Construction engineering pile foundation fixing method
By using adjustable pile foundation fixing equipment and detection mechanism in the pile foundation fixing method, the problem of adjusting position angle before pile tube fixing and settlement displacement detection after curing is solved, and more efficient pile foundation fixing and safety monitoring is achieved.
Patent Information
- Application Number
- CN202411706207.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-26
- Publication Date
- 2025-02-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing pile foundation fixing method is difficult to adjust the spatial angle and position before the pile pipe is fixed, and it is difficult to detect settlement, displacement and slope changes after the pile pipe is cured, which increases the safety risks of buildings.
Provide a method for fixing pile foundations in construction projects, including laying pile foundation fixing equipment, defining the depth and angle of pile pipe layout, placing a steel cage and pouring concrete, and locking the position and angle of pile pipes. After the pile pipe is solidified, the settlement, displacement and slope changes are monitored through the front and rear detection mechanisms.
It realizes flexible adjustment of the spatial angle and position before pile pipe fixation, and can detect changes in settlement, displacement and slope after pile pipe is cured, which improves the fixing and curing effect of pile foundations and reduces the safety risks of buildings.
Smart Images

Figure CN119465946A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pile foundation fixing, in particular to a method for fixing a pile foundation of a construction project. Background Art
[0002] In the field of construction engineering, pile foundation is the basic structure that bears the weight of the building. Its stability and safety are directly related to the safety and durability of the entire building. With the continuous development of construction technology, the construction method and fixing technology of pile foundation are also constantly improving.
[0003] Traditional pile foundation fixing methods mostly rely on concrete pouring, steel cage binding and pile top connection plates for fixing. These methods can meet the basic stability requirements of pile foundations to a certain extent. However, in practical applications, these methods have also exposed some problems. First, traditional fixing methods often lack flexibility, and it is difficult to accurately adjust the spatial angle and position before the pile pipe is fixed, resulting in low construction efficiency and difficulty in ensuring the precise positioning of the pile foundation. Secondly, after the pile foundation is solidified, due to the lack of effective monitoring methods, it is difficult to detect the settlement, displacement and slope changes of the pile foundation in time, which increases the safety risk of the building.
[0004] In the prior art, a patent document with publication number CN111945768B discloses a civil engineering pile foundation fixing structure, including a support frame, a connecting plate and a fixing block, wherein a fixing block is welded to the inner wall of the support frame, a connecting plate is fixedly connected to the upper surface of the support frame, a support rod is installed above the support frame, a reinforcement block is arranged above the support frame, a protective wall is arranged on the outer surface of the support frame, an elastic pad is arranged on the upper surface of the support frame, a flexible protective pad of a plate is arranged on the upper surface of the elastic pad, and a limiting hole is arranged on the upper surface of the connecting plate.
[0005] The above-mentioned device is connected to the connecting plate through a connecting rod, and can stably fix multiple support frames, thereby achieving the effect of jointly fixing the pile foundation, which significantly increases the fixing effect. However, when the pile pipe of the pile foundation is fixed by the above-mentioned technical method, on the one hand, it is not convenient to realize the flexible adjustment of the spatial angle and spatial position before the pile pipe is fixed, and on the other hand, it is not convenient to realize the detection of the settlement, displacement and slope change of the pile pipe body after the pile pipe is solidified. Based on this, the present invention provides a method for fixing pile foundation of a construction project to solve the problems raised in the above-mentioned background technology. Summary of the invention
[0006] The present invention aims at the technical problems existing in the prior art and provides a method for fixing pile foundations in construction projects to solve the problems that, on the one hand, the existing devices are not convenient for realizing flexible adjustment of the spatial angle and spatial position before the pile pipe is fixed, and on the other hand, are not convenient for realizing detection of the settlement, displacement and slope change of the pile pipe body after the pile pipe is solidified.
