Connection construction method for steel building arc pieces

By adopting a fixed pulling system and elastic hopper design on the steel structure building, the problems of low installation efficiency of arc-shaped steel beam parts and poor welding slag joint stability in the steel structure building construction are solved, and efficient construction is achieved and the welding environment is safe.

CN119244015AActive Publication Date: 2025-01-03中国电建集团贵州工程有限公司

Patent Information

Application Number
CN202411452911.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-17
Publication Date
2025-01-03
Estimated Expiration
2044-10-17

AI Technical Summary

Technical Problem

In the construction of steel structure buildings, the existing technology requires dismantling the scaffolding set up on the ground to install the arc steel beams below, resulting in low construction efficiency. In high wind environments, the hopper is prone to throw out welding slag due to wind swing due to wind power. .

Method used

Using a fixed pull-up system, the lower arc steel beam parts are fixed through the tie rod, the bottom support rod and the spot welding plate to form a stress-bearing whole, and an elastic gripper and the clamping hopper are installed on the arc steel beam parts to stabilize the Catch the welding slag.

Benefits of technology

Improve construction efficiency, avoid the necessity of scaffolding disassembly, and stabilize the welding slag in high wind environment through the design of elastic grip and clamp plate to prevent it from falling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119244015A_ABST
    Figure CN119244015A_ABST
Patent Text Reader

Abstract

The invention discloses a connection construction method for arc parts of a steel building body, which comprises a construction process that a lower arc-shaped steel beam part is used as a stress whole to support an upper arc-shaped steel beam part so as to present a fixed tie system of the arc parts of the steel building body. The two ends of the lower arc-shaped steel beam piece are connected and positioned with the side edges of the steel structure building body in a spot welding mode through spot welding plates, and meanwhile the lower arc-shaped steel beam piece forms a stress whole to install the upper supporting rods to support the upper arc-shaped steel beam piece through pulling stress of the pull rods and supporting of the bottom supporting rods. After the arc-shaped steel beam piece on the upper portion is welded and fixed to the steel structure building body through the welding layer, the arc-shaped steel beam piece on the lower portion can be welded to the steel structure building body, the problem that the arc-shaped steel beam piece on the lower portion can be installed and constructed only after a scaffold is erected on the ground to support the arc-shaped steel beam piece on the upper portion is solved, and construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a connection construction method for arc parts of a steel building body, belonging to the technical field of steel structure building body construction. Background Art

[0002] When welding an outwardly cantilevered curved steel beam of a steel structure building, the curved steel beam must first be supported at a corresponding height and then welded to the side of the steel structure building.

[0003] The existing steel beam support technology is shown in Chinese Patent Publication No. CN112459488A. Although a scaffold can be set up on the ground to support the steel beam, for a construction environment with two vertically spaced arc-shaped steel beams, after the scaffold is set up on the ground to support the upper arc-shaped steel beam, the scaffold occupies the space of the lower arc-shaped steel beam, so the scaffold needs to be dismantled before the lower arc-shaped steel beam can be installed for construction, which reduces the construction efficiency. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a connection construction method for arc parts of a steel building body.

[0005] The present invention is achieved through the following technical solutions.

[0006] The present invention provides a method for connecting and constructing circular arc parts of a steel building, comprising:

[0007] The lower arc-shaped steel beam is used as a load-bearing whole to support the upper arc-shaped steel beam, thereby presenting the construction process of the fixed tie system of the circular arc parts of the steel building body.

[0008] The fixing and fastening system of the arc parts of the steel building body comprises:

[0009] A steel structure building body in a fixed state, with arc-shaped steel beams distributed vertically at intervals on the side of the steel structure building body;

[0010] The upper arc-shaped steel beam member is supported above the lower arc-shaped steel beam member through an upper support rod.

[0011] The inner diameter surface of the arc-shaped steel beam at the bottom is fixedly connected to the steel structure building body through a tie rod; one end of the tie rod is fixed to the steel structure building body; the other end of the tie rod is provided with a bayonet to engage with the vertical reinforcement plate on the arc-shaped steel beam at the bottom.

[0012] The pull rods are two rods distributed at intervals to tie the lower arc-shaped steel beam to the steel structure building body for positioning.

[0013] The upper and lower surfaces at both ends of the arc-shaped steel beam member at the bottom are spot-welded, positioned and fixedly connected to the side of the steel structure building body through spot welding plates.

[0014] The arc-shaped steel beam member at the bottom is supported on the bottom platform by a bottom support rod, and the bottom support rod is located at the corresponding engagement position between the pull rod and the steel structure building body.

[0015] The two ends of the upper arc-shaped steel beam are fixed to the side of the steel structure building body through a welding layer.

[0016] A receiving hopper for receiving welding slag is installed on the arc-shaped steel beam member at the welding layer.

