 feeds back the adjusted AGV scheduling instructions and CTU scheduling instructions to the MOM / WMS system 300. The MOM / WMS system 600 adjusts the material scheduling tasks according to the AGV scheduling instructions and CTU scheduling instructions fed back by the RCS system 700, and feeds back the adjusted scheduling tasks to the MES system 500.
[0117] In some preferred embodiments, the docking protocol between the MES system 500 and the MOM / WMS system 600 adopts the websevber / API protocol, the docking protocol between the MOM / WMS system 600 and the RCS system 700 adopts the websevber / API protocol, and the docking protocol between the RCS system 700 and the AGV trolley 300 and the CTU trolley 400 adopts the Modbus-tcp protocol. The docking protocol between the ICMS system (equipment management system) 800 and the MOM / WMS system 600 and the RCS system 700 adopts the http protocol.
[0118] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A manufacturing plant, characterized in that: The manufacturing plant includes a plurality of workshops and at least one central warehouse; A first distribution route is set between each of the workshops and the central warehouse, and between multiple workshops; The first distribution route is used for the AVG vehicle to move back and forth between each of the workshops and the central warehouse, and between multiple workshops along the first distribution route; Each of the workshops includes multiple layers of production units, and each of the workshops is provided with an end warehouse elevator and a tail warehouse elevator connected to the multiple layers of production units; Outside each of the workshops, the first-layer production unit is provided with an end warehouse docking station and a tail warehouse docking station; the end warehouse docking station is connected to the end warehouse elevator, and the tail warehouse docking station is connected to the tail warehouse elevator; Inside each of the workshops, each production unit on each floor is provided with an end warehouse docking platform and a tail warehouse docking platform; the end warehouse docking platform is connected to the end warehouse elevator, and the tail warehouse docking platform is connected to the tail warehouse elevator; Inside each of the workshops, each production unit is provided with an end warehouse, a tail warehouse, a line side warehouse, and a plurality of production lines; A second distribution route is arranged between the end warehouse docking station, the end warehouse, the lineside warehouse, the plurality of production lines, the tail warehouse, and the tail warehouse docking station; The second distribution route is used for the CTU trolley to move back and forth between the end warehouse docking station, the end warehouse, the line side warehouse, multiple production lines, the tail warehouse, and the tail warehouse docking station along the second distribution route.
2. The manufacturing plant according to claim 1, characterized in that: When the AVG vehicle moves back and forth between each of the workshops and the central warehouse, and between multiple workshops along the first distribution route; The AVG trolley docks with the end warehouse docking station or the tail warehouse docking station to deliver materials between each workshop and the central warehouse, and between multiple workshops.
3. The manufacturing plant according to claim 1, characterized in that: When the CTU trolley moves back and forth between the end warehouse docking station, the end warehouse, the line side warehouse, the plurality of production lines, the tail warehouse, and the tail warehouse docking station along the second distribution route; The CTU cart is connected to the end warehouse docking station, the end warehouse, the line side warehouse, multiple production lines, the tail warehouse, and the tail warehouse docking station, and delivers materials between the end warehouse docking station, the end warehouse, the line side warehouse, multiple production lines, the tail warehouse, and the tail warehouse docking station.
4. The manufacturing plant according to claim 1, characterized in that: The end warehouse docking station adopts a double-layer double-row roller docking station to connect with the end warehouse hoist; The end warehouse docking station includes: an end warehouse upper conveying roller group and an end warehouse lower conveying roller group; The upper conveying roller group of the end warehouse includes a first upper conveying roller and a second upper conveying roller; the lower conveying roller group of the end warehouse includes a first lower conveying roller and a second lower conveying roller; The AVG trolley is a double-layer double-row roller-type AGV trolley, including an upper roller group and a lower roller group; The upper roller set includes a first upper roller and a second upper roller; the lower roller set includes a first lower roller and a second lower roller; When the AVG trolley docks with the end warehouse docking station, the first upper roller is aligned with the first upper conveying roller, the second upper roller is aligned with the second upper conveying roller, the first lower roller is aligned with the first lower conveying roller, and the second lower roller is aligned with the second lower conveying roller.
5. The manufacturing plant according to claim 4, characterized in that An end warehouse conveying box is arranged in the end warehouse hoist, and the end warehouse conveying box moves back and forth in the vertical direction in the end warehouse hoist, and is used to convey the materials of the end warehouse docking station to the end warehouse docking station of each production unit layer; Wherein, a first conveying roller and a second conveying roller are arranged in the end warehouse conveying box; When the end warehouse conveying box moves in the vertical direction in the end warehouse hoist to the end warehouse docking station, the first conveying roller is aligned with the first upper conveying roller and the second upper conveying roller of the end warehouse upper conveying roller group, and the second conveying roller is aligned with the first lower conveying roller and the second lower conveying roller of the end warehouse lower conveying roller group, and the end warehouse conveying box receives the materials conveyed by the end warehouse docking station; When the end warehouse conveying box moves in the vertical direction in the end warehouse elevator to the end warehouse docking platform of each layer of production units, the end warehouse docking platform receives the materials conveyed by the first conveying roller and the second conveying roller.