[0007] The technical solution of the present invention to solve the above technical problem is as follows: A method for fixing a pile foundation of a construction project comprises the following steps: SS01, laying out, laying out the pile foundation fixing equipment at the pile foundation fixing location, after the pile foundation fixing equipment is fixed, the pile foundation fixing equipment can effectively clamp the pile pipe body; SS02, pipe laying: After step SS01, the pile foundation fixing device limits the laying depth and laying angle of the pile pipe body on the pile hole, and then places the steel cage inside the pile pipe body. After the steel cage is placed, concrete is poured inside the pile pipe body. During the pouring and concrete curing, the pile foundation fixing device locks the laying position and laying angle of the pile pipe body. SS03, detection, after the concrete in the pile pipe body is cured, the pile foundation fixing device loses its clamping effect on the pile pipe body. After the clamping effect is removed, the front detection mechanism and the rear detection mechanism on the pile foundation fixing device detect the settlement, displacement and slope change of the cured pile pipe body; The pile foundation fixing device comprises a fixing platform, on which a fixing arm with adjustable spatial layout position and layout angle is installed, a guide arc groove is provided on the fixing arm, a rotating frame is slidably connected to the guide arc groove, a guide module for driving the rotating frame to rotate is installed on the fixing arm, a clamping piece is installed on the rotating frame, two mirror-image-arranged fixing parts are transmission-connected to the clamping piece, a pile pipe body is clamped between the two fixing parts, a transmission shaft driven by a worm motor a is rotatably connected to the rotating frame, the two fixing parts are both transmission-connected to the transmission shaft, and a front detection mechanism and a rear detection mechanism cooperating with the fixing parts are installed on the rotating frame.
[0008] Based on the above technical solution, the present invention can also be improved as follows.
[0009] Further, the fixed platform includes a load vehicle, an electric rotator is installed on the load vehicle, a rotating platform is installed on the rotating surface of the electric rotator, a first boom is hinged on the rotating platform, a second boom is hinged on the first boom, a third boom is hinged on the second boom, a group of arm adjustment push rods are hinged between the relative surfaces of the first boom and the rotating platform, between the relative surfaces of the second boom and the first boom, and between the relative surfaces of the third boom and the second boom, a corner arm is installed on the third boom, an electric push rod is hinged between the corner arm and the third arm, a screw lifting module is installed on the corner arm, the screw lifting module is transmission-connected to the fixed arm, and a central control host is installed on the load vehicle.
[0010] The beneficial effect of adopting the above further scheme is that, during operation, the spatial layout position and spatial layout angle of the fixed arm can be adjusted in multiple directions through the arrangement of the first boom, the second boom, the third boom, the electric rotator and the swivel table. Through the adjustable spatial layout position and layout angle of the fixed arm, on the one hand, the pipe piles to be fixed can be quickly loaded and fixed on the pile foundation fixing device, and on the other hand, the pile pipe body fixed on the pile foundation fixing device can be quickly adjusted to a coaxial position with the pile hole.
[0011] Furthermore, the guide module includes a worm motor c fixed on a fixed arm, a transmission gear is fixedly installed on the output shaft end of the worm motor c, an arc rack is fixedly installed on the rotating frame, the transmission gear is transmission-connected to the arc rack, and the full arc of the arc rack and the arc of the guide arc groove are both 170°.
[0012] The beneficial effect of adopting the above further solution is that, when in use, the rotation axis of the rotating frame and the axis of the pile pipe body are in the same straight line, and the axis center of the guide arc groove is on the rotation axis of the rotating frame; When the pile pipe body is fixed, when the arrangement angle and the fixing angle of the pile pipe body need to be adjusted, the worm motor c can drive the rotating frame to rotate at a set angle, thereby changing the fixing angle of the pile pipe body.
[0013] Furthermore, the pitch adjusting member includes a worm motor b fixed to the side of the rotating frame and a clamping screw rotatably connected to the rotating frame, the output shaft end of the worm motor b is fixedly connected to the clamping screw, and the clamping screw is symmetrically provided with a positive thread segment and a negative thread segment.