[0017] The beneficial effects of the present invention are as follows: the two ends of the lower arc-shaped steel beam are spot-welded and positioned with the side of the steel structure building body through spot welding plates, and at the same time, the arc-shaped steel beam below is formed into a force-bearing whole through the tension rod tensioning and the support of the bottom support rod to install the upper support rod supporting the arc-shaped steel beam above. After the upper arc-shaped steel beam is welded and fixed to the steel structure building body through the welding layer, the lower arc-shaped steel beam can be welded to the steel structure building body immediately, which solves the problem that the scaffolding erected from the ground to support the upper arc-shaped steel beam needs to be dismantled before the lower arc-shaped steel beam can be installed, thereby improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the structure of the present invention;

[0019] Figure 2 It is a structural schematic diagram of the arc-shaped steel beam, the material receiving hopper and the installation assembly of the present invention;

[0020] Figure 3 It is a structural schematic diagram of the material receiving hopper and the installation assembly of the present invention;

[0021] Figure 4 It is a schematic diagram of the structure in which the pull rod of the present invention is installed with the vertical reinforcing plate through the bayonet;

[0022] In the figure: 1-arc steel beam; 11-pull rod; 12-bayonet; 13-vertical reinforcement plate; 14-spot welding plate; 2-bottom support rod; 3-bottom platform; 4-upper support rod; 5-welding layer; 6-receiving hopper; 7-installation assembly; 71-elastic grip tube; 72-installation rod; 73-nut A; 74-clamping plate; 75-extrusion nut; 76-clamping nut; 9-steel structure building. DETAILED DESCRIPTION

[0023] The technical solution of the present invention is further described below, but the scope of protection claimed is not limited to the description.

[0024] like Figures 1 to 4 shown.

[0025] The present application discloses a steel building body arc member fixing and fastening system, comprising:

[0026] A steel structure building body 9 is constructed and fixed on a ground foundation, and arc-shaped steel beams 1 are vertically spaced and distributed on the sides of the steel structure building body 9.

[0027] The inner diameter surface of the arc-shaped steel beam 1 at the bottom is fixedly connected to the steel structure building body 9 through a tie rod 11; one end of the tie rod 11 is spot-welded to the steel structure building body 9; the other end of the tie rod 11 is provided with a bayonet 12 which engages with a vertical reinforcement plate 13 on the arc-shaped steel beam 1 below, and the vertical reinforcement plate 13 is a component fixed to the arc-shaped steel beam 1 itself; the tie rods 11 are two spaced-apart tie rods 11 which tie the arc-shaped steel beam 1 below to the steel structure building body 9 for position limiting.

[0028] The upper and lower surfaces of both ends of the arc-shaped steel beam member 1 at the bottom are spot-welded and fixedly connected to the side of the steel structure building body 9 through spot welding plates 14.

[0029] The arc-shaped steel beam 1 at the bottom is supported on the bottom platform 3 by the bottom support rod 2, and the bottom support rod 2 corresponds to the engagement position between the pull rod 11 and the steel structure building body 9, and the arc-shaped steel beam 1 at the bottom is fixed to the bottom support rod 2 by bolts.

[0030] The arc-shaped steel beam member 1 at the top is supported on the top of the arc-shaped steel beam member 1 at the bottom through the upper support rod 4 , and both ends of the arc-shaped steel beam member 1 at the top are fixed to the side of the steel structure building body 9 through the welding layer 5 .

[0031] A clamping and stable receiving hopper 6 is installed on the arc-shaped steel beam 1 at the welding layer 5.

[0032] The two ends of the arc-shaped steel beam 1 at the bottom are spot-welded and positioned with the side of the steel structure building body 9 through the spot welding plate 14, and at the same time, the tension rod 11 is used to pull the force and the bottom support rod 2 to support the arc-shaped steel beam 1 at the bottom to form a force-bearing whole to install the upper support rod 4 to support the arc-shaped steel beam 1 at the top. After the arc-shaped steel beam 1 at the top is welded and fixed with the steel structure building body 9 through the welding layer 5, the arc-shaped steel beam 1 at the bottom can be welded with the steel structure building body 9 immediately, which solves the problem that the arc-shaped steel beam 1 at the bottom needs to be disassembled after the construction of the scaffolding supporting the arc-shaped steel beam at the top is erected from the ground, thereby improving the construction efficiency. After the arc-shaped steel beam 1 at the bottom is welded, the upper support rod 4, the bottom support rod 2, and the tension rod 11 are disassembled. When the upper support rod 4 is installed, it is removably fixed with the arc-shaped steel beam 1 at the top and bottom through bolts and nuts, and when the bottom support rod 2 is installed, it is removably fixed with the arc-shaped steel beam 1 at the bottom through bolts and nuts.

[0033] The present invention provides a method for connecting and constructing arc parts of a steel building, comprising:

[0034] The lower arc-shaped steel beam member 1 is used as a force-bearing whole to support the upper arc-shaped steel beam member 1, thereby presenting the construction process of the fixed tie system of the circular arc member of the steel building body.

[0035] Steel structure buildings need to be constructed by welding multiple components. When the curved steel beams are welded on the side of the steel structure building, the welding slag produced by the welding carries high temperature and falls, which will affect the installation of the construction workers below. Therefore, a slag catcher is required to catch the welding slag.