6. The manufacturing plant according to claim 1, characterized in that The tail warehouse docking station adopts a double-layer double-row roller docking station to connect with the tail warehouse elevator; the tail warehouse docking station includes: an upper conveying roller group of the tail warehouse and a lower conveying roller group of the tail warehouse; The upper conveying roller group of the tail warehouse includes a third upper conveying roller and a fourth upper conveying roller; the lower conveying roller group of the tail warehouse includes a third lower conveying roller and a fourth lower conveying roller; The AVG trolley is a double-layer double-row roller-type AGV trolley, including an upper roller group and a lower roller group; The upper roller set includes a first upper roller and a second upper roller; the lower roller set includes a first lower roller and a second lower roller; When the AVG trolley docks with the tail warehouse docking station, the first upper roller is aligned with the third upper conveying roller, the second upper roller is aligned with the fourth upper conveying roller, the first lower roller is aligned with the third lower conveying roller, and the second lower roller is aligned with the fourth lower conveying roller.
7. The manufacturing plant according to claim 6, characterized in that A tail warehouse conveying box is arranged in the tail warehouse elevator, and the tail warehouse conveying box moves back and forth in the vertical direction in the tail warehouse elevator, and is used to convey the materials of the tail warehouse docking platform of each production unit to the tail warehouse docking station; Wherein, a third conveying roller and a fourth conveying roller are arranged in the tail warehouse conveying box; When the tail warehouse conveying box moves vertically in the tail warehouse elevator to the tail warehouse docking platform of each production unit, the third conveying roller and the fourth conveying roller receive the material conveyed by the tail warehouse docking platform; When the tail warehouse conveying box moves in the vertical direction in the tail warehouse elevator to the tail warehouse docking station, the third upper conveying roller and the fourth upper conveying roller of the tail warehouse upper conveying roller group are aligned with the third conveying roller, and the third lower conveying roller and the fourth lower conveying roller of the tail warehouse lower conveying roller group are aligned with the fourth conveying roller, and the tail warehouse docking station receives the material conveyed by the tail warehouse conveying box.
8. The manufacturing plant according to claim 1, characterized in that The end warehouse docking platform adopts a double-layer double-row roller docking platform, a single-layer double-row roller docking platform or a single-layer single-row roller docking platform.
9. The manufacturing plant according to claim 1, characterized in that The tail warehouse docking platform adopts a double-layer double-row roller docking platform, a single-layer double-row roller docking platform or a single-layer single-row roller docking platform.
10. A material distribution system for a manufacturing plant as claimed in any one of claims 1 to 9, characterized in that: The material distribution system comprises: MES system is used to manage the production tasks of each workshop, generate production plans, and send them to MOM / WMS system; The MOM / WMS system is used to receive the production plan issued by the MES system, generate material scheduling tasks according to the production plan, and issue them to the RCS system; The RCS system is used to receive the material scheduling tasks issued by the MOM / WMS system, generate AGV scheduling instructions and CTU scheduling instructions, and send the AGV scheduling instructions to the AGV trolley and send the CTU scheduling instructions to the CTU trolley; The AGV trolley is used to receive the AGV dispatching instruction, and according to the AGV dispatching instruction, move back and forth along the first distribution route between the end warehouse docking station or tail warehouse docking station of each workshop and the central warehouse, and between the end warehouse docking stations or tail warehouse docking stations between multiple workshops to distribute materials; The CTU trolley is used to receive the CTU dispatching instruction and move back and forth between the end warehouse docking station, the end warehouse, the line side warehouse, multiple production lines, the tail warehouse, and the tail warehouse docking station along the second distribution route according to the CTU dispatching instruction to distribute materials; The ICMS system is used to monitor the end warehouse docking station, the tail warehouse docking station, the end warehouse elevator, the tail warehouse elevator, the end warehouse docking platform and the tail warehouse docking platform in real time, generate monitoring data, and feed the monitoring data back to the MOM / WMS system and the RCS system in real time; The MOM / WMS system adjusts the material scheduling tasks according to the monitoring data fed back by the ICMS system; The RCS system adjusts the AGV scheduling instructions and the CTU scheduling instructions according to the monitoring data fed back by the ICMS system.