[0014] Furthermore, the fixed component includes a pressure clamp and a force measuring clamp, both of which are slidably connected to the rotating frame, the positive thread segment and the negative thread segment are respectively transmission-connected to the pressure clamps in the two fixed components, a group of force measuring sensors are installed between the pressure clamp and the force measuring clamp, the force measuring sensor is electrically connected to the central control host, four regularly distributed clamping beads are embedded on the inner wall of the force measuring clamp, the clamping beads are made of silicone, and a driving module for driving the pile pipe body to displace along the axial direction is installed on the force measuring clamp.
[0015] The beneficial effect of adopting the above further scheme is that, when in use, the spacing between the two clamps can be quickly adjusted by setting the positive thread section and the negative thread section on the clamping screw, thereby effectively clamping the pile pipe body or pile barrel to be fixed, and the force sensor can be set to monitor the clamping strength of the pile pipe body by the force measuring clamp in real time, and the bead can be set to effectively limit and guide the pile pipe body.
[0016] Furthermore, the driving module includes a transmission wheel and a driven shaft rotatably connected to the force measuring clamp, the transmission wheel is made of silicone, a wheel axle is fixedly installed on the transmission wheel, a linkage guide groove with openings at both ends fixedly opened on the driven shaft and slidingly connected to the transmission shaft rod is fixedly installed on the driven shaft and the wheel axle, and the two linkage bevel teeth are meshed with each other.
[0017] The beneficial effect of adopting the above further scheme is that when it is necessary to lock the position and angle of the pile pipe body, the transmission wheel is locked, and when it is necessary to drive the pile pipe body to move in the axial direction, the two transmission wheels rotate at the same speed and in the same direction, thereby driving the pile pipe body to move in the axial direction, thereby changing the depth of the pile pipe body penetrating into the pile hole, thereby facilitating the rapid change of the position and angle of the pile pipe body.
[0018] Furthermore, the cross-sections of the linkage guide groove and the transmission shaft are both regular polygons, the axial direction of the transmission shaft is the same as the axial direction of the clamping screw, and the rotational axis direction of the transmission wheel is the same as the axial direction of the transmission shaft.
[0019] The beneficial effect of adopting the above further solution is that, through the setting of the regular polygonal cross section of the linkage guide groove and the transmission shaft, the transmission shaft can continuously and effectively drive the transmission wheel when the position of the transmission wheel changes.
[0020] Furthermore, the front detection mechanism includes a vacuum cylinder, a vacuum cavity is fixedly opened inside the vacuum cylinder, the vacuum cylinder is fixedly connected to the fixed arm, a group of inspection cylinders distributed in a circular array are installed on the vacuum cylinder, the inner cavity of the inspection cylinder is connected to the vacuum cavity, a pressure sensor is installed on the inner wall of the inspection cylinder, the pressure sensor is electrically connected to the central control host, a pressure measuring ball cooperating with the pressure sensor is slidably connected to the inner wall of the inspection cylinder, each connection between the inspection cylinder and the vacuum cylinder is provided with a limit ring for limiting the position of the pressure measuring ball, the axis of the vacuum cylinder is perpendicular to the axis of the inspection cylinder, and the axial direction of the vacuum cylinder is perpendicular to the axial direction of the transmission shaft.
[0021] The beneficial effect of adopting the above further solution is that before the pile pipe body is solidified, by setting up multiple inspection tubes and multiple pressure sensors, the axis of the pile pipe body can be kept perpendicular to the horizontal plane before the pile pipe body is solidified, thereby facilitating the precise definition of the solidification angle and solidification position of the pile pipe body.
[0022] Furthermore, the rear detection mechanism includes a tachometer fixed in the middle of the rotating frame and two first ranging probes, two second ranging probes are installed on the two force measuring clamps, the axial direction of the first ranging probe is perpendicular to the axial direction of the second ranging probe, the axial direction of the first ranging probe is perpendicular to the axial direction of the clamping screw, and the axial direction of the second ranging probe is the same as the axial direction of the clamping screw.