[0036] The existing slag catcher for catching welding slag is shown in Chinese Patent Publication No. CN208961281U. Although the hopper can be suspended by a hanging rope and a hook, the strong wind in the construction environment near the sea and at high altitude easily causes the hopper to swing on the hook with the hanging rope and throw out the welding slag.

[0037] A slag collector for welding of the present application comprises:

[0038] A receiving hopper 6 is installed on the arc-shaped steel beam 1 below the welding layer 5 to receive the welding slag. The receiving hopper 6 is clamped and stably installed on the arc-shaped steel beam 1 by two sets of mounting components 7.

[0039] The mounting assembly 7 comprises a mounting rod 72 with an elastic gripping tube 71 on a horizontal section, wherein the elastic gripping tube 71 is made of elastic rubber material, and the horizontal sections of the mounting rod 72 on both sides of the elastic gripping tube 71 are screwed with extrusion nuts 75, and the two extrusion nuts 75 are screwed on the horizontal sections of the mounting rod 72 to squeeze the elastic gripping tube 71 in opposite directions, so that the elastic gripping tube 71 undergoes elastic deformation;

[0040] The vertical sections at both ends of the mounting rod 72 are screwed with a clamping plate 74 through a nut A73. The clamping plate 74 is provided with a through hole for the vertical section of the mounting rod 72 to slide through. The nut A73 is screwed on the clamping plate 74 and pressed against the arc-shaped steel beam 1. The upward extrusion force of the clamping plate 74 pressing against the arc-shaped steel beam 1 and the downward extrusion force of the elastic grip tube 71 pressing against the arc-shaped steel beam 1 are clamped on the arc-shaped steel beam 1.

[0041] The bottom end of the mounting rod 72 passes through a through hole provided on the side of the receiving hopper 6, and the bottom end of the mounting rod 72 is clamped to the side of the receiving hopper 6 by two clamping nuts 76, so that the bottom end of the mounting rod 72 and the side of the receiving hopper 6 can be detachably fixed.

[0042] The material receiving hopper 6 is clamped and connected to the installation component 7, and the installation component 7 is clamped and stably installed on the arc-shaped steel beam 1 through the clamping plate 74 and the elastic gripping tube 71. When blown by strong winds, the elastic force of the elastic gripping tube 71 provides buffering, and the clamping plate 74 and the elastic gripping tube 71 clamp the material receiving hopper 6 on the arc-shaped steel beam 1 to keep it stable and avoid swinging, thereby solving the problem that the material receiving hopper is easily swung and thrown out welding slag when it is suspended by a hanging rope and a hook when the wind is strong.

Claims

1. A method for connecting arc parts of steel buildings, characterized in that: include: The lower arc-shaped steel beam member (1) is used as a load-bearing whole to support the upper arc-shaped steel beam member (1), thereby presenting the construction process of the fixed tie system of the circular arc member of the steel building body.

2. The method for connecting and constructing steel building arc parts according to claim 1, characterized in that: The fixing and fastening system of the arc parts of the steel building body comprises: A steel structure building body (9) in a fixed state, with arc-shaped steel beams (1) distributed vertically at intervals on the side of the steel structure building body (9); The upper arc-shaped steel beam member (1) is supported above the lower arc-shaped steel beam member (1) via an upper support rod (4).

3. The method for connecting arc parts of steel building bodies according to claim 2, characterized in that: The inner diameter surface of the arc-shaped steel beam member (1) at the bottom is fixedly connected to the steel structure building body (9) via a tie rod (11); one end of the tie rod (11) is fixed to the steel structure building body (9); the other end of the tie rod (11) is provided with a bayonet (12) for engaging with a vertical reinforcing plate (13) on the arc-shaped steel beam member (1) at the bottom.

4. The method for connecting arc parts of steel building bodies as claimed in claim 3, characterized in that: The pull rods (11) are two rods spaced apart from each other and are used to tie the lower arc-shaped steel beam (1) to the steel structure building body (9) for positioning.

5. The method for connecting and constructing circular arc parts of a steel building as claimed in claim 2, characterized in that: The upper and lower surfaces of both ends of the arc-shaped steel beam member (1) at the bottom are spot-welded and fixedly connected to the side of the steel structure building body (9) through spot welding plates (14).

6. The method for connecting arc parts of steel building bodies as claimed in claim 2, characterized in that: The arc-shaped steel beam member (1) at the bottom is supported on the bottom platform (3) through a bottom support rod (2), and the bottom support rod (2) corresponds to the engagement position between the pull rod (11) and the steel structure building body (9).

7. The method for connecting arc parts of steel buildings as claimed in claim 2, characterized in that: The two ends of the upper arc-shaped steel beam member (1) are fixed to the side of the steel structure building body (9) via a welding layer (5).

Citation Information

Patent Citations

  • High-altitude overhanging steel structure and rotary construction method thereof

    CN101446110A

  • Segmental general assembly method for aluminum alloy superstructure

    CN103010404A

  • Construction method of large-span arc-shaped steel structure

    CN118481296A

  • Cantilever structure steel platform supporting frame

    CN219863951U

  • Fixing and tying system for steel building arc part

    CN223482011U

Cited By

  • Method for installing arc cross beam in circular tower type steel structure

    CN122129090A