[0023] The beneficial effect of adopting the above further scheme is that after the pile pipe body is fixed and when the force measuring clamp loses its limiting effect on the pile pipe body, the first distance measuring probe, the second distance measuring probe and the speed meter are set to effectively monitor the settlement amount, angular deviation direction and angular deviation amount of the pile pipe body after being cured, and then detect the fixing tightness and curing effect of the pile pipe body.
[0024] The beneficial effects of the present invention are: 1) On the one hand, the present invention can realize the flexible adjustment of the spatial angle and spatial position before the pile pipe is fixed, and on the other hand, it can also realize the detection of the settlement, displacement and slope change of the pile pipe body after the pile pipe is solidified, and then detect the fixing and solidification effect of the pile pipe.
[0025] 2) In the present invention, before the pile pipe body is solidified, multiple inspection tubes and multiple pressure sensors are provided so that the axis of the pile pipe body can be kept perpendicular to the horizontal plane before the pile pipe body is solidified, thereby facilitating the accurate definition of the solidified angle and solidified position of the pile pipe body. After the pile pipe body is fixed and when the force measuring clamp loses its limiting effect on the pile pipe body, the first distance measuring probe, the second distance measuring probe and the speed meter are provided to effectively monitor the settlement amount, angle deviation direction and angle deviation amount of the pile pipe body after solidification, thereby detecting the fixing tightness and solidification effect of the pile pipe body.
[0026] 3) In the present invention, when the position and angle of the pile pipe body need to be locked, the transmission wheel is locked. When the pile pipe body needs to be driven to move in the axial direction, the two transmission wheels rotate at the same speed and in the same direction, thereby driving the pile pipe body to move in the axial direction, thereby changing the depth of the pile pipe body penetrating into the pile hole, thereby facilitating the rapid change of the position and angle of the pile pipe body. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of a pile foundation fixing device used in a method for fixing a pile foundation of a construction project according to the present invention; Figure 2 It is a schematic diagram of the structure of the fixed arm and the inspection tube of the present invention; Figure 3 For the present invention Figure 2 A schematic diagram of the local enlarged structure at point A in the middle; Figure 4 It is a schematic diagram of the cross-sectional structure of the vacuum chamber and the pressure measuring ball of the present invention; Figure 5 It is a schematic diagram of the structure of the wheel axle and the force measuring pliers of the present invention; Figure 6 For the present invention Figure 5 A schematic diagram of the local enlarged structure at B in the middle; Figure 7 It is a structural schematic diagram of the bead clamp and the second distance measuring probe of the present invention; Figure 8 For the present invention Figure 7 A schematic diagram of the local enlarged structure at C in the middle; Fig. 9 It is a schematic diagram of the structure of the cylinder inspection and speed measuring instrument of the present invention; Fig.10 It is a schematic structural diagram of the guide arc groove and the arc rack of the present invention; Fig.11 The present invention is a schematic diagram of the process structure of a method for fixing a pile foundation of a construction project.
[0028] In the accompanying drawings, the components represented by the reference numerals are listed as follows: 1. Pile foundation fixing equipment; 2. Pile pipe body; 3. Fixed arm; 4. Guide arc groove; 5. Rotary frame; 6. Transmission shaft; 7. Load car; 8. Electric rotator; 9. Rotary table; 10. First boom; 11. Second boom; 12. Third boom; 13. Adjusting arm push rod; 14. Screw lifting module; 15. Central control host; 16. Transmission gear; 17. Arc rack; 18. Clamping screw; 19. Pressing pliers; 20. Force measuring pliers; 21. Force measuring sensor; 22. Clamping beads; 23. Transmission wheel; 24. Driven shaft; 25. Wheel axle; 26. Vacuum cylinder; 27. Inspection cylinder; 28. Pressure sensor; 29. Pressure ball; 30. Speed meter; 31. First distance measuring probe; 32. Second distance measuring probe; 33. Angle arm; 34. Electric push rod; 35. Vacuum chamber. DETAILED DESCRIPTION
[0029] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0030] The present invention provides the following preferred embodiments like Figure 1-10 As shown, a method for fixing a pile foundation of a construction project comprises the following steps: SS01, laying out, laying out the pile foundation fixing device 1 at the pile foundation fixing location, after the pile foundation fixing device 1 is fixed, the pile foundation fixing device 1 can effectively clamp the pile pipe body 2; SS02, pipe laying, after step SS01, the pile foundation fixing device 1 limits the laying depth and laying angle of the pile pipe body 2 on the pile hole, and then places the steel cage inside the pile pipe body 2. After the steel cage is placed, concrete is poured in the pile pipe body 2. During the pouring and concrete curing, the pile foundation fixing device 1 locks the laying position and laying angle of the pile pipe body 2; SS03, detection, after the concrete in the pile pipe body 2 is cured, the pile foundation fixing device 1 loses its clamping effect on the pile pipe body 2. After the clamping effect is removed, the front detection mechanism and the rear detection mechanism on the pile foundation fixing device 1 detect the change in settlement, displacement and slope of the cured pile pipe body 2; The pile foundation fixing device 1 comprises a fixing platform, on which a fixing arm 3 with adjustable spatial layout position and layout angle is installed; The fixed platform includes a load vehicle 7, on which an electric rotator 8 is installed, a rotating platform 9 is installed on the rotating surface of the electric rotator 8, a first boom 10 is hinged on the rotating platform 9, a second boom 11 is hinged on the first boom 10, a third boom 12 is hinged on the second boom 11, a group of arm adjustment push rods 13 are hinged between the relative surfaces of the first boom 10 and the rotating platform 9, between the relative surfaces of the second boom 11 and the first boom 10, and between the relative surfaces of the third boom 12 and the second boom 11, a corner arm 33 is installed on the third boom 12, an electric push rod 34 is hinged between the corner arm 33 and the third boom 12, a screw lifting module 14 is installed on the corner arm 33, and the screw lifting module 14 is transmission-connected to the fixed arm 3, and a central control host 15 is installed on the load vehicle 7.
[0031] During operation, the spatial layout position and spatial layout angle of the fixed arm 3 can be adjusted in multiple directions through the arrangement of the first boom 10, the second boom 11, the third boom 12, the electric rotator 8 and the rotary table 9. The adjustable spatial layout position and layout angle of the fixed arm 3 can, on the one hand, enable the pipe pile to be fixed to be quickly loaded and fixed on the pile foundation fixing device 1, and on the other hand, enable the pile pipe body 2 fixed on the pile foundation fixing device 1 to be quickly adjusted to a coaxial position with the pile hole.
[0032] The fixed arm 3 is provided with a guide arc groove 4, the guide arc groove 4 is slidably connected to the rotating frame 5, the fixed arm 3 is mounted with a guide module for driving the rotating frame 5 to rotate; The guide module includes a worm motor c fixed on the fixed arm 3, a transmission gear 16 is fixedly installed on the output shaft end of the worm motor c, an arc rack 17 is fixedly installed on the rotating frame 5, the transmission gear 16 is connected to the arc rack 17, and the full arc of the arc rack 17 and the arc of the guide arc groove 4 are both 170°.
[0033] When in use, the rotation axis of the rotating frame 5 is in the same straight line as the axis of the pile pipe body 2, and the axis of the guide arc groove 4 is on the rotation axis of the rotating frame 5; When the pile pipe body 2 is fixed, when the layout angle and the fixed angle of the pile pipe body 2 need to be adjusted, the worm motor c can drive the rotating frame 5 to rotate at a set angle, thereby changing the fixed angle of the pile pipe body 2; A clamping member is installed on the rotating frame 5, and two mirror-image fixed components are transmission-connected to the clamping member. The pile pipe body 2 is clamped between the two fixed components. A transmission shaft 6 driven by a worm motor a is rotatably connected to the rotating frame 5. Both the two fixed components are transmission-connected to the transmission shaft 6. A front detection mechanism and a rear detection mechanism that cooperate with the fixed components are installed on the rotating frame 5.
[0034] The pitch adjusting member includes a worm motor b fixed to the side of the rotating frame 5 and a clamping screw 18 rotatably connected to the rotating frame 5. The output shaft end of the worm motor b is fixedly connected to the clamping screw 18, and the clamping screw 18 is symmetrically provided with a positive thread segment and a negative thread segment.
[0035] The fixed components include a pressure clamp 19 and a force measuring clamp 20, both of which are slidably connected to the rotating frame 5, and the positive thread segment and the negative thread segment are respectively connected to the pressure clamp 19 in the two fixed components by transmission, and a group of force measuring sensors 21 are installed between the pressure clamp 19 and the force measuring clamp 20, and the force measuring sensor 21 is electrically connected to the central control host 15. Four regularly distributed clamping beads 22 are embedded on the inner wall of the force measuring clamp 20, and the clamping beads 22 are made of silicone. A driving module for driving the pile pipe body 2 to displace along the axial direction is installed on the force measuring clamp 20.
[0036] When in use, the spacing between the two clamps 19 is quickly adjusted by setting the positive thread section and the negative thread section on the clamping screw 18, thereby effectively clamping the pile pipe body 2 or the pile barrel to be fixed. By setting the force sensor 21, the clamping strength of the pile pipe body 2 by the force measuring clamp 20 can be monitored in real time. By setting the clamping bead 22, the pile pipe body 2 can be effectively limited and guided.
[0037] The driving module includes a transmission wheel 23 and a driven shaft 24 which are rotatably connected to the force measuring clamp 20. The transmission wheel 23 is made of silicone. A wheel axle 25 is fixedly installed on the transmission wheel 23. A linkage guide groove with openings at both ends and slidingly connected to the transmission shaft 6 is fixedly opened on the driven shaft 24. Linkage bevel teeth are fixedly installed on the driven shaft 24 and the wheel axle 25, and the two linkage bevel teeth are meshed with each other.
[0038] When the position and angle of the pile pipe body 2 need to be locked, the transmission wheel 23 is locked. When the pile pipe body 2 needs to be driven to move in the axial direction, the two transmission wheels 23 rotate at the same speed and in the same direction, thereby driving the pile pipe body 2 to move in the axial direction, thereby changing the depth of the pile pipe body 2 penetrating into the pile hole, thereby facilitating the rapid change of the position and angle of the pile pipe body 2.
[0039] The cross-sections of the linkage guide groove and the transmission shaft 6 are both regular polygons. The axial direction of the transmission shaft 6 is the same as the axial direction of the clamping screw 18 . The rotational axis direction of the transmission wheel 23 is the same as the axial direction of the transmission shaft 6 .
[0040] By setting the linkage guide groove and the regular polygonal cross section of the transmission shaft 6, the transmission shaft 6 can continuously and effectively drive the transmission wheel 23 when the position of the transmission wheel 23 changes.
[0041] The front detection mechanism includes a vacuum cylinder 26, a vacuum chamber 35 is fixedly opened inside the vacuum cylinder 26, the vacuum cylinder 26 is fixedly connected to the fixed arm 3, a group of inspection cylinders 27 distributed in a circular array are installed on the vacuum cylinder 26, the inner cavity of the inspection cylinder 27 is connected to the vacuum chamber 35, a pressure sensor 28 is installed on the inner wall of the inspection cylinder 27, the pressure sensor 28 is electrically connected to the central control host 15, a pressure measuring ball 29 cooperating with the pressure sensor 28 is slidably connected to the inner wall of the inspection cylinder 27, and a limit ring for limiting the position of the pressure measuring ball 29 is provided at the connection between each inspection cylinder 27 and the vacuum cylinder 26, the axis of the vacuum cylinder 26 is perpendicular to the axis of the inspection cylinder 27, and the axial direction of the vacuum cylinder 26 is perpendicular to the axial direction of the transmission shaft 6.
[0042] Before the pile pipe body 2 is cured, the plurality of inspection tubes 27 and the plurality of pressure sensors 28 are arranged so that the axis of the pile pipe body 2 can be kept perpendicular to the horizontal plane, thereby facilitating accurate definition of the cured angle and cured position of the pile pipe body 2.
[0043] The rear detection mechanism includes a tachometer 30 fixed to the middle of the rotating frame 5 and two first distance measuring probes 31. Two second distance measuring probes 32 are installed on the two force measuring clamps 20. The axial direction of the first distance measuring probe 31 is perpendicular to the axial direction of the second distance measuring probe 32. The axial direction of the first distance measuring probe 31 is perpendicular to the axial direction of the clamping screw 18. The axial direction of the second distance measuring probe 32 is the same as the axial direction of the clamping screw 18.
[0044] After the pile pipe body 2 is fixed and when the force measuring clamp 20 loses its limiting effect on the pile pipe body 2, the first distance measuring probe 31, the second distance measuring probe 32 and the speed meter are set to effectively monitor the settlement amount, angular deviation direction and angular deviation amount of the pile pipe body 2 after being cured, and then detect the fixing tightness and curing effect of the pile pipe body 2.
[0045] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0046] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0047] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for fixing a pile foundation in a construction project, characterized in that: The following steps are involved: SS01, laying out, laying out the pile foundation fixing device (1) at the pile foundation fixing location, and after the pile foundation fixing device (1) is fixed, the pile foundation fixing device (1) can effectively clamp the pile pipe body (2); SS02, pipe laying: after step SS01, the pile foundation fixing device (1) limits the laying depth and laying angle of the pile pipe body (2) on the pile hole, and then places a steel cage inside the pile pipe body (2). After the steel cage is placed, concrete is poured inside the pile pipe body (2). During the pouring and concrete curing, the pile foundation fixing device (1) locks the laying position and laying angle of the pile pipe body (2); SS03, detection, after the concrete in the pile pipe body (2) is completely solidified, the pile foundation fixing device (1) loses its clamping effect on the pile pipe body (2), and after the clamping effect is removed, the front detection mechanism and the rear detection mechanism on the pile foundation fixing device (1) detect the settlement, displacement and slope change of the solidified pile pipe body (2); The pile foundation fixing device (1) comprises a fixing platform, on which a fixing arm (3) with an adjustable spatial layout position and layout angle is installed, a guide arc groove (4) is provided on the fixing arm (3), a rotating frame (5) is slidably connected to the guiding arc groove (4), and a guide module for driving the rotating frame (5) to rotate is installed on the fixing arm (3).
2. A method for fixing pile foundation of a construction project according to claim 1, characterized in that: The rotating frame (5) is provided with a clamping member, and the clamping member is transmission-connected to two fixed components arranged in a mirror image, and the pile pipe body (2) is clamped between the two fixed components. The rotating frame (5) is rotationally connected to a transmission shaft (6) driven by a worm motor a, and the two fixed components are both transmission-connected to the transmission shaft (6). The rotating frame (5) is provided with a front detection mechanism and a rear detection mechanism that cooperate with the fixed components.
3. A method for fixing pile foundation of construction engineering according to claim 2, characterized in that: The fixed platform comprises a load vehicle (7), an electric rotator (8) is mounted on the load vehicle (7), a rotating platform (9) is mounted on the rotating surface of the electric rotator (8), a first boom (10) is hingedly connected to the rotating platform (9), a second boom (11) is hingedly connected to the first boom (10), a third boom (12) is hingedly connected to the second boom (11), a group of arm adjustment push rods (13) are hingedly connected between the relative surfaces of the first boom (10) and the rotating platform (9), between the relative surfaces of the second boom (11) and the first boom (10), and between the relative surfaces of the third boom (12) and the second boom (11), and a first arm (13) is hingedly connected to the third boom (12). A corner arm (33) is provided, an electric push rod (34) is hinged between the corner arm (33) and the third suspension arm (12), a screw lifting module (14) is installed on the corner arm (33), and the screw lifting module (14) is transmission-connected to the fixed arm (3), and a central control host (15) is installed on the load vehicle (7); the guide module comprises a worm motor c fixed on the fixed arm (3), a transmission gear (16) is fixedly installed on the output shaft end of the worm motor c, an arc rack (17) is fixedly installed on the rotating frame (5), and the transmission gear (16) is transmission-connected to the arc rack (17); the distance adjustment member comprises a worm motor c fixed on the side of the rotating frame (5); The worm motor b and the clamping screw (18) are rotatably connected to the rotating frame (5), the output shaft end of the worm motor b is fixedly connected to the clamping screw (18), and the clamping screw (18) is symmetrically provided with a positive thread section and a negative thread section; the fixed component comprises a pressure clamp (19) and a force measuring clamp (20), the pressure clamp (19) and the force measuring clamp (20) are both slidably connected to the rotating frame (5), the positive thread section and the negative thread section are respectively connected to the pressure clamp (19) in the two fixed components by transmission, and a group of force measuring sensors (21) are installed between the pressure clamp (19) and the force measuring clamp (20), the force measuring sensors (21) are electrically connected to the central control host (15), and the force measuring clamp ( The inner wall of the force measuring clamp (20) is embedded with four regularly distributed clamping beads (22), the clamping beads (22) are made of silicone, and a driving module for driving the pile pipe body (2) to move along the axial direction is installed on the force measuring clamp (20); the driving module comprises a transmission wheel (23) and a driven shaft (24) rotatably connected to the force measuring clamp (20), the transmission wheel (23) is made of silicone, a wheel shaft (25) is fixedly installed on the transmission wheel (23), a linkage guide groove with two ends opened and slidably connected to the transmission shaft (6) is fixedly opened on the driven shaft (24), and linkage bevel teeth are fixedly installed on the driven shaft (24) and the wheel shaft (25), and the two linkage bevel teeth are meshed with each other.
4. A method for fixing pile foundation of construction engineering according to claim 3, characterized in that: The full arc of the arc rack (17) and the arc of the guide arc groove (4) are both 170°.
5. A method for fixing pile foundation of construction engineering according to claim 4, characterized in that: The cross-sections of the linkage guide groove and the transmission shaft (6) are both regular polygons, the axial direction of the transmission shaft (6) is the same as the axial direction of the clamping screw (18), and the rotational axis direction of the transmission wheel (23) is the same as the axial direction of the transmission shaft (6).
6. A method for fixing pile foundation of construction engineering according to claim 5, characterized in that: The front detection mechanism comprises a vacuum cylinder (26), a vacuum cavity (35) is fixedly opened inside the vacuum cylinder (26), the vacuum cylinder (26) is fixedly connected to the fixed arm (3), a group of inspection cylinders (27) distributed in a circumferential array are installed on the vacuum cylinder (26), the inner cavity of the inspection cylinder (27) is communicated with the vacuum cavity (35), a pressure sensor (28) is installed on the inner wall of the inspection cylinder (27), the pressure sensor (28) is electrically connected to the central control host (15), a pressure measuring ball (29) matched with the pressure sensor (28) is slidably connected to the inner wall of the inspection cylinder (27), and a limit ring for limiting the position of the pressure measuring ball (29) is provided at the connection between each inspection cylinder (27) and the vacuum cylinder (26).
7. A method for fixing pile foundation of construction engineering according to claim 6, characterized in that: The axis of the vacuum cylinder (26) is perpendicular to the axis of the inspection cylinder (27), and the axis direction of the vacuum cylinder (26) is perpendicular to the axis direction of the transmission shaft (6).
8. A method for fixing pile foundation of construction engineering according to claim 7, characterized in that: The rear detection mechanism comprises a tachometer (30) fixed to the middle of the rotating frame (5) and two first distance measuring probes (31); two second distance measuring probes (32) are installed on the two force measuring clamps (20); the axis direction of the first distance measuring probe (31) is perpendicular to the axis direction of the second distance measuring probe (32); the axis direction of the first distance measuring probe (31) is perpendicular to the axis direction of the clamping screw (18); and the axis direction of the second distance measuring probe (32) is the same as the axis direction of the clamping screw (18).
Citation Information